Loading...
HomeMy WebLinkAboutDecision - 815 CHESTNUT STREET 1/23/2006 myp= 1 }' ^ BK 10042 PG , ofrm of""Now"vvsftwd CLERK'S OFF C,4MVpvc*dStmft t 0180 ThIs Is to coft%M (20)dAVs have WAMW ftm of dedsim tied . Wmea t o We TWI-M GC .t A.SMdohm Town Town PhAuff F Town Clerk Time Stamp a �n�Y(�,� gyp be Med VU16dAll(ITV)dqs da the do offg tt Notices in the off►o1'JIM TOwn Dee,. Jamary 23,200 Daft of : Nov. 1,2005--Doc.20,2005 Pin or Watt$AS901UOr Ca>Ca - _ 1m 81S CEce�taut�{tceet,North Arcttr,li+iA d1g4S Y Premim Aff : 'Watts Rqddor Compimy,813 Chwtoot Sft*e4 North And veer,MA 41M yea Reftino to tlae abm ped*m with ptaMoaY of KiGr.I.,,CrWpW 404$et 10411 M aeWon 8.3 o fthe zoning bylaw for a Sate Plan Review Sp%W Pamit for Pbm 1 for C =MruWon otmed PuWg mm for fta building uqmgm vvift the 1»1&R-2 Zoning Dishict. At a public bmino Own on the abm dft the Phoning DOW voted to APVROVX a co Sato P10 RMW S " wr+rth a uAmmm vow of 5.0 bamd on the fprit>: og Sipod: ut Laa�oin aUatay,Tnwvri 1'ettmer ` w. App Rldmd N Abut John Ste,V'u*C lWr TomDepaunents Richud Rowaa,aeti�o C kxk A%eft AngJea ka C ATTEST- A Tide Copy Town 01ork Pap 1 a r� Watts stator Company 0042 P 348 815 Chestnut Street 107C,Parcel®22&71 Bits,plan tttviow/spatz Pemit—Construction otParkin0 Arts Jdnuary 20,2006 The Planning Board herein approves the Special Permit/Site Plan Review for the construction of two parking lots consisting of 29 spaces and 47 spaces respectfully, site lighting,drainage and stormwater management structures, and landscaping located at 815 Chestnut Street. The site improvements will be constructed south and west of the odstiang building and is located in the Industrial 1 (I1)and Residence 2(R2)Zoning Districts on Assessors Map 107C,Parcels 22&71. This Special Permit was requested by Dutton&Garfield,Inc.43 Giganw Drive,'Hamstead,NH 03841. This application was filed with the Planning 13owd on Sept, 30, 2005. The applicant submitted a complete application which was noticed and reviewed in accordance with Sections 8.3,10.3,and 10.31 of the Town of North Andover Zoning Bylaw and MGL c.40A,sec.9. The Planning Board makes the following findings as required by the North Andover Zoning Bylaws Section 8.3 and 14.3: MMINGS QF FACT: 1. The specific site is an approprU te'lacation for the project involving the construction of a 47- space parking lot located ca the southerly side the project,a 29-space parking lot located on the westerly side of the project, site lighting, screening, and landscape plan to service the wdsting and future expartaion to the exlsting tvvo-story building. The maximum number of parking spaces shall not exceed 233 spaces. The site is zoned Industrial 1(11)and Residence 2 (R2) Zoning Districts. The proposed parking lots and landscape plan provide eahanccd landscape buffer and screening from the abutting residential proper ies; 2. The use as developed will not adversely affect the neighborhood as is suffieieut buffer and screening has been provided along the frontage of F4ship.DTive and the southerly portion of the parcel abutting the residential properties. To protect the health and welfare of the abutting residential properties,the Town Planner will review the site at the completion of the project. Any additional screening or buffering as may be reasonably required at the discretion of Town Planner will be added at the applicant's expense. The landscaping has been placed so as to enhance the appearance of site and in accordance with the landscaping and site plans referenced in Condition #21. All plantings and screening depicted on the approved plans referenced herein,shall remain in perpetuity over the life of the project, 3. There will be no nuisance or serious herd to vehicles or pedestrians. The applicant has demonstrated that the proposed improvetncnts will trot increase tragic flow or volumes,will improve on-site circulation,and provide for enhanced pedestrian connections throughout the preperT 4. The landscaping approved as a part of this plan mecca the requirements of Section 8,4 as amended by the Planning Board,of the North Andover Zoning Bylaw; 5. no site drainage system is designed in accordance with the Town Bylaw requirements and has been reviewed and approved by the Outside Consulting Engineer, Vaaasse, Hangen Brustlin,Inc; 6. The applicant,has met the requirements of the Town for Site Plan Review as stated in Section Page 2 of 7 _ ..._.i it. -- . .._... .._ _...._------- --. • - :-.__.____. __._....._.___...-._..... ._._.._'_._ A watts Regulator Comm" 1 0042 PQ 349 81S Chutnut Street,107C,Par=k 22 dk 71 site Plan Rerkw/Speclal Permit--Constructioa of Parking Arm January 20,2M 8.3 of the Zoning Bylaw except for any Waivers granted in Condition 18; 7. Adequate and appropriate facilities will be provided for the proper operation of the proposed use. The project includes the construction of it stormwater detention pond Mid grading sufficient to hold the inmase in runoff resulting from the new impervious surface. i Finally the Planning Board finds that this project generally complies with the Town of North ,Andover Zoning Bylaw requirements as listed in Section 8.35,but requires conditions in order to be fully in compliance. The Planning Board hereby grants an approval to the applicant provided the following