Loading...
HomeMy WebLinkAboutCorrespondence - 1003 OSGOOD STREET 10/2/2006 Standard #9: Operation/maintenance plan Construction Phase The BMPs associated with this project will be owned by 1003 Osgood Street, LLC, who will be responsible for inspection, operation and maintenance. 1) The contractor is to install and maintain drainage facilities as shown on plan(202306, by MHF Design Consultants, Inc. revised, dated August, 2006). 2) Prior to construction, all erosion/silt control devices shown on above plan are to be installed. To prevent silt intrusion into surrounding areas during construction, the contractor is to set silt fencing at all slopes which may erode in the direction of any open drainage facilities or abutting property. Such preventive measures are to be maintained throughout the construction process. 3) All construction of drainage facilities is to be inspected by inspectors from the Town of North Andover and an authorized agent to verify conformance to the design plan. 4) The sequence of drainage construction shall be as follows: a) Clear, grub, excavate areas for detention system. b) Install catch basins, pipes, stormceptor and detention system. c) Trench and install drainage channel. 4) Erosion controls are to be inspected and maintained on a daily basis. Upon discovery of silt build-up in any catch basin sumps, Stormceptor, drainage channel, detention system, emergency control outlet structure or any other structures they are to be cleaned. 5) All exposed soils shall be immediately stabilized with a layer of mulch hay. 6) Upon installation of catch basins, inlet protection - as described on aforementioned plan- shall be installed and maintained until ready for paving. 7) Prior to construction of impervious areas, all drainage structures and pipes shall be installed and inspected for proper function. During construction of other site features, all drainage facilities shall be inspected on a daily basis and cleaned/repaired immediately upon discovery of sediment build-up or damage. 8) After paving is installed, it shall be swept clean on a monthly basis. F:\Projects\Eng\202306\202306-O&M Plan.doc 1 Post-Development Phase The owner is to be responsible for maintenance of all drainage structures in the project - including drain pipes and detention system. The future owner is expected to be 1003 Osgood Street, LLC, who will ultimately be responsible for compliance with Plan. Regular maintenance is to include the following: 1) Inspection of all drainage facilities (catch basins, drainage channel, .Ytorniceplor, emergency outlet control structure, underground detention and infiltration systems,) every three months. During the first year of operation, all drainage facilities should be inspected after every large storm, and 2-3 days afterward. During these inspections the inspector as designated by 1003 Osgood Street, LLC shall look for evidence of the following: structural damage, silt accumulation (near inlet inverts on catch basins), and improper function. 2)After inspection, if any of the above conditions exist, the inspector shall notify 1003 Osgood Street, LLC, who shall immediately arrange for all necessary repairs and sediment removal. 3)Parking areas are to be swept clean every three months spring through fall and otherwise as needed (ie. visually noticeable debris build-up). 4) The Catch Basins, Drainage Channel, Infiltration Trenches, Detention System including the emergency outlet control structure and Stormceptor are to be inspected every three months. Remove oil, debris and sediment after inspections. 5) All graded slopes shall be inspected every spring for erosion. Upon discovery of any failure (ie. erosion) loam and seed shall be put in place and nurtured. 6) During the winter months, all snow is to be stored such that snowmelt is controlled within the paved area and enters the storm water treatment systems. In the event the amount of snow exceeds such capacity, it is to be removed off-site. The minimum amount of deicing chemicals needed is to be used. No toxic chemicals are to be used for snow or ice control. 7) During the summer months, all landscape features are to be maintained with the minimum possible amount of fertilizers, pesticides or herbicides. The materials used should be organic, biodegradable, non-toxic in nature. If in question, maintenance personnel should check with the Conservation Commission. All personnel involved with the maintenance of landscaping will be informed of this condition. F.