Loading...
HomeMy WebLinkAboutCorrespondence - 1789 GREAT POND ROAD 8/14/2003 TOWN OF NORTH ANDOVER PLANNING BOARD ENGINEERING REVIEW OF WATERSHED SPECIAL PERMIT FOR CONFORMANCE WITH THE TOWN OF NORTH ANDOVER ZONING BYLAW AND STANDARD ENGINEERING PRACTICE Site Plan Title: Site Plan of Land in North Andover VHB No.:06716.82 Location: 1789 Great Pond Road Owner: Richard J.Arnone,220 Broadway,#101,Lynnfield,MA 01940 Applicant: Richard J.Arnone,220 Broadway,#101,Lynnfield,MA 01940 Applicant's Engineer: McKenzie Engineering Group,Inc., 196 Central Street,Saugus,MA 01906 Plan Date: August 14,2003 Review Date: September 16,2003 Vanasse Hangen Brustlin,Inc.(VHB)has been retained by the Town of North Andover to provide an engineering review of the Special Permit Submission for the proposed construction of a single family house at 1789 Great Pond Road,North Andover,MA 01845. This review is conducted in accordance with the Town of North Andover Zoning Bylaw,Massachusetts Department of Environmental Protection(DEP)Stormwater Management Policy and standard engineering practice. VHB has received the following drawings and documents for review: • Cover letter dated August 19,2003 from Richard Arnone to VHB • Town of North Andover Planning Board Application for Watershed Special Permit • Site Plans(2 sheets)dated August 14,2003 I SECTION 4.135 WATERSHED PROTECTION DISTRICT Section 2—Boundaries and Zones 1. VHB assumes that the resource area on the south side of Great Pond Road is a wetland area and not Lake Cochichewick. Given that the lot was created before October 24,1994,the various zones shown on the plan are not accurate. The applicant should revise the plans to be consistent with the regulations for a lot created before October 24, 1994. The Non-Disturbance Zone should be located 100-feet from the edge of the wetland area and the Non-Discharge Zone should be located 325-feet from the edge of wetland area. i i Section 3-Uses and Requirements 2. Note that section 3.b.iii(2)and(3)prohibit the use of any lawn care or garden product that may contribute to the degradation of the public water supply. The Applicant should address this. Section 4—Special Permit Requirements 3. VHB assumes that the annual mean high water mark of Lake Cochichewick is located 400-feet or more from any proposed activity. The Applicant should verify. 4. The edge of any vegetative clearing should be indicated clearly on the plans. 5. Section 4.c.iii requires that written certification,by a professional engineer,stating that there will not be any significant degradation of the quality or quantity of water in or entering Lake Cochichewick be provided. Written certification was not provided in the material that VHB received for review. 1 \\\iawatr\te\fA571fi\dots\tell nHs\77fl9GreatPond-walershed-091603.doc 6. It appears that the proposed single family house could be located outside of the Non-Discharge Zone. Refer to section 4.e.iv. However,this would likely result in disturbance to an existing slope(2:1)which is protected under section 8.10. Therefore,there does not appear to be a reasonable alternative location outside of the Non- Discharge Zone. 7. The Applicant's engineer should provide calculations that show that the proposed underground leaching drywell will function as designed. Given that the proposed drywell is located in a `cut'condition(approximately 8-feet), the applicant's engineer should evaluate the suitability of the soils to infiltrate the runoff by means of a test pit for ground water and a percolation test for permeability. General Comments 1. The plan shows that there is an existing driveway across the southern portion of the lot. Is there an existing easement(common driveway)to the lot or lots to the east? 2. This lot appears to be incompliance with section 8.10 Lot/Slope Requirements. However,the Applicant's engineer should verify. 3. The lot area and frontage do not meet the minimum requirements for Zane R-1. The Applicant states that this lot is exempt and makes reference to MGL Ch.40A,section 6. This reference appears to be correct. 4. The Applicant should review the Watershed Special Permit Application to correct apparent minor errors in section 7(zoning district)and section 10(lot area). S. The rock wall detail indicates that fence is proposed when the wall height exceeds 4-feet. VHB suggests that the plan show the limits of the proposed fence. 6. VHB recommends that a trench detail be included in the plans for the proposed water and sewer work within the Town roadway. The Applicant's engineer should refer to the Town standard details located within the Rules and Regulations Governing the Subdivision of Land. 7. The plans indicate that the proposed sewer pipe may have less than 4-feet of cover. Can this be avoided by construction another manhole? The Applicant's engineer should investigate. As this section of the sewer is located within Town roadway,the Town Engineer should be consulted for approval. It is recommended that the applicant provide WRITTEN RESPONSES to the issues and comments contained herein. Reviewed by: �� Date. 146 0 Timothy B.McIntosh,P.E. Project Manager—Highway and Municipal Engineering 2 \\Mawatr\te\06716\dus\repurts\1789Greatrund•watenhed4091603.dm \ � ���� /� �� LA, /� � 2.63 Rooming House Any building oo portion thereof containing more than two and less than ten rooms without kitchen facilities that are used, rented or hired out to he occupied for sleeping purposes for cnoupeuxoiioo, vvbeibcc the compensation hc paid directly o«indirectly. 2.04 Special Permit The words Special 9onnit where used bu this Bylaw ubnD nuouu ayeonii granted under the guidelines of Section 9of Chapter 40-Aof the General I.mv. 2°65 Special Permit Granting Authority � The Planning Boardshall be the granting authority of all Special Permits to Cluster Development, Planned Development District, (1985/15)driveways,`,,,,"hursing and convalescent homes,Watershed Protection District (1994/37), Wireless Service Facilities (1998/37) and large estate condominium conversions. The Board of Selectmen shall be the granting authority of all Special Permits pertaining to non-accessory signs as specified in Section 6.52 of this Bylaw. The Board of Appeals shall be the granting authority of all other Special Permits allowed in this Zoning Bylaw. 2.66 Special Permit Unit Anse ofz building mlot or an action upon premises which may be permitted under this Bylaw only upon application to the appropriate Special Pen-nit Granting Authority for aSpecial Permit and subject to the approval of such Permit Granting � Authority and the conditions stipulated. � 2.07 Street A public vvuy or u private vvuy open to travel by the general public` or a way ubmv/o on uplun of subdivision theretofore duly approved by the Planning Board, 2.68 Structure | Means a 000zbbzo1ioo of materials to form uoouubncboo that is safe and stable, including, uuxoog others, buildings, stadiums, tents, reviewing stands, y]u\h>ona, staging, observation (ovvoro, radio Lnvvoro` vvuior tanks, towers, private and public swimming pools, trestles, piers and vvbuzvoy' sheds, ubel1cro' fe000a and � walls, and display si�um' �bu k�ou a(nmcioco ohoU hc construed uu if by�b�words "or part�b�con�'. � , , � / 2.69 Town House An attached house inurow of three mmore such houses capable of being sold nman independent dwelling � with its own lot, as provided>y this Bylaw. � 2.70 Tributary Any portion o[any brook,stream,bog,swamp, or pond, which flows into Lake Cochichewick. � 2.71 Yard (Setback) � /\n open space,which lies between the principal building or group uf buildings and u lot line. 2.72 Yard,Front(Sctbac&) An open space extending across the entire width of a lot between any building thereon and the street lot line � uf the lot ou which such building stands. 