The applicant is requesting to amend the site plan special permit originally issued by the Planning Board
on May 14, 2001 for the construction of a 300,649 square foot high school building located within the
Residential-2 Zoning District.To date, the building and drainage structures are close to completion. The
amendment proposes changes to the northern and southern playfields.
Changes to the northern playfield involves the construction of a synthetic material and track field
complex in an area originally proposed for two soccer fields.Proposed is a permeable synthetic playing
field that will host field hockey and soccer,and on the outskirts a high jump area and three pole vault
areas are proposed. Also proposed is a storage building of approx.720 s.f.,bleachers for approx. 250
people, a scoreboard and a retaining wall.Fencing and walks have been reconfigured to address the
changes.
Proposed changes to the southern playing field include reconfiguration of the two originally proposed
soccer fields furthest to the west into one synthetic turf field to be utilized for football, soccer and
lacrosse. This field will be lighted and bleachers for approximately 1200 people, a press box,concession
stand,toilet and storage building are proposed to be constructed north of this playfield. Grading of the
two fields to the east have been revised to allow for potential future softball use.
In addition, the tennis courts are proposed to be repaved.
My review is as follows:
SITE PLAN REVIEW:
i. NORTH ARROW/LOCATION MAP: This has been provided.
ii. SURVEY OF LOT/PARCEL: This has been provided.
iii. NAME/DECRIPTION OF PROJECT: This has been provided.
iv. EASEMENTS/LEGAL CONDITIONS: Addressed under original filing.
V. TOPOGRAPHY: This has been provided.
vi. ZONING INFORMATION: Zoning information has been provided.
vii. STORMWATER DRAINAGE: Please see attached review performed by the Town's
consulting engineer. The project was subject to extensive review by the Conservation
Commission's consultant Lisa Eggleston. At this time, VHB has conducted a preliminary
review of the revised drainage, which is more complex than the original drainage review.
The review to date has been limited to the set up of the hydrologic model. Overall VHB
agrees the existing conditions model appears to be a good representative of existing
conditions and is in agreement that the overall system is designed conservatively.
Specific changes are highlighted in the review letter. The project will result in an
increase in volume but peak rates of discharge from the site have been decreased. The
design does allow for the maximum infiltration possible given site condition.
viii. BUILDING LOCATION: Two buildings are proposed under the amendment. One is a
storage building of 720 s.f. and the other is a press box/concession/toilet/storage building
totaling 3,615 (total) s.f. Buildings must be constructed to meet all applicable building
and zoning regulations
ix. BUILDING ELEVATION: Both buildings are proposed to a height of 20 feet.
X. LOCATION OF PARKINGIWALKWAYS: Walkways have been revised to
accommodate the proposed changes. Ten parking spaces have been eliminated to
accommodate the new press box. DiNisco submitted a letter to Robert Nicetta dated
October 28, 2003 advising him of the space reduction. The applicants stated the proposed
1200 seat bleachers take the place of the informal seating on the hillside of the original
plan and do not increase the total parking load on the site. The gym remains the
maximum "public use" parking load and events will not be scheduled concurrently with
the outdoor field use. The amendment will allow for the construction of a total of 645
spaces for the facility use. I have spoken with the Building Inspector who stated that
DiNisco may provide for an additional ten spaces up along the edge of the northfield.
This should be discussed. The Planning Board may wish to consider conditioning the
gym events and outdoor events not be scheduled on the same evening so as to prevent a
possible parking shortage.
A. LOCATION OF WETLANDS/NOTICE OF INTENT: The applicants have filed a
modification request with the Conservation Commission. The applicants were requested
to submit a wildlife habitat analysis to document if the proposed lighting would impact
the wetland resource areas.
xii. LOCATION OF WALLS/SIGNS: The amendment proposes a new versa-lok retaining
wall in the northern playfield. The wall is approximately 120 feet in length and is located
5' off the property line. Wall ranges 4 to 5 feet in height.
xiii. SIGNAGE: Two score boards, one in the northfield and one in the southfield are
proposed in addition to a wall sign for the new press box. I am not aware on any
restrictions associated with size and height of the scoreboards. The sign
specifications/drawings/details for the concession stand should be submitted for review.
A condition should be placed stating the sign must conform to Section 6 of the Zoning
regulations and must be approved by the Building Department.
xiv. LOCATION OF ROADWAYS/DRIVES: The layout of the emergency access drive at
the northern playfields (including Prescott curb cut) has been revised to accommodate the
changes to the northern playfields. The curb cut has been relocated approx. 20 feet to the
west of the previous location. The site drive at the parking lot south of the new school has
been revised to accommodate the proposed press box.
xv. OUTDOOR STORAGE/DISPLAY AREAS: There is no outdoor storage being
proposed under this amendment.
xvi. LANDSCAPING PLAN: The landscaping plan has been revised to accommodate the
proposed changes. Specific changes are not clear and details on the landscaping changes
should be submitted or displayed more clearly.
xvii. REFUSE AREAS: If additional refuse areas are required from the concession stand
they should be displayed on the plans. It does not appear any new areas (dumpsters) are
proposed or displayed on the plans.
xviii. LIGHTING FACILITIES: Field lighting will be provided for the new multipurpose
field at the southern playfields. Lighting on six poles is proposed. Locations, details and
level plans are shown on the submitted plans SKZ 1.5, SKZ- 1.20 and ZKA-1.20A. Four
poles are located in the vicinity of the press box and bleachers and 2 are located on the
outskirts of the football field. Poles range in height from 76' to 80' feet. Conditions
should be placed stating lighting can not shine into the McDonald's facility, traffic within
Route 125 or surrounding residential properties. A nighttime inspection by the Town
Planner should be conditioned prior to sign-offs.
xix. DRAINAGE SYSTEM: See above comments under Stormwater Management.
xx. TRAFFIC IMPACT STUDY: No additional traffic impact studies were conducted for
the amendment. The applicants state the proposed facilities will not increase the traffic
impacts from the original proposal. The approved gym holds a seating capacity of 3,200
people. This compares to the 250 people seating capacity in the northfield and the 1200
seating capacity in the southfield. The Board may want to restrict use of the gym and
playfields simultaneously to reduce traffic and parking impacts.
xxi. EROSION CONTROLS: All erosion controls should be replaced in the newly proposed
work areas.
xxii. COMMONWEALTH REVIEW: N/A
xxiii. UTILITIES: Revised utility locations have been shown on the plans.
xxiv. FISCAL IMPACT: Proposed amendments do not appear to generate additional fiscal
impact.
xxv. COMMUNITY IMPACT: Proposed amendments do not appear to generate any further
community impact.
ADDITIONAL ISSUES
VHB review is not complete and I anticipate additional comments to be submitted.
11/18/2003 16:56 FAX [�001/001
11/18/03 3:48:00 P14
Printed By: Jon Oxman tul
Subject: NAHs Athletic Complex - 11/25/03 Planning Board Meeting
Date: Tuesday, November 18, 2003 3:44:41 PM
sender: Jon Oxman <j.oxman @dinisco.com>
From: Jon Oxman <j.cxman @dinisco.col
To: Heidi Griffin <hgriffin @townofnorthandover.com>, dwilson @townofnorthandover.com, Rick Rice <
r.rice @dinisco.coi
NAHS Athletic Complex - 11/25/03 Planning Board Meeting
Dear Heidi,
This email is to confirm my conversation today with Debbie Wilson of your office
regarding the postponement of the previously scheduled informal discussion of the
High School project.
As the Planning Board has asked us to postpone the previously scheduled informal
discussion of the High School project we request being put on the agenda for
discussion items at the extra Planning Board meeting that has been added on Tuesday
25 November 2003.
If we do need to make a formal submission to the Planning Board for the proposed
changes to the High School site plan, we need to make this submission by the 05
December 2003 deadline in order to not delay the anticipated construction schedule.
Waiting for this informal discussion later than the 25 November meeting would be
cutting it too close in order to make the submission.
Sincerely,
All
Son Oxman AIA
DiNisco Design Partnership
87 Summer Street
Boston, MA 02110
"xman—cRalskcZcom
617-426-2858
617-426-1457 (fax)
oo e a
�I a. rc h i t e c t s a n �� �= raanr �r� e r s
Limited
OBSERVATION REPORT NO. 123 9, 2004
Project: North Andover High School
Date: 10 August 2004
Location: Job Site
Present: North Andover School Department (NASD) Harry Harutunian (partial)
Greg Roberts
Paul Szymanski
John T: Callahan & Sons (JTC) Philip Briselli
Dave Anderson
Tim Callahan (partial)
Phil Ricci
Sagamore Plumbing & Heating John Herald (partial)
Electrical Contractor Ray Croteau
Municipal Building Consultants (MBC) Pat Saitta
Gale Associates Jim Boudreau (partial)
Schofield Brothers of New England (SBNE) Matt Smith
Clerk of Works (COW) Richard Warner
DiNisco Design Partnership (DDP) Richard Rice
Action Date
A. SITE SAFETY AND SECURITY
Simplex 07/27/04 A48.4.12 Security�System - Greg Roberts reported that.
Maiuri Simplex has returned to correct programming
issues, which are ongoing as the system is
operated (i.e. doors programmed to wrong
partitions). GR has created a list of devices that
are not functioning. The wiring problems must still
be corrected by Maiuri.
A52.
B. OWNER ISSUES
DDP 07/27/04 B47.1.3 Tech Ed Equipment- Greg Roberts questioned
3Si 07/29/04 whether all F&E (i.e. tables and chairs) have
been installed. DDP will review with 3Si.
(07/29/04) 3Si advised DDP that chairs and
"loose tables" were not provided with tech ed
equipment. DDP will order remaining furnishings.
Kenneth DiNisco Richard N. Rice Gary E.Ainslie Christopher Huston Donna DiNisco
8 7 S u m m e r S t r e e t B o s t o n M A 0 2 1 1 0 6 1 7 . 4 2 6 , 2 8 5 8 f a x 4 2 6 1 4 5 7
w w w . din i s c 0 c 0 m
OBSERVATION REPORT NO. 123 North Andover High School Page 2
DDP 07/27/04 B47.1.4 Tech Ed Equipment - JTC advised that they
Maiuri have instructed Maiuri not to begin electrical
connections to shop equipment until all F&E
equipment has been installed.
(07/29/04) Maiuri faxed a list of equipment
connection questions to DDP.
R&R 08/13/04 B49.2.2 Admin/Arts Windows (Postscript) - In a phone
conversation on 08/13/04, R&R advised DDP that
scissors arm operators will be adjusted so that
windows close at the small admin wing windows.
At the arts wing, A&A stated single arm operators
must be installed per sample. DDP agreed to this
approach.
DDP 03/30/04 B50. Gymnasium Switches - Greg Roberts requested that DDP
TE investigate substituting pushbutton switches for gym
lighting, curtain, and backboard counters. GR noted that the
key switches installed are all keyed differently and require a
good deal of time to operate individually. The pushbuttons
could be secured from unauthorized use by a surface
mounted locking cabinet. Also, GR requested that the gym
lighting only be operated by the center control point. DDP
and TE to review.
-- 08/10/04 B56. South Fields/Football Practice - Harry Harutunian (HH)
inquired whether the south fields will be ready for football
practice beginning 08/23/04. The field would be in use for
double sessions from 8:00 AM to 8:00 PM
Mondays-Saturdays. The first day of school is on 09/07/04.
NASD 08/10/04 B56.1 South Fields/Football Practice - JTC stated that
JTC- turf fields will be ready for use by 08/23/04.
However, JTC stated sitework will be ongoing
until the first of September, and the school
department and JTC would need to develop a
plan to get the students to and from the field
safely, while not disrrupting construction. It was
discussed that coaches could see that players
cross the site together. Of great concern are the
expected parents/spectators who could come at
any time; it was discussed that the south lot could
be closed to discourage spectators from
inadvertently entering the construction area.
NASD and JTC will further discuss logistics during
the next two weeks.
NASD 08/10/04 B56.2 South Field/Lighting - In response to NASD's
JTC question, JTC advised that the ballfield lighting
will be operational by 08/23/04. It was discussed
that the school department can control the lights
operation by limiting operating instructions to a
few key people.
OBSERVATION REPORT NO. 123 North Andover High School Page 3
-- 08/10/04 B57. Basketball Camp - HH advised that a basketball camp will
be operating in the gym over the next few days. It was
agreed that the south lot would be closed to all but
construction operations, and campers and staff would use
the north entry and lot. Moveable gates will close the south
parking lot off from the access road, and signs will direct
people to the north lot. NASD will advise the fire department
that the south lot will be closed off using the moveable
gates. Record item.
NASD 08/10/04 B58. Parking Spaces - NASD noted that the school would be
handing out spaces to students on 08/28/04-08/29/04, and
inquired as to the availability of the south lot beginning those
days. JTC advised that paving work will be underway right
up to the start of school. It was discussed that the school
should limit parking to the north lot (where staff are assigned
spaces) until the south lot is ready for use; the school will
make alternate plans for students who would ultimately park
in the south lot.
DDP 08/10/04 B58.1 Parking Space Numbering - It was discussed and
agreed that DDP will on a drawing number all
spaces (not including HP spaces). The
numbering will be done under a work order by
JTC.
B59.
C. PERMITS & INSPECTIONS
-- 03/26/02 CO3. DPW Permits
-- 07/01/03 C69.4.1 Wetland Markers - Paul Szymanski confirmed that
wetland markers had been installed, but have
apparently been removed.
JTC 06/01/04 C99.07.6 MEP Punchlists - JTC to provide DDP with
copies of the plumbing, HVAC and Electrical
(South Wing) punchlists with completed items
crossed off for verification by DDP's consultants.
JTC 07/20/04 C12.1.1 ABP Permit- Bob Nicetta stated that the electrical
contractor that comes on board to finish the
contract work must pull a permit. JTC will
coordinate.
-- 07/27/04 C122. Erosion Control - SBNE reported that maintenance work has
08/10/04 been performed in the last week, and no severe conditions
exist at this time. SBNE advised JTC of some CB
maintenance items, and noted that some erosion controls
need to be addressed at the southwest corner of the site at
Chickering Road. Record item.
JTC 08/10/04 C122.1 Erosion Control - SBNE reported that there is a
new gap in the silt fence that needs to be repaired
at the newly loamed area adjacent to Chickering
Road, and that hay bales must be extended at
another newly loamed area. Also, C131 is in
need of repair. SBNE has advised the JTC site
foreman of these issues.
OBSERVATION REPORT NO. 123 North Andover High School Page 4
JTC 07/27/04 C123. Auditorium Electrical Inspection - It was discussed that a final
inspection by the town inspector is needed. JTC will
schedule with the electrical inspector.
C124.
D. CONSTRUCTION SCHEDULE
DDP 08/10/04 D137.3 Punchlist Completion - JTC stated that the interior
JTC punchlist is sufficiently complete; to be reviewed
by DDP. It was agreed that DDP and JTC will
meet at 8:00 AM Thursday, 08/19/04, to review
punchlist status and identify any items of critical
importance not yet done.
-- 08/10/04 D142. Construction Progress - JTC gave an overview of
upcoming activities, as follows: Record item.
-- 08/10/04 D142.1 South Site - Parking area being readied for base
course paving scheduled for this week; bleachers
will be completed by 08/11/04. Turf field
completed except for a day or two for detail work.
Fencing ongoing. Record item.
-- 08/10/04 D142.2 North Fields - 'D' areas have been prepped for
paving and preparation is underway for track
paving scheduled for later in the week. Field will
be ready for turf installation 48 hours after D'
areas are paved. Record item.
D143.
E. SUBMITTAL SCHEDULE
E16.
F. SUBMITTALS
CTI 04/13/04 F85.3.3 Tile in Cooler/Freezers - CTI must confirm if cooler
freezers were installed using SP-100 or Spectra
Loc.
DDP 04/13/04 F85.3.4 Laticrete Recommendation- PM recommends that
06/28/04 :given the use and cleaning materials employed at
NAHS (which PM will confirm in a visit to the
kitchen), the Spectra•Locfloor grout should remain.
CTI offered an extended warrantee; DDP stated a
bond may be required if this is accepted. Laticrete
must put their recommendation in writing.
(06/28/04) DDP received letter dated 04/23/04
directly from Laticrete on 06/28/04. DDP will
consider recommendations.
JTC 03/30/04 F98.1 Concrete Reinforcing - Returned approved as
noted/resubmit items noted.
Musco 05/18/04 F100.1 Field Lights - Field lights returned "Approved as
noted/Resubmit items noted" (electrical control
panel components).
Musco 05/27/04 F100.1.1 Field Lights - Musco shall revise and re-submit for
record the structural calculations.
OBSERVATION REPORT NO. 123 North Andover High School Page 5
DDP 07/20/04 F100.1.2 Field Lights - Paul Szymanski reported that a
07/23/04 lighting submittal package had been forwarded to
the school department from Musco. PS will
forward a copy to DDP for processing (Received
by DDP 07/23/04).
F114.
G. COORDINATION DRAWINGS
G28.
H. PAYROLL REPORTS
H42.
I. REQUISITIONS
-- 08/10/04 142. Application for Payment#29 (Postscript) - JTC application
for Payment#29 reviewed following the 08/10/04 job
meeting, with revisions made by JTC and the final
requisition approved by the SBC on 08/12/04. Record item.
143.
J. CHANGE ORDERS
DDP 06/29/04 J26. PCO LOG - JTC distributed a PCO Log updated as of
JTC 06/29/04. DDP and JTC reviewed outstanding PCO's that
JTC would like to clear. DDP and JTC to review further.
DDP 07/20/04 J27. Electrical PCO's - DDP and JTC will meet to review
JTC electrical PCO's in preparation for a meeting with the
bonding companies.
J28.
K. WORK ORDERS
K15.
L. FIELD ORDERS
L18.
M. PROPOSAL REQUESTS
Capi`tal'; 08/05/03 M25.2.1 . PCO#075.=.DDP responded to Capital's letter
with regard to credit offered for VCT replaced by
terrazzo. Capital to revise credit per
specifications.
M36.
N REQUEST FOR INFORMATION
DDP 03/25/03 N45.1.2 Exterior Hose Bibs - Grasseschi's proposal to
protect exterior bibs submitted for DDP's review.
DDP 04/01/03 N50. RFI #267 - DDP will issue letter to NAPD and Building
Department advising them that sprinkler heads in elevator
shaftway and the elevator shunt trip will be deleted in
accordance with the code moratorium still in effect.
DDP 12/02/03 N89. Clothes Dryers - JTC noted no vents are shown on HVAC
F&T drawings for dryer in Study Skills#2050 and the kitchen.
DDP to review with F&T and advise.
OBSERVATION REPORT NO. 123 North Andover High School Page 6
N96.
O. DEMOLITION
005.
P. SITE WORK
JTC 09/30/03 P41. Art Plaza Pavement- DDP reviewed CRJA site visit report
of 09/26/03. JTC stated radius will be cut. The clerk
observed that the puddles noted disappeared in less than
an hour, and low spots are very shallow.
DDP 10/08/03 P41.1 Arts Plaza Pavement (Postscript) - CRJA
Clerk followed up, advising DDP that low spots would
be an icing concern, and requested that the
tolerances be checked per the paving spec (See
Spec 02500-3.01-19). DDP to advise clerk to
confirm.
JTC 03/16/04 P49. Catch Basins - SBNE noted that JTC has yet to install the
hoods on the catch basin structures as required.
NASD 04/20/04 P52. Commemorative Plantings - Paul Szymanski advised that
DDP the school will be planting some memorial trees, and is
looking into some way to incorporate future memorials in an
orderly, planned fashion. DDP and NASD will coordinate.