\Projects\Eng\202306\202306-O&M Plan.doc 2 AGREEMENT OF EASEMENT Reference is made to a plan of land in North Andover, Essex County, MA, entitled: Site Development & Landscape Plan, Assessors Map 35, Lot 20, 1025 Osgood Street, North Andover, Massachusetts, Dated January 28, 2005, prepared by MHF Design Consultants, Inc. , and attached hereto ("the Easement Plan") . For good and valuable consideration, the sufficiency and receipt of which are hereby acknowledged, the undersigned, being the owners of those certain parcels of land with all improvements thereon and located on the southerly side of Osgood Street, North Andover, Essex County, MA, all as more particularly described in "Exhibit A" annexed hereto prior to the execution hereof and herein incorporated by reference as if fully set out hereon (hereinafter termed "1025 Osgood Street Parcel" and "1003 Osgood Street Parcel") , hereby grant and reserve to themselves, their respective successors and assigns, the following rights and easements, to wit: 1. A temporary easement for the benefit of the 1025 Osgood Street Parcel, covering and concerning that portion of the 1003 Osgood Street Parcel abutting the 1025 Osgood Street Parcel which is designated on the said Easement Plan as "Temporary Grading Easement. " The easement is granted to allow the owner of the 1025 Osgood Street Parcel, its agents, servants and employees, to enter onto the Temporary Grading Easement area by foot or by vehicle for the limited purpose of completing the construction of the driveway and parking area which will serve the improvements to be erected on the said 1025 Osgood Street Parcel. 2. A permanent easement for the benefit of the 1025 Osgood Street Parcel, covering and concerning that portion of the 1003 Osgood Street Parcel abutting the 1025 Osgood Street Parcel which is designated on the said Easement Plan as "Prop. 10' x 10' Conc. Pad for Dumpster wi Fenced Enclosure & Cap Cod Berm. " The easement is granted to allow the owner of the 1025 Osgood Street Parcel, its agents, servants and employees, to enter that area by foot or by vehicle to construct, install, maintain, replace and repair a concrete pad and dumpster with surrounding fence and asphalt berm. The obligation to install, maintain, repair, replace and keep all portions of the constructed or installed improvements shall be shared equally by the owners of the 1025 Osgood Street Parcel and the 1003 Osgood Street Parcel. 3. (A) . A permanent easement, in common with others entitled thereto, over, across and through the paved areas of the 1025 Osgood Street Parcel for the benefit of the 1003 Osgood Street Parcel, for the sole and limited purpose of access to and egress from the said 1003 Osgood Street Parcel to Great Pond Road, by foot or by means of vehicle. (B) . A permanent easement, in common with others entitled thereto, over, across and through the paved areas of the 1003 Osgood Street Parcel for the benefit of the 1025 Osgood Street Parcel, for the sole and limited purpose of access to and egress from the said 1025 Osgood Street Parcel to Osgood Street, by foot or by means of vehicle. {A9261\63191W0118789.3} 4 . A permanent easement for a common driveway and parking over, across and through that portion of the 1003 Osgood Street Parcel abutting the 1025 Osgood Street Parcel, which area is designated on the said Easement Plan as "Proposed Parking and Driveway Easement, " for the benefit of both the 1025 Osgood Street Parcel and the 1003 Osgood Street Parcel, for the purposes of: (a) access to and egress from Osgood Street, by foot or by means of vehicle, to both the 1025 Osgood Street Parcel and the 1003 Osgood Street Parcel, and (b) vehicular parking in the designated spaces for the benefit of the 1025 Osgood Street Parcel in the designated spaces which are located within said "Parking and Driveway Easement". Such easement shall be for the unrestricted joint use by the owners of the said 1003 Osgood Street Parcel and the 1025 Osgood Street Parcel, and their successors in title. It is hereby further agreed by the undersigned that an equal portion of the cost of installation, maintenance, replacement and repair of the said "Parking and Driveway Easement" area shall be borne by the respective owner(s) of said 1003 Osgood Street Parcel and the 1025 Osgood Street Parcel, and their successors in