Loading...
HomeMy WebLinkAboutCorrespondence - 1789 GREAT POND ROAD 10/20/2004 "v (-vv� •vww &�•„ 1 u 1 manuvnlravn MA 11u, 0104100 I UJ t', Ue/ue LAW OFFICE OF MARK H, JODNSON 200 12 Chostnut Slrect OCT 2 O Andover,Massachusetts 01810.3706 NORTH AN PLANNING ("8)475-4488 're1=plw: (97II)475-6703 willcuilb KATORYN MARK U. JUIINSAW (MA,N11.00 V I.IANNV Nt?CR M.IS U I'A I I.DI t9 1A13) I% U%)RI-N;111!N (MA,rR) MIC111;V: C. JONIKAS 1ANQt IIONVA14TI (MA) KA1111.F:RN 11, I IAK11r-R MAI1K A. Ml RO)11 01A,11.) KAR),N P. 1?IIRAMIIAN JOHN (1, LAMB 1N1A) DAWN M. WALKER BI ANDI 01. 110x1 October 20,2004 1,is 1 Ilcsim&,1978-688.9542 11irJ mist l hats Hall Town of North Andover,flannin�11otlyd Alla: Mary 27 C;lnrles Struct North Andover,MA 01945 Re: idichard Arnone,Jr,/C>reat Pond Road,North Andover,MA ASSWssom Map 35, Parce)Number 40 31 it a li 't n 1 lktlr 1'lanuing hoard Mt 0VU: As recluostc(i,this letter will confirm that the applicant has requested and Itssantcd to a colltilulance of the Board's blearing on the abovei-referenced matter to the Board's meeting scheduled for 7:00 p.m.on November 16,2004,in the.North Andover 1),P.W. buildhig. The applicant Airihor assents to the Boards taking of final action on this application by the end of the following husinoas day. Very truly yours, LAW OFFICE OF MARIA B. JOHNS, Donald F.Boren m c�: Rich;IrJ ArnaJlo,Jr. North Andover Town Clerk pow j,ae,v wo(u„,jp n? re1w.nkoYeV1420041tz Transportation `and Development Environmental S c r v i c r imagination innovation energy , r... October 28,2004 llJJllISS(' �Icllt�c'JJ fi?'JE�►';.' .r::r Ref: 06716.82 Heidi Griffin,Director Community Development&Services Town of North Andover 27 Charles Street North Andover,MA 01845 Re: 1789 Great Pond Road Engineering Review-Watershed Special Permit North Andover,MA Dear Heidi: Vanasse Hangen Brustlin,Inc.(VHB)has received the McKenzie Engineering Group's revised design plans(with revision date of October 20,2004)for the above referenced project. VHB has previously reviewed various driveway design alternatives throughout the life of this project. VHB understands that the Applicant has essentially reverted back to the original driveway design. VHB understands that the Town of North Andover Fire Department(NAFD)has some concerns regarding access by emergency vehicles to the proposed dwelling. VHB assumes that the Applicant will address these concerns directly with NAFD. It appears that all of VHB's previous comments have been adequately addressed and VHB's concerns in this matter have been satisfied. No further engineering review is required at this time. If you need copies of VHB's previous review letters,please let me know. If you have any questions or concerns,please call me at your convenience. Very truly yours, VANASSE HANGEN BRUSTUN,INC. Timothy B.McIntosh,P.E. Project Manager-Highway&Municipal Engineering rn. N:, \\Maw alr\te\tM7:682\das\letters\lei-Einal-hreatPond-tMBt}l.da 617.924.1770 . FAX 617.924.2286 TOWN OF NORTH ANDOVER Fire Department Central Fire Headquarters 124 MAIN STREET NORTH ANDOVER. MASSACHUSETTS 01845 William V. Dolan Telephone(978) 688-9593 ChiefofDeparbnent FAX(978) 688-9594 dolan.,c i TownofNorthAndoNIer.com William P. Martineau w martineau a TovNnofNorthAndoirer.com Deputy Chief To: Jacki Byerley, Planning Consultant From: Fire Chief Dolan Re: 1789 Great Pond Road Date:26 October 2004 I have reviewed the plan submitted dated 10/18/04 regarding the single-family dwelling proposed for 1789 Great Pond Road. The fire department is opposed to the construction of this dwelling as proposed due to the excessive grade of the driveway. Fire apparatus and ambulance access would be severely restricted if not impossible in snow or ice conditions on this driveway. Please advise me of the time and place of the November 16`h meeting as I plan to attend. William V. Dolan, Fire Chief Cc:Deputy William P. Martineau Town n ®f north Andover Office of the Planning Department Community Development and Services Division 27 Charles Street North Andover,Massachusetts 01845 Town Planner: iwoodsCQtownofnorthandover.com P (978)688-9535 J.Justin Woods http:,I/www.townofnorthandover.com F (978)688-9542 Technical Review Committee