-- 04/27/04 P53. Athletic Fields - DDP, MBC, JTC, and Gale reviewed the
athletic field upgrade work, with the following noted.
DDP 04/27/04 P53.8 Scoreboards -JTC reiterated that their proposal
includes two scoreboards (one football, one track)
with conduits to a third "future" location (in
baseball field). DDP will confirm locations.
DDP 05/18/04 P53.8.1 Scoreboard - It was agreed that football
scoreboard will be relocated to the est end of the
football field, back-to-back with the "future"
baseball scoreboard. DDP will issue a field order
locating this scoreboard.
NASD: 07/20/04 P53.8.2 Track/Softball Scoreboard - It was discussed that
07/27/04 the track scoreboard could be fed from the
construction trailer service on Presscott, DDP will
consult with Thompson-Endineering to`provide
Paul Szymanski with the information needed to
obtain a permanent service from this location from
Mass Electric.
(07/27/04) Information forwarded to Paul
Szymanski by DDP on 07/26/04.
OBSERVATION REPORT NO. 123 North Andover High School Page 7
JTC 06/29/04 P56.3.3 Sand/Loam Mix Test- P&S will take samples of
07/20/04 stockpiled loam and will mix with samples of
08/10/04 Pitcherville Sand and will test for optimum
sand/loam/organic content.
(07/20/04) P&S test results forwarded to JTC.
JTC questioned apparent reversal in
recommended sand mix ratio. Follow up with P&S
needed to clarify.
(08/10/04) It was discussed whether the P&S
recommendation for organics and mixing
constitutes an extra to the contract. DDP agreed
that the "means and methods" are up to JTC,
noting the "final product" is what JTC is
responsible for. As for adding organics to the top
soil, DDP interprets this as a specified
requirement; JTC will review the specifications
language and respond.
-- 06/29/04 P56.3.4 Mixing Sand and Loam -JTC noted that Section
02900 specifies mixing sand and loam by
harrowing, and at this time this is JTC's intent.
Bob Pine stated that more satisfactory results will
be achieved far more easily by mixing with loader
buckets after the loam is screened. P&S will come
to the site to monitor JTC's mixing of the sand and
loam to establish a procedure and consistant
result.
JTC 06/29/04 P56.3.6 Drainage - JTC and DDP described how the field
CRJA sub grade for drainage as shown on the contract
drawings no longer reflects the final grades due to
changes made necessary by the athletic field
upgrades. CRJA agreed that adjustments to
J-drain and collector pipe layout would be
acceptable as long as "downhill" criteria is met.
CRJA will inspect subdrainage when completed,
.and before being covered with sand, to see that
this criteria is met.
-- 06/22/04 P64. Emergency Access -JTC questioned whether ambulance
08/10/04 access is possible to the football field, suggesting that the
stone dust paving behind the baseball backstop could be
used for access. DDP and Gale will review. Record item.
-- 08/10/04 P64.1 Emergency Access - DDP agreed that the stone
dust paving be utilized for emergency/service
access to the fields. To this end, NASD has
requested that a gate be added at the southeast
area of the turf field. DDP also stated that the
circular concrete curb be deleted in this area to
facilitate access.
JTC 06/29/04 P68.1 Leaning Trees - CRJA expained that they do not
Emanouil require trees to be guyed because studies have
shown that unguyed trees are stronger. However,
the spec does require trees to be plumbed if
required. JTC will advise Emanouil to reset the
trees.
OBSERVATION REPORT NO. 123 North Andover High School Page 8
-- 06/29/04 P69. Crabapple Trees - CRJA reviewed problems observed
with crabapple trees, noting that the trees planted were not
tagged by CRJA. In any case, die back has caused most
crabapples to no longer meet specifications and those must
be replaced. (Postscript: CRJA has flagged trees that must
be replaced). JTC will so advise Emanouil.
CRJA 07/30/04 P69.1 Crabapple Trees (Postscript) - Response from
Emanouil received by DDP and forwarded to
CRJA on 07/30/04. CRJA to respond.
Emanouil 06/29/04 P70.1 Lawns at Arts Wing -JTC agreed that Emanouil
would repair the bare spots in the lawn between
the arts classrooms and the driveway.
DDP 07/23/04 P72.3 Pavement Grades at Concession Stand
(Postscript): DDP faxed sketch of revised grading
to JTC on 07/23/04. DDP to follow up with Work
Order.
-- 07/27/04 P73. Football Goal Posts - JTC inquired as to desired width of
08/10/04 uprights (High School or NCAA dimensions). DDP will
confer with the athletic department. Record item.
-- 08/10/04 P73.1 Football Goal Posts - Goal posts installed.
Record item.
JTC 08/10/04 P74. Turf Fields - Gale reported that south field installation is
Gale nearly 100% complete, with "G max"testing to be performed
by Field Turf and results submitted to Gale (through DDP).
The north field final grade will be ready for inspection by
Gale (to determine suitability for turf installation to begin)
within the next two days.
-- 08/10/04` P75. Miscellaneous Site Issues - The following issues were
discussed. Record item.
Gale 08/10/04 P75.1 Track Width - Gale will reconfirm the 32'-8"width
shown for JTC.
-- 08/10/04 P75.2 HP Seating - DDP requested that a five foot deep
flat paved area be created at the low wall gaps
east and west of the bleachers. Grade would be
blended to meet the paving edge. Record item.
NASD 08/10/04 P75.3 Gates - JTC requested that any changes in
JTC fencing and gates be forwarded as soon as
possible. (Postscript - DDP forwarded fence/gate
revisions to NASD and JTC on 08/13/04).
NASD 08/10/04 P75.4 Toe Boards - It is to be reconfirmed whether toe
C&I boards are recommended at track and field venues
Gale through conversations with Jack Stephenson and
Cape and Island.
P76.
OBSERVATION REPORT NO. 123 North Andover High School Page 9
Q. ARCHITECTURAL
Bass 04/27/04 Q30.8.03 Academic Wing Gravel Stop does not conform at
Stanley 07/20/04 south side, and is coming loose on north side (item
Q30.7.1
08/10/04 (08/19/03)%) - Gravel stop issues shared by JTC
(blocking), Bass (forming) and Stanley
(installation). DDP and JTC will inspect entire
roof perimeter and list areas be reworked.
(04/27/04) JTC advised that Bass will likely not
perform any of the repairs previously reviewed
without a formal punchlist.
(07/20/04) Bass, JTC, DDP and clerk met to
review outstanding cladding items. DDP
reviewed with Bass cladding issues from exterior
punchlist inspection. Bass will be on site the
week of 07/26/04 to address outstanding items.
Bass will forward to DDP a drawing of proposed
cladding between clerestory and curtainwall on
north side of arts wing. It was agreed that brake
metal backed by polystyrene insulation would be
used in this area.
(07/27/04) JTC advised that Bass will be on site
by 07/28/04.
(08/10/04) JTC reported that Bass has not yet
come to the site.
DDP 04/13/04 Q91. Auditorium Chair Lift- DDP will make calls to clarify Mass.
Elevator Board's position on whether the chair lift is to be
inspected.
Q92.
R. STRUCTURAL
R37.
S. FIRE PROTECTION
RWS 06/22/04 -,.S20.1 System Pressure - It was reported that the
Hampshire technician on site feels the reported
180# pressure in the system is proper. DDP will
discuss with RWS.
S21.
T. PLUMBING
Grasseschi 05/18/04 T30.2.1 Gas Shutoff Valve - DDP has been informed by
RWS that all their conversations with Grasseschi
were with regard to Grasseschi's request to
substitute a standard access panel for a valve
cabinet (which was done). RWS at no time
instructed Grasseschi that the door should have a
lock. Grasseschi is to remove lock and install latch
per detail on 8.0.3.
Grasseschi 04/13/04 T33. Photo Dark Room - Greg Roberts advised that backflow
preventer has been installed, but exposed hot and cold
water piping must be insulated.
OBSERVATION REPORT NO. 123 North Andover High School Page 10
Grasseschi 05/04/04 T35. Push Button Faucets - Greg Roberts reported that kids have
been taking the push buttons off of the lavatory metering
faucets. Upon examination, NASD found that set screws
were not tightened. Grasseschi to tighten set screws, and
shall provide NASD with spare knobs.
Grasseschi 06/04/04 T36.1 Hot Water(Postscript) - RWS memo distributed
on 06/07/04. Grasseschi to advise on system
balancing.
DDP 06/08/04 T36.2 Hot Water- Greg Roberts questioned type of
RWS tanks and piping arrangement, wondering if this
would play some part in the hot water circulation
issue. JTC stated tanks were piped per RWS
directives in response to a question from
Grasseschi. DDP will review further with RWS.
T37.
U. HVAC
ABP 06/08/04 030.1.2 Fume Hood Fans-ABP has ordered special
starter required for two fans.
Sagamore 06/15/04 U34.1.2 Mainstreet Fin Tube - DDP reviewed conditions
and found that fin tube cover has been
adequately screwed to support structure.
Sagamore shall consistently cope the end covers
tight to columns, concealing the piping.
F&T 03/16/04 U35. Kitchen ElevatorShaft - It was discussed that even with
keeping the boiler room doors closed, a strong down draft is
keeping the elevator shaft cold in the kitchen. DDP will
review with F&T.
--
.06/15/04 037.3.1 ERU-2- Sagamore'advised that the coil will be
06/22/04' replaced, which will necessitate using a crane.
07/20/04 Sagamore will advise on lead time.
(06/22/04) Sagamore reported new cooling coil will
be delivered these weeks from 06/21/04, and
installed the week of 07/19/04.
(07/20/04) JTC reported that coil will be installed
in ERU-2 by 07/23/04.
Sagamore 06/15/04 U37.6.2 Systems Balancing - F&T has returned the report
06/22/04 for revisions. At the 06/15/04 meeting, F&T noted
07/20/04 that information for pumps and several fans was
not provided. Furthermore, the water system
must be rebalanced following the recommissioning
of the control valves.
(06/22/04) Sagamore reported balancing will be
completed by 07/16/04.
(07/20/04) JTC advised that the last of the
balancing will be completed following the
replacement of ERU-2's coil this week.
Sagamore 04/20/04 U41. Pipe Insulation - It was noted that there is radiator piping
uncovered at the upper west end of the gym and at the shot
feeder system.
OBSERVATION REPORT NO. 123 North Andover High School Page 11
Sagamore 06/22/04 U41.2 Pipe Insulation - Sagamore stated
07/13/04 repair/completion of insulation will start on
06/28/04.
(07/13/04) Sagamore stated insulation will be
replaced once faulty coils are replaced.
Sagamore 06/22/04 043.1.1 due on advised that
the last of
will filters are on
07/13/04
07/27/04 delivery.
(07/13/04) Filters are on site.
(07/27/04) Sagamore advised that filters on hand
were not correct, and that replacements have
been ordered.
-- 06/08/04 045.1 Boiler Leak- Greg Roberts reported that
Sagamore has repaired the leak between
sections. However, the boiler has not since been
fired to determine if repair will hold.
-- 07/13/04 U46.5.1 Valves - Starting on 07/05/04, Sagamore, JCI and
07/20/04 Thomas Young (balancer) will be on site to
07/27/04 recommission valves and rebalance the water
08/10/04 system. Sagamore will be on site to repair piping,
etc. found to be necessary during the
recommissioning. By 07/16/04 the balancing will
be completed, and RDK can retest a sampling of
equipment.
(06/29/04).Greg Roberts has been informed by
JCI that work will not start on 07/05/04, but has
been rescheduled for 07/12/04. JTC will request
that Sagamore provide an updated schedule.
(07/13/04) Johnson is on site this week
recommissioning control valves. Thomas Young
will be balancing valves beginning 07/14/04.
(07/20/04) JTC reported that the last of the
valves will be completed this week.
(07/27/04) Sagamore stated all valves have been
replaced and RDK may begin recommissioning .
Record item.
(08/10/04) Sagamore reported that JCI will be
replacing all control valve actuators due to a
manufactoring defect (plastic composition). It was
recommended to Sagamore that JCI confirm the
number of actuators being replaced. NASD
stated JCI must be out of the east and west
accademic wings by 08/16/04 so that room
cleaning can begin.
OBSERVATION REPORT NO. 123 North Andover High School Page 12
Sagamore 07/13/04 046.5.2 punchlist on 0/28/04,will start will work on pu
JTC 07/20/04 nchlist
items during down time of the valve
07/27/04 recommissioning effort.
08/10/04 (06/29/04) Greg Roberts reported Sagamore was
on site on 06/28/04, but was not on site on
06/29/04. JTC will contact Sagamore.
(07/13/04) Sagamore punchlist is completed to
date with the exception of the fin tube covers not
matching the fan coil units. Sagamore will be
replacing the fin tube covers in the weeks to
come.
(07/20/04) JTC reported Sagamore is still
investigating mismatched cover color issue.
(07/27/04) Sagamore advised that both the fin
tube covers and fan coil units on the first floor
were the colors selected by DDP during shop
drawing review. Following the job meeting, DDP
and JTC confirmed that the fin tube cover color
was the off-white color selected by DDP.
However, DDP and JTC agreed that the fan coil
units were not the off-white color selected by
DDP, but were insted the manufacturer's
"standard beige." As perviously stated by DDP,
the fin tube covers on the first floor must match the
adjacent FCU's. JTC will so advise Sagamore.
(08/10/04) JTC reiterated that Sagamore must
directly address the mismatched fin tube cover
color at the first floor; Sagamore will respond.
Sagamore noted that main street fin tube end
covers have been reordered so that installation
may be consistant.
Sagamore 06/22/04 U46.5.3 Dust 0 llecto fittP n completed will be corrected on
07/13/04
(07/13/04) Dust collector controller is on site and
all that is left for completion is final electrical
connections.
Sagamore 06/22/04 046.5.4 Water Treatment System - Sagamore stated
07/27/04 water was retested last week and found to have
08/10/04 `''29% glycol content (specified range is 31-33%) '
Sagamore is prepared to add more glycol with the
rust inhibitor and other chemical additives that are
on site, and startup the system. Greg Roberts
noted that the system only ran for 24 hours after
the last glycol was added, and recommended that
the system be run longer to more thoroughly mix
the glycol.
(07/27/04) Sagamore reported water treatment
system work is completed, and that subcontractor
will be called back to site to retest after coil in
ERU-2 is completed.
(08/10/04) Sagamore stated water treatment work
will be completed the week of 08/16/04.
Sagamore 06/22/04 U46.5.5 As Built Drawings - Sagamore has piping 'as
builts' on a cad disk, and has received a second
copy of ductwork `as builts' to be added to disk.
OBSERVATION REPORT NO. 123 North Andover High School Page 13
Sagamore 06/22/04 U47.1 ERU-2 -GR recommended that Sagamore check
the outside air damper operator at ERU-2, after
recently observed high cooling air discharge
temperatures.
Sagamore 06/22/04 U47.2 Control Booth Split System - GR advised that
Sagamore should check piping joints for leakage.
Sagamore 07/27/04 U47.3.1 Burners - Greg Roberts reported that Power
Flame has been back to site, but Boiler#1
continues to"lock out."
Sagamore 07/27/04 047.4.1 must till provide Greg Roberts with repllace�ment
belts.
F&T 07/20/04 049. ne HVAC d t be reviewed by Fit em reported following items
er&T cc
Sagamore 07/27/04 U49.1.1 Condensation on Piping - DDP reviewed
08/10/04 observations that condensation is forming on
08/16/04 uninsulated strainers, etc. with F&T. F&T stated
that HVAC specification requires that the entire
piping system be insulated, and any valves,
strainers, etc. that are not now insulated shall be.
Sagamore so advised by JTC.
(08/10/04) Sagamore stated insulation will be
completed the week of 08/16/04. It was
discussed that some stains result from
condensation forming on ball valve handles which
are not typically insulated; DDP will advise F&T.
(08/16/04) F&T advised DDP that condensation
at valve handles is not an issue that is typically
addressed by insulating handles. If this is a
scattered occurance, F&T recommends the valves
be checked for leaks.
Sagamore 07/27/04 U49.1.2 Condensation at Roof Deck- DDP reviewed
observation that condensation is forming on deck
over the Consumer Science Room with F&T.
F&T recommended that rooftop unit curbing be
checked for air leaks and complete insulation.
Sagamore so advised by JTC.
Sagamore 07/27/04 U49.2.1 Split System - DDP reviewed observations that
split system A/C piping is uninsulated with F&T.
F&T stated that specifications require all split
system piping to be insulated. Sagamore so
advised by JTC.
Sagamore 07/27/04 U49.3.1 ERU's - DDP and RDK have been advised by
08/10/04 F&T that the specified 550 discharge air
temperature is a typo, and the temperature should
be 65°-70°. JTC advised Sagamore to confirm
that JCI followed contract documents for
addendums and the accepted A/C alternate.
(08/10/04) Sagamore stated the three (properly
sized) new control valves will be on site by
08/11/04, and the ERU unit piping will be
completed by 08/13/04.
OBSERVATION REPORT NO. 123 North Andover High School Page 14
-- 07/27/04 049.3.2 Pumps - It was questioned whether pumps will
08/16/04 meet the GPH requirements of the cooling coils in
the ERU's. DDP will review with F&T.
(08/16/04) F&T advised DDP that the pumps will
meet the cooling load GPH requirements. Record
item.
DDP 07/20/04 U49.4 Unoccupied Schedule - Greg Roberts questioned
F&T if unoccupied control sequence is contributing to
condensation. DDP will review with F&T.
U50.
V. ELECTRICAL
3Si 03/23/04 V59.3 Room 3011 -3Si has a recording meter on the
outlets in IDF 3011 due to three UPS units being
damages.
3Si 05/11/04 V59.3.1 Room 3044- Paul Szymanski noted a power
TEC issue has also been observed at V/D room 3044.
DDP reported that 3Si and TEC are working to
isolate and identify the problem, but nothing has
been discovered that can be positively
addressed.
TE 05/04/04 V69.4 Gamewell Comments -TE will call Gamewell to
discuss questions as to system wiring, how
wiring can affect panel performance, and to confirm
Gamewell's recommendations and requirements.
RDK 07/27/04 V70.1 Duct Smoke Detector Testing - RDK will
NAM coordinate testing with Greg Roberts and the fire
department.
-- 07/20/04 V71.7 ABP Default- The folowing ABP action items
have been deleted from the observation report
due to ABP's default, and will be addressed
outside of the observation report format:
A48.4.06 (security wiring); B33.2.4 (Studio
Doorbell); J18.1.3 (PR#21 Cost Proposal);
J21.1.4 (WO #33, 40 and 41 revised cost
proposal); K08 (WO#27 cost proposal); K08.1.1
(WO#28 revised cost proposal); V61 (Gym
backboard switches); V64.4 (Gym lights); V68
(Kitchen doorbell);V69.3.1 (Fire alarm wiring);
V71, V71.2 (Response to outstanding issues).
-- 07/27/04 V71.8 ABP Default - JTC reported on progress of
discussions with ABP's bonding company. JTC
stated that the bonding company has assigned
Maiuri Electric to come to the site, but at this time it
is not clear if this is a long term commitment. JTC
has also not received sufficient confirmation from
Maiuri that JTC's priority list is being addressed.
A meeting with the bonding company may be
necessary in the near future.
OBSERVATION REPORT NO. 123 North Andover High School Page 15
-- 08/10/04 V71.9 ABP Default- It was discussed that Maiuri has
been more responsive to JTC's direction in
completing punchlist items. It was discussed that
it would be advantageous for input from former
ABP field personnel to continue. JTC noted that
the total overall participation of the bonding
company and ABP in completing the project
remains unclear.