title. For Title References see the following: (A) 1025 Osgood Street Parcel: Deed to dated 2006 and recorded at Book Page (B) 1003 Osgood Street Parcel: Deed to 1003 Osgood Street, LLC, dated 2006 and recorded at Book Page The easement grants set forth herein are to and shall run with the land, and is and shall be for the benefit of and appurtenant to and a burden to the said 1003 Osgood Street Parcel and the 1025 Osgood Street Parcel, their current owners and their successors in title. Executed as a sealed instrument, this day of 2006. OWNER OF THE 1025 OSGOOD STREET PARCEL: Witness OWNER OF THE 1003 OSGOOD STREET PARCEL: 1003 Osgood Street, LLC Witness Joseph G. Levis, Manager hereto duly authorized {A9261\6319 1\A0118789.31 COMMONWEALTH OF MASSACHUSETTS Essex, ss On this day of , 2006, before me, the undersigned notary public, personally appeared hereto duly authorized proved to me through satisfactory evidence of identification, which was to be the person whose name is signed on the preceding document, and acknowledged to me that s/he signed it voluntarily for its stated purpose. COMMONWEALTH OF MASSACHUSETTS Essex, ss On this day of , 2006, before me, the undersigned notary public, personally appeared Joseph G. Levis, hereto duly authorized Manager, proved to me through satisfactory evidence of identification, which was to be the person whose name is signed on the preceding document, and acknowledged to me that he signed it voluntarily for its stated purpose. {A9261\6319 1\A0118789.3 1 Transportation Land Development • Environmental ° Services • i imagination innovation I energy Creating results for our clients and benefits for our communities October 2,2006 -Van sse Haneen Hr-us-tJin I12c— Ref: 09280.21 Mr.,Lincoln Daley-Iown Planner Town of North Andover 1600 Osgood Street North Andover,MA,01845 Re: 1003 Osgood Street North Andover,MA Dear Lincoln, the Iown of North Andover has requested that Vanasse Hangen Brustlin,Inc (VHB)comment on the adequacy of the drainage design and provide an opinion on the project's impact to L ake Cochichewick. Unfortunately,VHB has not provided a detailed drainage review for the above referenced project and therefore is not in a position to comment on the adequacy of the drainage design Please note that the drainage system appears to be similar to the adjacent property(1025 Osgood Street)and VHB reviewed and approved that design. VHB was previously asked to provide a ctusory review of the connection(common driveway) between this property and the adjacent property(1025 Osgood Street) As part of this cursory review, VHB suggested that the Best Management Practices(BMPs)proposed at 1025 Osgood Street be considered for the 1003 Osgood site Refer to VHB letters dated August 30 and September 21,2006.. Please note that all of the VHB suggested BMPs appear to have been incorporated into the project design and all of our cursory review comments have been satisfactorily addressed. Since the drainage design and BMPs for this property are similar to those proposed at 1025 Osgood Street,VHB would not expect significant impacts to the water quality of Lake Cochichewick If you have any additional questions or concerns,please call. Very truly yours, VANAS HAI\IGEN BRUSILIN,INC. Timothy P.E.. Y Project Manager -Highway&Municipal Engineering 101 Walnut Street Post Office Box 9151 Watertown, Massachusetts 02471-9151 617.9241770 ■ FAX 617.924.2286 \\Mawatr\te\0928021\does\letters\lehdaley-1003csgood•bmp.doc email:info@vhb.com www.vhb com Transportation Land Development Environmental Services e imagination innovation I energy Creating results for our clients and benefits for our communities October 2,2006 -Yanasse Nara ii Rsrustlinjnc- Ref: 09280.21 Mr.,Lincoln Daley-Town Planner Town of North Andover 1600 Osgood Street North Andover,MA,01845 Re: 1003 Osgood Street North Andovet,MA Dear Lincoln, the Iown of North Andover has requested that Vanasse Hangen Brustlin,Inc (VHB)comment on the adequacy of the drainage design and provide an opinion on the project's impact to Lake Cochichewick, Unfortunately,VHB has not provided a detailed drainage review for the above referenced project and therefore is not in a position to comment on the adequacy of the drainage design Please note that the drainage system appears to be similar to the adjacent property(1025 Osgood Street)and VHB reviewed and approved that design. VHB was previously asked to provide