22 Page 1 of 2 Woods, J. Justin From: Justin Woods wwoods@townofnorthandover.com]on behalf of Woods, J. Justin Sent: Thursday, September 25,2003 10:41 AM To: Rees, Mark; Santilli, Ray; Parrino, Julie; Nicetta, Robert; Sullivan, Jack; Lt. John Carney (E-mail); Griffin, Heidi; Dolan, Chief William; Lagrasse, Brian Cc: Hmurciak, Bill;Willett, Tim; Chief Richard M. Stanley(E-mail); Melnikas, Lt. Andrew; P. E.Timothy B. McIntosh (E-mail) Subject: 1789 Great Pond Road TRC Meeting TRC Members, One amendment to the comments below: The plans (that you do not yet have) currently show proposed water and sewer, as well as the proposed driveway, in the Conservation Zone of the Watershed Protection District owcver. as tile appli�ant will revue the 9planbto be October 24, 1994, the various zones shown on the plan consistent with the regulations fora 1 wetland ara before October and the t Non-Discharge lone Non-Disturbance l should be located Zone ocated 325-feet from located 100-feet from the edge of the the edge of wetland area. There is the topography y cf the land in tlee Consei vati n Zone). The The fortunate for ised flans applicant as the Bylaw prohibits g will be distributed to you as soon as they are available (the applicant's engineer said he would have to me by Monday). Thanks again,jw. r i J. Justin Woods Town Planner 'I'own of North Andover Community Development Division 27 Charles Street North Andover,MA 01845 P (978) 688-9535 F (978) 688-9542 mailto:'woods @townofnorthandover.com htt ://w ww.townofnorthandover.com/ ----Original Message----- From: Justin Woods [mailto:jwoods @townofnorthandover.com]On Behalf Of Woods, J. Justin Sent:Thursday, September 25, 2003 10:01 AM To: Rees, Mark; Santilli, Ray; Parrino, Julie; Nicetta, Robert; Sullivan, Jack; Lt. John Carney(E-mail); Griffin, Heidi; Dolan, Chief William; Lagrasse, Brian Cc: Hmurciak, Bill; Willett,Tim; Chief Richard M. Stanley (E-mail); Melnikas, Lt. Andrew; P. E.Timothy B. McIntosh (E-mail) Subject: RE:TRC meeting next Thursday, October 2 at 10:00am at DPW TRC Members, Tuesday night the Planning Board opened the public sectioyis 4.l'367�d Pond Noarth(Anclaver Lori Zoning Bylaw.1 application for a Watershed Special Permit under Richard Arnone, the applicant, seeks non-disturbance ildnd nonldisclhargellczoneeninl1theoW�ttei; zone and driveway through the conservation, 9/29/03 i Page 2 of 2 District. 1789 Great Pond:Road was one of three lots (A, B, and C)created via the approval not required statutes in 1979. Lots B and C had existing houses on them when they were approved and were accessed by an easement acrciss Lot A (To give you a general locus, Lot B is Lou Minicucci's house). Lot A, to this point, has never been built upon. The Planning Board had a number of questions regarding this application. Lot A presently does not meet either lot area or firontage n`equirements. However, it is the applicant's position that the lot is protected by the grandfathering provisions of MGL Chapter 40A, Section 6 (Zoning Questions). The proposed access for Lot A seeks to utilize the existing common drive, which goes across his property. 'Tile Zoning Bylaw only allows for two lots to share a common driveway ('Zoning,Police and Fire/Safety Questions). There are also some questions as to whether the subsurface leaching system can function as designed (Health, Planning, Conservation Questions). The proposed water and sewer, as well as the proposed driveway, would alter land in the conservation zone of the Watershed Protection District(DPW,Planning,Zoning Questions). Time, Planning Board requested that I schedule a TRC meeting to get all of the other department's comments on 9his project. I would propose meeting next Thursday, October 2 at 10:00am in the DPW meeting room. At present, I only have two extra copies of tine plan. The applicant agreed to bring in some additional copies and I vi11 distribute therm as soon as they are,vailable. Please let me know if you calm make next Thursday, October 2 at 10:00am. Thank you,jw. i J. Justin Woods Town PIanner Town of North Andover Community Development Division 27 Charles Street North Andover;ILIA 01845 P (978) 688-9535 F (978).688-9542 mailto•jwoods @ townofnorthandover.com http://www.townofnorthandover.com/ i 9/29/03 Town ®f North Andover oQ tea° ,°'na Office ®f the planning Department Community Development and Services Division 27 Charles Street North Andover,Massachusetts 01845 �SSnCIA S 4 Town Planner: iwoods@townofnorthandover.com P (978)688-9535 J.Justin Woods htW:,/,/www.toymoftiorthandover.com F (978)688-9542 Technical Review Committee Report TO: Richard Arnone FROM: J.Justin Woods,Town Planner/TRC Chair CC: Mark Rees,Town Manager Raymond Sautilli,Assistant Town Manager William V.Dolan, Chief of fire Department Lt.Andrew Melnilms,Fire Prevention Officer Lt.John Carney,Police Operations Division Commander Jack Sullivan,Town Engineer Tim Willett,Water&Sewer Superintendent .gob Nicetta,Building Commissioner/Zoning Enforcement Officer Julie Parrino,Conservation Administrator Brian LagRasse,Health Inspector Heidi Griffin,Community Development&Services Director RE: 1759 Great Pond Road—Watershed Special Permit : .............. DATE: October 10,2003 Following please find a summary of the comments of the TRC Committee members: 1) Building/Zoning A) The proposed site is grandfathered pursuant to Chapter 40A,Section 6. B) The attachment of the proposed driveway to the existing common driveway is not any more detrimental than what currently exists. C) The driveway should be designed so that water will not accumulate at the bottom of the common driveway and Great Pond Road to cause a safety problem. I 2) Fie Department The steep slope is an obstacle to access to the property. Providing reliable access, built in fire protection and elimination vegetative fuels will improve conditions. Accordingly, Fire Chief Dolan recommends the following: A) The driveway shall be paved its entire length using the bituminous concrete as shown on the plan or hot top with suitable subsurface to provide traction and support for fire apparatus and ambulances. B) It is recommended that the residence have a residential fire sprinkler system installed to insure fire protection. A licensed sprinkler contractor representing the builder should contact the Fire Prevention Officer-Lt. Andrew Mehnikas 978-688-9590 for information that will be required including hydraulic calculations for both domestic water supply and the sprinkler system. C) Decreasing the amount of vegetative fiiels on the slope will minimize the potential for exterior fire exposure to the structure. Information regarding "fire wise landscaping" can be obtained from www.fire wise.orl;. It is understood from the TRC meeting that the home owner intends to clear much of this vegetation for aesthetic purposes. BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688.9530 HEALTH 688-9540 PLANNING 688-9535 October 10,2003 Richard Arnone 1789 Great Pond Road Technical Review Committee Follow-Up Report to October 2,2003 D) The fire department will work with the homeowner to establish a suitable location and type of house number marker for the access way and his driveway. The fire department will investigate the possible use of the existing brick marker on Great Pond Road,currently being used by the other residences. 