DDP 07/06/04 V72. Lamp List - Greg Roberts requested a list of lamps used on
TE the project. DDP noted this is to be part of the electrical
O&M manuals, but with ABP's default DDP will request a list
from Thompson Engineering.
DDP 07/27/04 V74. Consession Stand Data/Power - In response to DDP's
3Si question, JTC reported that Systems Contracting has not
yet pulled the fire alarm cable to the concession stand.
Before they do, DDP stated that a communications cable
should be pulled with it. DDP will consult with 3Si and
advise as to the type of cable needed.
3Si 08/10/04 V74.1 Concession Stand Video- NASD forwarded to
DDP cabling requests from the cable commission
for broadcasting events. DDP to review with 3Si.
-- 08/10/04 V75. Security Cameras - NASD will be reinstituting the installation
of security cameras under a separate contract. It was
discussed that the 120 volt power for exterior cameras
mounted on light poles has not been completed, and that the
conduit routing is not as specified due to damage to
underground conduits. However, it was stated that a
conduit path exists to all three exterior locations.
V76.
W. HAZARDOUS MATERIALS
JTC 04/27/04 W06.1 Existing Auditorium Soffit- DDP authorized
Clerk removal of asbestos containing soffit boards on a
time and materials basis.
W08.
X. MISCELLANEOUS
Bass 08/26/03 X48. Sarnafil Roof Flashing - DDP, JTC and Stanley discussed
Stanley roof edge detail. DDP explained that Work Order required
JTC, Stanley and Bass to coordinate respective work. It
was discussed and agreed that Boss would provide
Stanley with stock so Stanley can form "snap on"trim. DDP
stated, in principle, this would be additional work by
Stanley, and less work (credit) by Bass (but no net change
in cost to Owner).
OBSERVATION REPORT NO. 123 North Andover High School Page 16
JTC 05/25/04 X67.05.1 Boiler Room - JTC advised that they believe the
Sub 06/01/04 water is entering the boiler room at the
06/08/04 brick/foundation wall joint. JTC is installing a
07/20/04 french drain, to be tied into the vertical clean out
pipe at the corners. Wall penetrations still are to
be made watertight by the respective subs.
(05/04/04) JTC stated supplemental drainage has
been installed, with no further leaking at wall
observed. JTC advised that one irrigation line
penetrating the wall must still be made to be water
tight.
(05/25/04) JTC noted that some leaking was
observed at Stair#8 after yesterday's rains.
(06/01/04) JTC stated no leaks at Stiar#8 were
observed after the recent rain.
(06/08/04) JTC stated no leaks were observed
the past week.
(07/20/04) JTC stated no leaks were observed
the past week.
JTC 05/04/04 X67.10 Roof Leak Status - In response to MBC's
questions, JTC stated that all leaks have been
` permanently repaired, with the exception of
cupola doors, which are awaiting hardware and
weather stripping.
JTC 06/22/04 X67.11 Cafeteria Roof Leak - Greg Roberts reported that
a leak at the east end of the cafeteria has
reappeared. JTC will investigate.
Musco 05/11/04 X69.1.3 Lighting Submission - After discussion, it was
05/18/04 agreed that to expedite lighting installation, Musco
submission is "approved as noted - contingent on
satisfactory compliance with specified lighting
criteria". Musco shall re-submit for record.
(05/18/04) Musco to submit electrical controls per
TE comments.
NASD 07/06/04 X71. Garbage Disposals - Greg Roberts reported that an official
DDP request will be forth coming from.school department for
installing garbage disposals in the Consumer Science
classroom.:In advance of the formal request, DDP will initiate
proposal request.
DDP 07/20/04 X71.1 Garbage Disposals - The relative safety and long
term maintenance issues associated with
providing garbage disposals was discussed.
Greg Roberts recommended "batch feed"type
units be provided for safety. NASD asked DDP
to investigate whether garbage disposals are
appropriate for the high school student use.
X72.
Y. PROJECT CLOSEOUT
Clerk 04/27/04 Y12.4 As Built Drawings - JTC has furnished clerk with
RWS as built mark ups of fire protection and plumbing
drawings. Clerk and RWS to review.
OBSERVATION REPORT NO. 123 North Andover High School Page 17
Clerk 03/02/04 Y13. Inventory- The clerk will begin an inventory of spare
materials and parts to be forwarded per specifications.
JTC 06/22/04 Y13.3 Auditorium Seat Inventory - JTC passed along to
S-D DDP a transmittal from Slay Dale stating seating
maintenance has been delivered. Clerk is
unaware of any such delivery. JTC will advise
Slay Dale to deliver materials to clerk's attention.
JTC 07/27/04 Y14. Closeout Submittals - JTC furnished DDP with a
Subs spreadsheet showing the status of the various manuals,
as-builts, warranties, and maintenance stock specified.
Y15.
ZZ. CONSTRUCTION PROGRESS
08/10/04 ZZ1 24,Construction Progress -The architect walked the site and
observed the following. Record item.
08/10/04 ZZ1 24.1 South Site - Preparation for parking lot paving
nearly completed. Turf field completed. Fascia
installed on stand. Record item.
08/10/04 ZZ1 24.2 North Fields - Fine grading ongoing for paving.
Record item.
ZZ125.
The next job meeting will be held at 1:00 PM on Tuesday, 17 August 2004 at the Contractor's
Trailer.
The discussions of this meeting are recorded as understood by the writer, who should be notified of
any omissions or corrections. Unless the writer is notified to the contrary, these notes are presumed to
be correct.
�
ichard.Rice ���
DiNISCO DESIGN
RNR/dp
cc: Louis Minicucci Gene Kingman
Harry Harutunian Kevin Murphy
Frederick King Ed Estabrook
Nancy Kurtz Kevin Burke
Susan Nicholson Richard Weber
Evan Karalolos Mike DiBari
Department of Public Works Kenneth DiNisco
Julie Parrino Richard Greenlee
NA Planning Board Angel Khazadian
Doug Seaboldt Jon Oxman
Robert Feinberg, ESCOA Bill Sousa, RDK
Paul Szymanski
cc (hand): Philip Briselli
Patrick Saitta
NY4� ^P L 4 m p
Municipal AUG I
Building Consultants, Inc.
Aug. 12, 2004
To: Louis Minicucci, Chairman
North Andover School Building Committee
C/O Paul Szymanski
675 Chickering Road
N. Andover, MA 01845
Re: North Andover High School < , ,'� d ' r4„
��.
CC: N. A. Planning Board
From: Pat Saitta
1. Con Corn Issues:
9/11/03
"As Built" replication drawing was prepared by Schofield Bros. Engineering and
submitted to N. A. Con Com.
10/9/03
Awaiting Con Cam officer letter that items previously noted have been resolved.
11/13/03
Resolution is being finalized.
12/10/03
Replication resolution is in progress.
4/08/04
Site withstood the 6" plus rain of 3/30/04 to 4/1/04 very well with no off site
sedimentation.
5/13/04
A proposal request was sent to JTC to install additional wet land plants as directed
by the Con Cam.
6/10/04
Favorable Con Corn decision on the site revisions has been received and recorded
(attached).
200 Sutton Street,North Andover,MA 01845 Tel: (978)686-5766 ® Fax: (978)685-2357 1
2. Major Item Summary:
A) Lower Parking Stabilization
7/8/04
The extra work approved at the last committee meeting to stabilize the full
operation under the parking lot extension was not 100% successful. The
Geotech engineer determined that the approximate last T-0 of fill be
changed to gravel, or equilivent. P.C.O. to achieve is included for review
and action.
8/12/04
The PCO to provide additional stabilization was approved at the
7/8/04 meeting and work is nearly completed, with apparent
satisfactory results.
B) Existing Building Demolition and New Fields:
5/13/04
Building demolition and concrete wall work is nearing completion. Site
utility work, plumbing and filling is in progress. Turf details have been
reviewed and finalized.
7/8/04
Building demolition is complete. Site fill, drainage system and stone fill
work is in progress. Concrete walls are complete and masonry is nearing
completion. Rough under slab plumbing and slabs on grade work is
complete. Light pole as�re on site, field e ge cur will-1e cast in p ace -
concrete. The turf installer requires that all field preparation work be
completed by 8/1/04 for the lower fields to be"ready to play" on Sept. 1,
2004. The G.C. projects that the preparation work will be completed in
nW July 2004, approximately one month early.
8/12/04
Lower filled turf field is substantially complete with work ongoing on
the fence, bleachers, lighting and protective netting. Press box/toilet
building is continuing with work ongoing in the roofing, door and
frame installation and interior finish categories. The lower natural
grass fields will follow the completion of the upper fields. Lower filled
turf fields will be ready for the fall 2004 athletic season. The upper
field work is being prepared for the installation of the synthetic track
surface and filled turf field grass. Upper fields should be ready for
athletic activity in Oct. 2004.
C) HVAC and Commissioning:
4/8/04
A meeting to address final commissioning, chiller start up and open issues
was held on 4/6/04 with all team members. Action list is attached and is
targeted for completion by the end of April.
2
5/13/04
Start up of chiller, balancing and commissioning is in progress and due to
be finalized shortly. (See attached list). Several unit control valves have
been replaced with the cause being investigated.
7/7/04
Work is in progress. (See JTC letter to Sagamore— 5/26/04).
8/12/04
Mechanical contractor has continued to work co-operatively with
Johnson Controls and RDK and is close to finalizing open issues.
Control valves are being replaced and will be completed by 8/30/04
(see RDK memo 8/5/04.
D) Building Water Intrusion:
4/8/04
The unusual torrential 6 to 8" rainfall of 3/30 through 4/1/04 caused water
to enter the structure in certain locations. Inspections and repairs
commenced immediately on the morning of 4/2/04. The majority have
been addressed and those requiring intrusive testing and investigation will
be addressed during April vacation.
5/13/04
All leaks have been investigated, identified and corrections made.
Monitoring continues in all areas.
E) Electrical Systems
6/10/04
Miscellaneous items are being expedited (See JTC letter to Palumbo —
5/26/04).
7/7/04
We have been informed that Palumbo Electric is no longer doing business.
Replacement options are being reviewed by Calahan. No project delay is
anticipated at this time.
8/12/04
The Bonding CO. for Palumbo Electric has engaged Maouri Electric
to continue with the electric completion. Work is in progress.
F) Punch list
5/13/04
The contractor is working a 2nd shift to minimize disruption in completing
the punch list. The contractor and Architect are updating the current status
of the list.
3
7/7/04
Work continues with updating in progress.
8/12/04
Work continues with updating in progress.
3. Change Proposals:
1/08/04
Proposed change orders (PCO's) continue to be solicited and reviewed. (See
attached change order log).
Athletic field up grade plans, Option#3, have been finalized and submitted to the
contractor for pricing.
2/12/04
Athletic field pricing was received from the contractor on 12/10/04 and is being
compared with the estimate received from Fogarty on 2/9/04.
4/8/04
Change Order#11 for the Athletic Field upgrades has been executed in the
amount of$4,099,808. Change Order#12 is attached for the committee's
approval.
5/13/04
Additional proposed change orders have been received and are being reviewed.
_(See attache ist) - -- - -
7/7/04
Additional items are being reviewed for inclusion into the next change order.
8/12/04
Additional items have been reviewed and will be included in the next C.O.
presented for approval.
4. Schedule:
Contract Completion Dates Actual Completion Dates
Phase I — New school 7/15/04 New school Feb. 20, 2004
Auditorium May 5, 2005
Phase II—Demo and site 5/5/05 Target - 11/15/04
Schedule update is attached.
4
N. Andover High School 8/122004
PCO# DESCRIPTION SUBMITTED STATUS CO AMT
PROPOSAL
1 Floor contractor substitute -- CO#1 $ 107,037
2 Sanitary line --- CO#2 $ 4,701
3 Site phasing --- --- ---
4 Seepage inlet -- CO#3 $ 3,300
5 Video survey of drain -- CO#3 $ 1,618
6 Steel revisions CO#6 $ 11,938
7 Sub drain piping -- CO#2 $ 26,273
8 Unsuit replacement -- CO#2 $ 20,315
9 Misc HVAC CO#5 $ 10,448
10 Unsuit soil & drain -- CO#3 $ 45,248
11 Roof power east --- --- ---
12 Language lab electric CO#5 $ 25,076
13 Paint parking lines -- CO#3 $ 5,304
14 Unsuit soil#2 --- CO#3 $ 47,775
15 Unsuit soil#3 -- CO#3 $ 26,331
16 Framing c@ stairs VOID ---
17 Consumer science power CO#5 $ 5,967
18 Metal plate Q mech screen CO#6 $ 9,430
19 Unsuit soil Q water -- CO#5 $ 86,318
20 Delete M.H. CO#6 $ (3,796)
21 Auditorium truss brace CO#6 $ 2,672
22 Auditorium beam revision CO#6 $ 2,313
23 Roof drain piping 967 In review
24 Plumbing change- - - - Not received- -- -- -- - - - -
25 Elec.transforrner& poles --- By owner ---
26 Condensate pipe rev CO#5 $ 3,312
27 Ext light fixtures $ (3,261) R& R
28 Locker additions CO#6 $ 7,655
29 Unsuitable replacement#4 CO#4 $ 28,580
30 Relocate power&data CO#9 $ 2,895
31 Auditorium stage found Not received
32 HVAC elec revisions CO#6 $ (7,131)
33 Parking sub drain CO#9 $ 5,666
34R1 Relocate electric panel CP-1 CO#6 $ 1,596
35 Electric service credit CO#4 $ (16,125)
36 Relocate data outlets CO#5 $ 2,030
37 Parking lot upgrade Not received
38 GWB cell c@ elec room Not received
39 Parking lot wet base Not received
40 Greenhouse galvy angle Not received
41 Stl mods c@ canopy drain CO#6 $ 3,459
4281 Parking lot drainage CO#7 $ 47,394
43 Smoke detectors. Not received
44 Gym dividers (4) CO#9 $ 37,339
4581 Gang toilet ceilings CO#7 $ 34,822
46 1 Unsuit replacement#5 ICQ#5 $ 9,325
Pagel
PCO# DESCRIPTION SUBMITTED STATUS CO AMT
PROPOSAL
47R1 Elec reverse RM 3052 CO#7 $ 8,108
48 Aud ceiling
49 Roof insulation substation CO#5 $ (22,800)
50 Curtain wall frames CO#6 $ 1,778
51 Trainer#1141 CO#7 $ 11,811
52 Ceiling clarifications
53 3rd fir window CO#6 $ 333
54 Lt coves c@ academic halls I
55 Revise catwalk framing CO#7 $ 2,660
56R2 Telecom revisions CO#7 $ 8,463
57 Remove plumbing chase
58 Moveable multi part CO#6 $ 8,030
59 Speaker back boxes CO#9 $ 9,691
60R1 Rev light fixtures CO#7 $ 3,968
61 Repair temp fence CO#7 $ 4,935
62 Delete electrical
63 Addl fire dampers CO#7 $ 4,116
64 Curved roof change CO#6 $ 132,450
65R1 Add lights to lecture hall CO#7 $ 1,187
66 Piping connection to structure $ 5,037 R&R
67 Terrazzo flooring CO#8 $ 434,740
68 Locker addition
69 Sprink at stairs
70R1 Locker relocation C0# 10
$ 6,547
71`R1_ Hand recognition access $ - 1-3,276 R&R
72R1 Basket ball shot clock VOID
73 Kitchen wall finish $ 4,561 In review
74R1 West wing gas detectors $ 3,271 R&R
7582 Auditorium tile CO#10 $ 31,988
76 HM window in office co#9 $ 1,189
77 Lam control cQ control booth CO#7 $ 1,694
78 Replace wet land plants CO#9 $ 2,004
79R1 Hall of Fame display CO#10 $ 16,069
80 Circulation pump on water CO#9 $ 1,587
81 Haul road upgrade CO#9 $ 9,575
8281 Add F42 fixtures $ 4,119 In review
83 Bay windows
84 Sports floor color CO#7 $ 2,605
85 Spectra glaze upchg CO#7 $ 2,869
86R1 Mill work changes CO#10 $ 25,515
87 Main Street light mounts
88 Repaint;ibrary areas CO#7 $ 1,592
89 Receptical in Science 3073
9081 Main Street revisions $ 5,760 R & R
91 Weathervane points CO#9 $ 977
92 South drive boulder CO#12 $ 1,960
93 Cafe bay window CO#9 $ 1,590
94R1 Add'I classrm storage cab CO# 10 $ 37,945
Page 2
PCO# DESCRIPTION SUBMITTED STATUS CO AMT
PROPOSAL
95 Change library light fixture CO#9 $ 2,522
96R1 Kitchen light fixture $ 5,032 In review
97R1 Fitness counter co#10 $ 8,686
98 Admin. Area revisions $ 13,213 In review
99 Electric panel DP9 revision
100 Ticket revisions ' VOID
101 Remove gas valves $ 2,782 R&R
102 Chem prep room VOID
103 Gym gates CO#9 $ 2,872
104 TV studio doorbell
105 Kiln hood revisions CO# 10 $ 2,063
106 F44 fixture credit
107 Revise speaker boxes VOID
108 Emergency power c boiler rm $ 2,848 In progress
109 Fence &striding CO# 10 $ 3,572
110 Custom light fixtures CO#10 $ 1,040
111 Delete staff mail boxes
112 Provide appliances in FF&E
113 Fold partition support CO#10 $ 915
114 Admin. Mailboxes CO#10 $ 12,558
115 Room 3071 material VOID
116R1 Water mixing valves CO#12 $ 2,108
117 Insulation of sinks CO#12 $ 2,060
118 Terrazzo changes CO#12 $ (7,50)
119 Snow guards $ 12,385 Approved
120 Window guards $ 3,121 In review
121 Wrap cupola CO#10 $ 1,292
122 Move H.C. ramps CO#10 $ 1,303
123 Stair#2 &#soffit Rejected
124 Auditorium light fixtures $ 2,450 In review
125R1 Relocate ventilation CO#12 $ 6,288
126 Control booth wall CO#12 $ 653
127 Revise H.C. sinks CO#10 $ 2,171
128 Extend EPDM $ 2,598 In review
129 Unsuitable mat removal CO#12 $ 12,652
130 Life safety heater fans
131 Add driveway drainage
132 Stair#6 ceiling CO#12 $ 781
133 VOID
134 Lecture hall ramp CO#12 $ 639
135 Quick ship frames $ 1,629 in review
136 Greenhouse sink CO#12 $ 206
137 Drywall T & M slips $ 3,853 In review
138 Acid waste connection
139 Drywall T&M slips $ 1,360 In review
140 Entry mats
141 Pipe frame at athletics CO#12 $ 3,904
142 Imodify oven millwork
Page 3
PCO# DESCRIPTION SUBMITTED STATUS CO AMT
PROPOSAL
143 Gym washer & dryer $ 3,744 R&R
144 Auditorium carpet CO#12 $ 4,072
145 Dryer vent
146 Devise dark room sink CO#12 $ 1,418
147 Gym logo CO#12 $ 3,909
147R1 Gym track lines CO#12 $ 11,943
148 Kitchen backflow valve CO# 13 $ 3,904
149 Outlet at Health
150 Cabinet heater $ 9,112 In review
151 Auditorium millwork $ 2,533 In review
152R1 Elec overtime $ 20,503 Rejected
153 F.A. system revisions $ 3,017 Disapproved
154 Athletic complex upgrades CO#11 $4,099,808
155 Revise gym curtain $ 7,592 In review
156 Dry F.P. in utility storage $ 1,233 Approved
157 Burnish VCT floors $ 7,546 In review
158 JAdd panel to F.A. $ 9,821 Rejected
159 Relocate water meter CO#12 $ 2,220
160 Re-install thresholds $ 2,606 In review
161 VOID
162 Install exhaust fan
163 Fitness&wrestling changes CO#12 $ 6,732
164 Dark rm backflow valves CO#12 $ 2,390
165 Elevator access controls CO# 13 $ 1,287
166 Added tackboards CO# 13 $ 7,548
167 Electric circuit @ dishwasher $ 441 In review
168 Elec T&M @ off ice & Recep $ 4,504 In review
169 Site light screen
170 Replace curved coil the $ 195 In review
171 Stair#8 steel work $ 2,440 In review
172 Add'I stair steel $ 3,271 In review
173 Stairs 1-4 rails $ 5,850 In review
174 exterior hand rails CO#13 $ 2,699
175 Additional synthetic turf costs CO# 13 $ 106,129
176 modify klight brackets CO# 13 $ 909
177 wetland replanting
178 remove PCB ballasts CO# 13 $ 12,508
179 cafes ceiling hooks
180 wet land plants CO# 13 $ 2,039
181 add fan to Room 1217
182 language labmaker bds CO#13 $ 760
183 thermostat covers
184 highway replace trees
185 parking stabilization $ 41,330 Approved
186 furure locker room utilities $ 9,207 In Review
187 wire heaters $ 2,183 In review
188 additional parking stabilization $ 69,373 Approved
189 goal post netting $ 25,000 Approved
TOTALS $ 316,502 1 $5,692,071
Page 4
Patrick Saitta
From: Bill Sousa[bsousa @rdkengineers.com]
Sent: Thursday, August 05, 2004 6:28 AM
To: Richard M. Rice(E-mail); Pat Saitta(E-mail); Paul Szymanski (E-mail); Gregory Roberts(E-
mail)
Cc: Bill Sousa; Howie McKew; Jason Peterson; Deborah Demaso
Subject: NAHS Commissioning
We will be holding off commissioning the FCU's,VAV's and Fin Tube that we
had planned for this week. I had a discussion with Mike Pramik at JCI and
learned that they are going to replace all the control valves with a new,
revised, improved model. He is discussing the logistics with Sagamore and
plans to have the work complete by the end of the month. I think our time
would be best spent doing some random sampling of the units after these new
valves are installed.