Report TO: Richard Arnone ]FROM: J.Justin Woods,Town Planner/TRC Chair CC: Marls Rees,Town Manager Raymond Santilli,.Assistant Town Manager William V.Dolan, Chief of Fire Department Lt. Andrew Melnikas,Fire Prevention Officer Lt.John Carney,Police Operations Division Commander Jack Sullivan,Town Engineer Tier Willett,Mater& Sewer Superintendent Bob Nicetta,Building Com ` sioner/Z,oning Enforcement Officer Julie Parrfno,Conservation Administrator Brian LagRasse,Health Inspector Heidi Griffin,Community Development&Services Director 1789 Great Pond Road—Watershed Special Permit DATE: October 10,2063 Following please find a summary of the comments of the TRC Committee members: 1) Building/Zoning A) The proposed site is grandfathered pursuant to Chapter 40A,Section 6. B) The attachment of the proposed driveway to the existing common driveway is not any more detrimental than what currently exists. C) The driveway should be designed so that water will not accumulate at the bottom of the common driveway and Great Pond Road to cause a safety problem. 2) Fire Department The steep slope is an obstacle to access to the property. Providing reliable access, built in fire protection and elimination vegetative fuels will improve conditions. Accordingly, Fire Chief Dolan recommends the following: A) The driveway shall be paved its entire length using the bituminous concrete as shown on the plan or hot top with suitable subsurface to provide traction and support for fare apparatus and ambulances. B) It is recommended that the residence have a residential fire sprinkler system installed to insure fare protection. A licensed sprinkler contractor representing the builder should contact the Fire Prevention Officer-Lt. Andrew Melnikas 978-688-9590 for information that will be required including hydraulic calculations for both domestic water supply and the sprinkler system. C) Decreasing the amount of vegetative fincls on the slope will minimize the potential for exterior fire exposure to the structure. Information regarding "fire wise landscaping" can be obtained from ww fire w. isp., ���;. It is understood from the TRC meeting that the home owner intends to clear much of this vegetation for aesthetic purposes. BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 6889530 HEALTH 688-9540 PLANNING 688-9535 October 10,2003 Richard Arnone 1789 Great Pond Road Technical Review Committee Follow-Up Report to October 2,2003 D) The fire department will work with the homeowner to establish a suitable location and type of house number marker for the access way and his driveway. The fire department will investigate the passible use of the existing brick marker on Great Pond Road,currently being used by the other residences. 3) DPW The Division of Public Works has reviewed the above referenced plan and following is a list of comments from the DPW regarding the proposed construction of a single-family residence at 1789 Great Pond Road: A) The existing driveway easement must be shown on the site plan. B) In order to size the proposed dry well properly, a soil percolation test is required, which must be witnessed by the Board of Health. C) The applicant needs to show how the electric, cable, and telephone services will access the property (overhead or underground) D) The proposed retaining wall at the rear of the property is approximately 7 to 8 feet high in some sections. Any wall over 4 feet high is considered an engineered wall and must be designed and certified by a structural engineer. The applicant stated that the plan will be redesigned so that the proposed retaining walls do not exceed 4 feet in height. E) Due to the steepness of the proposed driveway,the existing asphalt berm shall remain on the downhill side. A catch basin should be added at the base of the driveway and hard piped to the existing catch basin along the gutter line of Great Pond Road. 4) Conservation The applicant should file a Request for a Determination of Applicability for utility installation (sewer, electric,water and cable) in the buffer zone to BVW associated with Lake Cochichewick. Plans should be revised to reflect discussed drainage improvements including installation of a catch basin and piping. The 25' and 50' setbacks to wetland resource areas should be displayed on the plans. 