3) DPW The Division of Public Works has reviewed the above referenced plan and following is a list of comments from the DPW regarding the proposed construction of a single-family residence at 1789 Great Pond Road: A) The existing driveway easement must be shown on the site plan. B) In order to size the proposed dry well properly, a soil percolation test is required, which must be witnessed by the Board of Health. C) The applicant needs to show how the electric, cable, and telephone services will access the property (overhead or underground) D) The proposed retaining wall at the rear of the property is approximately 7 to 8 feet high in some sections. Any wall over 4 feet high is considered an engineered wall and must be designed and certified by a structural engineer. The applicant stated that the plan will be redesigned so that the proposed retaining walls do not exceed 4 feet in height. E) Due to the steepness of the proposed driveway,the existing asphalt berm shall remain on the downhill side. A catch basin should be added at the base of the driveway and hard piped to the existing catch basin along the gutter line of Great Pond Road. 4) Conservation The applicant should file a Request for a Determination of Applicability for utility installation (sewer, electric,water and cable)in the buffer zone to BVW associated with Lake Cochichewick. Plans should be revised to reflect discussed drainage improvements including installation of a catch basin and piping. The 25' and 50' setbacks to wetland resource areas should be displayed on the plans. 5) Planning A) Given that the lot was created before October 24, 1994, the various zones shown on the plan are not accurate. The applicant should revise the plans to be consistent with the regulations for a lot created before October 24, 1994. The Non-Disturbance Zone is correctly located 250-feet from the annual mean high water mark of Lake Cochichewick and the Non-Discharge Zone is correctly located at 325- feet. However there is no Conservation Zone for a lot created before October 24, 1994 and this should be removed. B) The existing driveway easement must be shown on the site plan. C) The Planner recommends using the existing brick marker on Great Pond Road to identify the houses. This brick marker should have the street numbers of all houses engraved on all four sides of the stone. all numbering on the stone shall be 4" in height. This condition will placed upon the applicant, for purposes of public safety. D) The applicant must conduct soil percolation tests to properly size the dry well and provide this data to VHB prior to obtaining approval. 6) Health All Soil testing must be coordinated with the staff in the Health Department. BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535 Town. of North Andover w office of the Planning Department <" Community Development and Services Division ���� ��,:�yo- 27 Charles Street "N") North Andover,Massachusetts 01845 P (978)6889535 Town Planner. htip://www.towtiofnc,rLhai-idover.com g (878)688-9542 J.Justin Woods 'woods@townofnorthandover.com e" tax To: Hr wee zie,PE From: J.Justin Woods µy Fax: 781-941-2662 �" �1• Pages: 3,including coversheet Phone 781-941-2211 j du Date: October 15,2003 Re: 1789 Great Pond Road CC: ❑ Urgent Q For Review ❑ Please Comment ®Please Reply Cif Please Recycle Comments: Iii Brad, Attached please find the Town of North Andover's Technical Review Committee report on the 1789 Great Pond Road. This report contains the recommendations of the various town departments. My understanding is that you are in the process of updating and revising the plans to be consistent with these recommendations. If you have any questions about any of the comments,please feel free to contact me. The public hearing on this application was continued to October 21, 00Board's posted policy on its meeting schedule states that, Any revision or to plans have to be submitted to the Department and Outside Engineer 8 days prior to the continued meeting." I anticipate that since revised plans have not yet been submitted,your client will request another continuance. The next Planning Board meeting is Thursday, November 6,2003. It is recommended that that you provide WRITTEN RESPONSES AND PLAN REVISIONS to the issues and comments contained in both the TRC and VHB's review. Copies of any written responses and plan revisions should be submitted to the Planning Department with a copy being provided directly to VHB.The deadline for submission of revised plans for the November 6,2003 meeting is October 29,2003 at 12:00 noon. Re S' ely .in Woods THE DOCUMENTS INCLUDED IN THIS TRANSMISSION ARE INTENDED FOR THE RECIPIENT TO WHOM IT IS ADDREESED. IT MAY BE PRIVILIGED AND CONFIDENTIAL OR PROTECTED AS AN ATTORNEY CLIENT 8S AND DJESTROY THE O UMENT®YOU RECEIVED INTENDED N ERROR. PLEASE NOTIFY(978)6 yyam�,�� f id's W KENZI E-��-.,,-,1��:1-,,.,�.:�-.:,,,-:,-:,,1-��-I--,---�:�:�,,:,-.,.,.-.��-1�--.-��I:.1���1..1.����,,�,,,�-:,..-:��-:��.1,,-,.�,,,,:.1�-.�,�1I,1�:�1:,,�.-,�I 1,�:,.�,�-��,--_.���-�I--,:�,:-�11�I 1,.-"-:.1,,I�-:1%,:-1-,:.-:.�-%"�,-.I-,�,:,�Z1 I-�..I I,1.-:�--�1�;1,1�,,-.,,ENGINEERING - ( GROUP, INC, j ,�,-,�1�,���,, I. .-1 I� Professional Civil Engineering•Land Planning•Project Management r+i:"a " r 196 Central Street � 't7 °L -t�1 Saugus,Massachusetts 01906 Tel:781.941.2211 Fax:781.941.2662 OV t �) -�- 2100 Washington Street Hanover, Massachusetts 02339 (� f'IT )�`K?D( 1, Tel:781.792.3900 @L f�illl(� i.>t r�9r% r:r,:a�s'� Fax:781.792.0333 Webs.ite:www:mciceng.com October 31,2003 Mr. J.Justin Woods Town of North Andover 27 Charles Street Nortl Andover,MA'I - 1. Re: Watershed Special Permit 1789 Great'Pond Road Dear Mr.Woods: This letter is in response to a review letter from your office dated October 10,2003 for the above referenced project. Enclosed herewith are the following: • 1$Copies ofplan entitled"Site Flan of Land* North Andover"dated August 14, 2003 grid revised October 31;2003 by McKenzie Engineering Group,Inc, • Drainage Calculations.'(including soil testing results)dated October 31,2003 by McKenzie Engineering Group,Inc. The following written comments address the review comments Tro4ithe Technical review Committee: 1.Building/Zoning A) No response requu`ed. B) No xesponse required. C) The first 100 feet of h e driveway has been redesigned such that the proposed paved. surface is super elevated at a 2%cross slope toward a proposed bituminous berm which directs stormwater flows into a proposed catch basin. The catch basin is connected to the closed drainage system located on Great Pond Road via a piped connection(see comment #3 E). 2. Fire Department I. A) The entire length of the proposed driveway will be paved as requested. 1-1-...�_�,��::��: , � ��:�::�6:,:::O,� - %�.�,:�:�� - - -.- � I 1.11 -': I:- , - - -4-!-t.--1.--, '�.,��' ..-- :� :-.- I :_��, 1 , , - I '. . .-- -�:,...-1 ,. -- :%�- --- - _- - -.''-- l. - 11 - � : � ��--� ::��, ;�- , , :� .� ­ . , ,� . , .: - I � - , - - , - �-�:���__�-� : % 1. 1 . , . - ,� ��:��.- � ,. --, .�, �,�,�-�,��: , � � :- . . I - ." :- - � -,:- :-1' � %�%.�-,:,,,...,:!:�:��:���f������.�,�'. -_ --,!,�� ��.- -W�,,�:�._': . :,::� ---: : 1� :,'',- --:'', :�,--- :-%::--�1.7 - . -.1 - 1-1- - 1 - 1 % I I .. I ' ' . -.--� , --:- �: I � ����:�.�:��.��:,�:,,�::���, .��,,�:1 - : -: -�% � % . . - I 1 1. I I I : .1 - - -,: --'-. -% .-,-_:, 1, I i 1 , . . - : : I -�4 �� �' - - :.,:-:- - - .- � - 1 - �.- - I I �. " . . ."l- - % . - I 1. .1 � - �- -- - . � 1--. ::: :,,,�: �.:,�,:..1:1 1%.. ����.,.,::��:,�:�:, �:�,,���,�::::: ��::�� .1,�,: .%�:: ..: .��'', :., � . I � _ _ - � I ,�i �. � -, 1-1- ,�� -- :� -:�, I I -, I � ­, I I I , . :��% :, I - . 1 - ---:--- - � :,: � .- . �----� :1 I :� I I , ­- %-1. ,:: �:�i,�.,: _ �- I %�,�-:--:--:: : � �.:''- : - - �.