Greg and I are coordinating the smoke detector shut down sequence testing
and will execute based on Greg's schedule.
I'll be out from August 9, returning on the 23rd. Jason Peterson (X149)or
Deborah Demaso(X147)will be following NAHS while I'm out and should be
your contact points for any communication.
Thanks,
Bill
William Sousa
Project Manager
LEEDS Accredited Professional
Richard D. Kimball Company, Inc.
200 Brickstone-Squares-Suite 201
Andover, MA 01810
Tel : (978)475-0298 ext 224
Fax: (978)475-5768
Email: bsousa @rdkengineers.com
website:www.rdkengineers.com
1
° Activity Activity Orig ILOCT SSSL Rem % Early Early Late Late Total
tD Description Dur our Comp Start Finish Start Finish Float
MILESTONES
100 NOTICE TO PROCEED 0 MILE 0 100 01MAR04A 01MAR04A—]
103 LOWER FIELD 0 MILE 0 0 13JUL04 08SEP04 40
112 UPPER FIELD 0 MILE 0 0 19JUL04 08SEP04" 36
109 SOUTH SCHOOL PARKING 0 MILE 0 0 23JUL04 01SEP04" 28
106 CONCESSION STAND 0 MILE 0 0 08SEP04 01SEP04" -4
ADDED WORK
OWNER VACATE PREMISES
,,0000 OWNER VACATE BUILDING-EXISTING SCHOOL 0 P2 OWN 0 0 14MAF.04'��09MAR04 5
LOWER FIELDS
02 DEMO EXTERIOR SOFFIT 161P2 FLD 16 0 01MAR04 22MAR04 17AUG04 08SEP04
10 119
1015 SITE PREP&EROSION CONTROL 15 P2 FLD 15 0 05MAR04 25MAR04 18A0004 08SEP04 116
1005 SECURE BUILDING UTILITIES 11 P2 FLD 11 0 08MAit04 22MAR04-. .27JUL04 10AUG04 99
1004 COMPLETE POLICE/FIRE TRAINING 11 P2 FLD 11 0 08MAR04 22MAR04 24AUG04 08SEP04 119
1007 GRIND&PREP PARKING 3 P2 FLD 3 0 15MAR04 17MAR04 09MAR04 11MAR04 -4
1003 DEMO BACK LOCKER AREA 8 P2 FLD 8 0 15MAR04 24MAR04 27A0004 08SEP04 117
1016 DEEP SITE PIPING 30 P2 FLD 30 0 15MAR04 23APR04 26MAY04 06JUL04 50
1008 DEMO BUILDING 30 P2 FLD 30 0 19MAR04 29APR04 15MAR04 23APR04 4
1009 BLDG&ELEVATION 102 CONCRETE 25 P2 FLD 25 0 22MAR04 23APR04 23MAR04 26APR04 1
1006 ABESTOS ABATEMENT 20 P2 FLD 20 0 23MAR04 19APR04 11AUG04 08SEP04 99
1010 WATERPROOFING 2 P2 FLD 2 0 14APR04 15APR04 25JUN04 28JUN04 51
1011 BLEACHER FILL 5 P2 FLD 5 0 26APR04 30APR04 29JUN04 06JUL04 45
1019 SITE FILL @ WEST 15 P2 FLD 15 0 26APR04 14MAY04 20APR04 10MAY04 -4
1012 CONCRETE ELEVATION 107-FLAT WORK-109 211P2 FLD 25 0 26APR04 31 MAY04 07JUL04 10AUG04 50
1026 CONCRETE FLA-I-WORK 115 30 P2 FLD 30 0 26APR04 07JUN04 28JUL04 08SEP04 65
1014 BUILDING INTERIOR&ELEVATION 115+ 15 P2 FLD 15 0 03MAY04 21 MAY04 18AUG04 08SEP04 75
1017 SHALLOW SITE PIPING 30 P2 FLD 30 0 03MAY04 14JUN04 07JUL04 17AUG04 45
1023 TURF ANCHOR&FINISH GRADE 10 P2 FLD 10 0 17MAY04 31 MAY04 08JUL04 21JUL04 36
1020 SITE FILL @-EAST 15 P2 FLD 15 0 17MAY04 07JUN04 `11 MAY04 01JUN04 -4
1022 SUBDRAIN GRAVEL,GOALS,SCOREBOARD& 20 P2 FLD 20 0 17MAY04 14JUN04 08JUL04 04AUG04 36
1013 BACKFILL BLEACHER AREA AND STONE 5 P2 FLD 5 0 25MAY04 31 MAY04 04A0004 10AUG04 50
1018 SITE ELECTRIC 10 P2 FLD 10 0 01JUN04 14JUN04 04AUG04 17AUG04 45
1025 BLEACHERS 20 P2 FLD 20 0.01JUN04 28JUN04 11AUG04 08SEP04 50
A1023 TURF SURFACE 30 P2 FLD 30 0 01JUN04 13JUL04 28JUL04 08SEP04 40
1021 FINAL GRADE FILL 3 P2 FLD 3 0 08JUN04 10JUN04 03SEP04 08SEP04 62
1024 SITE-LIGHTING 15 P2 FLD 15 0 15JUN04 .06JUL04 18AUG04 08SEP04 45
SOUTH BUILDING PARKING
1027 UNDERGROUND ELECTRIC&WATER 5 P2 ACS 5 0 08JUN04 14JUN04 119JUL04 23JUL04 28
1028 GRADE AND BASE 10 P2 ACS 10 0 15JUN04 28JUN04 16JUL14 06AUG04 28
IUG`J 'f%�tiIIVV BASE ilY% IHI..J 1 7I 0129jUNCA I06JVL04 109ALIG04 113AVG04 I no
1030 CURBING. 5 P2 ACS 5 0 07JUL04 13JUL04 16AUG04 20AUG04 28
0 07JUL04 13JUL04 16AUG04 20AUG04 28
1031 CONCRETE FLATWORK&BIT WALKS 5 P2 ACS 5
1032 FINISH LIGHTING&SITE ACCESS 5 P2 ACS 5 0 14JUL04 20JU1.04. 23AUG04 27AUG04 28
1033 FINAL PAVE,STRIP&FINISH 3 P2 ACS 3 0 21JUL04 23JUL04 30AUG04 01SEP04 28
UPPER FIELDS
1035 CLEAR OWNER ?OPSOIL 5 P2 OF 5 0 17MAY04 21MAY04 17JUN04 23JUN04 22
1047 SOFTBALL FIEL�GRADING 5 P2 OF 5 0 01JUN04 07JUN04 10AUG04 16AUG04 49
1043 FIELD TURF 25 P2 OF 25 0 01JUN04 06JUL04 22JUL04 25AUG04 36
Start Data OWAR04 . ._.8 rr Early Bar NAAF SEP i/C Cr N.0
'Finish Dale 08SEP04
Data Date 01MAR04 Progress Bar
Run Date 02APR04 08:18 Critical Activity,
Activity Activity Orig LOCT SSSL Rem % Early Early Late I Late Total
ID Description Dur Dur Comp Start Finish Start I Finish Float
1048 FINAL GRADING AND LOAM 1 P2 OF 1 0 08JUNU4 08JUN04 17A0004 17AUG04 49
1036 GRADING&BASE @TRACK 5 P2 OF 5 0 08JUN04 14JUN04 24JUN04 30JUN04 12
1049 FENCE AND SPORTS EQUIPMENT 101P2 OF 10 0 09JUN04 22JUN04 18AUG04 131AUG04 49
1037 INTERIOR SUBDRAIN 5 P2 OF 5 0 15JUN04 21JUN04 01JUL04 08JUL04 12
1038 TRACK SUBDRAIN&MONUMNETS 10 P2 OF 10 0 22JUN04 06JUL04 09JUL04 22JUL04 12
1050 PLANT,SEED,&FINISH 5 P2 OF 5 0 23JUN04 29JUN04 01SEP04 08SEP04 49
1039 SUBDRAIN GRAVEL AND TURF PREP 20 P2 OF 20 0 29JUN04 27JUL04 16JUL04 12AUG04 12
1046 SPORTS COATING 7 P2 OF 7 0 30J'JN04 09JUL04 30A0004 08SEP04 42
1044 INFIELD SPORT EQUIPMENT 5 P2 OF 5 0 07JUL04 13JUL04 26AUG04 01SEP04 36
1045 FINAL PAVE rRACK AND INFIELD 4 P2 OF 4 0 14JUL04 19JUL04 02SEPO.1 08SEP04 36
1040 SITE PREP ELECTRIC. 15 P2 OF 15 0 28JUL04 17AUG04 13A0004 02SEP04 12 .
1041 PAVE BASE TRACK&INFIELD 3 P2 OF -3 0 18AUG04 20AUG04 03SEP04 08SEP04 12
BUILDING WORK
1100 FILL AND PLUMB ING UNDERGROUND 10 P2 BLG 10 0 12APR04 23APR04 13APR04 26APR04 1
1103 PREP AND SOG 5 P2 BLG 5 0 26APR04 30APR04 27APR04 03MAY04 1
1106 104 BEARING WALL 10 P2 BLG 10 0 03MAY04 14MAY04 04MAY04 17MAY04 1
1109 117 FLOOR PLANK 5 P2 BLG 5 0 17MAY04 21MAY04 18MAY04 25MAY04 1
1117 117 BEARING WALLS 20 P2 BLG 20 0 25MAY04 21JUN04 26MAY04 22JUN04 1
1112 PLUMBING ROUGH 15 P2 BLG 15 0 08JUN04 28JUN04 02JUN04 22JUN04 -4
1121 121 ROOF PLANK 5 P2 BLG 5 0 22JUN04 28JUN04 23JUN04 29JUN04 1
1124 117'AND 121 TOPPING COURSE 5 P2 BLG 5 0 29JUN04 06JUL04 30JUN04 07JUL04 1
1136 EXTERIOR DOORS,WINDOWS&ROLLUF 5 P2 BLG 5 0 29JUNQ4 06JUL04 22JUL04 28JUL04 16
1115 TICKET FOUNDATION 10 P2 BLG 10 0 29JUN04 13JUL04 23JUN04 07JUL04 -4
1127 ROOFING AND FACIA 10 P2 BLG 10 0 29JUN04 13JUL04 30JUN04 14JUL04 1
1130 INTERIOR MASONRY 10 P2 BLG 10 0 14JUL04 27JUL04 08JUL04 21JUL04 -4
1133 ROOF PLATFORM ANDHANDRAIL 10 P2 BLG 10 0 14JUL04 27JUL04 25AUG04 08SEP04 30
1142 ELECTRICAL ROUGH 15 P2 BLG 15 0 14JUL04 03AUG04 08JUL04 28JUL04 -4
1139 INTERIOR DRYWALL 5 P2 BLG 5 0 28JUL04-- 03AUG04 22JUL04 28JUL04 -4 -
1145 INTERIOR PAINT 10 P2 BLG 10 0 04AUG04 17AUG04 29JUL04 11AUG04 -4
1148 ELECTRICAL FIN ISH 10 P2 BLG 10 0 18AUG04 31AUG04 19AUG04 01SEP04 1
1151 PLUMBING FINISH 151P2 BLG 15 0 18AUG04 08SEP04 12AUG04 01SEP04 -4
Start Date 01MAR04 NAAF
Finish Date 08SEP04 Eariy Bar N.AN
Data Date OIMAR04 A W Progress Bar
Run Dale 02APR04 08:18
Critical Activity
/`tl, ,e/ architects and p la. nners
Limited
) ppp"IN w^rw
OBSERVATION REPORT NO.' 124
Project: North Andover High School
Date: 17 August 2004
Location: Job Site
Present: North Andover School Building Committee (NASBC) Harold Dushame (partial)
North Andover School Department (NASD) Jack Stephenson (partial)
Paul Szymanski (partial)
North Andover Building Commissioners (NABC) Bob Nicetta
John T. Callahan & Sons (JTC) Philip Briselli
Dave Anderson
Phil Ricci
Sagamore Plumbing & Heating John Herald (partial)
Paul O'Lean
Meridian Consulting Group (MCG) Dominic Nicosia
Municipal Building Consultants (MBC) Pat Saitta
Schofield Brothers of New England (SBNE) Matt Smith
Clerk of Works (COW) Richard Warner
DiNisco Design Partnership (DDP) Richard Rice
Action Date
A. SITE SAFETY AND SECURITY
-- 07/27/04 A48.4.12 Security System - Greg Roberts reported that
08/17/04 Simplex has returned to correct programming
issues, which are ongoing as the system is
operated (i.e. doors programmed to wrong
partitions). GR has created a list of devices that
are not functioning. The wiring problems must still
be corrected by Maiuri. Record item.
Kenneth DiNisco Richard N. Rice Gary E. Ainslie Christopher Huston Donna DiNisco,
8 7 S u m m e r S t r e e t B o s t o n M A 0 2 1 1 0 6 1 7 . 4 2 6 . 2 8 5 8 f a x 4 2 6 1 4 5 7
w w w . d i n i s c o c o m
OBSERVATION REPORT NO. 124 North Andover High School Page 2
Maiuri 08/17/04 A48.4.13 Security System - Domenic Nicosia/MCG
Simplex reported that the shorts at doors appear to be at
the frame, and that Mauri is protecting the wiring
with grommets and sleeves. MCG reported that it
appears that other operational problems stem
from the power draw of the LED's in the devices.
MCG stated Simplex has been called to address
this, and that the LED's may be deactivated in
order to solve the problem. Simplex will also
reprogram where it has been found that multiple
devices have the same address.
A52.
B. OWNER ISSUES
DDP 07/27/04 B47.1.3 Tech Ed Equipment- Greg Roberts questioned
3Si 07/29/04 whether all F&E (i.e. tables and chairs) have
been installed. DDP will review with 3Si.
(07/29/04) 3Si advised DDP that chairs and
"loose tables" were not provided with tech ed
equipment. DDP will order remaining furnishings.
DDP 07/27/04 B47.1.4 Tech Ed Equipment - JTC advised that they
TE 08/17/04 have instructed Maiuri not to begin electrical
connections to shop equipment until all F&E
equipment has been installed.
(07/29/04) Maiuri faxed a list of equipment
connection questions to DDP.
(08/17/04) DDP will review with TE.
R&R 08/13/04 B49.2.2 Admin/Arts Windows (Postscript) - In a phone
conversation on 08/13/04, R&R advised DDP that
scissors arm operators will be adjusted so that
windows close at the small admin wing windows.
At the arts wing, A&A stated single arm operators
must be installed per sample. DDP agreed to this
approach.
DDP 03/30/04 B50. Gymnasium Switches - Greg Roberts requested that DDP
TE investigate substituting pushbutton switches for gym
lighting, curtain, and backboard counters. GR noted that the
key switches installed are all keyed differently and require a
good deal of time to operate individually. The pushbuttons
could be secured from unauthorized use by a surface
mounted locking cabinet. Also, GR requested that the gym
lighting only be operated by the center control point. DDP
and TE to review.
OBSERVATION REPORT NO. 124 North Andover High School Page 3
-- 08/10/04 856.1 South Fields/Football Practice -JTC stated that
08/17/04 turf fields will be ready for use by 08/23/04.
However, JTC stated sitework will be ongoing
until the first of September, and the school
department and JTC would need to develop a
plan to get the students to and from the field
safely, while not disrrupting construction. It was
discussed that coaches could see that players
cross the site together. Of great concern are the
expected parents/spectators who could come at
any time; it was discussed that the south lot could
be closed to discourage spectators from
inadvertently entering the construction area.
NASD and JTC will further discuss logistics during
the next two weeks. Record item.
NAHS 08/17/04 B56.1.1 South Fields/Football Practice - It was discussed
JTC that Field Turf must complete their punchlist and
receive formal acceptance of the south fields taken
before the field can be used. DDP reported that
Gale and Field Turf are scheduled to inspect the
field tomorrow(08/18/04) at 11:00 AM. Jack
Stephenson stated that given the timing, the first
day of practice on the south fields would be
Thurday morning, 08/26/04.
-- 08/17/04 B56.1.2 South Fields/Temporary Ball Net-Jack
Stephenson inquired whether a temporary ball net
would be necessary at the east end of the field to
keep balls out of the construction zone. JTC did
not feel that this would be necessary, noting that
the bulk of the work on the baseball field will be
completed in two weeks.
-- 08/10/04 B56.2 South Field/Lighting - In response to NASD's
08/17/04 question, JTC advised that the ballfield lighting
will be operational by 08/23/04. It was discussed
that the school department can control the lights
operation by limiting operating instructions to a
few key people. Record item.
DDP 08/17/04 B56.2.1 Field Lighting Controller-Jeck Stephenson
expressed concern that a second remote controller
be obtained to assure that the lights can be
operated if the provided controller malfunctions.
JTC stated that in the event of such a failure; the
lights can be turned on and off manually. DDP will
clarify for the school department how the ballfield
lights operate.
MUSCO 08/17/04 B56.2.2 Field Lighting Controller-JTC reported that the
controller was damaged in shipping and that
Musco is replacing it.
OBSERVATION REPORT NO. 124 North Andover High School Page 4
-- 08/10/04 B58.1 Parking Space Numbering - It was discussed and
08/17/04 agreed that DDP will on a drawing number all
spaces (not including HP spaces). The
numbering will be done under a work order by
JTC. Record item.