5) Planning A) Given that the lot was created before October 24, 1994, the various zones shown on the plan are not accurate. The applicant should revise the plans to be consistent with the regulations for a lot created before October 24, 1994. The Non-Disturbance Zone is correctly located 250-feet from the annual mean high water mark of Lake Cochichewick and the Non-Discharge Zone is correctly located at 325- feet. However there is no Conservation Zone for a lot created before October 24, 1994 and this should be removed. B) The existing driveway easement must be shown on the site plan. C) The Planner recommends using the existing brick marker on Great Pond Road to identify the houses. This brick marker should have the street numbers of all houses engraved on all four sides of the stone. all numbering on the stone shall be 4" in height. This condition will placed upon the applicant, for purposes of public safety. D) The applicant must conduct soil percolation tests to properly size the dry well and provide this data to VHB prior to obtaining approval. 6) Health All Soil testing must be coordinated with the staff in the Health Department. BOARD OF APPEALS 68$-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535 tyORTH Town of North Andover ®� s` 0 a , y Office of the Planning Department _ y Community Development and Services Divisions 27 Charles Street �SSgce+us�� North Andover,Massachusetts 01845 Town Planner. htW://www.towrtofnorffimdover.com P (978)688-9535 Julie Parrino jparrh lo@townofilorthandover.com_ F (978)688-9542 flAr To: From: n f Fag: '" 7 Pages: ,including coversheet Phone: Date: Re: CC: ❑Urgent ❑For Review ❑ Please Comment ❑Please Reply H Please Recycle 0 Comments: THE DOCUMENTS INCLUDED IN THIS TRANSMISSION ARE INTENDED FOR THE RECIPIENT TO WHOM IT IS ADDRESSED. IT MAY BE PRIVILIGED AND CONFIDENTIAL OR PROTECTED AS AN ATTORNEY CLIENT COMMUICATION. IF YOU ARE NOT THE INTENDED RECIPIENT, PLEASE NOTIFY(978)688-9635 AND DESTROY THE DOCUMENTS YOU RECEIVED IN ERROR. =148.5 =148,0 PROP. BIT, l CONC\DRIVEWA\Y rn\ \ ERVICE m zENCH DAM CENTER) TUBING / � � � ZOP. LIMIT �.RVICE ' 0 ':: TP-3 CLEEARING LOT 4'0 MANHOL / � fi ! I i< 58,101 ± S.F. s ;1 .33 ACRES PA�ATION OP. BIT. 85ERM IC-����• .'� Sf A. 0+00 TO,,, � - 26 - - S`TA. 1;i-26, R T ED )T ZONE j / �- _. .-,� °° . )URCE EXIS NG DRIVEWAY a- / Tl & NHOLE `o / ° ` - '- � x � °� —�,MAINTENANCt EASEMENT { �- —/ -,-- — \` -DtEQ BOOK; 1383 PAGE: _ PLAN BOOK: 1383 PAGEi _PROP. DOUBLE�-$,ZAKED :H BASIN J ; ° HAYBAL.ES W/SILTATIQN k �; r �' - ° (CONSTRUCT`' . PIPE) !R -° =120( =� - 126 60 . 116 4 , % �Q" I I _ — �� �`--LIMIT OF PA'AF-MCNT APRON � - v�:r�f�_—C°rl;Fi LI J ExIST �a – — — — _ r oUl�l GRZA T POND R( t LIMIT LIMIT OF TRENC u..w•MNV(IN)=116.20 � 'awsw+ ,WORK J LIMIT OF RESOURCE AREA1 MEAN—ANNUAL°-HIGH- WAT -R__.MARK . _____ EXISJ, H, —TO -FAKE--C-0GHIGHC—WWCK- — ---— ..._ — __ ° ° °•0 O•°°•°O•O O.°°•O°.°°. O o o -o o °o o e—a _yi.=-_°....;_a °I_:-. o.�`.: WF-2-- .. . , --.... -- - • • -- A.. �� y>..._.•�. n • _. - _.._. _.. �_ ,^ -__ ___._ -_ -` .. �.. _rte._a. TOWN OF NORTH ANDOVER PLANNING BOARD ENGINEERING REVIEW OF WATERSHED SPECIAL PERMIT FOR CONFORMANCE WITH THE TOWN OF NORTH ANDOVER ZONING BYLAW AND STANDARD ENGINEERING PRACTICE Site Plan Title: Site Plan of Land in North Andover VHB No.:06716.82 Location: 1789 Great Pond Road Owner: Richard J.Arnone,220 Broadway,#101,Lynnfield,MA 01940 Applicant: Richard J.Arnone,220 Broadway,#101,Lynnfield,MA 01940 Applicant's Engineer: McKenzie Engineering Group,Inc_, 196 Central Street,Saugus,NIA 01906 Plan Date: August 14,2003 Review Date: September 16,2003 Vanasse Hangen Brustlin,Inc.