� � 1 . - �I I 1 : � �, ,: :: , I :--_- : -1 :-- - : �- : - - I - 11 �..,:-:,�:-% � 1.1-1- I �- p. I - -1 .1 � I - I � I --.: �'.., .- I .1 1.1 -- . 1- 111. - 1 � � I , - 1. I - 1.1- -�, ,:- - I - - � .11 I I I 1 . - I � 1, � I 1-1- 1 - 11 - 1% :�:,�: � j - � , � :,_ -� :� ,:� , , 1 . , � - 111. . - � � � - I I I ,� I - 1 . - I I � , , � � , � I - :-: -1- . � � - --. 1 - 111 . - - - 1-11 il - - , - :1- �-- � 11, -- -- � ,:- - I., . -- :' - -1 - - .- .. . 1-1:1- 1- �:.- -- -':.. I I - 1 .11 ::,� I I . I . I . I -1 ,�: , ::�: , , - - 1 . - 1. - - - � 1 I . : : �--� I -: :� , %i- . � - - - 11 ,�: I I � �� � 1 - 111 - . �: _��.:, -::. � 11 -1-: 1- 1- � . - - -� I ,::, � � I - - . .- I � - , -1 - 11 : :. 1"'': ::-�,�,� :!:.:-i� : --- - : I I I � .1 � l : .:��'. . :��,, � l :,� ::,:%:, � l. ::� ,: � ''i �. :1�� :� .�:�'..'',�:''::.::,�.��,� , �:�,:,�1:1�1,111,�,,�:, : , I . . I - :1- ::- :.:�::,%. I - : �: , I � : % � . I I I . 11� I - - . I I -::::::: �:1 ,- � - -:,:�,�-::��. - I . I I � I-. � 1 . i 1 , I � I .1 � I - 1 - 1- 1- I �: ': ,, :� �:,%, -1 � I I I - % 1- 11- 1- --- 1 - 1 . 11 I - --..::: -,:-: 1 -: , :,:1 : , --. �:�:., I I .�- 11.1�lil �,�,���.",:�""�. ,�. , �,� ' . -%-:� '. --�:.�: �:�.-- �-- -�: ;� 1-:- - z - I , I � -1 � 1- 111 - - - � � I I . 11 � .1 , - -,�-- : I 11 1 . \I Town of North Andover Page;2 October 31,2003 �11 B) Afire sprinkler system is being designed for the proposed dwelling. Drawings and supporting calculations willbe submitted by the applicant under separate cover: li C) The applicant intends to clear the".vegetative fuels" located in the vicinity of the I 11 I dwelling and constructing appropriate landscaping.il, q! D) The existing brick marker will be utilized to display the house numbers;per the`Town 11 ,Planner's recommendations:(see comment#5 C).-11 3.DPW A.,'- ) The existing driveway easement has been ad- I ..the plan as requested. B) A soil percolation test,witnessed by the board of;heaIth's consultant,was performed on kriday October 24,2003. C) The electric,'cable and telephone services mill be underground from them respective connection points at Great Pond Road to the proposed dwelling: D) The retaining wall at the rear of the property has been redesigned such that the proposed height does riot exceed four feet. E) The first 100 feet of the driveway has been redesigned such that the proposed paved surface is super elevated at a 2%cross slope toward a proposed bituminous berm located at the downhill side which directs'stormwater flows into a proposed catch basin. The catch basin is connected to'the closed drainage system located on Great Pond Road via a piped connection as requested. 4. Conservation A Request for Determination of Applicability was submitted to the North Andover Conservation Commission and DEP HERO. A negative determination was issued at;the public hearing held on October 22,2403. i 5. Planning A) The;plan has been modified to show buffer zones consistent with a lot created prior to 11 11 October 24 1994 and located within the watershed protection district:11 B) The.existing driveway easement is shown on the plans as requested.11,C) The existing brick inarker will be utilized as recommended. D) A soil percolation test was performed on October 24,2003 as requested. The results are 1. included in the drainage calculations. 6. Health Soil testing was performed on October 24,2,003 and witnessed by the North Andover 11 w ii Board of Health's.consultant. Town of North Andover Page 3 October 31, 2003 Please feel free to contact me prior to the November 18,2003 meeting should you have any questions or require additional information. Very Truly Yours, i 1 McKENZIE ENGINEERING GROUP, INC. Richard A. Salvo,P.E. Project Manager RAS/js Enclosures cc: Timothy B.McIntosh,P.E. --VHB Richard Arnone—Applicant I ' i Town of North Andover NORTH q Office of the Planning bepartment � A Community Development and Services Division 27 Charles Street ?A North Andover,Massachusetts 01845 �SSACHUS�� Telephone (978)688-9535 Fax(978) 688-9542 December 11,2003 Mr.Tom Urbelis,Esq. Urbelis,Fieldsteel,LLP 155 Federal Street Boston,MA 02210 RE: 1789 Great Pond Road I am forwarding you the information regarding 1789 Great Pond Road on the behalf of Heidi Griffin. This project is before the Planning Board regarding a Watershed Special Permit. Heidi sent you an email requesting a legal opinion as to the next step the applicant needs to take to resolve the issue of the common driveway and if the applicant needs to seek zoning relief. Please call if you need further information. Thank you, Debbie Wilson Planning Assistant BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535 Town of North Andover F� ° � ` °7, Office of the Planning Department a � „a x Community Development and Services Division �5 us�� 27 Charles Street �SSgc►+ North Andover,Massachusetts 01845 Town Planner. http://www.townofiiorffimdover.com P (978)688-952 Julie Panino jparru loOtownohiorthandover.com- F (978)688-95442 c" To: From: a Fax: G' Pages: 7 ,including coversheet Phone: Date: + Re: CC: ❑Urgent ❑For Review ❑Please Comment ❑Please Reply H Please Recycle •Comments: i ' THE DOCUMENTS INCLUDED IN THIS TRANSMISSION ARE INTENDED FOR THE RECIPIENT TO WHOM IT IS ADDREESED. IT MAY BE PRIVILIGED AND CONFIDENTIAL OR PROTECTED AS AN ATTORNEY CLIENT COMMUICATION. IF YOU ARE NOT THE INTENDED RECIPIENT, PLEASE NOTIFY(978)688-9535 AND DESTROY THE DOCUMENTS YOU RECEIVED IN ERROR. =148,5 .=148,0 ��� ✓ ��~ PROP. 'BIT, 1 Z� CQNC\DRIVEWAYY ERMCIf WAR. (q CQ m 2ENCH DAM CENTER)-7,.< TUBING :RVI cn / c��ROP. LIMIT ; ..I�) _ CE IOF CL ARING (T?t'P:) 1 ��'� 1 �.:�P 3 MANHOL ,LOT 40- 58,101 ± S.F. 1 .33 ACRES .PA ATION, , .� POP. BIT. BiRM 26 StA, 0+00 TO,,, ' ! / To 1+26, Rl" ;�� ED h'- / .III �_ •, _�' '` / c:1 I ZONE , )URGE 128 , °" XISTING DRIVEWAY �- .& ? 26 / \ `'� -MAINTENANCt EASEMENT r NHOLE 'G�_ / x �'DEEV BOOK; 1383 PAGE: PLAN BOOK: 1383 PAGEf- ti PROP. DOUBLEL;Sf]�kKED H BASIN� _,' - c .��`- r -- --` od -HAYBAL,ES W/SILTATEQN a° •V, FEN CONSTRUCT it =r't !R-120( PIPE) ,�► 126.60, r�:�c- 116.4 �- / + i_11IIT OF PA1%EMFNT APRON - �.�_�'�' -0 Jt;w o �..< <x FOUNI IFU T)=115.40 GRZ-A PON40 R( LIMIT OF TRENCH I ( m ,wANV(IN)=116.201q"` " "'"w°""� .�„q,LIMIT omm i WORK ,) c, LIMIT OF RESOURCE AREA ExlI-11. 1-11 .. .. . — — ——MEAN'-ANNUAL••-H{GH--WAT R-..MARK___ _.__ __.._. ___._-- _.. . bAfEE-C-BC-HI-GHEWICK--- —— — —— —_ — —— o -••••_-o .! 4 D� ti L r p G a n-0 4~ o V� G a Y C v 0 °v--J )O•O°� ° 0 O.O O.O O.0 00 v•0 4.0 e--a -- -- _... - .- --- WF--4 Al URBELIS&FIELDSTEEL, LLP 155 FEDERAL STREET BOSTON, MASSACHUSETTS 02110-1727 Telephone 617-338-2200 Andover CAROL HADAR WGRAVEY Telephone 978-475-4552 OF COUNSEL Telecopier 617-338-0122 e-mail chm @ufb.com December 23, 2003 Heidi Griffin Director of Community Development& Services Town of North Andover 27 Charles Street North Andover,MA 01845 RE: REQUEST FOR OPINION 1789 GREAT POND ROAD Dear Heidi: In response to your request for an opinion as to whether the above-referenced lot is subject to the zoning by-law restricting common driveways to 2 units,we submit the following. Your question arises in connection with the application by the owner of 1789 Great Pond Road for a Watershed Special Permit, which may not be granted unless the premises is in compliance with the provisions of the zoning bylaw. Section 2.30.1 of the North Andover Zoning Bylaw, enacted in 1989,provides that, subject to the granting of a Special Permit by the Planning Board, a driveway may be shared by not more than two lots. The question has arisen as to whether the lot at issue is "grandfathered," and thereby exempt from this provision of the Bylaw. M.G.L. c. 40A, § 6 provides, in pertinent