-- 08/19/04 B58.1.1 Parking Space Numbering (Postscript) - As
discussed at the 08/17/04 job meeting, DDP
forwarded revised Work Order#107 with space
numbers beginning at 001. Record item.
-- 08/17/04 859. Wall Cleaning/Paint- DDP reported that on 08/13/04, Vinny
Valentino called to report that in cleaning marks from painted
classroom and corridor walls, custodians had been
scrubbing paint off the drywall. Richard Warner reported
that after further investigation, NASD was able to clean
walls without damaging the paint. Record item.
DDP 08/17/04 B60. Noise Complaint- Paul Szymanski (PS) reported that he
NASD had received a telephone complaint from a neighbor on
Osgood Street complaining of a loud whine from the HVAC
system. PS will forward to DDP a copy of the letter also
received.
DDP 08/19/04 B61. South Field's Fences and Gates (Postscript) - JTC
NASD forwarded to DDP cost proposals for gates requested by
NASD at south fields. DDP to review with Paul Szymanski.
DDP . 08/17/04 B62. Concession Stand/Water Fountain - Jack Stephenson
NASD requested that a hose connection be added to the outside of
the concession stand for attachment of a drinking water
device during practices. DDP to further review with NASD
and advise JTC of the plumbing change required.
-- 08/17/04 B63. Bleacher Fencing -Jack Stephenson requested that fencing
along walkway be lowered to 42 inches high to address
sightline of people in first row. (Postscript- JTC stated 48
inch high fencing already on site. Paul Szymanski stated the
fence will not be changed.) Record item.
-- 08/17/04 B64. North Fields - In response to Jack Stephenson's questions,
JTC stated north field would not be available this fall due to
the adjacent ongoing site work. Record item.
B65.
C. PERMITS & INSPECTIONS
-- 03/26/02 CO3. DPW Permits
OBSERVATION REPORT NO. 124 North Andover High School Page 5
-- 07/01/03 C69.4.1 Wetland Markers - Paul Szymanski confirmed that
wetland markers had been installed, but have
apparently been removed.
JTC 06/01/04 C99.07.6 MEP Punchlists - JTC to provide DDP with
copies of the plumbing, HVAC and Electrical
(South Wing) punchlists with completed items
crossed off for verification by DDP's consultants.
JTC 07/20/04 C121.1 ABP Permit- Bob Nicetta stated that the electrical
contractor that comes on board to finish the
contract work must pull a permit. JTC will
coordinate.
-- 08/10/04 C122.1 Erosion Control - SBNE reported that there is a
08/17/04 new gap in the silt fence that needs to be repaired
at the newly loamed area adjacent to Chickering
Road, and that hay bales must be extended at
another newly loamed area. Also, CB12 is in
need of repair. SBNE has advised the JTC site
foreman of these issues. Record item.
JTC 08/17/04 C122.2 Erosion Control - SBNE reported that JTC had
addressed the erosion control items noted the
previous week, and that the site performed well
during the recent heavy rains. SBNE noted that
some gully erosion near CB13 needs to be
repaired.
-- 07/27/04 C123. Auditorium Electrical Inspection - It was discussed that a final
08/17/04 inspection by the town inspector is needed. JTC will
schedule with the electrical inspector. Record item.
-- 08/17/04 C123.1 Auditorium Electrical Inspection -JTC reported
that the wiring inspector has signed off on the
auditorium. Record item.
NABC 08/17/04 C124. Concession Stand Building - It was noted that both the
wiring and plumbing inspectors are on vacation, and the
necessary inspections must be performed upon their return.
Bob Nicetta will do a preliminary walkthrough on 08/23/04. If
not available by 08/26/04, Jack Stephenson stated other
arrangements will be made for players during practice.
JTC 08/17/04 C124.1 Concession Stand - Following the meeting, JTC
and DDP observed progress at the concession
stand itself. JTC will expedite completion with
consideration to a Health Department inspection.
DDP advised coved base should be installed on
the block walls.
OBSERVATION REPORT NO. 124 North Andover High School Page 6
C125.
D. CONSTRUCTION SCHEDULE
-- 08/17/04 D143. Construction Progress - JTC gave an overview of
upcoming activities, as foolows. Record item.
-- 08/17/04 D143.1 Consession Stand - Plumber will install fixtures in
the next few days. FRP walls have been
completed. Windows have been installed with
security grilles expected on site by 09/01/04.
Record item.
-- 08/17/04 D143.2 South Fields - Bleacher detailing to be completed
by 08/18/04. Field lights awaiting delivery of
replacement controller. Record item.
-- 08/17/04 D143.3 South Site - Curbing underway. Bollards being
installed. Remaining light poles will be installed
next week.
-- 08/17/04 D143.4 North Site - Paving being completed for track.
Stone for turf nearly completed. Record item.
D144.
E. SUBMITTAL SCHEDULE
E16.
F. SUBMITTALS
CTI 04/13/04 F85.3.3 Tile in Cooler/Freezers- CTI must confirm if cooler
freezers were installed using SP-100 or Spectra
Loc.
DDP 04/13/04 F85.3.4 Laticrete Recommendation - PM recommends that
06/28/04 given the use and cleaning materials employed at
NAHS (which PM will confirm in a visit to the
kitchen), the Spectra Loc floor grout should remain.
CTI offered an extended warrantee; DDP stated a
bond may be required if this is accepted. Laticrete
must put their recommendation in writing.
(06/28/04) DDP received letter dated 04/23/04
directly from Laticrete on 06/28/04. DDP will
consider recommendations.
JTC 03/30/04 F98.1 Concrete Reinforcing - Returned approved as
noted/resubmit items noted.
OBSERVATION REPORT NO. 124 North Andover High School Page 7
Musco 05/18/04 F100.1 Field Lights - Field lights returned "Approved as
noted/Resubmit items noted" (electrical control
panel components).
Musco 05/27/04 F100.1.1 Field Lights - Musco shall revise and re-submit for
record the structural calculations.
DDP 07/20/04 F100.1.2 Field Lights - Paul Szymanski reported that a
07/23/04 lighting submittal package had been forwarded to
the school department from Musco. PS will
forward a copy to DDP for processing (Received
by DDP 07/23/04).
F114.
G. COORDINATION DRAWINGS
G28.
H. PAYROLL REPORTS
H42.
I. REQUISITIONS
143.
J. CHANGE ORDERS
DDP 06/29/04 J26. PCO LOG - JTC distributed a PCO Log updated as of
JTC 06/29/04. DDP and JTC reviewed outstanding PCO's that
JTC would like to clear. DDP and JTC to review further.
DDP 07/20/04 J27. Electrical PCO's - DDP and JTC will meet to review
JTC electrical PCO's in preparation for a meeting with the
bonding companies.
J28.
K. WORK ORDERS
K15.
L. FIELD ORDERS
L18.
OBSERVATION REPORT NO. 124 North Andover High School Page 8
M. PROPOSAL REQUESTS
Capital 08/05/03 M25.2.1 PCO #075 - DDP responded to Capital's letter
with regard to credit offered for VCT replaced by
terrazzo. Capital to revise credit per
specifications.
M36.
N. REQUEST FOR INFORMATION
DDP 03/25/03 N45.1.2 Exterior Hose Bibs - Grasseschi's proposal to
protect exterior bibs submitted for DDP's review.
DDP 04/01/03 N50. RFI #267 - DDP will issue letter to NAPD and Building
Department advising them that sprinkler heads in elevator
shaftway and the elevator shunt trip will be deleted in
accordance with the code moratorium still in effect.
DDP 12/02/03 N89. Clothes Dryers - JTC noted no vents are shown on HVAC
F&T drawings for dryer in Study Skills #2050 and the kitchen.
DDP to review with F&T and advise.
N96.
O. DEMOLITION
005.
P. SITE WORK
JTC 09/30/03 P41. Art Plaza Pavement - DDP reviewed CRJA site visit report
of 09/26/03. JTC stated radius will be cut. The clerk
observed that the puddles noted disappeared in less than
an hour, and low spots are very shallow.
DDP : :10/08/0&, P41.1 Arts Plaza Pavement (Postscript) - CRJA
Clerk followed up, advising DDP that low spots would
be an icing concern, and requested that the
tolerances be checked per the paving spec (See
Spec 02500-3.01-19). DDP to advise clerk to
confirm.
JTC 03/16/04 P49. Catch Basins - SBNE noted that JTC has yet to install the
hoods on the catch basin structures as required.
NASD 04/20/04 P52. Commemorative Plantings - Paul Szymanski advised that
DDP the school will be planting some memorial trees, and is
looking into some way to incorporate future memorials in an
orderly, planned fashion. DDP and NASD will coordinate.
OBSERVATION REPORT NO. 124 North Andover High School Page 9
-- 04/27/04 P53.8 Scoreboards -JTC reiterated that their proposal
08/19/04 includes two scoreboards (one football, one track)
with conduits to a third"future" location (in
baseball field). DDP will confirm locations.
Record item.
-- 05/18/04 P53.8.1 Scoreboard - It was agreed that football
08/19/04 scoreboard will be relocated to the est end of the
football field, back-to-back with the "future"
baseball scoreboard. DDP will issue a field order
locating this scoreboard.
(08/19/04) JTC confirmed with Jack Stephenson
the location of the football/soccer scoreboard at
the east end of the field on 08/19/04. The sign will
overhang the walk, with the bottom edge of the
scoreboard 10' above the walk. This will allow
sufficient clearance for vehicles. Record item.
NASD 07/20/04 P53.8.2 Track/Softball Scoreboard - It was discussed that
07/27/04 the track scoreboard could be fed from the
construction trailer service on Presscott. DDP will
consult with Thompson Engineering to provide
Paul Szymanski with the information needed to
obtain a permanent service from this location from
Mass Electric.
(07/27/04) Information forwarded to Paul
Szymanski by DDP on 07/26/04.
JTC 06/29/04 P56:3.3 Sand/Loam Mix Test - P&S will take samples of
07/20/04 stockpiled loam and will mix with samples of
08/10/04 Pitcherville Sand and will test for optimum
sand/loam/organic content.
(07/20/04) P&S test results forwarded to JTC.
JTC questioned apparent reversal in
recommended sand mix ratio. Follow up with P&S
needed to clarify.
(08/10/04) It was discussed whether the P&S
recommendation for organics and mixing
constitutes an extra to the contract. DDP agreed.
that the "means and methods" are up to JTC,
noting the "final product' is what JTC is
responsible for. As for adding organics to the top
soil, DDP interprets this as a specified
requirement; JTC will review the specifications
language and respond.
OBSERVATION REPORT NO. 124 North Andover High School Page 10
-- 06/29/04 P56.3.4 Mixing Sand and Loam -JTC noted that Section
02900 specifies mixing sand and loam by
harrowing, and at this time this is JTC's intent.
Bob Pine stated that more satisfactory results will
be achieved far more easily by mixing with loader
buckets after the loam is screened. P&S will come
to the site to monitor JTC's mixing of the sand and
loam to establish a procedure and consistant
result.
JTC 06/29/04 P56.3.6 Drainage -JTC and DDP described how the field
CRJA sub grade for drainage as shown on the contract
drawings no longer reflects the final grades due to
changes made necessary by the athletic field
upgrades. CRJA agreed that adjustments to
J-drain and collector pipe layout would be
acceptable as long as "downhill'criteria is met.
CRJA will inspect subdrainage when completed,
and before being covered with sand, to see that
this criteria is met.
-- 08/10/04 P64.1 Emergency Access - DDP agreed that the stone
dust paving be utilized for emergency/service
access to the fields. To this end, NASD has
requested that a gate be added at the southeast
area of the turf field. DDP also stated that the
circular concrete curb be deleted in this area to
facilitate access. Record item.
-- 08/17/04 P64.2 Emergency Access - DDP and JTC reviewed the
access. It was agreed that the route from the
driveway would follow that of JTC's present haul
road. DDP agreed that the straight curb would be
installed with a 3-inch reveal to form a"mountable"
section. Record item.
JTC 06/29/04 P68.1 Leaning Trees - CRJA expained that they do not
Emanouil require trees to be guyed because studies have ..
shown that unguyed trees are stronger. However,
the spec does require trees to be plumbed if
required. JTC will advise Emanouil to reset the
trees.
Emanouil 06/29/04 P70.1 Lawns at Arts Wing -JTC agreed that Emanouil
would repair the bare spots in the lawn between
the arts classrooms and the driveway.
DDP 07/23/04 P72.3 Pavement Grades at Concession Stand
(Postscript): DDP faxed sketch of revised grading
to JTC on 07/23/04. DDP to follow up with Work
Order.
OBSERVATION REPORT NO. 124 North Andover High School Page 11
-- 08/10/04 P74. Turf Fields - Gale reported that south field installation is
08/18/04 nearly 100% complete, with "G max"testing to be performed
by Field Turf and results submitted to Gale (through DDP).
The north field final grade will be ready for inspection by
Gale (to determine suitability for turf installation to begin)
within the next two days. Record item.
-- 08/18/04 P74.1 Turf Fields (Postscript) - "G-Max"testing
forwarded to Gale and Gale and Field Turf
inspected fields on 08/18/04. Record item.
Gale 08/10/04 P75.1 Track Width - Gale will reconfirm the 32'-8"width
shown for JTC.
-- 08/10/04 P75.3 Gates - JTC requested that any changes in
08/17/04 fencing and gates be forwarded as soon as
possible. (Postscript- DDP forwarded fence/gate
revisions to NASD and JTC on 08/13/04).
Record item.
DDP 08/17/04 P75.3.1 Gates - NASD approved the additional gate
drawings approved by DDP. DDP to issue work
order to JTC.
NASD 08/10/04 P75.4 Toe Boards - It is to be reconfirmed whether toe
C&I boards are recommended at track and field venues
Gale through conversations with Jack Stephenson and
Cape and Island.
P76.
OBSERVATION REPORT NO. 124 North Andover High School Page 12
Q. ARCHITECTURAL
Bass 04/27/04 Q30.8.03 Academic Wing Gravel Stop does not conform at
Stanley 07/20/04 south side, and is coming loose on north side (item
07/27/04 Q30.7.1)
08/10/04 (08/19/03) - Gravel stop issues shared by JTC
(blocking), Bass (forming) and Stanley
(installation). DDP and JTC will inspect entire
roof perimeter and list areas be reworked.
(04/27/04) JTC advised that Bass will likely not
perform any of the repairs previously reviewed
without a formal punchlist.
(07/20/04) Bass, JTC, DDP and clerk met to
review outstanding cladding items. DDP
reviewed with Bass cladding issues from exterior
punchlist inspection. Bass will be on site the
week of 07/26/04 to address outstanding items.
Bass will forward to DDP a drawing of proposed
cladding between clerestory and curtainwall on
north side of arts wing. It was agreed that brake
metal backed by polystyrene insulation would be
used in this area.
(07/27/04) JTC advised that Bass will be on site
by 07/28/04.
(08/10/04) JTC reported that Bass has not yet
come to the site.
DDP 04/13/04 Q91. Auditorium Chair Lift- DDP will make calls to clarify Mass.
Elevator Board's position on whether the chair lift is to be
inspected.
Q92.
R. STRUCTURAL
R37.
S. FIRE PROTECTION
RWS 06/22/04 520:1 System Pressure - It was reported that the
Hampshire technician on site feels the reported
180# pressure in the system is proper. DDP will
discuss with RWS.
S21.
OBSERVATION REPORT NO. 124 North Andover High School Page 13
T. PLUMBING
Grasseschi 05/18/04 T30.2.1 Gas Shutoff Valve - DDP has been informed by
RWS that all their conversations with Grasseschi
were with regard to Grasseschi's request to
substitute a standard access panel for a valve
cabinet (which was done). RWS at no time
instructed Grasseschi that the door should have a
lock. Grasseschi is to remove lock and install latch
per detail on 8.0.3.
Grasseschi 04/13/04 T33. Photo Dark Room - Greg Roberts advised that backflow
preventer has been installed, but exposed hot and cold
water piping must be insulated.
Grasseschi 05/04/04 T35. Push Button Faucets - Greg Roberts reported that kids have
been taking the push buttons off of the lavatory metering
faucets. Upon examination, NASD found that set screws
were not tightened. Grasseschi to tighten set screws, and
shall provide NASD with spare knobs.
Grasseschi 06/04/04 T36.1 Hot Water (Postscript) - RWS memo distributed
on 06/07/04. Grasseschi to advise on system
balancing.
DDP 06/08/04 T36.2 Hot Water- Greg Roberts questioned type of
RWS tanks and piping arrangement, wondering if this
would play some part in the hot water circulation
issue. JTC stated tanks were piped per RWS
directives in response to a question from
Grasseschi. DDP will review further with RWS.
T37.
U. HVAC
Maiuri 06/08/04 U30.1.2- Fume Hood Fans - ABP has.ordered.special
MCG 08/17/04 starter required for two fans.
(08/17/04)JTC advised MCG that starters are
required at two fume hood fans.
Sagamore 06/15/04 U34.1.2 Mainstreet Fin Tube - DDP reviewed conditions
08/10/04 and found that fin tube cover has been
adequately screwed to support structure.
Sagamore shall consistently cope the end covers
tight to columns, concealing the piping.
(08/10/04) Sagamore has ordered end caps for
Main Street fin tube.
OBSERVATION REPORT NO. 124 North Andover High School Page 14
F&T 03/16/04 U35. Kitchen ElevatorShaft - It was discussed that even with
keeping the boiler room doors closed, a strong down draft is
keeping the elevator shaft cold in the kitchen. DDP will
review with F&T.
Sagamore 06/15/04 U37.6.2 Systems Balancing - F&T has returned the report
06/22/04 for revisions. At the 06/15/04 meeting, F&T noted
07/20/04 that information for pumps and several fans was
08/17/04 not provided. Furthermore, the water system
must be rebalanced following the recommissioning
of the control valves.
(06/22/04) Sagamore reported balancing will be
completed by 07/16/04.
(07/20/04) JTC advised that the last of the
balancing will be completed following the
replacement of ERU-2's coil this week.
(08/17/04) System Balancing - Sagamore
advised that balancing will be completed by
08/20/04.
-- 04/20/04 U41. Pipe Insulation - It was noted that there is radiator piping
08/17/04 uncovered at the upper west end of the gym and at the shot
feeder system. Record item.
-- 08/17/04 U41.1.1 Pipe Insulation - Completed at upper west end of
gym. Record item.
Sagamore 06/22/04 U41.2 Pipe Insulation - Sagamore stated
07/13/04 repair/completion of insulation will start on
08/17/04 06/28/04.
(07/13/04) Sagamore stated insulation will be
replaced once faulty coils are replaced.
(08/17/04) Sagamore stated insulator is on site
and will be completed next week.
Sagamore 06/22/04 U43.1.1 Sagamore advised that the last of the filters are
07/13/04 due on site on 07/06/04 and will be.installed on
07/27/04 delivery.(07/13/ 4) Filters are on site.
(07/27/04) Sagamore advised that filters on hand
were not correct, and that replacements have
been ordered.
-- 06/08/04 U45.1 Boiler Leak- Greg Roberts reported that
Sagamore has repaired the leak between
sections. However, the boiler has not since been
fired to determine if repair will hold.
OBSERVATION REPORT NO. 124 North Andover High School Page 15
-- 07/20/04 U46.5.1 Valves - Starting on 07/05/04, Sagamore, JCI and
07/27/04 Thomas Young (balancer) will be on site to
08/10/04 recommission valves and rebalance the water
08/17/04 system. Sagamore will be on site to repair piping,
etc. found to be necessary during the
recommissioning. By 07/16/04 the balancing will
be completed, and RDK can retest a sampling of
equipment.