conditions are met: SPECIAL CDNDI'iflONS: 1, Environmental Monitor'She applicant shall designate an independent environmental Inonitor who shall be chosen in consultant with the Planning Department, The Environmental Monitor must be available upon four(4)hours' notice to Inspect the site with the Planning Board,designated official. The Environmental Monitor shall make weekly inspections of the .project and file monthly reports to the Planning Board throughout the duration of the project. The monthly reports shall detail area of non-compliance,if any and actions taken to resolve these issues.The designated monitor may not be applicant and/or developer 2. Construction Monitor: The applicant shalt designate an independent construction monitor who shall be chosen in consultant with the Planning Department. The construction monitor must be available upon four (4) hours' notice to inspect the site with the Planning Board designated official. Ills Construction Monitor shall make weekly inspectional of the project ` and file monthly reports to the Planning Board throughout the duration of the project. The monthly reports shall detail area of non-compliance,if any and Factions taken to resolve these issues. The designated monitor may not be the applicant and/or developer. 3. Prior to the endorsement of the plans by the Planning Hoard, the appli¢ant must comply with the following conditions: a. The final plan must be reviewed and approved by the DPW and the Town Planner and subsequmdy endorsed by the Planning Board, The final plans must be submitted for review within ninety days of filing the decisiou with the Town CleA. b. A band in the amount of duce thousand dollars($3,000)must be posted for the purpose of insuring that a final as-built plan showing the location of all on-silo utilities,shuctums, curb cuts,parking spaces,topography,and drainage facilities is sutmaitteti. The board is also in plane to insure that the site is constructed in accordance with the approved plaza. The fonn of security must be acceptable to the planning Board. c. If applicable, the applicant must supply a copy of the approved Massachusetts klighway De xdmentpermits necessary for construction of the site to the Planning Department. Page 3 of 7 With Regubtar Company BK 10042 p 350 als Cb*staut Strut,107C,Panels 22 71 Site Plan lteviaw/Bpecls<t Permit—Conrtruction of Purlclnl Arm danaKry 2%2W6 I i f _ - 4. Peer to the start of construction. i a. A construction schedule shall be submitted to the Town Planner for the purpose of tracking the consumflon and informing the public of anticipated activities on the site. b. During construction,the site must be kept clean and swept regularly. c. it shall be the responsibility of the developer to.assure that no erosion on the site shall : occur wliiah will came deposition of soil or sedWwwt upon adjacent properties or public Off- ways,excopt as normally ancillaty to ofl`site sewer or other off-site constntctiott, t site erosion will be a basis for the Planning Board mAdng a finding that the project is not in compliance with the plan; provided, however, that the Planning Board shall give the developer written notice of any such finding and ten days to cure said condition. d. The applicant shall provide the Planning board with copies of permits, plaits and decisions received from all other town boards,commissions or departments. In aMtion to receipt of these plans, the applicant "I supply the Town Planner with a letter outlining any and all revisions resulting Rolm said'permits,plans and decisions received from other town boards, commissions and departments that differ from the approved plans referenced in Condition#21. 5. Prior to FORM U verltfcatlon(Building Permit Is nce): i • a. no Planning Board must endorse the Etna! site plan my+lars and three(3)copies of the signed plans must be delivered to the Planning Department b. One certified copy of the recorded decision must be submitted to the Planning l Depat'lntent. s 6. Prior to veri8cxt9on of the Certificate of Ogeopancy: a. The applicant must submit a letter from the architect and engineer of the project stating that the building,signs,landscaping,lighting and site layout substantially comply with the plans i referenced at the end of this decision as endorsed by the I°la Wng Board. b. The Town Planner' shall approve all artificial lighting used to illuminate the site. All lighting shall have underground wiring and shall be so w=ged that all direct rays from such lighting falls entirely within the site and shall be shielded or recessed so as not to shine upon abutting properties or streets. The Town Planner shall review the site. Any changes to the approved lighting plan as may be reasonably required by the Town Planner shall be made at the owner's expense.All site lighting shall provide security for Page 4 of 7 Wads fti lator Company 1 0042 P 1 sis Chataut Strrd,107C,P'aeceta 22 71 Site Plan i4viewJSpscial Parmit..Constrattion of Parldog Areas .fanuary 20,2M the site and structures however it must not create any glare or project any light onto adjacent residential properties. e. Any revisions to the approved signage plans must conform to Section 6,Signage and Outdoor Lighting Regulations of the Town of North Andover Zoning Bylaw and must be approved by the building Department.All additional permits must be obtained by the j applicant prior to construction. 