Loading...
HomeMy WebLinkAboutCorrespondence - 30 MASSACHUSETTS AVENUE 4/7/1987 raowrty OFFICES OF: Town of 120 Mab-i .Street Noi'th Aridover, APPEAI-S BUILDING3 NORTH ANDOVER. Massachusetts o I F-w, C(--)NSERVA-1'1(.)N CHU DIVISION OF (617)6853-4775 I-IL ALTI-I PLANNING PLANNING & COMMUNITY DEVELOPMEW KAREN H.P. NEE-SON, DIRECTOR Februsry 20 1987 Planning Board r6-' 30 Mass. Ave. This Dept. has no objections to the proposed Office Building as long as adequate measures are taken to prevent erosion from polluting the river. Sincerely Y Inspector Board of HeOlth mg gc W Richard F. Kaminski & Associates, Inc. March 19, 1987 Mr. Erich Nitzsche, Chairman North Andover Planning Board Town Hall 28 Main Street North Andover, MA 01845 Re: Site Plan Unity Realty Trust-Essex 30 Mass Ave. North Andover, MA Dear Mr. Chairman: As requested, we have added the outside building dimensions to the ground floor footprint shown on our site plan. Additionally, I have included five (5) prints of our site plan for your use. I will be in attendance at your next meeting on Monday, April 6, 1987 to answer any questions regarding this matter. R e tf lly RTs C U and F. Kami' ski Assoc. , Inc. 6"4V Res Xafm?f ichard F K insk ' , P.E. 1 RFK/ncr 7resident cc: Atty. Thomas Callahan RFK1352 Architects ❑ Engineers ❑ Surveyors ❑ Land Planners 200 Sutton St., North Andover, MA 01845, (617) 687-1483 Richard F. Kaminski & Associates Inc. March 16, 1987 Mr. Erich Nitzsche, Chairman North Andover Planning Board Town Hall 28 Main Street N. Andover, MA 01845 Re: Site Plan, Unity Realty Trust-Essex, 30 Massachusetts Ave. North Andover, MA Dear Mr. Chairman: As a result of changes to the building design by the project architect and structural engineer, we have been forced to change the site plan that our office prepared and submitted to the North Andover Planning Board. Since the public hearing was closed at your March 21 1987 meeting, I felt that this change, although minor, should be brought to your attention prior to your preparation of an Order of Conditions. Essentially there have been four changes to the site plan since we last met on March 2, 1987. These changes are: 1. The ground floor footprint has changed in configuration and not in area. There is no affect upon flood storage or drainage. 2. The fourth floor has been shown on our site plan as requested, along with the appropriate property line setbacks. Architects ❑ Engineers ❑ Surveyors ❑ Land Planners 200 Sutton St., North Andover, MA 01845, (617) 687-1483 i E. Nitzsche March 16, 1987 Page 2 3. Structural steel columns are shown in the front of the building and along the right side, which is the east elevation. These columns are required in order to support the second floor framing. 4. Five parking spaces will be lost because of the added columns along the east elevation. It was necessary, therefore, to reconfigure the parking in this area in order to accommodate the columns. This loss of parking does not affect our design or our conformance with the zoning regulations since we still have more parking than is required by zoning. I will be in attendance at your meeting on Monday, March 16, 1987 to answer any questions regarding this matter. r e pectf ally, i h rd F. Kami ski & Assoc. , Inc. Richard F Ka inski P.E. President RFK/ncr cc: Atty. Thomas Callahan RFK1.340 i Architects ® Engineers ® Surveyors ® Land Planners 200 Sutton 5t., North Andover, MA 01845, (617) 687-1483 Richard F. Kaminski & Associates, Inc. February 2, 1987 Ms. Karen Nelson Planning Director North Andover Town Hall Main Street North Andover, MA 01845 Re: Proposed Project, Unity Realty Trust-Essex Dear Karen: We have been retained to develop property line survey and definitive site plan documents for a proposed building located at 30 Massachusetts Ave, in North Andover, Massachusetts. This is the site of the former Jilly's Restaurant. our client is Unity Realty Trust-Essex. I am writing to request that the public hearing scheduled for Monday, February 2, 1987 be continued to your next regularly scheduled meeting on February 23, 1987 in order to allow us to develop additional survey and engineering information critical to this project. Additionally, since we are on the agenda for your February 2, 1987 meeting, I request that this meeting serve as a work session with the Planning Board in order that we may discuss the project and hopefully obtain valuable input from both your office and the North Andover Planning Board. [7 Respectfully, Ri and F. Kaminski & ssoc. , Inc. R & X") J !,A Richard F. Kaminski P.E. ado J RD P President RFK/ncr CC: Thomas Callahan RFK1208 Architects ❑ Engineers ❑ Surveyors ❑ Land Planners 200 Sutton St., North Andover, MA 01845, (617) 687-1483 Town of 120 Main Street AI 11'I Al-S North And(,)\,er, NORTH ANDOVER BUILDING MassachuSelts 01845 CON7l I WATION ss"9NO�� 1)1\71SION OF (G 17)G85-4775 I 11--A1:1'1-1 PLANNING PLANNING & COMMUNITY DEVELOPMENT KAREN H.P. NELSON, DIRECTOR May 28, 1987 Date Euga Azzociates 407 R, My,6tic Avenue Su,bte 32C Med4o,td, MA 02155 Dean Si)t: UndeA Buitding PeAmit #160, i,6,sued to Unity Remy T)Lust, E5.6ex, you aAe AequiAed to submit to thin DepaAtment peAiodic iLepoAt,6 ,,LegaAding the pupm.6 o4 the con.6tAuction. The Permit was ,issued May 4, 1987. A,6 o4 this date, we have not teceived any veAbat o& wtitten Aepo&ts. So that the work wilt not be stopped, you must immediatety sign the enctozed a�4idavit and hetb(An it to " atong with youA A' epoAt,6 on the wo&k to date. SinceAety youu, 14 ChaAtes H. Foster, Inspectoa o6 Buitding.6 CHF:.gb Enc. cc: NA., .DPCD