(06/29/04) Greg Roberts has been informed by
JCI that work will not start on 07/05/04, but has
been rescheduled for 07/12/04. JTC will request
that Sagamore provide an updated schedule.
(07/13/04) Johnson is on site this week
recommissioning control valves.Thomas Young
will be balancing valves beginning 07/14/04.
(07/20/04) JTC reported that the last of the
valves will be completed this week.
(07/27/04) Sagamore stated all valves have been
replaced and RDK may begin recommissioning .
Record item.
(08/10/04) Sagamore reported that JCI will be
replacing all control valve actuators due to a
manufactoring defect (plastic composition). It was
recommended to Sagamore that JCI confirm the
number of actuators being replaced. NASD
stated JCI must be out of the east and west
accademic wings by 08/16/04 so that room
cleaning can begin.
(08/17/04) JCI has not yet begun to replace the
valves. Since cleaning of classrooms is now
underway, JTC stated that JCI shall not start
valve replacement work until classroom cleaning is
done.
OBSERVATION REPORT NO. 124 North Andover High School Page 16
Sagamore 07/20/04 046.5.2 Punchlist- Sagamore will start work on F&T
JTC 07/27/04 punchlist on 06/28/04, and will work on punchlist
DDP 08/10/04 items during down time of the valve
08/17/04 recommissioning effort.
(06/29/04) Greg Roberts reported Sagamore was
on site on 06/28/04, but was not on site on
06/29/04. JTC will contact Sagamore.
(07/13/04) Sagamore punchlist is completed to
date with the exception of the fin tube covers not
matching the fan coil units. Sagamore will be
replacing the fin tube covers in the weeks to
come.
(07/20/04) JTC reported Sagamore is still
investigating mismatched cover color issue.
(07/27/04) Sagamore advised that both the fin
tube covers and fan coil units on the first floor
were the colors selected by DDP during shop
drawing review. Following the job meeting, DDP
and JTC confirmed that the fin tube cover color
was the off-white color selected by DDP.
However, DDP and JTC agreed that the fan coil
units were not the off-white color selected by
DDP, but were insted the manufacturer's
"standard beige." As perviously stated by DDP,
the fin tube covers on the first floor must match the
adjacent FCU's. JTC will so advise Sagamore.
(08/10/04) JTC reiterated that Sagamore must
directly address the mismatched fin tube cover
color at the first floor.
(08/17/04) Following the meeting, DDP, JTC, and
Sagamore inspected first floor fin tube/fan coil
color match. Sagamore stated their opinion that
the fan coil color is closer to the color selected by
DDP than the "standard beige." DDP requested
that Sagamore confirm what was shipped. DDP
will take this information under advisement.
Sagamore 06/22/04 U46.5.3. Dust Collector- Panel voltage will be corrected on
07/13/04 06/29/04, and fittings completed.
(07/13/04) Dust collector controller is on site and
all that is left for completion is final electrical
connections.
OBSERVATION REPORT NO. 124 North Andover High School Page 17
Sagamore 06/22/04 U46.5.4 Water Treatment System - Sagamore stated
07/27/04 water was retested last week and found to have
08/10/04 29% glycol content (specified range is 31-33%)
08/17/04 Sagamore is prepared to add more glycol with the
rust inhibitor and other chemical additives that are
on site, and startup the system. Greg Roberts
noted that the system only ran for 24 hours after
the last glycol was added, and recommended that
the system be run longer to more thoroughly mix
the glycol.
(07/27/04) Sagamore reported water treatment
system work is completed, and that subcontractor
will be called back to site to retest after coil in
ERU-2 is completed.
(08/10/04) Sagamore stated water treatment work
will be completed the week of 08/16/04.
(08/17/04) Sagamore stated water treatment work
will be completed by 08/20/04.
Sagamore 06/22/04 U46.5.5 As Built Drawings - Sagamore has piping `as
builts'on a cad disk, and has received a second
copy of ductwork `as builts' to be added to disk.
Sagamore 06/22/04 U47.1 ERU-2-GR recommended that Sagamore check
the outside air damper operator at ERU-2, after
recently observed high cooling air discharge
temperatures.
Sagamore 06/22/04 U47.2 Control Booth Split System - GR advised that
Sagamore should check piping joints for leakage.
Sagamore 07/27/04 U47.3.1 Burners - Greg Roberts reported that Power
Flame has been back to site, but Boiler#1
continues to"lock out."
Sagamore 07/27/04 U47.4.1 AHU-3 - Sagamore has replaced the pulley, but
must still provide Greg Roberts with replacement
belts.
F&T 07/20/04 U49. HVAC Issues - Greg Roberts reported the following items
need to be reviewed by Fitzemeyer & Tocci.
OBSERVATION REPORT NO. 124 North Andover High School Page 18
Sagamore 08/10/04 U49.1.1 Condensation on Piping - DDP reviewed
F&T 08/16/04 observations that condensation is forming on
08/17/04 uninsulated strainers, etc. with F&T. F&T stated
08/19/04 that HVAC specification requires that the entire
piping system be insulated, and any valves,
strainers, etc. that are not now insulated shall be.
Sagamore so advised by JTC.
(08/10/04) Sagamore stated insulation will be
completed the week of 08/16/04. It was
discussed that some stains result from
condensation forming on hall valve handles which
are not typically insulated; DDP will advise F&T.
(08/16/04) F&T advised DDP that condensation
at valve handles is not an issue that is typically
addressed by insulating handles. If this is a
scattered occurance, F&T recommends the valves
be checked for leaks.
(08/17/04) Sagamore discussed condensation
issues with Ed Estabrook/ F&T, and requested
that F&T meet at the site while the high humidity
conditions still exist above the ceilings.
(08/19/04) Postscript- F&T, Sagamore, JTC and
DDP met on 08/19/04 and viewed condensation
conditions. F&T and Sagamore will again meet at
the site on 08/25/04 when Greg Roberts is
available to describe how A/C system has been
operated.
Sagamore 07/27/04 U49.1.2 Condensation at Roof Deck- DDP reviewed
08/17/04 observation that condensation is forming on deck
over the Consumer Science Room with F&T.
F&T recommended that rooftop unit curbing be
checked for air leaks and complete insulation.
Sagamore so advised by JTC.
(08/17/04) Sagamore confirmed that bottom of
curb is insulated.
Sagamore 07/27/04 U49.2.1 Split System - DDP reviewed observations that
split system A/C piping is uninsulated with F&T. _
F&T stated that specifications require all split
system piping to be insulated. Sagamore so
advised by JTC.
Sagamore 07/27/04 U49.3.1 ERU's - DDP and RDK have been advised by
08/10/04 F&T that the specified 550 discharge air
08/17/04 temperature is a typo, and the temperature should
be 650-700. JTC advised Sagamore to confirm
that JCI followed contract documents for
addendums and the accepted A/C alternate.
(08/10/04) Sagamore stated the three (properly
sized) new control valves will be on site by
08/11/04, and the ERU unit piping will be
completed by 08/13/04.
(08/17/04) Sagamore reported that all new valves
for ERU's have not yet been received from JCI.
OBSERVATION REPORT NO. 124 North Andover High School Page 19
DDP 07/20/04 U49.4 Unoccupied Schedule - Greg Roberts questioned
F&T if unoccupied control sequence is contributing to
condensation. DDP will review with F&T.
U50.
V. ELECTRICAL
3Si 03/23/04 V59.3 Room 3011 -3Si has a recording meter on the
outlets in IDF 3011 due to three UPS units being
damages.
3Si 05/11/04 V59.3.1 Room 3044- Paul Szymanski noted a power
TEC issue has also been observed at V/D room 3044.
DDP reported that 3Si and TEC are working to
isolate and identify the problem, but nothing has
been discovered that can be positively
addressed.
TE 05/04/04 V69.4 Gamewell Comments -TE will call Gamewell to
discuss questions as to system wiring, how
wiring can affect panel performance, and to confirm
Gamewell's recommendations and requirements.
RDK 07/27/04 V70.1 Duct Smoke Detector Testing- RDK will
NAFD coordinate testing with Greg Roberts and the fire
department.
Maiuri 08/17/04 V70.1.1 FA/Duct Smoke Test- MCG stated Maiuri
personnel are on site daily and will assist with
testing the duct smokes.
-- 07/20/04 V71.7 ABP Default- The folowing ABP action items
have been deleted from the observation report
due to ABP's default, and will be addressed
outside of the observation report format:
A48.4.06 (security wiring); B33.2.4 (Studio
Doorbell); J18.1.3 (PR#21 Cost Proposal);
J21.1.4 (WO #33, 40 and 41 revised cost
proposal); K08 (WO#27 cost proposal); K08.1.1
(WO#28 revised cost proposal); V61 (Gym
backboard switches); V64.4 (Gym lights); V68
(Kitchen doorbell); V69.3.1 (Fire alarm wiring);
V71, V71.2 (Response to outstanding issues).
DDP 07/06/04 V72. Lamp List- Greg Roberts requested a list of lamps used on
TE the project. DDP noted this is to be part of the electrical
O&M manuals, but with ABP's default DDP will request a list
from Thompson Engineering.
OBSERVATION REPORT NO. 124 North Andover High School Page 20
DDP 07/27/04 V74. Consession Stand Data/Power - In response to DDP's
3Si question, JTC reported that Systems Contracting has not
yet pulled the fire alarm cable to the concession stand.
Before they do, DDP stated that a communications cable
should be pulled with it. DDP will consult with 3Si and
advise as to the type of cable needed.
3Si 08/10/04 V74.1 Concession Stand Video - NASD forwarded to
DDP cabling requests from the cable commission
for broadcasting events. DDP to review with 3Si.
-- 08/10/04 V75. Security Cameras - NASD will be reinstituting the installation
of security cameras under a separate contract. It was
discussed that the 120 volt power for exterior cameras
mounted on light poles has not been completed, and that the
conduit routing is not as specified due to damage to
underground conduits. However, it was stated that a
conduit path exists to all three exterior locations.
08/17/04 V76. Electrical Punchlist Status - MCG provided an update on
progress, as follows:
MCG 08/17/04 V76.1 Punchlist/General - Maiuri has been averaging
five workers per day, and has nearly completed
the DDP punchlist and is approximately 2/3rds
through the TE punchlist. MCG will be updating
the punchlist status letter previously submitted.
DDP 08/17/04, V76.1.1 Disputed Items DDP will advise as to items
listed as "N.I.C." MCG reported that they do not
have all work orders and other contract change
documents.
TE 08/17/04 V76.1.2 TE Site Visit- TE will meet with MCG on 08/30/04
MCG to review status of punchlist.
Maiun 08/17/04 V76.2 Gym Lights - MCG advised that six components
of the high-low system are on order.
Maiun 08/17/04 V76.3 Wrestling Room Lights - MCG advised missing
parts have been ordered.
Maiun 08/17/04 V76.4 Auditorium Step Lights - MCG advised
components to complete top steps not yet on
hand.
DDP 08/17/04 V76.5 Flagpole Lighting - In response to discussions,
DDP will review control specified with TE.
V77.
OBSERVATION REPORT NO. 124 North Andover High School Page 21
W. HAZARDOUS MATERIALS
JTC 04/27/04 W06.1 Existing Auditorium Soffit- DDP authorized
Clerk removal of asbestos containing soffit boards on a
time and materials basis.
W08.
X. MISCELLANEOUS
Bass 08/26/03 X48. Sarnafil Roof Flashing - DDP, JTC and Stanley discussed
Stanley roof edge detail. DDP explained that Work Order required
JTC, Stanley and Bass to coordinate respective work. It
was discussed and agreed that Boss would provide
Stanley with stock so Stanley can form "snap on"trim. DDP
stated, in principle, this would be additional work by
Stanley, and less work (credit) by Bass (but no net change
in cost to Owner).
JTC 05/25/04 X67.05.1 Boiler Room - JTC advised that they believe the
Sub 06/01/04 water is entering the boiler room at the
06/08/04 brick/foundation wall joint. JTC is installing a
07/20/04 french drain,to be tied into the vertical clean out
pipe at the corners. Wall penetrations still are to
be made watertight by the respective subs.
(05/04/04) JTC stated supplemental drainage has
been installed;with no further leaking at wall
observed. JTC advised that one irrigation line
penetrating the wall must still be made to be water
tight.
(05/25/04) JTC noted that some leaking was
observed at Stair #8 after yesterday's rains.
(06/01/04) JTC stated no leaks at Stiar#8 were
observed after the recent rain.
(06/08/04) JTC stated no leaks were observed
the past week.
(07/20/04) JTC stated no leaks were observed
the past week.
JTC 05/04/04 X67.10 Roof Leak Status - In response to MBC's
questions, JTC stated that all leaks have been
permanently repaired, with the exception of
cupola doors, which are awaiting hardware and
weather stripping.
JTC 06/22/04 X67.11 Cafeteria Roof Leak - Greg Roberts reported that
a leak at the east end of the cafeteria has
reappeared. JTC will investigate.
OBSERVATION REPORT NO. 124 North Andover High School Page 22
Musco 05/11/04 X69.1.3 Lighting Submission -After discussion, it was
05/18/04 agreed that to expedite lighting installation, Musco
submission is "approved as noted - contingent on
satisfactory compliance with specified lighting
criteria". Musco shall re-submit for record.
(05/18/04) Musco to submit electrical controls per
TE comments.
NASD 07/06/04 X71. Garbage Disposals - Greg Roberts reported that an official
DDP request will be forth coming from school department for
installing garbage disposals in the Consumer Science
classroom. In advance of the formal request, DDP will initiate
proposal request.
DDP 07/20/04 X71.1 Garbage Disposals - The relative safety and long
term maintenance issues associated with
providing garbage disposals was discussed.
Greg Roberts recommended "batch feed"type
units be provided for safety. NASD asked DDP
to investigate whether garbage disposals are
appropriate for the high school student use.
X72.
Y. PROJECT CLOSEOUT
Clerk 04/27/04 Y12.4 As Built Drawings - JTC has furnished clerk with
RWS as built mark ups of fire protection and plumbing
drawings. Clerk and RWS to review.
Clerk 03/02/04 Y13. Inventory - The clerk will begin an inventory of spare
materials and parts to be forwarded per specifications.
JTC 06/22/04 Y13.3 Auditorium Seat Inventory- JTC passed along to
S-D DDP a transmittal from Slay Dale stating seating
maintenance has been delivered. Clerk is
unaware of any such delivery. JTC Will advise
Slay Dale to deliver materials to clerk's attention.
JTC 07/27/04 Y14. Closeout Submittals - JTC furnished DDP with a
Subs spreadsheet showing the status of the various manuals,
as-builts, warranties, and maintenance stock specified.
Y15.
ZZ. CONSTRUCTION PROGRESS
-- 08/17/04 ZZ125.Construction Progress -The architect walked the site and
observed the following. Record item.
OBSERVATION REPORT NO. 124 North Andover High School Page 23
08/17/04 ZZ1 25.1 South Fields - Loam being stockpiled on baseball
field. Bleachers nearing completion. Interior of
concession stand nearly complete. Record item.
08/17/04 ZZ1 25.2 South Site - Curbing installation well along. Prep
for walk at south entry begun. Record item.
08/17/04 ZZ1 25.3 North Fields - Paving at track nearly completed.
Emergency road paved. Record item.
ZZ126.
The next job meeting will be held at 1:00 PM on Tuesday, 24 August 2004 at the Contractor's
Trailer.
The discussions of this meeting are recorded as understood by the writer, who should be notified of
any omissions or corrections. Unless the writer is notified to the contrary, these notes are presumed to
be correct.
Ric and N. Rice
DiNISCO DESIGN
RNR/dp
cc: Louis Minicucci Gene Kingman
Harry Harutunian Kevin Murphy
Frederick King Ed Estabrook
Nancy Kurtz Kevin Burke
Susan Nicholson Richard Weber
Evan Karalolos Mike DiBari
Department of Public Works Kenneth DiNisco
Julie Parrino Richard Greenlee
NA Planning Board Angel Khazadian
Doug Seaboldt Jon Oxman
Robert Feinberg, ESCOA Bill Sousa, RDK
Paul Szymanski
cc (hand): Philip Briselli
Patrick Sait-ta
Planning Board Site Inspection Sheet
Date:
/'Y el,
Permit: Watershed Det Subdivision (.S ,)
Issued:
Address: z
Agent/Representative/Owner Present:
Findings:
a r c h i t e c t s a n d p l a n n e r s
Limited
(OBSERVATION REPORT NO. 125
Project: North Andover High School '4 '
Date: 24 August 2004
Location: Job Site NOR DI I/1 M V,,
Present North Andover School Department (NASD) Susan AAh ohson (partial) �
Greg Roberts
Paul Szymanski (partial)
North Andover Building Commissioners (NABC) Bob Nicetta
John T. Callahan & Sons (JTC) Philip Briselli
Dave Anderson"
Northeast Turf (NET) John Huard (partial)
Gale Associates Jim Boudreau (partial)
Dale Harris (partial)
Municipal Building Consultants (MBC) Pat Saitta
Schofield Brothers of New England (SBNE) Matt Smith
Clerk of Works (COW) Richard Warner
DiNisco Design Partnership (DDP) Richard Rice
Action Date
A. SITE SAFETY AND SECURITY
Maiuri 08/17/04 A48.4.13 Security System - Domenic Nicosia/MCG
Simplex reported that the shorts at doors appear to be at
the frame, and that Mauri is protecting the wiring
with grommets and sleeves. MCG reported that,it.---
appears that other operational problems stem
from the power draw of the LED's in the devices.
MCG stated Simplex has been called to address
this, and that the LED's may be deactivated in
order to solve the problem. Simplex will also
reprogram where it has been found that multiple
devices have the same address.
Simplex 08/24/04 A48.4.14 Security System NASD reported that Simplex
Maiuri has not been observed on site to correct the
programming/equipment issues. It was stressed
that the security system must be corrected before
the start of school on 09/07/04.
A52.
Kenneth DiNisco Richard N. Rice Gary E.Ainslie Christopher Huston Donna DiNisco
8 7 S u m m e r S t r e e t B o s t o n M A 0 2 1 1 0 6 1 7 . 4 2 6 . 2 8 5 8 f a x 4 2 6 1 4 5 7
w w w . d i n i s c o c o m
OBSERVATION REPORT NO. 125 North Andover High School Page 2
B. OWNER ISSUES
DDP 07/27/04 B47.1.3 Tech Ed Equipment- Greg Roberts questioned
3Si 07/29/04 whether all F&E (i.e. tables and chairs) have
been installed. DDP will review with 3Si.
(07/29/04) 3Si advised DDP that chairs and
"loose tables" were not provided with tech ed
equipment. DDP will order remaining furnishings.
DDP 07/27/04 B47.1.4 Tech Ed Equipment - JTC advised that they
TE 08/17/04 have instructed Maiuri not to begin electrical
Clerk 08/24/04 connections to shop equipment until all F&E
equipment has been installed.
(07/29/04) Maiuri faxed a list of equipment
connection questions to DDP.
(08/17/04) DDP will review with TE.
(08/24/04) NASD needs the equipment in the
fabrication shop to be completed for the start of
school. The clerk will contract the F&E installer to
direct him to complete his work.
R&R 08/13/04 B49.2.2 Admin/Arts Windows (Postscript) - In a phone
conversation on 08/13/04, R&R advised DDP that
scissors arm operators will be adjusted so that
windows close at the small admin Wing windows.
At the arts wing, A&A stated single arm operators
must be installed per sample. DDP agreed to this
approach.
