Loading...
HomeMy WebLinkAboutInspection - 1020 SALEM STREET 11/19/2013 North Andover Health Department Community Development Division QNSITE WASTEWATER SY T M CONSTRUCTION NOT LOCATION INFORMATION ADDRESS: 1020 Salem St. MAP: 104D LOT: 32 INSTALLER: Robert Daigle DESIGNER: Ben Osgood PLAN DATE: 10/28/13, Rev. 11/12/13 BOH APPROVAL DATE ON PLAN: 11/19/13 INSPECTIONS TANK INSPECTION: DATE OF BED BOTTOM INSPECTION: 7/11/14 (partial) DATE OF FINAL CONSTRUCTION INSPECTION: 7/25/14 (partial) DATE OF FINAL GRADE INSPECTION: SITE CONDITIONS ® Contractor reports any changes to design plan N/A Existing septic tank properly abandoned N/A Internal plumbing all to one building sewer ® Topography not appreciably altered Comments: SOIL ABSORPTION SYSTEM (General) ❑ Bottom of SAS excavated down to C soil layer, as provided on plan ❑ Size of SAS excavated as per plan X Title 5 sand installed, if specified on plan N/A 40 Mil HDPE barrier installed ® Laterals installed and ends connected to header (and vented if impervious material above) ® Elevations of laterals and chambers installed as on approved plan N/A Retaining wall (boulder/ concrete /timber/ black) Final cover as per plan Comments: 32'Wx23'L FINAL GRADE Loamed �d/ Seeded Cover per plan Comments: DOCUMENTS NEEDED t Certification of Installation Form submitted By engineer and signed and dated by Engineer and installer As-Built Plan BM = 140.38 HR = 9.40 HI = 149.78 SYSTEM ELEVATIONS ROD AS- LT INVERT DESIGN INVERT ELEVATION ELEV ELEV Benchmark Lateral 1 TOP 0.77 / 0.82 Lateral 1 INVERT 148.66 / 148.61 148.77 / 148.68 Lateral 2 TOP 0.86 / 1.00 Lateral 2 INVERT 148.57 / 148.43 148.75 / 148.66 *Elevations of laterals were about .10 - .20+/- lower than approved plan but elevations were based on existing elevations of the end of the each existing trench. Blackburn, Lisa From: Isaac Rowe <irowe @millriverconsulting.com> Sent: Thursday, July 31, 2014 4:14 PM To: Blackburn, Lisa; Sawyer, Susan Cc: 'Pam Lally'; 'Isaac Rowe' Subject: RE: Salem St. Final Construction Attachments: 1020 Salem St - Final inspection form,doc Susan/Lisa, Attached is the 'Final inspection form for the above referenced property.The invert of the extended portions of the trenches were about 0.1 -0.2" lower than the approved plan. However, the installer was using the existing end elevations of the existing trenches. PIetllro' o' e k n"6 w if a6,1hav y e any questions Thanks, Isaac M. Rowe, R.S. Project Manager III River Consulting 6 Sargent Street Gloucester, MA 01930-2719 Phone: 978-282-0014 ext.80 Fax: 978-282-1318 ir¢ewe(")millriverconsulfiog gon7 Wvvvv.millrivercons,qlf .corn From: Blackburn, Lisa [ma i Ito:LBlackburn c tQwnofnorthandover.com] Sent: Thursday, July 24, 2014 8:37 AM To: Dan Ottenheimer; Isaac Rowe; Pam Lally Subject: Salem St. Final Construction Gooch Morning, Please call Rob Daigle (978.423.6933) for final construction at 1020 Salern St. Thank you, Lisa Blackburn Health Department Town of North Andover 1600 Osgood Street,Suite 2035 North Andover, MA 01845 Phone 978-688-9540 Fax 978-688-8476 Email blackburn(c town ofnorthandover.corn Web www.TownofNorthAndover,com 1