(VHB)has been retained by the Town of North Andover to provide an engineering review of the Special Permit Submission for the proposed construction of a single family house at 1789 Great Pond Road,North Andover,MA 01845. This review is conducted in accordance with the Town of North Andover Zoning Bylaw,Massachusetts Department of Environmental Protection(DEP)Stormwater Management Policy and standard engineering practice. VHB has received the following drawings and documents for review: • Cover letter dated August 19,2003 from Richard Arnone to VHB • Town of North Andover Planning Board Application for Watershed Special Permit • Site Plans(2 sheets)dated August 14,2003 SECTION 4.136 WATERSHED PROTECTION DISTRICT Section 2—Boundaries and Zones I. VHB assumes that the resource area on the south side of Great Pond Road is a wetland area and not Lake Cochichewick. Given that the lot was created before October 24, 1994,the various zones shown on the plan are not accurate. The applicant should revise the plans to be consistent with the regulations for a lot created before October 24, 1994. The Non-Disturbance Zone should be located 100-feet from the edge of the wetland area and the Non-Discharge Zone should be located 325-feet from the edge of wetland area. Section 3-Uses and Requirements 2. Note that section 3.b.iii(2)and(3)prohibit the use of any lawn care or garden product that may contribute to the degradation of the public water supply. The Applicant should address this. Section 4—Special Permit Requirements 3. VIIB assumes that the annual mean high water mark of Lake Cochichewick is located 400-feet or more from any proposed activity. The Applicant should verify. 4. The edge of any vegetative clearing should be indicated clearly on the plans. 5. Section 4.c.iii requires that written certification,by a professional engineer,stating that there will not be any significant degradation of the quality or quantity of water in or entering Lake Cochichewick be provided. Written certification was not provided in the material that VHB received for review. 1 \\\iawatr\te\06716\dnts\rernrts\17R9GreatPond- aterslhed-091603.doc 6. It appears that the proposed single family house could be located outside of the Non-Discharge Zone. Refer to section 4.c.iv- However,this would likely result in disturbance to an existing slope(2:1)which is protected under section 8.10. Therefore,there does not appear to be a reasonable alternative location outside of the Non. Discharge Zone. 7. The Applicant's engineer should provide calculations that show that the proposed underground leaching drywell will function as designed. Given that the proposed drywell is located in a `cut'condition(approximately 8-feet), the applicant's engineer should evaluate the suitability of the soils to infiltrate the runoff by means of a test pit for ground water and a percolation test for permeability. General Comments 1. The plan shows that there is an existing driveway across the southern portion of the lot. Is there an existing easement(common driveway)to the lot or lots to the east? 2. This lot appears to be incompliance with section 8.10 Lot/Slope Requirements. However,the Applicant's engineer should verify. 3. The lot area and frontage do not meet the minimum requirements for Zone R-1. The Applicant states that this lot is exempt and makes reference to MGL Ch.40A,section 6. This reference appears to be correct. 4. The Applicant should review the Watershed Special Permit Application to correct apparent minor errors in section 7(zoning district)and section 10(lot area). 5. The rack wall detail indicates that fence is proposed when the wall height exceeds 4-feet. VHB suggests that the plan show the limits of the proposed fence. 6. VHB recommends that a trench detail be included in the plans for the proposed water and sewer work within the Town roadway. The Applicant's engineer should refer to the Town standard details located within the Rules and Regulations Governing the Subdivision of Land. 7. The plans indicate that the proposed sewer pipe may have less than 4-feet of cover. Can this be avoided by construction another manhole? The Applicant's engineer should investigate. As this section of the sewer is located within Town roadway,the Town Engineer should be consulted for approval. It is recommended that the applicant provide WRITTEN RESPONSES to the issues and comments contained herein. ReNlewed by: s '' ", � Date: q �6 Timothy B.McIntosh,P.E. Project Manager—Highway and Municipal Engineering 2 \\Mawatr\te\06716\dus\reports\1789GwatPund-watershed-091603Am McKENZ1E ENGINEERING GROUP, INC. Professional Civil Engineering•Land Planning•Project Management , 196 Central Street `rn E �'� `, ?' ;.._°~�� Saugus,Massachusetts 01906 Tel:781.941.2211 NOV 1 2 2003 Fax:781.941.2662 2100 Washington Street Hanover, Massachusetts 02339 Tel:781.792.3900 Fax:781.792.0333 Website:www.mckeng.com I i October 31, 2003 Mr. J. Justin Woods Town of North Andover 27 Charles Street North Andover, MA 01845 Re: Watershed Special Permit 1789 Great Pond Road i Dear Mr. Woods: This letter is in response to a review letter from your office dated October 10,2003 for the above referenced project. Enclosed herewith are the following: • 18 Copies of plan entitled"Site Plan of Land in North Andover"dated August 14, 2003 and revised October 31,2003 by McKenzie Engineering Group,Inc. • Drainage Calculations(including soil testing results)dated October 31,2003 by McKenzie Engineering Group,Inc. The following written comments address the review comments from the Technical review Committee: a i 1. Building/Zoning i A) No response required. B) No response"required. C) The first 100 feet of the driveway has been redesigned such that the proposed paved surface is super elevated at a 2%cross slope toward a proposed bituminous berm which directs stormwater flows into a proposed catch basin. The catch basin is connected to the closed drainage system located on Great Pond Road via a piped connection(see comment #3 E). 2. Fire Department I A) The entire length of the proposed driveway will be paved as requested. i 'j I Town of North Andover Page 2 October 31,2003 1 B) A fire sprinkler system is being designed for the proposed dwelling. Drawings and supporting calculations will be submitted by the applicant under separate cover. C) The applicant intends to clear the"vegetative fuels" located in the vicinity of the proposed dwelling and constructing appropriate landscaping. D) The existing brick marker will be utilized to display the house numbers per the Town Planner's recommendations(see comment#5 Q. 3. DPW i A) The existing driveway easement has been added to the plan as requested. B) A soil percolation test, witnessed by the board of health's consultant,was performed on Friday October 24,2003. C) The electric, cable and telephone services will be underground from their respective connection points at Great Pond Road to the proposed dwelling. D) The retaining wall at the rear of the property has been redesigned such that the proposed height does not exceed four feet. j E) The first 100 feet of the driveway has been redesigned such that the proposed paved surface is super elevated at a 2%cross slope toward a proposed bituminous berm located at the downhill side which directs stormwater flows into a proposed catch basin. The catch basin is connected to the closed drainage system located on Great Pond Road via a piped,connection as requested. 4. Conservation A Request for Determination of Applicability was submitted to the North Andover Conservation Commission and DEP NERO. A negative determination was issued at the public hearing held on October 22,2003. 5. Planning A) The plan has been modified to show buffer zones consistent with a lot created prior to October 24, 1994 and located within the watershed protection district. B) The existing driveway easement is shown on the plans as requested. C) The existing brick marker will be utilized as recommended. D) A soil percolation test was performed on October 24,2003 as requested. The results are included in the drainage calculations. 6. Health Soil testing was performed on October 24,2003 and witnessed by the North Andover Board of Health's consultant. Town of North Andover Page 3 October 31, 2003 Please feel free to contact me prior to the November 18, 2003 meeting should you have any questions or require additional information. Very Truly Yours, McKENZfE ENGINEERING GROUP, INC. Richard A. Salvo, P.E. Project Manager RAS/js Enclosures cc: Timothy B. McIntosh, P.E. -- VHB Richard Arnone—Applicant Puzo Iof2 Woods, J. Justin From: Justin Woods Uwoods@townofnorthandover.coml on behalf of Woods, J. Justin Sent: Thursday, September 25. 