DDP 03/30/04 B50.. Gymnasium Switches - Greg Roberts requested that DDP
TE investigate substituting pushbutton switches for gym
lighting, curtain, and backboard counters. GR noted that the
key switches installed are all keyed differently and require a
good deal of time to operate individually. The pushbuttons
could be secured from unauthorized use by a surface
mounted locking cabinet. Also, GR requested that the gym
lighting only be operated by the center control point. DDP
and TE to review..
OBSERVATION REPORT NO. 125 North Andover High School Page 3
-- 08/17/04 B56.1.1 South Fields/Football Practice- It was discussed
08/24/04 that Field Turf must complete their punchlist and
receive formal acceptance of the south fields taken
before the field can be used. DDP reported that
Gale and Field Turf are scheduled to inspect the
field tomorrow (08/18/04) at 11:00 AM. Jack
Stephenson stated that given the timing, the first
day of practice on the south fields would be
Thurday morning, 08/26/04.
(08/24/04) Bob Nicetta stated that while it may be
possible for the coaches to get players on and off
the field safely, too much construction work is
ongoing to insure the safety of the inevitable
spectators, especially during a scrimmage now
planned for 08/30/04. Therefore, Bob Nicetta
stated that he will not allow access to the field until
the adjacent pressbox and site construction is
sufficiently complete and safe for spectators.
Record item.
DDP 08/17/04 B56.2.1 Field Lighting Controller-Jack Stephenson
expressed concern that a second remote controller
be obtained to assure that the lights can be
operated if the provided controller malfunctions.
JTC stated that in the event of such a failure, the
lights can be turned on and off manually. DDP will
clarify for the school department how the ballfield
lights operate.
MUSCO 08/17/04 B56.2.2 Field Lighting Controller-JTC reported that the
controller was damaged in shipping and that
Musco is replacing it.
-- 08/24/04 B58.2 Parking - Parking availability at the start of school
was discussed with Susan Nicholson, as follows.
Record item.
JTC 08/24/04 B58.2.1 Space Numbering - JTC will have.the north lot
numbered on 08/27/04. 'The south lot will be
finish paved, striped, and numbered by 09/13/04.
It was agreed that the school will arrange for
off-site parking through 09/14/04 for students who
would otherwise use the south lot. JTC was
made aware that the south lot will be needed for
the home football game on 09/10/04, and for town
voting on 09/14/04.
DDP 08/24/04 B58.2.2 Parking Signs -The school department has
NASD purchased signs (visitors parking, etc.). DDP,
JTC JTC and NASD will coordinate installation.
OBSERVATION REPORT NO. 125 North Andover High School Page 4
-- 08/24/04 B58.2.3 South Lot Parent Drop-Off - Susan Nicholson
reported that starting on 09/07/04, parents would
use the drop-off lane at the south east parking lot.
Drop-off and pick-up periods would be 45
minutes in the morning and afternoon. JTC stated
this will not be a problem for whatever
construction activities that may remain. Record
item.
DDP 08/17/04 B60. Noise Complaint- Paul Szymanski (PS) reported that he
NASD had received a telephone complaint from a neighbor on
Osgood Street complaining of a loud whine from the HVAC
system. PS will forward to DDP a copy of the letter also
received.
DDP 08/19/04 B61. South Field's Fences and Gates (Postscript) - JTC
NASD forwarded to DDP cost proposals for gates requested by
NASD at south fields. DDP to review with Paul Szymanski.
DDP 08/24/04 B61.1 South Field Fences and Gates - Paul Szymanski
approved the proposed layout. JTC has
authorized Costco to proceed. DDP will issue a
work order for record.
-- 08/24/04 B61.2 South Field Ramp Rails -JTC is pricing the ramp
08/27/04 rails needed at the bleachers from multiple
sources. Record item.
DDP 08/27/04 B61.2.1 South Field Ramp.Rails - JTC has authorized
fabricator to proceed. DDP will issue a work order
for record.
DDP 08/17/04 B62. Concession Stand/Water Fountain -Jack Stephenson
requested that a hose connection be added to the outside of
the concession stand for attachment of a drinking water
device during practices. DDP to further'review with NASD
and advise JTC of the plumbing change required.
B65.
C. PERMITS & INSPECTIONS
-- 03/26/02 CO3. DPW Permits
JTC 06/01/04 C99.07.6 MEP Punchlists - JTC to provide DDP with
copies of the plumbing, HVAC and Electrical
(South Wing) punchlists with completed items
crossed off for verification by DDP's consultants.
OBSERVATION REPORT NO. 125 North Andover High School Page 5
-- 08/17/04 C122.2 Erosion Control - SBNE reported that JTC had
08/24/04 addressed the erosion control items noted the
previous week, and that the site performed well
during the recent heavy rains. SBNE noted that
some gully erosion near CB13 needs to be
repaired. Record item.
JTC 08/17/04 C124.1 Concession Stand - Following the meeting, JTC
and DDP observed progress at the concession
stand itself. JTC will expedite completion with
consideration to a Health Department inspection.
DDP advised coved base should be installed on
the block walls.
-- 08/24/04 C124.2 Concession Stand - Bob Nicetta advised that too
much construction work remains at the bleachers
and concession stand/toilet building to allow
player access to toilet facilities at this time.
Record item.
-- 08/24/04 C125. Erosion Controls - SBNE reported that the site performed
well during the recent heavy rains. However, silt fencing
requires repair in three locations, and JTC will replace the
boots in all catch basins. It was discussed that damage to
the erosion controls at the old Chickering Road gate was
done by the town's drainage contractor. Record item.
C126.
D. CONSTRUCTION SCHEDULE
-- 08/24/04 D144. Construction Progress - JTC gave an overview of
upcoming activities, as follows. Record item.
-- 08/24/04 D144.1 Concrete - Major pours at walks scheduled for
08/26/04 and 08/27/04, with all flatwork to be
completed by 08/31/04. Record item.
-- 08/24/04 D144.2 Bituminous - Walks at southeast parking lot being
placed today. JTC is seeking a commitment from
Brox to complete finish paving in roadways and
parking lots the week of 08/30/04. JTC will be
raising covers and grates and sweeping
pavements through 08/30/04. Record item.
-- 08/24/04 D144.3 Stairs - Handrail will be back from galvanizer and
ready for installation as early as 08/27/04. Record
item.
OBSERVATION REPORT NO. 125 North Andover High School Page 6
-- 08/24/04 D144.4 Fencing - Costco will start coring for fence posts
at bleachers on 08/25/04, with completion
possibly on 08/27/04.
-- 08/24/04 D144.5 Loam - Now roughed around pavements, with
Emanouil scheduled for 08/28/04 through 08/31/04
to complete islands, etc. Record item.
D145.
E. SUBMITTAL SCHEDULE
E16.
F. SUBMITTALS
DDP 04/13/04 F85.3.4 Laticrete Recommendation - PM recommends that
06/28/04 given the use and cleaning materials employed at
NAHS (which PM will confirm in a visit to the
kitchen), the Spectra Loc floor grout should remain.
CTI offered an extended warrantee; DDP stated a
bond may be required if this is accepted. Laticrete
must put their recommendation in writing.
(06/28/04) DDP received letter dated 04/23/04
directly from Laticrete on 06/28/04. DDP will
consider recommendations.
Musco 05/18/04 F100.1 Field Lights - Field lights returned "Approved as
noted/Resubmit items noted" (electrical control
panel components).
Musco 05/27/04 F100.1.1 Field Lights - Musco shall revise and re-submit for
record the structural calculations.
DDP , 07/20/04 F100.1.2 Field Lights - Paul Szymanski reported that a
07/23/04 lighting submittal package had been forwarded to
- the school department from Musco. PS will
forward a copy to DDP for processing (Received
by DDP 07/23/04).
F114.
G. COORDINATION DRAWINGS
G28.
H. PAYROLL REPORTS
H42.
OBSERVATION REPORT NO. 125 North Andover High School Page 7
I. REQUISITIONS
143.
J. CHANGE ORDERS
DDP 06/29/04 J26. PCO LOG - JTC distributed a PCO Log updated as of
JTC 06/29/04. DDP and JTC reviewed outstanding PCO's that
JTC would like to clear. DDP and JTC to review further.
DDP 07/20/04 J27. Electrical PCO's - DDP and JTC will meet to review
JTC electrical PCO's in preparation for a meeting with the
bonding companies.
J28.
K. WORK ORDERS
K15.
L. FIELD ORDERS
L18.
M. PROPOSAL REQUESTS
Capital 08/05/03 M25.2.1 PCO #075 - DDP responded to Capital's letter
with regard to credit offered for VCT replaced by
terrazzo. Capital to revise credit per
specifications.
M36.
N. REQUEST FOR INFORMATION
DDP 04/01/03 : N50. RFI #267 - DDP will issue letter to NAPD and Building
Department advising them that sprinkler heads in elevator
shaftway and the elevator shunt trip will be deleted in
accordance with the code moratorium still in effect.
DDP 12/02/03 N89. Clothes Dryers - JTC noted no vents are shown on HVAC
F&T drawings for dryer in Study Skills #2050 and the kitchen.
DDP to review with F&T and advise.
N96.
O. DEMOLITION
005.
OBSERVATION REPORT NO. 125 North Andover High School Page 8
P. SITE WORK
JTC 09/30/03 P41. Art Plaza Pavement - DDP reviewed CRJA site visit report
of 09/26/03. JTC stated radius will be cut. The clerk
observed that the puddles noted disappeared in less than
an hour, and low spots are very shallow.
DDP 10/08/03 P41.1 Arts Plaza Pavement (Postscript) - CRJA
Clerk followed up, advising DDP that low spots would
be an icing concern, and requested that the
tolerances be checked per the paving spec (See
Spec 02500-3.01-19). DDP to advise clerk to
confirm.
JTC 03/16/04 P49. Catch Basins - SBNE noted that JTC has yet to install the
hoods on the catch basin structures as required.
NASD 04/20/04 P52. Commemorative Plantings - Paul Szymanski advised that
DDP the school will be planting some memorial trees, and is
looking into some way to incorporate future memorials in an
orderly, planned fashion. DDP and NASD will coordinate.
NASD 07/20/04 P53.8.2 Track/Softball Scoreboard - It was discussed that
07/27/04 the track scoreboard could be fed from the
construction trailer service on Presscott. DDP will
consult with Thompson Engineering to provide
Paul Szymanski with the information needed to
obtain a permanent service from this location from
Mass Electric.
(07/27/04) Information forwarded to Paul
Szymanski by DDP on 07/26/04.
JTC 06/29/04 P56.3.3 Sand/Loam Mix Test- P&S will take samples of
07/20/04 stockpiled loam and will mix with samples of
08/10/04 Pitcherville Sand and will test for optimum
sand/loam/organic content.
(07/20/04) P&S test results forwarded to JTC.
JTC questioned apparent reversal in
recommended sand mix ratio. Follow up with P&S
needed to clarify.
(08/10/04) It was discussed whether the P&S
recommendation for organics and mixing
constitutes an extra to the contract. DDP agreed
that the "means and methods" are up to JTC,
noting the "final product" is what JTC is
responsible for. As for adding organics to the top
soil, DDP interprets this as a specified
requirement; JTC will review the specifications
language and respond.
OBSERVATION REPORT NO. 125 North Andover High School Page 9
-- 06/29/04 P56.3.4 Mixing Sand and Loam - JTC noted that Section
02900 specifies mixing sand and loam by
harrowing, and at this time this is JTC's intent.
Bob Pine stated that more satisfactory results will
be achieved far more easily by mixing with loader
buckets after the loam is screened. P&S will come
to the site to monitor JTC's mixing of the sand and
loam to establish a procedure and consistant
result.
JTC 06/29/04 P56.3.6 Drainage -JTC and DDP described how the field
CRJA 08/24/04 sub grade for drainage as shown on the contract
drawings no longer reflects the final grades due to
changes made necessary by the athletic field
upgrades. CRJA agreed that adjustments to
J-drain and collector pipe layout would be
acceptable as long as"downhill"criteria is met.
CRJA will inspect subdrainage when completed,
and before being covered with sand, to see that
this criteria is met.
(08/24/04) In response to CRJA's inquiry as to
when the baseball field drainage work would
commence, JTC advised DDP that this work
would not begin before 09/07/04.
JTC 06/29/04 P68.1 Leaning Trees - CRJA expained that they do not
Emanouil require trees to be guyed because studies have
shown that unguyed trees are stronger. However,
the spec does require trees to be plumbed if
required. JTC will advise Emanouil to reset the
trees.
Emanouil 06/29/04 P70.1 Lawns at Arts Wing - JTC agreed that Emanouil
would repair the bare spots in the lawn between
the arts classrooms and the driveway.
DDP 07/23/04 P72.3 Pavement Grades at Concession Stand
(Postscript): DDP faxed sketch of revised grading
to JTC on 07/23/04. DDP to follow up with Work
Order.
-- 08/10/04 P75.4 Toe Boards - It is to be reconfirmed whether toe
08/30/04 boards are recommended at track and field venues
through conversations with Jack Stephenson and
Cape and Island. Record item.
OBSERVATION REPORT NO. 125 North Andover High School Page 10
-- 08/24/04 P75.4.1 Toe Boards - Gale reiterated that it is their
08/30/04 recommendation to install the toe boards, but
recognizing that the installation has some
maintenance implications will again continue with
Jack Stephenson. (Postscript - On 08/30/04
Gale confirmed with Jack Stephenson that toe
boards shall be provided. Record item.)
-- 08/24/04 P76. Athletic Field - Progress was reviewed with Gale and JTC
as follows. Record item.
-- 08/24/04 P76.1 South Field - Gale advised that stones have
been removed, hash marks painted, and low infill
areas brought up to grade. DDP signed
acceptance certificate at the 08/24/04 meeting.
DDP 08/24/04 P76.1.1 Painted Lines - NASD has requested that a
Gale proposal request be issued for painted practice
soccer lines and for painted field hockey lines at
the south field because the school department's
line painter is unavailable. Gale to provide DDP
with line drawing.
DDP 08/24/04 P76.1.2 Manhole- Some rework is necessary at manhole
Gale outside the field of play. Gale reported that this is
not a safety concern, but rather that the manhole
outline is telegraphing through the turf.
NET 08/24/04 P76.1.3 O&M Instructions - NET to furnish O&M manuals
NASD and schedule owner instruction of turf field
maintenance.
JTC 08/24/04 P76.1.4 Accessories - JTC stated temporary goal post
pads will be on site in a few days, and field goal
netting complete by 08/31/04.
JTC 08/24/04 P76.2 North Fields - JTC has not yet received turf
installation schedule from Field Turf. JTC is
getting a"Late Date"for track surfaces from Cape
and Island.
Gale 08/24/04 P76.3 Bleachers - DDP requested that Gale do a
punchlist inspection of bleachers on 08/24/04, so
that installer can be made aware of any items to
be corrected when they return on 08/30/04.
OBSERVATION REPORT NO. 125 North Andover High School Page 11
-- 08/24/04 P76.3.1 Bleachers at Pole - Bleacher supplier, Dant
Clayton, to advise as to corrective meansures to
close bleachers to pole base at concession stand.
JTC reported that it was their expectation from
previous discussions with Dant Clayton that
bleachers would "run through." Other than this
one interface issue, JTC reported that they have
been very pleased with Dant Clayton's efforts on
the project.
P77.
Q. ARCHITECTURAL
Bass 04/27/04 Q30.8.03 Academic Wing Gravel Stop does not conform at
Stanley 07/20/04 south side, and is coming loose on north side (item
07/27/04 Q30.7.1)
08/10/04 (08/19/03) -Gravel stop issues shared by JTC
(blocking), Bass (forming) and Stanley
(installation). DDP and JTC will inspect entire
roof perimeter and list areas be reworked.
(04/27/04) JTC advised that Bass will likely not
perform any of the repairs previously reviewed
without a formal punchlist.
(07/20/04) Bass, JTC, DDP and clerk met to
review outstanding cladding items. DDP
reviewed with Bass cladding issues from exterior
punchlist inspection. Bass will be on site the
week of 07/26/04 to address outstanding items.
Bass will forward to DDP a drawing of proposed
cladding between clerestory and curtainwall on
north side of arts wing. It was agreed that brake
metal backed by polystyrene insulation would be
used in this area.
(07/27/04) JTC advised that Bass will be on site
by 07/28/04.
(08/10/04) JTC reported that Bass has not yet
come to the site.
DDP 04/13/04•. Q91. Auditorium Chair Lift.- DDP will make calls to clarify Mass.
Elevator Board's position on whether the chair lift is to be
inspected.
Q92.
R. STRUCTURAL
R37.
OBSERVATION REPORT NO. 125 North Andover High School Page 12
S. FIRE PROTECTION
RWS 06/22/04 S20.1 System Pressure - It was reported that the
Hampshire technician on site feels the reported
180# pressure in the system is proper. DDP will
discuss with RWS.
S21.
T. PLUMBING
Grasseschi 05/18/04 T30.2.1 Gas Shutoff Valve - DDP has been informed by
RWS that all their conversations with Grasseschi
were with regard to Grasseschi's request to
substitute a standard access panel for a valve
cabinet (which was done). RWS at no time
instructed Grasseschi that the door should have a
lock. Grasseschi is to remove lock and install latch
per detail on 8.0.3.
Grasseschi 04/13/04 T33. Photo Dark Room - Greg Roberts advised that backflow
preventer has been installed, but exposed hot and cold
water piping must be insulated.
Grasseschi 05/04/04 T35. Push Button Faucets - Greg Roberts reported that kids have
been taking the push buttons off of the lavatory metering
faucets. Upon examination, NASD found that set screws
were not tightened. Grasseschi to tighten set screws, and
shall provide NASD with spare knobs.
Grasseschi 06/04/04 T36.1 Hot Water(Postscript) - RWS memo distributed
on 06/07/04. Grasseschi to advise on system
balancing.
DDP 06/08/04 736.2 Hot Water- Greg Roberts,questioned type of
RWS. tanks and piping arrangement, wondering if this
would play some part in the hot water circulation
issue. JTC stated tanks were piped per RWS
directives in response to a question from
Grasseschi. DDP will review further with RWS.
T37.
U. HVAC
Maiuri 06/08/04 U30.1.2 Fume Hood Fans -ABP has ordered special
MCG 08/17/04 starter required for two fans.
(08/17/04)JTC advised MCG that starters are
required at two fume hood fans.
OBSERVATION REPORT NO. 125 North Andover High School Page 13
Sagamore 06/15/04 034.1.2 Mainstreet Fin Tube - DDP reviewed conditions
08/10/04 and found that fin tube cover has been
adequately screwed to support structure.
Sagamore shall consistently cope the end covers
tight to columns, concealing the piping.
(08/10/04) Sagamore has ordered end caps for
Main Street fin tube.
F&T 03/16/04 U35. Kitchen ElevatorShaft - It was discussed that even with
keeping the boiler room doors closed, a strong down draft is
keeping the elevator shaft cold in the kitchen. DDP will
review with F&T.
Sagamore 06/15/04 037.6.2 Systems Balancing - F&T has returned the report
06/22/04 for revisions. At the 06/15/04 meeting, F&T noted
07/20/04 that information for pumps and several fans was
08/17/04 not provided. Furthermore, the water system
must be rebalanced following the recommissioning
of the control valves.
(06/22/04) Sagamore reported balancing will be
completed by 07/16/04.
(07/20/04) JTC advised that the last of the
balancing will be completed following the
replacement of ERU-2's coil this week.
(08/17/04) System Balancing - Sagamore
advised that balancing will be completed by
08/20/04.
