Loading...
HomeMy WebLinkAboutInsubstantial Change - 315 TURNPIKE STREET 2/7/2012 V%oRvF I 0� eoC LAH K. y1• 4( 201 J [I ri � I L�7 I 1 i es ADRATED pPp� R5 LIS PLANNING DEPARTMENT Community Development Division 1600 Osgood Street North Andover,Massachusetts, 01845 SITE PLAN REVIEW DECISION Date: February 7, 2012 Petition of: Merrimack College in partnership with Middlesex Islanders,LLC 315 Turnpike St. Forth Andover,MA 01845 Premises Affected: 315 Turnpike St.,North Andover MA,Assessor's Map 25,Parcel 67. On February 7, 2012, the Planning Board approved a Site Plan Approval Special Permit for Merrimack College for the expansion of the Volpe Athletic Center to include a second ice rink and expanded office and training space for the Athletic Department and the Sports Medicine Departments. There will be an expanded entrance on the west end of the building with a more prominent entrance, including a canopy over the entrance. The south fagade will retain the existing entrance and the plaza at that entrance will also be maintained. The new parking area will be built within the area of the existing tennis courts and there will also be new on-street parking along Cullen Avenue, for a total of 39 new spaces. Stormwater Management improvements include the creation of two rain gardens adjacent to the wetlands on the northern and eastern side of the building, as well as replacement of existing catch basins and a storm drain line that connects to the Football Field Detention Basin, all improvements to be made within the Residential—3 (R3)Zoning District. The project is located at 315 Turnpike Street, North Andover, Massachusetts, 01845, Assessors Map 25, Parcel 67. The parcel totals approximately 466,069 sq. ft. with frontage on Cullan Avenue,within the Merrimack College campus. On April 10, 2013, the College requested a change to the Site Plan in order to allow a more pedestrian-friendly streetscape along Cullen Avenue, more efficient vehicular travel, additional landscaping and reduced impervious surfaces. Revisions to the site Plan includes the following: 1. Changing vehicular travel along Cullen Avenue to previous two-way travel to one- way travel into campus. 2. Reducing the Cullen Avenue roadway width from 24 feet to 18 feet. 3. Reconfiguring parking areas and bus drop areas along Cullen Avenue. 4. Expanding Schelzi Plaza along Cullen Avenue with a gentle"bump-out". 1 Merrimack College,315 Turnpike St. Map 25,Parcel 67 Site Plan Special Permit—Athletic Center Expansion Insubstantial Change 5. Reducing the sidewalk width along the fagade of the expansion project from 8 feet to 6 feet. These revisions have been reviewed by the town's stormwater consultant, Lisa Eggleston, who has determined that the revisions will not alter the flow of stormwater on the site. COI®DITIONS The applicant will reflect all revisions to the original plan in the final as-built: Based on the above information, these changes are deemed to be insubstantial and do not require review by the Planning Board. m mo o. On behalf of the North Andover Planning Board Judith Tymon 2