Loading...
HomeMy WebLinkAboutConsultant Review - 315 TURNPIKE STREET 1/30/2014 Transportation Land Development Environmental o Imago nation Innovation energy Creating resul1,;for our cheats and fwnefits for our comm€antic January 30,2014 Mr.John Simons,Chairman North Andover Planning Board 1600 Osgood Street North Andover, MA 01845 Re: Substantial Completion- Volpe Athletic Center Expansion Merrimack College 315 Turnpike Street North Andover, MA Dear Chairman and Board Members, VHB has reviewed the site/civil engineering components of the Merrimack College—Volpe Athletic Center Expansion project site designed by VHB,as documented in the"Volpe Athletic Center Expansion"approved Plans issued August 5,2011 and revised through January 16,2013,and the Cullen Avenue revisions dated April 16,2013 reviewed with the Planning Board as an administrative change. The work included in these documents was found,to the Engineer's best knowledge, information and belief,to be substantially complete in conformance with the project documents. This finding was based on VHB's familiarity with the above-noted drawings, periodic site visits during construction, review of shop drawings,visual inspection of the project site on August 9,2013 and review of the final As-Built Plan of Land prepared by VHB,dated October 30, 2011 Minor modifications to the approved drawings include: 1) Addition of a new flared end section at the backside of the Volpe Center per request of the Conservation Commission 2) Addition of a wooden egress landing on the south side of the building. 3) Revised location of proposed transformer between Cullen Avenue and Deegan East per NSTAR Coordination, 4) Revised location of proposed dumpster enclosure at rear of building. Please contact me should you have any questions with the information provided. Sincerely, Christopher M. Lovett, P.E. Senior Project Manager 1011 kVta410 We(-A,1100("Afice Box 9151 WaIrilomt, h lolw, icllus lt.i 02471-96 6-17.924.1770 m FAX 617.924,Z286 Transportation Land Development Environmental ° S e r v i c e s e imagination I innovatton energy Creating results for our clients and benefits for our communities August 10,2012 e Hang-e-n Hang—e— Brustlin, Inc. Town of North Andover Building Department Attn:Mr.Gerald Brown 1600 Osgood St. North Andover,MA 01845 Re: Volpe Athletic Center Expansion @ Merrimack College—315 Turnpike Street Site/Civil Design Affidavit Dear Mr.Brown, In accordance with 780 CMR,the Massachusetts State Building Code 8th Edition,I,Christopher M. Lovett,MA PE Registration#40726,being a registered PE hereby certify that I have prepared or directly supervised the preparation of all civil site plans and relative computations and specifications for the above named project and that,to the best of my knowledge,such plans,computations, specifications meet the applicable provisions of the Massachusetts State Building Code. Very truly yours, VA E HANGEN BRUSTLIN,Inc tstopher M. vet, E,LEED AP S Senior Project ge 3 ��tt Of sX'S��'J ? ,�� CN�ilSTO,nF�fR hS. Y°�A WET t Fdo 40724 �QiS(1?'ii'il5:t in 101 Walnut Street,P.O.Box 9151 Watertown,Massachusetts 02471-9151 617.924.1770 m FAX 617.924.2286 email:info @vhb.com www.vhb.com