HomeMy WebLinkAboutInspection - 1907 SALEM STREET 12/9/2010 F �iOR7N
-
W ED
SACM5 r
!7i`I� I �3L�1�
PUBLIC HEALTH DEPARTMENT
Community Development Division TOWN OF NORTH ANDOVER
HEALTH DEPARTMENT
TOWN OF NORTH ANDOVER
SEPTIC DISPOSAL SYSTEM—INSTALLATION CERTIFICATION
The undersigned hereby certify that the Sewage Disposal System(v�Constructed;O repaired;
By:_ Te7 X717 bAT E/710
(Print Name)
Located at D-7 !j7 LI%1—I LEES
(Installation Address)
Was installed in conformance with the North Andover Board ofIIealth approved plan,originally dated
O ` �J - Cam—and last revised on j d-Z fi- 1,0 ,with a design flow of
0 gallons per day. The materials used were in conformance with those specified on the
approved plan;the system was installed in accordance with the provisions of 310.CMR 15.000,Title 5 and local
regulations,and the final grading agrees substantially with the approved plan.All work is accurately represented on
the As-built which has been submitted to the Board of Health.
Bottom of Bed Inspection Date: `®
Engineer Representative(Signature)
And-Print Name Yom`
Final Construction Inspection Date:
Engineer Representative(Signature)
And-Print Name
Installer• (Signature) Date: C 77- f
0 EA
And-Print Name
Enginer: V;�j/Rd<� /�r� �(Signature) Date: j Z� _(� O
VLA b► i
And-Print Name
1600 Osgood Street, North Andover, Massachusetts 01845
Phone 978.688.9540 Fax 978.688.8476 Web http://www.townofnorthandover.com
•
•
North Andover Health Department
Community Development Division
QNSITE WASTEWATER SYSTEM T U I NOTES
LOCATION INFORMATION
ADDRESS: 1907 Salem Street MAP: 106B LOT: 12
INSTALLER: Todd Bateson
DESIGNER: Vladimir Nemchenok
PLAN DATE: 10/5/10
BOH APPROVAL DATE ON PLAN: 11/8/10
TANPKEIINSPECTION: � �
DATE OF BED BOTTOM INSPECTION:p )
DATE OF FINAL CONSTRUCTION INSPECTION: 11/24/10
DATE OF FINAL GRADE INSPECTION:
SITE CONDITIONS
NA Contractor reports any changes to design plan
® Existing septic tank properly abandoned
® Internal plumbing all to one building sewer
® Topography not appreciably altered
Comments:
SEPTIC TANK
® Building sewer in continuous grade, on
compacted firm base
NA Cleanouts per plan
Bottom of tank hole has 6" stone base
Weep hole plugged
® 1500 gallon tank has been installed
H-10 loading
® Monolithic tank construction
® Water tightness of tank has been achieved by
Visual testing
® Inlet tee installed, centered under access port
F7 Outlet tee installed, centered under access port
(effluent filter)
® 24" inch cover to within 6" of final grade
installed over inlet and 24" cover to grade over
outlet access port
® Hydraulic cement around inlet & outlet
Comments:
DISTRIBUTION-BOX
® Installed on stable stone base
® H-20 D-Box
NA Inlet tee (if pumped or >0.08'/foot)
® Hydraulic cement around inlet & outlets
® Observed even distribution
® Speed levelers provided (not required)
Comments:
SOIL ABSORPTIONi SYSTEM (General)
Bottom of SAS excavated down to C soil layer,
as provided on plan
® Size of SAS excavated as per plan
® Title 5 sand installed, if specified on plan
NA 40 Mil HDPE barrier installed
® Laterals installed and ends connected to
header (and vented if impervious material
above)
® Elevations of laterals and chambers installed as on
approved plan
NA Retaining wall (boulder/concrete /timber/ block)
❑ Final cover as per plan
Comments: � Y ►'l� b S
SOIL ABSORPTION SYSTEM (Gravel-less Chambers)
® Brand and Model of Chamber: Low-Profile
Standard Quick 4 Infiltrator Chambers
® Number of chambers per row: 11
® Number of rows (trenches): 5
Comments: Total Chambers = 55
BM = 100.00
HR = 4.04
HI = 104.04
SYSTEM ELEVATIONS
ROD AS-BLT INVERT DESIGN INVERT
ELEVATION ELEV ELEV
Benchmark 4.04 100.00 100.00
Building Sewer OUT 6.29 97.40 97.4
Septic Tank IN 6.66 97.03 97.04
Septic Tank OUT 6.83 96.86 96.79
Distribution Box IN 6.95 96.74 96.72
Distribution Box OUT 7.12 96.57 96.55
