HomeMy WebLinkAboutInspection - 1020 SALEM STREET 11/19/2013 North Andover Health Department
Community Development Division
QNSITE WASTEWATER SY T M CONSTRUCTION NOT
LOCATION INFORMATION
ADDRESS: 1020 Salem St. MAP: 104D LOT: 32
INSTALLER: Robert Daigle
DESIGNER: Ben Osgood
PLAN DATE: 10/28/13, Rev. 11/12/13
BOH APPROVAL DATE ON PLAN: 11/19/13
INSPECTIONS
TANK INSPECTION:
DATE OF BED BOTTOM INSPECTION: 7/11/14 (partial)
DATE OF FINAL CONSTRUCTION INSPECTION: 7/25/14 (partial)
DATE OF FINAL GRADE INSPECTION:
SITE CONDITIONS
® Contractor reports any changes to design plan
N/A Existing septic tank properly abandoned
N/A Internal plumbing all to one building sewer
® Topography not appreciably altered
Comments:
SOIL ABSORPTION SYSTEM (General)
❑ Bottom of SAS excavated down to C soil layer,
as provided on plan
❑ Size of SAS excavated as per plan
X Title 5 sand installed, if specified on plan
N/A 40 Mil HDPE barrier installed
® Laterals installed and ends connected to
header (and vented if impervious material
above)
® Elevations of laterals and chambers installed as on
approved plan
N/A Retaining wall (boulder/ concrete /timber/ black)
Final cover as per plan
Comments: 32'Wx23'L
FINAL GRADE
Loamed
�d/ Seeded
Cover per plan
Comments:
DOCUMENTS NEEDED
t Certification of Installation Form submitted
By engineer and signed and dated by
Engineer and installer
As-Built Plan
BM = 140.38
HR = 9.40
HI = 149.78
SYSTEM ELEVATIONS
ROD AS- LT INVERT DESIGN INVERT
ELEVATION ELEV ELEV
Benchmark
Lateral 1 TOP 0.77 / 0.82
Lateral 1 INVERT 148.66 / 148.61 148.77 / 148.68
Lateral 2 TOP 0.86 / 1.00
Lateral 2 INVERT 148.57 / 148.43 148.75 / 148.66
*Elevations of laterals were about .10 - .20+/- lower than approved plan but
elevations were based on existing elevations of the end of the each
existing trench.
Blackburn, Lisa
From: Isaac Rowe <irowe @millriverconsulting.com>
Sent: Thursday, July 31, 2014 4:14 PM
To: Blackburn, Lisa; Sawyer, Susan
Cc: 'Pam Lally'; 'Isaac Rowe'
Subject: RE: Salem St. Final Construction
Attachments: 1020 Salem St - Final inspection form,doc
Susan/Lisa,
Attached is the 'Final inspection form for the above referenced property.The invert of the extended portions of the
trenches were about 0.1 -0.2" lower than the approved plan. However, the installer was using the existing end
elevations of the existing trenches.
PIetllro' o' e k n"6 w if a6,1hav
y e any questions
Thanks,
Isaac M. Rowe, R.S.
Project Manager
III River Consulting
6 Sargent Street
Gloucester, MA 01930-2719
Phone: 978-282-0014 ext.80
Fax: 978-282-1318
ir¢ewe(")millriverconsulfiog gon7
Wvvvv.millrivercons,qlf .corn
From: Blackburn, Lisa [ma i Ito:LBlackburn c tQwnofnorthandover.com]
Sent: Thursday, July 24, 2014 8:37 AM
To: Dan Ottenheimer; Isaac Rowe; Pam Lally
Subject: Salem St. Final Construction
Gooch Morning,
Please call Rob Daigle (978.423.6933) for final construction at 1020 Salern St. Thank you,
Lisa Blackburn
Health Department
Town of North Andover
1600 Osgood Street,Suite 2035
North Andover, MA 01845
Phone 978-688-9540
Fax 978-688-8476
Email blackburn(c town ofnorthandover.corn
Web www.TownofNorthAndover,com
1