part: Any increase in area, frontage, with,yard or depth requirements of a zoning ordinance or by-law shall not apply to a lot for single and two-family residential use which at the time of recording or endorsement,whichever occurs sooner was not held in common ownership with any adjoining land, conformed to the then existing requirements and had less than the proposed requirement but at least five thousand square feet of area and fifty feet of frontage. s:\wp5l\work\ii-andove\couesp\giiffin.Itr-greatpoiidrcLdoc URBELIS&FIELDSTEEL, LLP December 23, 2003 Page 2 This provision provides an exemption from area, frontage, width, yard or depth requirements,but does not, in our opinion,provide relief from the provisions of Section 2.30.1 of the North Andover Zoning By-Law,which limits the use of common driveways to two lots. In order to obtain relief from this provision of the Bylaw, it is our opinion that the applicant would have to apply for a variance under Section 10.4 of the Bylaw for relief from the provisions of Section 2.30.1 of the Bylaw in order to permit the common driveway to serve three lots. If the variance is granted, an application may be made to the Planning Board for a common driveway special permit. Please note the requirement of a maintenance agreement in Section 2.30.1. If the driveway variance and special permit are granted, then the Watershed Special Permit may be issued. Please let me know if you have any questions or if we may be of further assistance. Very truly yours, Carol Hajjar McGravey CHM/lah cc: Mark Rees D. Robert Nicetta JAN-05-2004 MON 10;46 AM MARKJOHNSON FAX NO, 9784756703 P. 02 LAW OFFICE or MARK B. JOHNSON 12 Chestnut Strut AodoVdr, 15S,XIMSC118 01810.3706 (978)475-4488 I.&copier- (978)475-6703 pnmleb,t KA'I IIRYN M.MORIN MARK r3. J()i INSON (MA,N11,1)(;) 1:IANNi71 C'Ri,51'Al.d)1 DONA1.1) F. (I()11R;)ti rJAN (MA,ME) JUAN 11,MIT )ANIFS BONFANi'i (btA) M1011TEC:.JONIKAS MAI:K A-MI.Rc)La.l (MA.10 51tA11T`IA 1?,M�:cnlCftlY,J.T). January 5,2004 lIeidi Griffin, Collltlllinity Development Director ToNvii ol'North Andover Charles Strut North Andover, MA 01945 12.c: 1789 G at,P i d Road_,Nqgtjj Andover, MA Dear Members of the Planning Board: I represent Richard Arnone, Jr. and have been asked to address the question thtlt has ,iriscu as to the use of the driveway to access what is showy as Lot A Crept Pond Road on a Form A flan endorsed by the Planning Board on August 10, 1979 and recorded at the Essex North District Registry of needs as Plan 48166. it is Illy 1i11de'rst.lnding that tlhc Planning Board has raised a question as to wl1c111er o1- r)(it 1.11c existing driveway located on Lot A can be used to access Lot A or if it is a common driveway can be used to access 3 kits only pursuant to a special permit. Currently, the common driveway appears to provide access to Lot i; and T,ot C which,both lots are accessed by the driveway wbicli is over Lot A. I have reviewed the 'Zoning Bylaw of the"Town of North Andover and it is my be)ief*that the common driveway is not considered a common driveway for the purposes of accessing Lot A but is only a common driveway for the purposes of ticcessing Lot 3 :and C, Its to Lot A it is an accessory structure pursuant to section 2,21 ol'the Zoning By Law. Since the driveway which services Lot A is 100%within Lot A, it would not be considered a common driveway on Lot A. f�t1:pcir,V,n n+no,J.,Rn,h;xp97��5111P7 Gn.,G Pc�d NLplsr.ainA hn,ad W ib80.1.wr. JAN-05-2004 MON 10:46 AM MARKJOHNSON FAX N0, 9784756703 P. 03 I Iciili Cirinin, community Development r)irector Jauunry S, 2004 Pago 2. Further, the'. access driveway was shown on the Form A Plan endorsed by 111c 1'1,lnning Hoard and was also the subject of a Driveway Easement and Maintenance Agreement which was entered into in August 1979 as when the Plan w;1s endorsed. Section 2,30.1 (Driveways)which limits common driveways to serving 2 lots witlunat a special permit was not enacted until 1989, well after tilt; driveway wits installed, the plan signed and the Driveway Easement and Maintenance Agreement executed and recorded. I belim.that the driveway would be considered a common driveway only after it loaves the limits of Lot A to provide access to Lois I3 and L. It would be a strange result it*the owner of Lot A was unable to use the driveway located on Lot A without a special permit. I would be more than happy to discuss this with you or the Planning Board to addrrss fray other questions or concern that you might have. Very truly yours, Johnson 1V(k3J--lclb ' pc: Richard Arnonc, Jr. FA W_,w(k)cJVitUom,Jr,.Pichir(1103.7571789 Great Pond MpLinoing board-11t 12-8-03,doc February 20, 2004 Julie: My apologies for the delay in sending you the attached plan. It's been a crazy week. As discussed,please review and let me know if you think,VHB should make any additional comments before or next hearing date. My goal is to have EVERYTHING done for that hearing so I can get my long awaited approval on the special permit. If you have any questions, please call me on my cell phone (781) 953-7112. lh 'c y y ard Arnone F EB 2 Nor;-[l I AN LAW OFFICE OF MARK B. JOHNSON 12 Chestnut Street Andover,Massachusetts 01810-3706 (978)475-4488 Telecopier: (978)475-6703 Paralegals KATHRYN M.MORIN MARK B. JOHNSON (MA,NH,DC) J U 2 2004 LIANNE CRISTALDI DONALD F. BORFNSTEIN (MA,ME) MICHELE C. JONIKAS JAMES BONFANTI (MA) KATHLEEN H. HARBER MARK A. MEROLLI (MA,IL) RAMJIAN PLANNING REH JOHN G. LAMB (MA) DAWN M. WALKER July 1, 2004 VIA FACSIMILE/(978) 688-9542 and FIRST CLASS MAIL Julie Parrino Town Planner North Andover Planning Board 27 Charles Street North Andover, MA 01845 Re: Arnone/1789 Great Pond Road Dear Julie: Confirming the conversation you had this morning with Kathy Harber of my office, it is requested that the Board's hearing in this matter be continued until the July 20, 2004 meeting. I have recently been informed that a member of the development team will be on vacation and therefore unable to attend. I can communicate to you that I have been assured by Mr. Arrione that we will be prepared to give a full presentation at the Jul 24th meeting and would, otherwise, have been so prepared for the July 6t� meeting. On behalf of the applicant, I apologize for this delay and inconvenience and appreciate the cooperation of the Board and its members regarding this revision to the hearing schedule. if you should desire any other documentation regarding this continuance request, would you notify FANew-Docs\arnone,jr.,flchar(A03-757 V89 great pond rd\parrino Itr 07-01-04.doe Julie Pairino,Town Planner North Andover Planning Board July 1, 2004 Page 2 me of same. Further,I will be at next Tuesday's meeting on another matter and will therefore be available to answer any questions you might have regarding this matter. Very truly yours, LAW OFFICE OF MARK B. J )PNSON Donald F. Barn in re DFB/dms cc: Richard Arnone, Jr. Richard A. Salvo, PE FANew-DoWarnone,jr.,richard\03-757 1789 great pond rd\parrino Itr 07-01-04.doc Octoberl9,2004 PB Annotated Agenda Discussion Items: Bond Release for 257 Bridle Path,for David &Margaret Kealler. The applicant is requesting a final release of all funds held for 257 Bridle Path . They received a permit on June 6, 2001 to construct a 16' x 31' deck and 1126 SF addition to the first floor. On October 4 a site visit was conducted with the submitted as-built plan. Based on this visit I would recommend final acceptance of the as-built plan and release of all funds held. (JAB) Bond Release for 225 Bridle Path,for Howell Design & Build. The applicant is requesting a final release of all funds held for 225 Bridle Path. They received a permit