Februsry 20 1987
Planning Board
r6-' 30 Mass. Ave.
This Dept. has no objections to the proposed
Office Building as long as adequate measures are taken to prevent erosion
from polluting the river.
Sincerely
Y
Inspector Board of HeOlth
mg gc
W
Richard F. Kaminski & Associates, Inc.
March 19, 1987
Mr. Erich Nitzsche, Chairman
North Andover Planning Board
Town Hall
28 Main Street
North Andover, MA 01845
Re: Site Plan
Unity Realty Trust-Essex
30 Mass Ave.
North Andover, MA
Dear Mr. Chairman:
As requested, we have added the outside building dimensions to
the ground floor footprint shown on our site plan.
Additionally, I have included five (5) prints of our site plan
for your use.
I will be in attendance at your next meeting on Monday, April 6,
1987 to answer any questions regarding this matter.
R e tf lly
RTs C U
and F. Kami' ski Assoc. , Inc.
6"4V
Res
Xafm?f
ichard F K insk ' , P.E.
1
RFK/ncr 7resident
cc: Atty. Thomas Callahan
RFK1352
Architects ❑ Engineers ❑ Surveyors ❑ Land Planners
200 Sutton St., North Andover, MA 01845, (617) 687-1483
Richard F. Kaminski & Associates Inc.
March 16, 1987
Mr. Erich Nitzsche, Chairman
North Andover Planning Board
Town Hall
28 Main Street
N. Andover, MA 01845
Re: Site Plan,
Unity Realty Trust-Essex,
30 Massachusetts Ave.
North Andover, MA
Dear Mr. Chairman:
As a result of changes to the building design by the project
architect and structural engineer, we have been forced to change
the site plan that our office prepared and submitted to the
North Andover Planning Board.
Since the public hearing was closed at your March 21 1987
meeting, I felt that this change, although minor, should be
brought to your attention prior to your preparation of an Order
of Conditions.
Essentially there have been four changes to the site plan since
we last met on March 2, 1987.
These changes are:
1. The ground floor footprint has changed in configuration
and not in area. There is no affect upon flood
storage or drainage.
2. The fourth floor has been shown on our site plan as
requested, along with the appropriate property line
setbacks.
Architects ❑ Engineers ❑ Surveyors ❑ Land Planners
200 Sutton St., North Andover, MA 01845, (617) 687-1483
i
E. Nitzsche
March 16, 1987
Page 2
3. Structural steel columns are shown in the front of the
building and along the right side, which is the east
elevation. These columns are required in order to
support the second floor framing.
4. Five parking spaces will be lost because of the added
columns along the east elevation. It was necessary,
therefore, to reconfigure the parking in this area in
order to accommodate the columns. This loss of
parking does not affect our design or our conformance
with the zoning regulations since we still have more
parking than is required by zoning.
I will be in attendance at your meeting on Monday, March 16,
1987 to answer any questions regarding this matter.
r
e pectf ally,
i h rd F. Kami ski & Assoc. , Inc.
Richard F Ka inski P.E.
President
RFK/ncr
cc: Atty. Thomas Callahan
RFK1.340
i
Architects ® Engineers ® Surveyors ® Land Planners
200 Sutton 5t., North Andover, MA 01845, (617) 687-1483
Richard F. Kaminski & Associates, Inc.
February 2, 1987
Ms. Karen Nelson
Planning Director
North Andover Town Hall
Main Street
North Andover, MA 01845
Re: Proposed Project, Unity
Realty Trust-Essex
Dear Karen:
We have been retained to develop property line survey and
definitive site plan documents for a proposed building located
at 30 Massachusetts Ave, in North Andover, Massachusetts.
This is the site of the former Jilly's Restaurant.
our client is Unity Realty Trust-Essex.
I am writing to request that the public hearing scheduled for
Monday, February 2, 1987 be continued to your next regularly
scheduled meeting on February 23, 1987 in order to allow us to
develop additional survey and engineering information critical to
this project.
Additionally, since we are on the agenda for your February 2,
1987 meeting, I request that this meeting serve as a work
session with the Planning Board in order that we may discuss the
project and hopefully obtain valuable input from both your office
and the North Andover Planning Board.
[7
Respectfully,
Ri and F. Kaminski & ssoc. , Inc.
R &
X")
J !,A Richard F. Kaminski P.E.
ado J RD
P
President
RFK/ncr
CC: Thomas Callahan
RFK1208
Architects ❑ Engineers ❑ Surveyors ❑ Land Planners
200 Sutton St., North Andover, MA 01845, (617) 687-1483
Town of 120 Main Street
AI 11'I Al-S North And(,)\,er,
NORTH ANDOVER
BUILDING MassachuSelts 01845
CON7l I WATION ss"9NO�� 1)1\71SION OF (G 17)G85-4775
I 11--A1:1'1-1
PLANNING PLANNING & COMMUNITY DEVELOPMENT
KAREN H.P. NELSON, DIRECTOR
May 28, 1987
Date Euga Azzociates
407 R, My,6tic Avenue
Su,bte 32C
Med4o,td, MA 02155
Dean Si)t:
UndeA Buitding PeAmit #160, i,6,sued to Unity Remy T)Lust, E5.6ex,
you aAe AequiAed to submit to thin DepaAtment peAiodic iLepoAt,6
,,LegaAding the pupm.6 o4 the con.6tAuction. The Permit was
,issued May 4, 1987. A,6 o4 this date, we have not teceived any
veAbat o& wtitten Aepo&ts. So that the work wilt not be stopped,
you must immediatety sign the enctozed a�4idavit and hetb(An it
to " atong with youA A' epoAt,6 on the wo&k to date.
SinceAety youu,
14
ChaAtes H. Foster,
Inspectoa o6 Buitding.6
CHF:.gb
Enc.
cc: NA., .DPCD