Re: Substantial Completion- Volpe Athletic Center Expansion
Merrimack College
315 Turnpike Street
North Andover, MA
Dear Chairman and Board Members,
VHB has reviewed the site/civil engineering components of the Merrimack College—Volpe Athletic Center
Expansion project site designed by VHB,as documented in the"Volpe Athletic Center Expansion"approved
Plans issued August 5,2011 and revised through January 16,2013,and the Cullen Avenue revisions dated
April 16,2013 reviewed with the Planning Board as an administrative change.
The work included in these documents was found,to the Engineer's best knowledge, information and
belief,to be substantially complete in conformance with the project documents. This finding was based on
VHB's familiarity with the above-noted drawings, periodic site visits during construction, review of shop
drawings,visual inspection of the project site on August 9,2013 and review of the final As-Built Plan of
Land prepared by VHB,dated October 30, 2011
Minor modifications to the approved drawings include:
1) Addition of a new flared end section at the backside of the Volpe Center per request of the
Conservation Commission
2) Addition of a wooden egress landing on the south side of the building.
3) Revised location of proposed transformer between Cullen Avenue and Deegan East per NSTAR
Coordination,
4) Revised location of proposed dumpster enclosure at rear of building.
Please contact me should you have any questions with the information provided.
Sincerely,
Christopher M. Lovett, P.E.
Senior Project Manager
1011 kVta410 We(-A,1100("Afice Box 9151
WaIrilomt, h lolw, icllus lt.i 02471-96
6-17.924.1770 m FAX 617.924,Z286
Transportation
Land Development
Environmental °
S e r v i c e s
e imagination I innovatton energy Creating results for our clients and benefits for our communities
August 10,2012 e Hang-e-n Hang—e— Brustlin, Inc.
Town of North Andover Building Department
Attn:Mr.Gerald Brown
1600 Osgood St.
North Andover,MA 01845
Re: Volpe Athletic Center Expansion @ Merrimack College—315 Turnpike Street
Site/Civil Design Affidavit
Dear Mr.Brown,
In accordance with 780 CMR,the Massachusetts State Building Code 8th Edition,I,Christopher M.
Lovett,MA PE Registration#40726,being a registered PE hereby certify that I have prepared or
directly supervised the preparation of all civil site plans and relative computations and specifications
for the above named project and that,to the best of my knowledge,such plans,computations,
specifications meet the applicable provisions of the Massachusetts State Building Code.
Very truly yours,
VA E HANGEN BRUSTLIN,Inc
tstopher M. vet, E,LEED AP S
Senior Project ge 3 ��tt Of sX'S��'J ?
,�� CN�ilSTO,nF�fR hS. Y°�A
WET t
Fdo 40724
�QiS(1?'ii'il5:t in
101 Walnut Street,P.O.Box 9151
Watertown,Massachusetts 02471-9151
617.924.1770 m FAX 617.924.2286
email:info @vhb.com
www.vhb.com