on September 11, 2003 to allow for a small addition to the existing kitchen,to add an eating area off the kitchen with a basement below, to add to the existing living room and to add a study with basement below and a bathroom. On October 4 a site visit was conducted with the submitted as-built plan. Confirmation from the Water Department has been given that the home as been placed on town sewer. Based on the visit and the water department's information I would recommend final acceptance of the as-built plan and release of all funds held. (JAB) Phased Development Bylaw Regulations: The regulations have been changed to reflect the anniversary date revisions to indicate that"the first lot in the subdivision received all other applicable approvals from land use boards"per the email I sent to the PB on 10/7/04. Continued Public Hearings: 1789 Great Pond Road— (Arnone) Mr. Arnone received his variance from the Zoning Board,of Appeals and as such I have drafted a decision included in your packets for your review. Wheelabrator,. At the last PB meeting,the Board continued the hearing for the following reasons: (1) The Chair of the PB had been actively working on the matter and the board wanted to wait for the chair's feedback, and(2)there was discussion of perhaps "phasing"the dioxin/furan testing to allow the testing to be every six months at first, vs. every 9 months and to increase the time permitted between testing if those results were positive. ® 15 Timber Lane, Watershed Special Permit: I left a message for their engineer indicating that as they had not yet applied for the special permit for the nonconforming lot that this item should be continued. Also, I did find a letter sent to the town manager from attorney mark Johnson seeking guidance from the town as to the removal of the cul de sac. The town manager is searching for his response and I will hopefully have it for the board to review at the meeting. The Board reserves the right to take items out of order and to discuss and/or vote on items that are not listed on the agenda. desktopOctoberl9PBAnnotatedAgenda Town of North Andover Q� yORTI1 Office of the Planning Department Community Development and Services Division 27 Charles Street North Andover,Massachusetts 01845 �SSA�NUSE�`y http://www.townofnorthandover.com P (978)688-9535 F (978)688-9542 MEMORANDUM TO: Chief Dolan FROM: Jacki Byerley, Planning Consultant RE: 1789 Great Pond Road (J DATE: October 22,2004 The Planning Board has received a revised plan for Plat 35 Lot 40 (1789)Great Pond Road and would like your comments regarding the driveway. This plan has been in front of the Planning Board for a year now and has since reverted back to what was originally submitted to all the departments. If you could please review this plan last revised on 10/18/04 and provide written comments to the Planning Board prior to our meeting on November 16, 2004. Thank you for help regarding this. BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535 I AORTH.4 ' Town of North Andover Office of the Planning Department i Community Development and Services Division 27 Charles Street �ss�cHUStt North Andover,Massachusetts 01845 Town Planner. http://www.townofnorffimdover.com P (978)688-9535 Julie Vondrak jvoiidr,tkil_Lowilofrtku•tli,intlow(>r_(om F (978)688-9542 Fc" To: -y From: Julie Vondrak lelw'l Fax: V17 &,Y- (J12Z- Pages: ,including coversheet Phone: Date: Re: CC: ❑ Urgent ❑ For Review ❑ Please Comment ❑ Please Reply El Please Recycle •Comments: Al �' C� f , D r--- THE DOCUMENTS INCLUDED IN THIS TRANSMISSION ARE INTENDED FOR THE RECIPIENT TO WHOM IT IS ADDREESED. IT MAY BE PRIVILIGED AND CONFIDENTIAL OR PROTECTED AS AN ATTORNEY CLIENT COMMUICATION. IF YOU ARE NOT THE INTENDED RECIPIENT, PLEASE NOTIFY(978)688-9535 AND DESTROY THE DOCUMENTS YOU RECEIVED IN ERROR. Town of North Andover °E N°RT 6�+ Office of the Planning Department I , A Community Development and Services Division c -- 27 Charles Street 'Y ��NAtto�YPy,tS North Andover,Massachusetts 01845 �SSACHU$�t b"://www.townofnorffimdover.com Town Planner. iparrino��townofitorthandover•com P (978)688-9535 Julie Vondrak F (978)688-9542 September 13, 2004 North Andover Zoning Board of Appeals 27 Charles Street North Andover, MA 01845 Att: Ellen McIntyre RE: Special Permit for 1789 Great Pond Road Dear Ellen: It is my understanding that Richard Arnone has filed for a variance with the Zoning Board of Appeals to permit construction of a driveway off an existing common driveway that currently services two residential homes. The project has been before the Planning Board for a Watershed Special Permit for over one year. Early in the permitting process, it was discovered that the newly proposed driveway would be accessed off an existing common driveway servicing two lots. Section 2.30.1 states"Subject to the granting of a Special Permit from the Planning Board, a driveway may be shared by not more than two(2)lots". The Planning Board sought an opinion from Town Counsel who opined that the applicant would have to apply for a variance under Section 10.4 of the Bylaw for relief from the provisions of Section 2.30.1 of the Zoning Bylaw in order to permit the common driveway to serve three lots(see attached). The applicant was instructed to seek relief from the Zoning Board of Appeals, however,the applicant chose to redesign the project by proposing a separate driveway to service the lot,thus, eliminating the need to obtain a variance with the ZBA. Upon review of the design,the Planning Board members were of the opinion that the amount of disturbance associated with the new driveway was unnecessary and could impact the waters of Lake Cochichewick,which is located directly across the street from the project site. Access of the common driveway would eliminate substantial grading,tree removal and the addition of impervious surface. The project currently proposes a significant amount of disturbance within 325' of the Lake. On behalf of the Planning Board,I would like to recommend that the ZBA highly consider the granting of the variance to permit the common driveway to service three lots. The lot is located in a very sensitive area directly across the street from the Lake. The slope and topography of the lot requires substantial grading to accommodate a driveway and dwelling. Granting of the variance will help to reduce the amount of impervious material on site, in addition to the need for substantial grading and clearing. The project has been reviewed by VI-IB and drainage and stormwater improvements have been incorporated into the design. The Planning Board has requested the applicant to place the utilities along the edge of the driveway to reduce clearing activities. This must be reflected on a revised plan to be submitted to the Planning Board. Given the sensitive location of the site within the Watershed Protection District,the Planning Board supports the granting of the variance in order to protect the interests outlined in Section 4.136 of the Zoning Bylaw. BOARD OF APPEALS 688-9541 BLJILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535 Thank you for your consideration and please feel to contact the Board members with any questions. Sincerejy,' / (./Julie V ridra�k, Town Planner cc:Planning Board Heidi Griffm, Community Development Director Robert Nicetta,Building Commissioner Donald Bornstein URBELIS &FIELDSTEEL, LLP 155 FEDERAL STREET BOSTON, MASSACHUSETTS 02110-1727 CAROL HAIJAR MCGRAVEY Telephone 617-338-2200 Andover OF COUNSEL Telecopier 617-338-0122 Telephone 978-475-4552 e-mail chm @ufb.com December 23, 2003 Heidi Griffin Director of Community Development& Services Town of North Andover 