a cursory review of the connection(common driveway) between this property and the adjacent property(1025 Osgood Street) As part of this cursory review, VHB suggested that the Best Management Practices(BMPs)proposed at 1025 Osgood Street be considered for the 1003 Osgood site Refer to VHB letters dated August 30 and September 21,2006. Please note that all of the VHB suggested BMPs appear to have been incorporated into the project design and all of our cursory review comments have been satisfactorily addressed. Since the drainage design and BMPs for this property are similar to those proposed at 1025 Osgood Street,VHB would not expect significant impacts to the water quality of Lake Cochichewick If you have any additional questions or concerns,please call.. Very truly yours, VANAS, HANGEN BR�UUSTT TN,INC. Timothy P,E., Y Project Manager -Highway&Municipal Engineering 101 Walnut Street Post Office Box 9151 Watertown,Massachusetts 02471-9151 617.924.1770 . FAX 617.924..2286 \\Mawatr\te\0928021\dots\letters\let-daley-1003a5good-bmp.doc email:info @vhb.com www vhb com t y': 103 Stiles Road •Suite One- Salem, New Hampshire 03079 MHF Design Consultants, Inc. TEL(603)893-0720 • FAX(603)893-0733 August 31, 2006 North Andover Planning Board Town of North Andover 1600 Osgood Street North Andover,MA 01845 Re: VHB Review Comments 1003 Osgood Street Lakeview Farms MHF#210206 Dear Board Members: Pease find enclosed a revised set of plans and supporting documentation regarding the above referenced project located at 1003 Osgood Street. The plans have been revised to address the comments in correspondence from VHB dated 8-30-06. Based on those comments we offer the following: 1. Access to Osgood Street has changed_from the original plan. VHB assumes that the Applicant will notify Mass Highway of this change and if necessary,update any access permit application. RESPONSE: Comment acknowledged,applicable permits will be obtained. 2. The Town had specific concerns regarding water quality for the adjacent property(1025 Osgood Street). That development incorporated specific measures designed to eliminate/minimize impacts to the water quality of Lake Cochichewick. Since the stormwater runoff from this development will be conveyed toward the lake,VHB suggests that the Applicant consider the following: a. Incorporate a mechanism in the outlet control manhole that could contain an emergency spill of hazardous material. Adjust the Operation and Maintenance Plan, (assuming one exists)to include language regarding this provision. The adjacent development incorporated a shear gate that could be closed by the owner thus containing any spill. RESPONSE: A shear gate has been added to the plan set as recommended and the Operation and Maintenance Plan has been revised and attached hereto. b. Incorporate check dams within the proposed grass swale. RESPONSE: Check dams with corresponding details have been added to the plan set. c. Incorporate a level spreader at the end of the proposed grass lined swale. RESPONSE: A level spreader and corresponding details have been added to the plan set. d. Clean the existing catch basin(s)along the frontage of the proposed development prior to and at the completion of construction of the development. RESPONSE: A note has been added to the plans. ENGINEERS PLANNERS SURVEYORS Now MHF Design Consultants, Inc. North Andover Planning Board August 31, 2006 Page 2 of 2 3. The Applicant should consider provided an edge treatment(curb or berm)at the rear of the"18'x18' concrete pad for trash receptacle". Edge treatment would ensure that stormwater and other undesirables remain within the parking lot and drain toward the drainage system. RESPONSE: Curbing has been added as recommended. 4. It appears that the overall traffic circulation works well given the configuration of the common driveway between the two properties. The access point between the two properties behind the proposed buildings also seems to work well. VHB assumes that the appropriate access easements will be executed by both properties at the appropriate time. RESPONSE: Comment acknowledged,the easement agreements are currently being written. Please review the attached revised information and should you have any questions,please feel free to call our office at your convenience. Sincerely yours, MPfophier' onsultan ,Inc. — Ty. ,EIT MSG/curt CR 210206 F:\Proj ects\Eng\210206�2102 VHBResponse-8-31-06.doc