Loading...
HomeMy WebLinkAboutSoil Testing Results - 100 RALEIGH TAVERN LANE 7/14/2004 BOARD OF LIEAL,Th NORTH Al®DOVER9 MASS. 01845 978-688-9540 APPLICATION FOR S®IL, TESTS DATE: MAP&PARCEL: C,w, "' 4 LOCATION OF SOIL TESTS: OWNER: TEL.NO. ADDRESS: I .-C,,; '" .,: t ( h: C,..l ✓ tr k.., f.._:.+ (._x�"a s...r :�.. (,.� 8 G�d.��; t�. �> ENGINEER: TEL.NO.: CERTIFIED SOIL EVALUATOR: Intended use of land: Residential Subdivision l Single Family Horne Commercial Is This: Repair testing _ Undeveloped lot testing Upgrade for addition In the Lake Cochichewick Watershed? Yes Nod — THE FOLLOWING MUST BE INCLUDED WITH THIS FORM: 1 . Proof of land ownership(Tax bill,deed,or letter from owner permitting tests) 2. Plot plan 3. Fee of S425.0 0 per lot for new construction. This covers the minimum two deep holes and two percolation tests required for each disposal area. Fee of$360.0 0 per lot for repairs or upgrades. GENERAL INFORMATION 1. Only Certified Soil Evaluators may perform deep hole inspections. 2. Only Mass.Registered Sanitarians and Professional Engineers can design septic plans. 3. At least two deep holes and two percolation tests are required for each septic system disposal area. 4. Repairs require at least two deep holes and at least one percolation test,at the discretion of the BOH representative. 5. Full payment will be required for all additional tests within two weeks of testing. 6. Within 45 days of testing,a scaled plan(no smaller than 1"-100')shall be submitted to the Board of Health showing the location of all tests(including aborted tests). 7. Within 60 days of testing soil evaluation forms shall be submitted. Please Do Not Write B w This Line N.A.Conservation Commission A royal: � pP 1141� Date Received: Check Amount: 5Check Date: JUL RECEIVED ?004 TOWN ,.,�,t ri Nq:OVE BH8491 E. Donald McKenzie, Jr. and Nancy McKenzie 1 of North Andover, Essex County,Massachusetts r 4: in consideration of Two IIundred Seventy Thousand One IIundred and no/100 �r ($270,100.00) Dollars y is grant to Brian G. Arsnow and Lucy Leake Arsnow j` a husband and wife as Tenants by the Entirety of 100 Raleigh Tavern Lane with quitclaim cobettants wwskdAfs North Andover, MA The land, with the. buildings thereon, " in North Andover, Essex I: County, Massachusetts, being shown as Lot 15 on a plan of land entitled "Definitive Plan, 'Raleigh Tavern Estates', North Andover, Massachusetts, Owner, Old North Andover Realty Trust, ' Engineer, Hayes Engineering, Inc„ dated May 15, 1968", and v recorded in the Essex North District Registry of Deeds as Plan" o No. 5913, said lot .being more particularly bounded and described as follows: r `r C SOUTHERLY and SOUTHWESTERLY: by Raleigh Tavern Lane (North) as appears on o said plan in two courses, 165.46 and 173.19 Z feet; NORTHWESTERLY: by Lot #14 as appears on said plan, 214.09 1 feet; a a t NORTHEASTERLY: by Lot #1.6 (remaining land) as shown on said plan, 100.67 feet; .and roc. r. EASTERLY: by Lot #16, as appears -on 'said plan, 235.00 feet. - F Containing 44,824 square feet of. land, more or less. V � ' b,° Being the same premises conveyed to us by deed of Walter R. McDonough and Madeleine D. McDonough dated October 30, 1981 and a recorded with said Deeds in Hook 1543, Page 3. 0 Executed as a sealed instrument this e2`f� day of Ju a 1992 E. Dondid enzie, r. r;rt ' 01 cn x o ff Nancy cKenzie t w to f-" ri 3' (L�he Gntmanfnealth of passac4usetts a Essex, u. June l 19 92 Then personally appeared the above nsmed. E. Donald McKenzie, Jr. and Nancy McKenzie t: and acknowledged the foregoing instrument to be thei free an d (� f Brjoreme, n rew a r. y, No,ary Public ux,>Exatw>r�� My commission expirce June'12, 1998 t 0� Iti0 DO 4SN O H n + • r ; �.h N 0 T o l' h ° �� a 9 �s2 Eo o � J h Q -Zo \ N H a Cl q fr 92 0 PA Z•2s2 �sZ-6o-ZF Z" ` � � y � � � � R * n Page 1 of 1 Dellechiaie, Pamela From: Dan Ottenheimer[info @millriverconsulting.com] Sent: Tuesday, August 17, 2004 1:69 PM To: Susan Sawyer; amcbrearty @millriverconsulting.cam; 'Pamela Dellechiaie' Subject: Raleigh Tavern soils Sue and Pam, Attached please find the soil and perk test results for 99 100 I igh Tavern Lane. Dan M III River co n s u I t iri Daniel Ottenheimer,President Mill River Consulting Septic System Management Services 2 Blackburn.Center Gloucester, MA 01930-2259 978-282-0014 or 1-800-377-3044 fax: 978-282-0012 www.mil.ii-iverconst lting.coni info(rnillriverconsulting.corn 8/30/2004 JmP rr a r rte �'qay 1I J Wq Jo k f J I9 A. , H �, 's fpaot. l t j' r r W(!, e,fll',,,, /04 w' u % SO4K n Tos A I d%1111 lip a r� y� �w l i i . >�, NVI pi% i/l�04 ri/raj�i r;; i i j f, h0 o' z �✓ r Y Y � i � mgr �, � � k im 1 � � I k�rr ill..gq i �y i j IT MI F PZZ - lz n r Z:51 I l Page I of I Dellechiaie, Pamela From: Andrew McBrearty [amcbrearty@millriverconsulting.com] Sent: Tuesday, November 09, 2004 10:56 AM To: pdellechiaie@townofnorthandover.com Subject: Re: 100 Raleigh Tavern Lane - Construction Status Scheduled for this afternoon (12:30). -andy Pamela DelleChiaie wrote: Fii guys, Ben called me as I was leaving at the end of the day yesterday.... This property is closing on Monday, Novernber 15th. John Soucy is waiting for the FAST system people, and needs you to check the pumps, etc.? Can you make sure this is all set and let us know so i can issue paperwork? Tx, P Pamela DelleChiaie, Health Dept Assistant Town of North Andover Community Development& Services 27 Charles Street North Andover, MA 01845 pdellecl7iaie@towt7ofnorthandovercom Tel. 978-688-9540 Fax 978-688-9542 11/9/2004