Loading...
HomeMy WebLinkAboutAs-Built Plan / Installation Certificate Form - 544 FOSTER STREET 5/22/2002 — SCHEDULE OF ELEVATIONS ON`3 ME -•_._-»...w_ ... •---------�—. LOCATION ELEVATION WF6 -y WF2 EOG'E OF " SHED WFS IaR: ! / EXISTING SLOE(TOP OF FOUNDATION) 130.31 .mv..' � EXISTING CELIAR FLOOR 123.5} 1'I PETER BREEN ' ' INVERT OF BLDG.SEWER AT FOUNDATION 12755 wFO 770 BOXFORD STREET REFERENCE VFA, NORTH ANDOVER, MA INVERT AT TREATMENT TANK INLET 127.30 PowT"a^ OFFICE TEL. 978-687-7774 INVERT Ai TREATMENT TANK OUTLET 12705 WF1 CELL. TEL. 978-2BENCHMARK FOR CONSTRUCTION: INVERT AT PUMP CHAMBER INLET 12702 CONCRETE STEPS AT HOUSE, <ELEVATION 131.00(ASSUMED) i: !/ HIGH WATER ALARM SET POINTI 125.33 ,q EXISTING DWELLING PUMP ON SET POINT• 125 11 V A MAP1048,LOT 4 WASHINGTON MUTUAL BANK, o PUMP OFF SETPOINT+ 123.33^d 1,500 GALLON TANK 544 FOSTER STREET , I / O rn WITH MICRO FAST 0.5 m FLOOR OF PUMP CHAMBER 122.7± TREATMENT UNIT 1 /� m 1P!) y DEC 1^'�t (FIE19 Vt /'l ERICE V Y ! o o/ INVERT AT PUMP CHAMBER OUTLET(3 128 73 Np{ER'�- yJ' /� INVERT OF 3"MANIFOLD T 126.95 i r OVERI'IL T FIEGTRIC_ _ AREA 30,300±S.F. I"PRESSURE DIST,PIPES(LEVEL) 127.59 G ;A j BOTTOM OF LEACHING FIELD STONE 12709 i d TO BE ADJUSTED BY CONTRACTOR HIGH WATER NSIDE(CEUAR WALLEPER) J SCHEDULE OF FIELD TIES feet /s / F Q / REFERENCE POINT'B^ l I LOCATION REFERENCE POINT REFERENCE POINT AIR BLOWER SEPTIC TANK INLET MANHOLE 30.2 14.8 3ggVV BOA gX(yNp'pq p,MPA4V `'T/ O `ELECTRIC(ESTIMATED LOCATION) /�� /� / EGC1F4�tD�lF F1C^ASBFO /3J ( I SEPTIC TANK OUTLET MANHOLE 34.6 13.5 4 1,000 GALLON PVMP CHAMBER 4 �ryy lry�ryll� "' WITH 1 HORSEPOWER PUMP L /3 rl I TREATMENT TANK INLET MANHOLE 43.6 18.3 (TIC MODEL SKi OOM2) D ?"PVC VEN T(NP FOR 7W0) TREATMENT TANK OBSERVATION PORT 49.2 20.3 It VENT �' f FORCE MAIN/MANIFOLD CONNECTION 54.8 38.9 j D: PRESSURE DISTRIBUTION FIE END LEACHING PIPE,D 62.7 34.8 L E 36'WIDE x 41'LONG x 0.5'DEEP /n� / END LEACHING PIPE,E 79.7 59.7 END LEACHING PIPE,F 57.5 55.7 of AK qc END LEACHING PIPE,G 30.0 270 { P 'L \ DAVID "4 A. AS BUILT PLAN OB64 PLANNER 9 No.0 V64 SUBSURFACE DISPOSAL SYSTEM F\ POEO' 79 AT S INdN.EN�� \\ 544 FOSTER STREET, NORTH ANDOVER, MA ®C3 HEREBY CERTIFY THAT TO THE BEST OF MY PROFESSIONAL KNOWLEDGE, MAY 22,2002 IN �® FORMATION,AND BELIEF THAT THE SUBSURFACE DISPOSAL SYSTEM AS \ CONSTRUCTED IS IN SUBSTANTIAL COMPLIANCE WITH THE DESIGN SHOWN ON PREPARED FOR: WASHINGTON MUTUAL BANK F.A. NOTE: THIS PLAN IS FOR SEPTIC SYSTEM CONSTRUCTION ONLY. IT \." THE PLAN DATED FEBRUARY 14,2001 (REVISED JUNE 28,2001)AND c/o MR.MICHAEL OLSON IS NOT A CERTIFIED PROPERTY LINE PLAN. REFERENCE PLAN FOR APPROVED BY THE TOWN OF NORTH ANDOVER AND THE MASSACHUSETTS HOMEOWNER'S ADVANTAGE PROPERTY LINE AND HOUSE LOCATION IS"PLAN OF LAND IN NORTH 2 DEPARTMENT OF ENVIRONMENTAL PROTECTION. _ 11-15 BIRD ST.,FOXBORO,MA ANDOVER,MA",SUBDIVIDED FOR WALENTY PAS,DATED AUGUST 27, �3._ DWI PREPARED BY. David Obefl nde P.E. 1947,PREPARED BY RALPH BRASSEUR,RLS. x P Z7__OZ ENGINEERING BDD EnglneeHng SCALE: 1"=20 ENGI EE DSs 2Z DATE Mo fj,ld,�MA 002048 ..._n.....d.m.__^_._.�..^^�..». ,., e....�. -339-080L..�..�.. _.m�._ O