Lateral 1 TOP 7.20
Lateral 1 INVERT 96.49 96.50
Lateral 2 TOP 7.19
Lateral 2 INVERT 96.50 96.50
Lateral 3 TOP 7.18
Lateral 3 INVERT 96.51 96.50
Lateral 4 TOP 7.18
Lateral 4 INVERT 96.51 96.50
Lateral 5 TOP 7.18
Lateral 5 INVERT 96.51 96.50
Top of Chamber 7.18 95.86 96.89
Bottom of Bed/Chamber
CRITICAL SETBACK DISTANCES
Mark those distances checked in the field against the design plan and regulatory
setback
Tank SAS Sewer
® Property line 10 10 --
® Cellar wall 10 20 --
® Inground pool 10 20 --
® Slab foundation 10 10 --
® Deck, on footings, etc 5 10 --
® Waterline 10 10 101
® Private drinking well 75 1002 50
® Irrigation well 75 100
® Surface Water 25 50
® Bordering Vegetated Wetland ,
Salt Marsh, Inland/Coastal Bank 75 100
® Wetlands bordering surface
water supply or trib. (in Watershed) 150 150
® Trib.to surface water supply 325 325
® Public well 400 400
® Interim Wellhead Prot. Area
® Reservoirs 400 400
® Drains (wat. supply/trib.) 50 100
® Drains (intercept g.w.) 25 50
® Drains (Other)Foundation 10(5) 20(10)
® Drywells 20 25
' Suction line 222(2)
2 100 feet is a minimum acceptable distance and no variance is allowed for a lesser distance(NA 5.02).
3 As defined in 310 CMR 10.55, 10.32, 10.54,and 10.30,respectively,pursuant to 15.211(3),also by NA
wetland bylaws
FINAL GRADE INS ,Elf,TION
Date:
F
Address:
LOAMED?
SEEDED?
COVER P LA" ?
Other:
DelleChiaie, Pamela
From: DelleChiaie, Pamela
Seat: Wednesday, April 13, 2011 10:54 AM
To: 'jon @faith-andover.org'
Cc: Sawyer, Susan; Grant, Michele
Subject: Septic System - 1907 Salem Street- Request for COC
Importance: High
Follow Up Flag: Fallow up
Flag Status: Flagged
Hello Jon,
I think that from the beginning of the septic system process for your property at 1907 Salem Street,our department has
kept you in the loop via email,and letting you know when applications came in,etc. All involved worked as quickly as
possible in order to complete your septic system work,
Our office did not receive the Installation Certification or the Septic As-Built from the engineer prior to this week. As
you know,at your request,I had notified you via email as the process went along,so if I had received all of the required
paperwork,I would have of course notified you at that time.
As the septic season was closed for the season right after your project was done,and we had such a long winter with
heavy snow,it is generally assumed that septic systems worked on at the end of the septic season would wrap up their
paperwork and finish the Final Grade in the spring,so therefore,there was no red flag for us. Also,a final grade where
the loaming and seeding is done cannot be done in the winter,and is commonly ompleted in the spring for homeowners
who complete their systems at the end of the year.
As you came to the office on Monday of this week requesting a Certificate of Compliance,I followed up with your
engineer,Bill Dufresne,to let him know we were missing the final paperwork. We were also never notified that the
system was ready for a Final Grade inspection, It is the responsibility of the engineer to be sure that all the proper
paperwork is submitted to the Health Department,and we cannot move forward until this is received. If there was a
reason to rush this through,it most likely would have been hand-delivered to us,of which I have no record. We also did
not receive any follow-up calls or requests in the month of December for a Final Grade Inspection or that the homeowner
was urgently waiting for a COC.
On your behalf,I requested that Bill scan the Installation Certification and Septic As Built to me,which he did,and it is
now being reviewed by Susan Sawyer. I also received the original in the mail today. In addition,Michele Grant adjusted
her schedule to be sure that the Final Grade inspection was completed for you on Monday,April 11th.