2OU31O:41AK4 To: Rees, Mark; Santilli, Ray; Parrino, Julie; Nicetta, Robert; Sullivan, Jack; Lt. John Carney (E-mail); � Griffin, Heidi; CW|an, Chief William; Lagreesa' Brian Cc: Hmuroiak EHU; VWUett, Tim; Chief Richard M. Stanley (E-mail); K8e|nikes' [i Andrew; P. E. Timothy B. McIntosh (E-mail) Subject: 1780 Great Pond Road TRCMeeting 7RL Members, One omeoJrneoLio the uorucneniubelow: The plans (that you do not yet have) onnmndy xbovv proposed vvute, and amvmc as well as the proposed driveway, in the Conservation Zone of the Watershed Protection District. E{nvvcver, as the lot was created in 1979, before October 24, l994` the various zones shown on the plan are riot accurate. The applicant will revise the plans \obc consistent with the rxgu|udmnn for a lot created before October 24, 1994. The Nou'I)iatorbanouZone should be inou1ed 100-feet from the edge of the wetland area and the Non-Discharge Zone should be located 325-feet from the edge ofwetland area. There is no Conservation Zone for lots created prior to 1979 (This is fortunate for the | applicant as the Bylaw prohibits altering the topography of the land in the Conservation Zone). The revised-[Jans will be distributed to you as soon as they are available (the opp0ouot'o engineer said b* would have to me by Monday). Thanks again,jw. l Justin Woods Town Planner � Town o{North Andover Cor000uui(Y Development Division � 27 Charles Street Nodh Andover, M/\ Al845 P (078) 6A8-9535 F (q78) 688-q542 � -----Original Message----- From: Justin Woods [mai|to:'woodo@tVwnofnorthandnvor.conl]On Behalf Of Woods, ]. Justin Sent: Thursday, September 25/ 2O031O:O1Ay1 To: Rees, Mark; SantiUi, Ray; Parrinm, ]ul|e; Nicetta, Robert; Sullivan, Jack; Lt. John Carney (E-nnai|); Griffin, Heidi; Dolan, Chief William; Lagrasse, Brian Cc: Hrnurdak Bill; Willett, Tim; Chief Richard M. Stanley (E-mail); Me|nikas, UL Andrew; P. E. Timothy B. � McIntosh (E-mail) Sm�����: ���T����6��0 O���hVrsday. �c�>b�r� �¢ 1O�OD��) ��DPVV -~ --_'' � TRC.N]ombus. � Tuesday night the Planning Board opened the public hcuhug on 1789 Great Pond Road (o/k/aLoL/\) to review an application for n Watershed Special Permit under xocdooa 4.136 and 10.3 of the Nngb Andover Zoning Bylaw. Richard /\rnoue, the upp|icxui' seeks u permit to build u single-family home in the non-discharge zone and driveway through the onnxorva1ion, non-di Stu rbalice and non-discharge zones in the Wu1cmbcd pruiooboo 9/20/U3 Page 2 of 2 District, 1789 Gre"It Pond Road. was one of three lots (A, B, and C) created via the approval nof required statutes in 1979. Lots B and C had existing houses on there when they were approved and were accessed by an eascruent across I.ot A ('To give you a general locus, Lot B is Lou Mjuicucci's hou.s&). Lot A, to this point, has never been built upon. 'I'lle Planning Board had a number of cluestious regarding this application, Lot A presently does not meet either lot area or frontage requirements. However, it is the applicant's position that the lot is protected by the grandfathering provisions of MGL Chapter 40A, Section 6 (Zoning Questions). The proposed access for Lot A seeks to utilize the existing common drive, which goes across his property. 'I he Zoning Bylaw only allows for two lots to share a common driveway (Zoning, Police and Fire/Safety Questions), There are also some questions as to whether the subsurface leaching system can function as designed (Health, Planning, Conservation Questions). 'The proposed water and sewer, as well as the proposed driveway, would alter land In the conservation zone of the Watershed Protection District(DPW, Planning,Zoninc-, Questions). L- C, The Planning Board requested that I schedule a TRC meeting to get all of the other department's corranents on 01this project. I would propose meeting next Thursday, October 2 at 10:00arri in the DPW meeting roorn. At 5 r-I L- "iVe sent. I only have two extra copies of the plan. Jhe applicant agreed to bring in some additional copies and I will distribute them as soon as they are available. Please let me know if you can make next Thursday, October 2 at 10:00am. Thank you,jw. J. Justin Woods Town Planner Town,of North Andover ('0111.11ILL114y Developinent Division 17 Charles Street Noah Andovef, MA 01845 P (978) 688-9535 F (978) 688-9542 iiiai I tojwoods @ townofnorthandover.com http-- ww.townofnorthandover.coni/ 9/29/03