27 Charles Street North Andover, MA 01845 RE: REQUEST FOR OPINION 1789 GREAT POND ROAD Dear Heidi: In response to your request for an opinion as to whether the above-referenced lot is subject to the zoning by-law restricting common driveways to 2 units,we submit the following. Your question arises in connection with the application by the owner of 1789 Great Pond Road for a Watershed Special Permit,which may not be granted unless the premises is in compliance with the provisions of the zoning bylaw. Section 2.30.1 of the North Andover Zoning Bylaw, enacted in 1989,provides that, subject to the granting of a Special Permit by the Planning Board, a driveway may be shared by not more than two lots. The question has arisen as to whether the lot at issue is "grandfathered," and thereby exempt from this provision of the Bylaw. M.G.L. c. 40A, § 6 provides, in pertinent part: Any increase in area, frontage, with, yard or depth requirements of a zoning ordinance or by-law shall not apply to a lot for single and two-family residential use which at the time of recording or endorsement,whichever occurs sooner was not held in common ownership with any adjoining land, conformed to the then existing requirements and had less than the proposed requirement but at least five thousand square feet of area and fifty feet of frontage. s:\wp5l\work\n-andove\corresp\grifrin.ltr-greatpondrddoc URBELIS& FIELDSTEEL, LLP December 23, 2003 Page 2 This provision provides an exemption from area, frontage, width, yard or depth requirements, but does not, in our opinion,provide relief from the provisions of Section 2.30.1 of the North Andover Zoning By-Law, which limits the use of common driveways to two lots. In order to obtain relief from this provision of the Bylaw, it is our opinion that the applicant would have to apply for a variance under Section 10.4 of the Bylaw for relief from the provisions of Section 2.30.1 of the Bylaw in order to permit the common driveway to serve three lots. If the variance is granted, an application may be made to the Planning Board for a common driveway special permit. Please note the requirement of a maintenance agreement in Section 2.30.1. If the driveway variance and special permit are granted,then the Watershed Special Permit may be issued. Please let me know if you have any questions or if we may be of further assistance. Very truly yours, i Carol Hajjar McGravey CHM/lah cc: Mark Rees D. Robert Nicetta LAW OFFICE OF MARK B. JOHNSON 12 Chestnut Street Andover,Massachusetts 01810-3706 (978)475-4488 Telecopier: (978)475-6703 Paralegals MARK B. JOHNSON (MA,NH,DC) KATHRYN M. MORIN DONALD F. BORENSTEIN (MA,ME) LIANNE CRISTALDI JAMES BONFANTI (MA) MICHELE C. JONIKAS MARK A. MEROLLI (MA,IL) KATHLEEN H. HARBER JOHN G. LAMB (MA) KAREN P. EHRAMJIAN DAWN M. WALKER BRANDI D.L. HURD October 1, 2004 Town of North Andover, Planning Board Attn: Mary 27 Charles Street North Andover, MA 01845 Re: Richard Arnone, Jr. /Great Pond Road,North Andover, MA Assessors Map 35,Parcel Number 40 Water Shed Protection District Special Permit Application Dear Mary: Pursuant to the Board's recent request, I enclose ten(10)copies each of the following: 1. Recorded Easement and Driveway Maintenance Agreement; 2. Recorded Plan of Driveway Easement; and 3. Correspondence from James Senior,Esquire to the North Andover Building Inspector regarding property's exemption from current dimensional requirements of the R-1 District. Should you have any questions or concerns,please do not hesitate to call. Very truly yours, LAW O2Borenstein OF MARK NSO Donald DFB/dms Enclosure cc: Richard Arnone F:1new-doc5lamone,richard103 757.2 great pond rd,no andover zbakno.andover pb Ib 10-01-04.doc 1 • it Ilt� - li�l - --- B K 13 8 3 DRIVEWAY EASEMENT AND MAINTENANCE AGREEMENT (COVERING LOTS A, B AND C, PLAN ) AGREEMENT made and dated this fourteenth day of August, 1979, by and between the following" parties: �A �� f� I I' DOROTHY 0. ARCHAMBAULT (hereinafter Mrs. Archambault); II ; JOHN J. KENNEDY and CLAIRE A. KENNEDY, husband and wife, ? (hereinafter the Kennedys); LOUIS Po MINICUCCI, JR. and JUDITH A. MINICUCCI, husband and ' wife, (hereinafter the Minicuccis); and ; { II�I zz EDWARD PALMISANO and CLARA PALMISANO, husband and wife, (hereinafter the Palmisanos). j WHEREAS Mrs. Archambault and the Kennedys are conveying Lots C and B respectively as shown on a certain plan to be recorded in connection with said real estate transaction and numbered ZAI h to the Palmisanos and Minicuccis respectively, and WHEREAS .Mrs. Archambault' is retaining ownership to Lot A as III . , . shown on said plan for her benefit and the benefit of her heirs and r assigns, and WHEREAS future sale and/or development of said Lot A will be dependent upon, and subject to, the use and enjoyment of a,:certain � right of way or driveway easement over part of said Lots A;and B, and shown on said plan as "Access Driveway" and including a five foot �"9y b ' maintenance easement on either side, and Flily ' Ilil j F71 v 1 3 r ` �4 I .djlll 9 �li 14E fy t; IlI� I 11 - I 2. { 1 ff I f j r Ii1 $ {i�if if f r !!'a11 I EK1383 - 3 � 3 WHEREAS access to Lots B and C over and across Lots A and B is absolutely critical for the Minicuccis and Palmisanos, their heirs and assigns, grantees of Lots B and C respectively, and WHEREAS the parties wish by this instrument to clarify their rights to the use.and enjoyment of said common driveway easement 1 t and the. obligations and duties of a il- parties towards each other, NOW THEREFORE, the parties, for themselves their heirs and assigns, .mutually covenant and agree as follows: The property shown on said plan as Lot C, conveyed by Mrs. Arhambault to the Palmisanos, and the property shown on said plan �. as Lot B, conveyed by the Kennedys to the Minicuccis, is and are conveyed together with and subject to the following easements and covenants, namely: ? 1. An easement is given and reserved for the benefit of the owners of Lots A, B and C, for access by vehicular and/or pedestrian traffic over and upon the portion of land shown on said plan as "Access Driveway", including a five foot maintenance easement on each side, and running from the northerly line of Great Pond Road up to and including the westerly line of Lot C, as shown on said plan. 2. The Minicucdis and the Palmisanos agree to share equally the cost of snow removal, maintenance and repair of said access a driveway. 3. Mrs. Archambault covenants for herself, her heirs and assigns, that any sale or development of Lot A as a dwelling lot shall be subject to the terms of this agreement, and that in convey- `� ing title to said Lot A that she will cause to be inserted the { $ K1383. following language, namely: The premises 'are subject to the pro- { visions of a certain Driveway Easement and Maintenance Agreement dated August 14, 1979, and recorded in North Essex Registry of " Deeds in Book 1383 Page 3 07 � , g , which shall be the date and place of recording of this instrument, so as to permit the p perpetuation of this easement through, over and across said Lot A, within and over said Driveway Easement. 4. Should Mrs. Archambault or her heirs and assigns construct a dwelling on said Lot A which is dependent upon said access driveway, then the owner of said Lot A, at the time of securing a certificate of occupancy for said dwelling, shall share equally in the costs of �- 4? maintenance, repair and snow removal on said easement with the then I; owners of said Lots B and C. Thereafter each record owner shall have I one vote per lot. A vote of at least two-thirds will be!