I feel that the Health Department acted in due dilligence to complete all of the work necessary to facilitate the repair of
your septic system. As we now have the final paperwork from the engineer,we now have the tools to review the
information,and issue a Certificate of Compliance for you. I will notify you as soon as it is complete.
Best Regards,
Pamela DelleChiaie
Departmental Assistant I Community Development I Health Department Town of North Andover 1600 Osgood Street
Bldg 20 1 Suite 2-36 North Andover,MA 01845 N Office-978-688-9540
9 Fax-978-688-8476
9 Email-pdi Jlc.�hi,,tip(4)townofnortliandover.coil1
Website 1 ttl,/fwww,to\\,iia fnortlwla�ndo\/cr, oLtIL3ges/index
"We can never see the path of our life if we are too busy focusing on the pebbles under our feet."--Anonymous
-----Original Message-----
From:1� ttCfazf riatl7 dzr�cl4 va x der �7 u[tc� P(,x9 aide <a ci a�rw _o g,
Sent:Wednesday,April 13,20119:26 AM
To: DelleChiaie,Pamela
Subject: Can I help
Hi Pam:
I do not like being a pest,but from my perspective-I should have received this certificate of compliance soon after the
work was completed on this septic system-last December. So...The ball was dropped somewhere. I want to make sure
this does not happen again.
So.... How is the progress and is there anything I can do to assist?
My understanding is that the engineer sent you via email what is needed.
Sorry to bother you.
Jon Heydenreich
Sent via B1ackBerry by AT&T
Please note the Massachusetts Secretary of State's office has determined that most emails to and from municipal offices
and officials are public records. For more information please refer to: JIttI-,)://www,sec,stat c.raaa.cas/ 7 e/prc icl .htn .
Please consider the environment before printing this email.
z
DelleChiaie, Pamela
From: DelleChiaie, Pamela
Sent: Monday, April 11, 2011 12:14 PM
To: 'Bill Dufresne (brdufresne @comcast.net)'
Cc: 'jon @faith-andover.org; 'marshy @faith-andover.org'; Grant, Michele; Sawyer, Susan
Subject: FW: Septic- 1907 Salem Street- ready for Final Construction Inspection
Hello Bill,
The homeowner,Jon Heydenreich,came to the office to request a Certificate of Compliance on his septic
system for 1907 Salem Street. The permit was applied for in November at the end of the septic season,and
Todd Bateson did the work at the end of November.
We have not yet received the installation certification form that you and the installer need to sign off on with
the applicable dates and signatures. Michele will conduct a Final Grade inspection today. Please advise as to
when we can expect to receive that paperwork. Thank you.
a,
Pamela DelleCliiaie
Departmental Assistant I Community Development I Health Department
']'own of North Andover
1600 Osgood Street I Bldg 20 1 Suite 2-36
North Andover,MA 01845
Office-978-688-9540
C9 Fax-978-688-8476
�-1
Email-pii€>ll<cI] aie( t4:rwrofnorth�ancicrver.cc7tn
Website li tp;ILwiA,,A towrlotnorthtundoN r.coii1L1'_4ge5/rrae}cx
"We can rrevei° see thefrratlr o owa fje��1'we mw toms bus:Yfoc°rr��ing aura the peb lee un(ler•our�i?ef.��„�-Allonpn us
From: DelleChiaie, Pamela
Sent: Wednesday, November 24, 2010 11:08 AM
To: 'Daniel Ottenheimer'; 'Isaac Rowe'; Peters, Marianne; 'Randy Burley'
Subject: Septic - 1907 Salem Street- ready for Final Construction Inspection
Hello,
Bill Dufresne called and spoke with Susan and stated that 1907 Salem Street is ready for a Final Construction
Inspection. Please call Todd Bateson at: 978.815.2703. Thank you.--
96e Refa44,
Pamela DelleChiaie
Departmental Assistant I Community Development I Health Department
'town of North Andover
1600 Osgood Street I Bldg 20 1 Suite 2-36
North Andover,MA 01845
Office-978-688-9540
( Fax-978-688-8476
i Email-pctllc t l�rack.(z,ta>waza;>,F,zaar t,17 arrclovc r c t7_r1
1 Website http.:./fwwwq.0 rrrrj]'gfc5:ssrtc_]txx
llff'e can never see tlrepalth of out,Iffy"Cf we// v too lXadsy.d(}'d.'Cdv'ing on
1