Loading...
HomeMy WebLinkAboutAs-Built Plan / Installation Certificate Form - 296 RALEIGH TAVERN LANE 6/22/2015 SUMMARY OF INVERTS BUILDING TIES SEWER @ FDTN. 153.29 BLDG. CORNER A 1 8 1 C D AOL THIS PLAN & CERTIFICATION IS NOT SEPTIC TANK IN 152.94 SEPTIC TANK OUT 33.5 14.5 A WARRANTY OF THE SUBSURFACE DISPOSAL SEPTIC TANK OUT 152.71 PUMP TANK OUT 24.1 17.0 SYSTEM. IT IS A RECORD OF THE LOCATION PUMP TANK IN 152.68 DIST. BOX AND ELEVATION OF THE EXISTING SYSTEM DIST. BOX IN 154.53 COMPONENTS. DIST. BOX OUT 154.36 INV. IN I HEREBY CERTIFY THE LOCATIONS, ELEVATIONS, TIES, COVER MATERIAL; BOTT. CHAMBER 154.02 EXPOSED COMPONENT COVERS ETC., SHOWN ON THIS AS—BUILT SUBSTANTIALLY AGREE WITH THE APPROVED PLAN AND HAVE DETERMINED THAT THE BREAK OUT ELEVATIONS, IF APPLICABLE, HAVE BEEN MET." APPROVED DESIGNS PLANS. 07rl SIGNATURE OF DESIGNER DATE (44,080 S.F.) 1500 GAL SEPTIC TANK 1000 GAL 0-MEMBRANE PUMP TANK Ndj CLEANOUT INSPECTION PORT NT zo, 00 D-BOX LEACH FIELD W/96 INFILTRATOR CHAMBERS 150.00'/ RAMIGH TA VEJ W L"E o VLADIhVR L N> acHENoK T 'AL A AS BUILT PLAN OF SUBSURFACE DISPOSAL SYSTEM LOCATED IN NORTH ANDOVER, MASS./296 RALEIGH TAVERN LANE AS PREPARE FOR RECEIVE[") E DAN MCQUAIDE TM: 1060 DATE: 6-22-15 TL: 112 SCALE: 1"=40' 0 20 40 80 MERRIMACK ENGINEERING SERVICES 66 PARK STREET ANDOVER, MASSACHUSETTS 01810 J