-required to undertake or commit improvements to said Access Easement and each lot shall bear one-third of the total cost of any repairs, snow f •t removal and maintenance. 5. The parties recognize that during periods of .severesnow- storms or during icy conditions, it may be temporarily impossible to get up said driveway by motor vehicle. In this regard it is agreed by the parties that during said periods, temporary parking for automobiles for the owners of Lots A, B and C, but not to exceed two vehicles per lot, shail be permitted.at the foot of the hill, within Lot A southeasterly of the southeasterly line of the Access Driveway. No obligation however is hereby imposed upon the owner 4 } il 1'. 7 J . l � 8 3 7 t BK1333 310 of said Lot A to grade and maintain said temporary parking area southeasterly of said Access Driveway. IN WITNESS WHEREOF the parties hereto set their hands and i seals on the date above written. Dorothy rc am au :3 n nne yj it en o. s MiniCU&ci, r. i inicucci i 11' ! war a a o {' j ara a misano �RII COMMONWEALTH OF MASSACHUSETTS 1 Essex, ss August 14, 1979. jThen personally appeared the above-named Dorothy 0. Archambault, John J. Kennedy and Claire A. Kennedy and acknowledged the foregoing to be their free act and deed, before me ernan ern— roin, Notary Public j My Commission Expires March 5, 1982 Recorded Au .14 1979 at 3:38PM #8109 1 i �l 1� 1 Ii l 1 LAW OFIgCBS OF JAMES R.SENIOR )PARK PLACE XAST 348 PARK STREET,SUITE 207 NORTH READING,MASSACHUSETTS 01864 TELEPHONE:(978)6640050 Fax: (978)6649502 May 27,2003 File no./03-008 Building Inspector Town of North Andover 27 Charles Street North Andover,Massachusetts 01845 Dear Sir: Re: 1789 Great Pond)?d., North Andover ]flap 35, Parcel 40 1 have conducted an investigation of the title and zoning history regarding the above property. I have concluded that,although the property is currently located in an R-1 Zoning District,and is of inadequate size for a lot in that zone,it is "grandfathered"from the dimensional requirements currently effective in that zone for the following reasons. The lot was created by a plan entitled "Plan of Land Prepared for John&Claire Kennedy and Dorothy Arehambault North Andover,Mass. , endorsed by the North Andover Planning Board on August 10, 1979,and recorded with Essex North District Registry of Deeds on August 14, 1979,as Flan No. 8166, As of the date of the recording of the plan,the property was located in an R-2 Zoning District. In that District,the area requirement at that time was 43,560 square feet and the frontage requirement was 150 linear feet. 'These requirements were in effect until at least 1984 (See attached Zoning By- law printed in 1984.) At the time of the recording of the above referenced plan,the lot conformed to the then existing dimensional requirements. Up to the time of the recording of the above plan,land adjacent to the subject property was hold in common ownership with property located at 1785 Great Pond Road. However,the property at that time conformed to the dimensio-nal requirements. From August 14, 1979 to the present tune,the subject property was not held in common ownership with any adjacent property, (See attached ownership chart,) Based upon the above,it is ray opinion that the property at 1789 Great Fond Rd,,North Andover, Massachusetts(Assessor's Map 35,Parcel 40)is exempt from the current dimensional requirements of the R-1 District in which is it currently located,under the provisions of M.G.L. Ch. 40A §6, since it confonned at the time it was created and has not been held in common ownership with adjacent land since it ceased to conform to applicable requirements. V ry truly yours, S amen R. Senior s a • 1 THE ZONING BY LAW 3' TOWN OF NORTH ANDOVER, MASSACHUSETTS 1972 " Reprinted 1984 1 •'CK ' PLANNING BOARD } r. -13- S 10N 3 ' ZANINO DISTRICTS AND BOUNDARIES 3. Establisbuent of District$ The Town of North Andover is hereby, divided into zoning districts designated as follows: Residence I District (R-1) Residence 2 District (R-2) Residence 3 District (R-3) Residence 4 District (R-4) Residence 5 District (R-5) Business 1 District (B-1) Business 2 District (B-2) Business 3 District (B-3) Business 4 District (B-4) General Business District (G-B) Industrial 1 District (1-1) f Industrial 2 District (1-2) Industrial 3 District (1-3) Industrial 8 District (I-S) Flood Hazard District 3.2 Zoning Map The zoning districts established by this By-Law are bounded as shown on a map entitled "Zoning Map of the Town of North Andover , dated May 12, . 1972, as the same may be adoptedd by the Town, and as it may 'hereafter be amended. Said map ac- companies and Is hereby made a part of this By Law. ' Any land area not designated upon said map as being within another . zoning district shall be within' the "Residence-2 District" . The Flood plain District is defined as all areas so desig- nated on maps entitled "Flood Insurance Rate Maps" (FIRM) � and Flood ,Bqunda�ry and Floodway Maps" dated June 15, 1983 and as it 'may hereafter be amended,, on file with the Town Clerk, incorporated by reference herein. 3.3 District Boundaries Where uncertainty exists as to the boundaries of any of the aforesaid districts as .shown on the Zoning Map, the Building Inspector ,shall determine the location of such boundaries. In reaching any such determination, the Building Inspector may properly rely upon the accuracy of the land area descrip- tions appearing in the Zoning By-Law adopted by the Town in 1956, 'and as thereafter amended, insofar as any of them may �1 �.. .. ..,.. �✓r yr r.��r 3,rrf^'6rrp t�'° r.,.�� ...f..: .. .._,,..,. _._. _. ,,:. .,.. er"rnW reran{ a* n cam �.o jo, y�ro eta � rt SI tq P 911 rh wrp m i �Ue M t4 P i 5� Q b a LA R. ! O .Gl 0 i► 'ri Q O O O W Q ' vt Ql b Y 4 ton O O twit d , w r O w 103 UA er N N O UNi b t?LA twit W �• G M O h • w � as r• � ! y N� tv `G Cr :n N�! r J.A b 4i W W O O O d N M W MV tQ D8 .0! Jh �.. LLA w wia uNi uNi Ln c N t,Lj y os a C5 ° A O O O vi °� } y ea w W w LA o o °a o y as >✓ NN W d Ln tl 0 W H 7. W G O 4 O to In O � � w ul tit 4 00 N:S M G twn ® W d O p A M o W w p, a. W O p N H 01 ' t M b O OA O N O -� Q O r 4 q N'.1 g, N >w O w to N C 0 Q O o U b U.) CIL d (Iq bd d C bn, h J cr �. '16 ul qo S � Q OWO OWO ONO N p 00 �+ 00 a 4 b W O C�i1 O N s Uq cD O`O OQ cc 00 W 00 } 1 W w rn cc w ` c rn 00 IN, w "„ L,,,,, F-w „ I I I I InnAwniravn r nA Irv, v(o4 loo w.) t', U&Ue LAW OFFICE Ot" MARK B, TODNSOIN OCT 2 0 200 12 Chwnut Street Andnvcr,Mansashusctts 018103706 `z NORTH f\ , pLAWNCi (978)475-4499 r�lu<+psa: (978)475-6703 rallic ula KATHRYN M, MORIN MIRK U. JOIRMW (MAN 1,10 1.!ANWCRISFAI.DI MMAIP P. Lpt)M-N!;II!N (MA,MIA MICIII;0.' C. JONIKAS )AMKfi IIONI'ANTI (MA) KATlII.hRN 11, HARDER MAUK A. MPRO I 1 (MAIL) KARYN p, P.IIRAMJIAN )011N (i• I.AMti IMA) DAWN M. WALKER 111tANn1 U.L. HURD October 20,2004 Via Farsimiir1978-688.9542 vin n'(51 c/11 AS H911 Town of Norili Andover,Planning BOOM Atlu: Mary It 27 Glories St"ect North Andover,MA 01845 ltc; Richard Arnone,Jr.I Cyreat Pond Road,North Andover,MA Mpxs,5ou,Mali 35, Parcel Number 40 t+lc�rh 1,'19 ��inn�� 9lE. riccill l'c it ,lli 't n I)t Ar Planning i3oard Mo bcrs: As rrgttostcd.this letter will confirm that the app ennt has requested and Llsst;lucd to a continuance of the Bodrd's!.gearing on the Above-referenced matter to the Board's meeting scheduled for 7;00 P.M.on November 16,2004,in the North Andover 1),P.W.buildillg. The applicant filrAtor assents to tho Boards taking of final action on this ;Ippliention by the and of the following;husino.s day. Very truly yours, LAW OFFICE,01 MARK B,JOHNS. Donald F.Doretts in c�: liich:lra Ar•nollc,Jr. North Andover Town Clerk a NN o b � 0 o a 1 wm- roro� .0