7. Prior to the fWal rtielo"of murity: a. The Town Planner shall review the site for compliance with the Town Bylaw and plans ! referenced in Condition#21. Upon the completion of the fence and natural bar on the southerly side of the project abutting the residential properties, the Town Planner will roview the site and any screening or buffering as may be reasonably required at the E discretion.of Town Planner,boll►natural and matunade,will be added at the applicant's expense. b. A final as-built plan showing final topography, Ow location of all on- site utilities, ' structures, curb cuts, parking spaces and drainage facilities must be submitted to and reviewed by the Town Planner and the Division of Public Works. 8. Any stockpiling of materials(did,wood,construction material,eta.)must be shown on$plan and reviewed and approved by the Town Planner. Any approved pales must reinein covered at all tithes to minimize any dust problems that my occur with 4acemt properties. Any stockpiles to remain for longer than one week must be fenced off and covered. t 9. in an effort to reduce noise levels, the applicant shall keep in optimum working order, through regular maintenance, any and all equipment that shall emanate sounds from the strmums or site. 10.The hours for construction shall be limited to between'7:00 aim and 7:00 p.m. Monday t through Friday and between$:DO am.and 5:00 p n.ott Saturday. 11.Any plants,trees or shrubs that have beenInoorporated into the Landscape Plan approved in this decision that die within one year from the date of planting sUl be replaced by the owner (by order of the Planning.Board all plants,trees or shrubs must be maintained in perpetuity). The replacement plants shall match the size and species as indicated and approved in Paragraph#2,in the Findings of Fact made as a part of this decision. 12.The contractor shall contact Dig Safe at least 72 hours prior to commencing any excavation. 13.Gas,Telephone,Cable and Electric utilities shall be installed underground as specified by the respective utility companies. Page 6of7 BK 10042 PG 352 • watts Regulator Company #IS Ch"Wat Strest,107C,P>areek 22 dr 71 'kite Plan ReVkw/SpetW permit w Construetton of parking Areas January 20,2006 14.No open burning shall be dons% accept as is pennitteil during burning season under the Fire Department regulations. 15.The provisions of this conditional approval shall apply to and be binding upon the applicant, its employees and all successors and assigns in interest or control, 16.All snow storage is to be removed from the site. Snow storage shall not result in the loss of parking spaces except during prompt removal operations. 17.Any action by a Town Hoard, Commission, or Doptu tent, which requires changes in the plan or desip of the building, as presented to the Planning Board, may be subject to modification by the Planning Board. 18.The project will be built in accordance with the heroin referenced plans and specifications and in full accordance with the design elements and features displayed and discussed during the Public Bearings. Any revisions shall be submitted to the Town Planner for review in accordance with Section 83.8 of the Zoning Bylaw. If the Town Planner in Wier sole diisoration deems these revisions to bo substantial as dofimcd•in Section 8.3.8, the applicant must submit revised plans to the planning Board for approval. 19.This Special Permit approval X11 bo deemed to have lapsed after January 17,2008(two years from the date permit Stunted)unless substantial use or construction bas commenced. Substantial use or construction,will be determined by a majority vote of the Planning Board. 20.The following waivers from the Section 8.3.5.c of the North Andover Bylaw have been GRANTED by the Planning Hoard: j a. A, waiver to Section. 8.3.5.e.4 has been granted so as to allow the applicant not to provide a fiscal impact study,as the buildings already exist. Ib.'A waiver to Scion 8.3.5.e.xiii has been gramted so as to allow tho applicant not to provide a community impact analysis,as the buildings already exist. a A waiver to Section 8.M.e.xix has been granted so as to allow the applicant not to provide a traffic study. The resulting construction will not incroase tho historic traffic flow or volumes as the puking is being provided to service existing buildings and potential future expansion. 21. The following information shall be deemed part of the decision: I'bw Titled: Warts Industries i Site Plan Review Filing Prepared for Applicant-Dutton 8c Garfield,Inc.,43 Gigante Drive,Hampstead,NH 03841 Owner—Watts Industries,Inc.,815 Chestnut Stmc4 North Andover,01$45 Prepared By; Port Enginee6ag Associates,Inc.,One Harris Street,Newbarypork MA E page 6 of I i ' BK 10042 PG 353 Wsttx Regulator Company 815 Chestnut Street,107C,Parcels 22&71 Site Plan Review/Special Permit--Constrattion of PurWag Aram January 20,2006 Seale: 1"=40' Sheets: Cover Sheet,Sheets I -4 Date: September 9,2005,Revised,November 11,2005,January 4,2006 14 port Tltl d: Hydrological Analysis for Wa#s Industries,North Andover,MA Dated: September 29,2005 1 tgmrtsd By Port Engineering Associates,Inc,,One Haffis Street,NewburMM MA f - Page 7of7•