Sagamore 06/22/04 U41.2 Pipe Insulation - Sagamore stated
07/13/04 repair/completion of insulation will start on
08/17/04 06/28/04.
(07/13/04) Sagamore stated insulation will be
replaced once faulty coils are replaced.
(08/17/04) Sagamore stated insulator is on site
and will be completed next week.
Sagamore 06/22/04 U43.1.1 Sagamore advised that the last of the filters are
07/13/04 due on site on 07/06/04 and will be installed on
07/27/04 delivery.
(07/13/04) Filters are on site.
(07/27/04) Sagamore advised that filters on hand
were not correct, and that replacements have
been ordered.
-- 06/08/04 045.1 Boiler tweak- Greg Roberts reported that
Sagamore has repaired the leak between
sections. However, the boiler has not since been
fired to determine if repair will hold.
OBSERVATION REPORT NO. 125 North Andover High School Page 14
-- 07/20/04 U46.5.1 Valves - Starting on 07/05/04, Sagamore, JCI and
07/27/04 Thomas Young (balancer) will be on site to
08/10/04 recommission valves and rebalance the water
08/17/04 system. Sagamore will be on site to repair piping,
etc. found to be necessary during the
recommissioning. By 07/16/04 the balancing will
be completed, and RDK can retest a sampling of
equipment.
(06/29/04) Greg Roberts has been informed by
JCI that work will not start on 07/05/04, but has
been rescheduled for 07/12/04. JTC will request
that Sagamore provide an updated schedule.
(07/13/04) Johnson is on site this week
recommissioning control valves. Thomas Young
will be balancing valves beginning 07/14/04.
(07/20/04) JTC reported that the last of the
valves will be completed this week.
(07/27/04) Sagamore stated all valves have been
replaced and RDK may begin recommissioning .
Record item.
(08/10/04) Sagamore reported that JCI will be
replacing all control valve actuators due to a
manufactoring defect (plastic composition). It was
recommended to Sagamore that JCI confirm the
number of actuators being replaced. NASD
stated JCI must be out of the east and west
accademic wings by 08/16/04 so that room
cleaning can begin.
(08/17/04) JCI has not yet begun to replace the
valves. Since cleaning of classrooms is now
underway, JTC stated that JCI shall not start
valve replacement work until classroom cleaning is
done.
OBSERVATION REPORT NO. 125 North Andover High School Page 15
Sagamore 07/20/04 U46.5.2 Punchlist- Sagamore will start work on F&T
JTC 07/27/04 punchlist on 06/28/04, and will work on punchlist
DDP 08/10/04 items during down time of the valve
08/17/04 recommissioning effort.
(06/29/04) Greg Roberts reported Sagamore was
on site on 06/28/04, but was not on site on
06/29/04. JTC will contact Sagamore.
(07/13/04) Sagamore punchlist is completed to
date with the exception of the fin tube covers not
matching the fan coil units. Sagamore will be
replacing the fin tube covers in the weeks to
come.
(07/20/04) JTC reported Sagamore is still
investigating mismatched cover color issue.
(07/27/04) Sagamore advised that both the fin
tube covers and fan coil units on the first floor
were the colors selected by DDP during shop
drawing review. Following the job meeting, DDP
and JTC confirmed that the fin tube cover color
was the off-white color selected by DDP.
However, DDP and JTC agreed that the fan coil
units were not the off-white color selected by
DDP, but were insted the manufacturer's
"standard beige." As perviously stated by DDP,
the fin tube covers on the first floor must match the
adjacent FCU's. JTC will so advise Sagamore.
(08/10/04) JTC reiterated that Sagamore must
directly address the mismatched fin tube cover
color at the first floor.
(08/17/04) Following the meeting, DDP, JTC, and
Sagamore inspected first floor fin tube/fan coil
color match. Sagamore stated their opinion that
the fan coil color is closer to the color selected by
DDP than the "standard beige." DDP requested
that Sagamore confirm what was shipped. DDP
will take this information under advisement.
Sagamore 06/22/04 046.5.3 Dust Collector- Panel voltage will be corrected on
07/13/04 06/29/04, and fittings completed.
(07/13/04) Dust collector controller is on site and
all that is left for completion is final electrical
connections.
OBSERVATION REPORT NO. 125 North Andover High School Page 16
Sagamore 06/22/04 U46.5.4 Water Treatment System - Sagamore stated
07/27/04 water was retested last week and found to have
08/10/04 29% glycol content(specified range is 31-33%)
08/17/04 Sagamore is prepared to add more glycol with the
rust inhibitor and other chemical additives that are
on site, and startup the system. Greg Roberts
noted that the system only ran for 24 hours after
the last glycol was added, and recommended that
the system be run longer to more thoroughly mix
the glycol.
(07/27/04) Sagamore reported water treatment
system work is completed, and that subcontractor
will be called back to site to retest after coil in
ERU-2 is completed.
(08/10/04) Sagamore stated water treatment work
will be completed the week of 08/16/04.
(08/17/04) Sagamore stated water treatment work
will be completed by 08/20/04.
Sagamore 06/22/04 U46.5.5 As Built Drawings - Sagamore has piping `as
builts' on a cad disk, and has received a second
copy of ductwork `as builts' to be added to disk.
Sagamore 06/22/04 U47.1 ERU-2-GR recommended that Sagamore check
the outside air damper operator at ERU-2, after
recently observed high cooling air discharge
temperatures.
Sagamore 06/22/04 U47.2 Control Booth Split System - GR advised that
Sagamore should check piping joints for leakage.
Sagamore 07/27/04 047.3.1 Burners - Greg Roberts reported that Power
Flame has been back to site, but Boiler#1
continues to "lock out."
Sagamore 07/27/04 U47.4.1 AHU-3 - Sagamore has replaced the pulley, but
must still provide Greg. Roberts with replacement
belts.
F&T 07/20/04 U49. HVAC Issues - Greg Roberts reported the following items
need to be reviewed by Fitzemeyer & Tocci.
OBSERVATION REPORT NO. 125 North Andover High School Page 18
DDP 07/20/04 U49.4 Unoccupied Schedule - Greg Roberts questioned
F&T if unoccupied control sequence is contributing to
condensation. DDP will review with F&T.
U50.
V. ELECTRICAL
3Si 03/23/04 V59.3 Room 3011 - 3Si has a recording meter on the
outlets in IDF 3011 due to three UPS units being
damages.
3Si 05/11/04 V59.3.1 Room 3044- Paul Szymanski noted a power
TEC issue has also been observed at V/D room 3044.
DDP reported that 3Si and TEC are working to
isolate and identify the problem, but nothing has
been discovered that can be positively
addressed.
TE 05/04/04 V69.4 Gamewell Comments-TE will call Gamewell to
discuss questions as to system wiring, how
wiring can affect panel performance, and to confirm
Gamewell's recommendations and requirements.
-- 07/27/04 V70.1 Duct Smoke Detector Testing - RDK will
08/24/04 coordinate testing with Greg Roberts and the fire
department. Record item.
-- 08/17/04 V70.1.1 FA/Duct Smoke Test- MCG stated Maiuri
08/24/04 personnel are on site daily and will assist with
testing the duct smokes. Record item.
RDK 08/24/04 V70.1.2 FA/Duct Smoke Test- Greg Roberts reported that
NAHS due to NAFD requirements, the testing of the duct
smoke/HVAC interface will be performed in
December with the yearly fire alarm testing.
-- 07/20/04 V71.7 ABP Default-The folowing ABP action items
have been deleted from the observation report
due to ABP's default, and will be addressed
outside of the observation report format:
A48.4.06 (security wiring); B33.2.4 (Studio
Doorbell); J18.1.3 (PR#21 Cost Proposal);
J21.1.4 (WO #33, 40 and 41 revised cost
proposal); K08 (WO#27 cost proposal); K08.1.1
(WO#28 revised cost proposal); V61 (Gym
backboard switches); V64.4 (Gym lights); V68
(Kitchen doorbell); V69.3.1 (Fire alarm wiring);
V71, V71.2 (Response to outstanding issues).
OBSERVATION REPORT NO. 125 North Andover High School Page 19
DDP 07/06/04 V72. Lamp List- Greg Roberts requested a list of lamps used on
TE the project. DDP noted this is to be part of the electrical
O&M manuals, but with ABP's default DDP will request a list
from Thompson Engineering.
DDP 07/27/04 V74. Consession Stand Data/Power- In response to DDP's
3Si question, JTC reported that Systems Contracting has not
yet pulled the fire alarm cable to the concession stand.
Before they do, DDP stated that a communications cable
should be pulled with it. DDP will consult with 3Si and
advise as to the type of cable needed.
3Si 08/10/04 V74.1 Concession Stand Video- NASD forwarded to
DDP cabling requests from the cable commission
for broadcasting events. DDP to review with 3Si.
-- 08/10/04 V75. Security Cameras - NASD will be reinstituting the installation
of security cameras under a separate contract. It was
discussed that the 120 volt power for exterior cameras
mounted on light poles has not been completed, and that the
conduit routing is not as specified due to damage to
underground conduits. However, it was stated that a
conduit path exists to all three exterior locations.
-- 08/17/04 V76. Electrical Punchlist Status - MCG provided an update on
progress, as follows:
MCG 08/17/04 V76.1 Punchlist/General - Maiuri has been averaging
five workers per day, and has nearly completed
the DDP punchlist and is approximately 2/3rds
through the TE punchlist. MCG will be updating
the punchlist status letter previously submitted.
DDP 08/17/04 V76.1.1 Disputed Items - DDP will advise as to items
listed as "N.I.C." MCG reported that they do not
have all work orders and other contract change
documents.
TE 08/17/04 V76.1.2 TE Site Visit- TE will meet with MCG on 08/30/04
MCG to review status of punchlist.
Maiuri 08/17/04 V76.2 Gym Lights - MCG advised that six components
of the high-low system are on order.
Maiuri 08/17/04 V76.3 Wrestling Room Lights - MCG advised missing
parts have been ordered.
Maiuri 08/17/04 V76.4 Auditorium Step Lights - MCG advised
components to complete top steps not yet on
hand.
OBSERVATION REPORT NO. 125 North Andover High School Page 20
DDP 08/17/04 V76.5 Flagpole Lighting - In response to discussions,
DDP will review control specified with TE.
V77.
W. HAZARDOUS MATERIALS
JTC 04/27/04 W06.1 Existing Auditorium Soffit- DDP authorized
Clerk removal of asbestos containing soffit boards on a
time and materials basis.
W08.
X. MISCELLANEOUS
Bass 08/26/03 X48. Sarnafil Roof Flashing - DDP, JTC and Stanley discussed
Stanley roof edge detail. DDP explained that Work Order required
JTC, Stanley and Bass to coordinate respective work. It
was discussed and agreed that Boss would provide
Stanley with stock so Stanley can form "snap on"trim. DDP
stated, in principle, this would be additional work by
Stanley, and less work (credit) by Bass (but no net change
in cost to Owner).
-- 06/01/04 X67.05.1 Boiler Room - JTC advised that they believe the
06/08/04 water is entering the boiler room at the
07/20/04 brick/foundation wall joint. JTC is installing a
08/24/04 french drain, to be tied into the vertical clean out
pipe at the corners. Wall penetrations still are to
be made watertight by the respective subs.
(05/04/04) JTC stated supplemental drainage has
been installed, with no further leaking at wall
observed. JTC advised that one irrigation line
penetrating the wall must still be made to be water
tight.
(05/25/04) JTC noted that some leaking was
observed at Stair#8 after yesterday's rains.
(06/01/04) JTC stated no leaks at Stiar#8 were
observed after the recent rain.
(06/08/04) JTC stated no leaks were observed
the past week.
(07/20/04) JTC stated no leaks were observed
the past week.
(08/24/04) JTC stated no leaks were observed
during the past several weeks. Record item.
JTC 05/04/04 X67.10 Roof Leak Status - In response to MBC's
questions, JTC stated that all leaks have been
permanently repaired, with the exception of
cupola doors, which are awaiting hardware and
weather stripping.
OBSERVATION REPORT NO. 125 North Andover High School Page 21
JTC 06/22/04 X67.11 Cafeteria Roof Leak- Greg Roberts reported that
a leak at the east end of the cafeteria has
reappeared. JTC will investigate.
Stanley 08/24/04 X67.11.1 Cafeteria Roof Leak- Greg Roberts reported that
JTC the leak over the cafeteria offices reappeared
during the rains of the past week. JTC has
advised Stanley.
Musco 05/11/04 X69.1.3 Lighting Submission - After discussion, it was
05/18/04 agreed that to expedite lighting installation, Musco
submission is "approved as noted - contingent on
satisfactory compliance with specified lighting
' criteria". Musco shall re-submit for record.
(05/18/04) Musco to submit electrical controls per
TE comments.
X72.
Y. PROJECT CLOSEOUT
Clerk 04/27/04 Y12.4 As Built Drawings - JTC has furnished clerk with
RWS as built mark ups of fire protection and plumbing
drawings. Clerk and RWS to review.
Clerk 03/02/04 Y13. Inventory - The clerk will begin an inventory of spare
materials and parts to be forwarded per specifications.
JTC 06/22/04 Y13.3 Auditorium Seat Inventory - JTC passed along to
S-D DDP a transmittal from Slay Dale stating seating
maintenance has been delivered. Clerk is
unaware of any such delivery. JTC will advise
Slay Dale to deliver materials to clerk's attention.
JTC 07/27/04 Y14. Closeout Submittals - JTC furnished DDP with a
Subs spreadsheet showing the status of the various manuals,,
as-builts, warranties, and maintenance stock specified.
Y15.
ZZ. CONSTRUCTION PROGRESS
-- 08/24/04 ZZ126,Construction Progress -The architect walked the site and
observed the following. Record item.
-- 08/24/04 ZZ126.1 South Fields - Electrician completing work in
concession building. Bituminous walks being
placed at southwest parking lot. Record item.
OBSERVATION REPORT NO. 125 North Andover High School Page 22
08/24/04 ZZ1 26.2 South Site - Curbing nearly completed. Loam
being placed in islands and along curbing. Prep
for concrete walks underway at south entry.
Record item.
08/24/04 ZZ1 26.3 North Site - Track paving completed. Stone base
for turf completed. Record item.
ZZ1 27.
The next job meeting will be held at 1:00 PM on Tuesday, 31 August 2004 at the Contractor's
Trailer. meeting are recorded as understood by the writer, who should be notified of
The discussions of this
any omissions or corrections. Unless the writer is notified to the contrary, these notes are presumed to
be correct.
lchard N. Rice
DiNISCO DESIGN
RNR/dp
Gene, Kingman
cc: Louis Minicucci Kevin Murphy
Harry Harutunian Ed Estabrook
Frederick King Kevin Burke
Nancy Kurtz Richard Weber
Susan Nicholson Mike DiBari
Evan Karalolos Kenneth DiNisco
Department of Public Works Richard Greenlee
Julie Parrino Angel Khazadian
NA Planning Board Jon Oxman
Doug Seaboldt Bill Sousa, RDK
Robert Feinberg, ESCOA
Paul Szymanski
cc (hand): Philip Briselli
Patrick Saitta
j�
nners
architects and pla
Limited
OBSERVATION REPORT NO. 126 RECEIVED
Project: North Andover High School P 8, 2004
Date: 31 August 2004 L
Location: Job Site
Present: North Andover School Department (NASD). Harry Harutunian (partial)
Greg Roberts
Paul Szymanski
Jack Stephenson (partial)
North Andover School Building Committee (NASBC) Harold Dushame
North Andover Building Commissioners (NABC) Bob Nicetta
North Andover Fire Department(NAFD) Chief Dolan (partial)
John T. Callahan & Sons (JTC) Philip Briselli
Dave Anderson
Mike Callahan (partial)
Phil Ricci
Meridian Consulting Group (MCG) Domenic Nicosia
Sagamore Plumbing & Heating John Herald (partial)
Gale Associates Jim Boudreau (partial)
Schofield Brothers of New England (SBNE) Matt Smith
Clerk of Works (COW) Richard Warner
DiNisco Design Partnership (DDP) Richard Rice
Action Date
A. SITE SAFETY AND SECURITY
Simplex 08/31/04 A48.4.15 Security System MCG reported that the system
is operational. Maiuri has repaired chaffed wiring,
and Simplex has deactivated the LED's. Simplex
is to be on site Saturday, 09/04/04 to reprogram
devices without addresses or with duplicate
addresses.
A52.
Kenneth DiNisco Richard N. Rice Gary E.Ainslie Christopher Huston Donna DiNisco
8 7 S u m m e r S t r e e t B o s t o n M A 0 2 1 1 0 6 1 7 . 4 2 6 . 2 8 5 8 f a x 4 2 6 1 4 5 7
w w w . d i n i s c o . c o m
OBSERVATION REPORT NO. 126 North Andover High School Page 2
B. OWNER ISSUES
DDP 07/27/04 B47.1.3 Tech Ed Equipment- Greg Roberts questioned
3Si 07/29/04 whether all F&E (i.e. tables and chairs) have
been installed. DDP will review with 3Si.
(07/29/04) 3Si advised DDP that chairs and
"loose tables" were not provided with tech ed
equipment. DDP will order remaining furnishings.
Maiuri 08/31/04 847.1.5 Tech Ed Equipment-The clerk has been in
contact with the vendor, who promises to be on
site to complete the installation by 09/03/04.
Thompson Engineering has reviewed the electrical
connection questions with Maiuri, who will
complete work in fabrication shop by 09/10/04;
NASD stated that date will be acceptable.
R&R 08/13/04 B49.2.2 Admin/Arts Windows (Postscript) - In a phone
conversation on 08/13/04, R&R advised DDP that
scissors arm operators will be adjusted so that
windows close at the small admin wing windows.
At the arts wing, A&A stated single arm operators
must be installed per sample. DDP agreed to this
approach.
DDP 03/30/04 B50. Gymnasium Switches - Greg Roberts requested that DDP
TE investigate substituting pushbutton switches for gym
lighting, curtain, and backboard counters. GR noted that the
key switches installed are all keyed differently and require a
good deal of time to operate individually. The pushbuttons
could be secured from unauthorized use by a surface
mounted locking cabinet. Also, GR requested that the gym
.lighting only be operated by the center control point. DDP
and TE to review.
MUSCO 08/31/04 B56.2.3 Field Lighting - JTC advised that the field lights
NASD will be tested by MUSCO tonight, 08/31/04 at
9:OOPM. Until the replacement controller is
delivered,the lights can be operated manually,
using a key switch. JTC stated that if Jack
Stephenson is available this evening, he (or his
designee) can be instructed on turning on the
lights. After tonight's testing, JTC stated that the
lights would be fully operational and available.
-- 08/31/04 B56.2.4 Field Lighting/Planning Board - DDP reported that
the town planner has been notified of the lighting
test at 9:OOPM on 08/31/04. Should the town
planner's evening meeting schedule allow, she
will take this opportunity to observe the lighting, in
accordance with the Order of Conditions.
OBSERVATION REPORT NO. 126 North Andover High School Page 3
JTC 08/24/04 B58.2.1 Space Numbering -JTC will have the north lot
numbered on 08/27/04. The south lot will be
finish paved, striped, and numbered by 09/13/04.
It was agreed that the school will arrange for
off-site parking through 09/14/04 for students who
would otherwise use the south lot. JTC was
made aware that the south lot will be needed for
the home football game on 09/10/04, and for town
voting on 09/14/04.
DDP 08/24/04 B58.2.2 Parking Signs - The school department has
NASD purchased signs (visitors parking, etc.). DDP,
JTC JTC and NASD will coordinate installation.
DDP 08/17/04 B60. Noise Complaint- Paul Szymanski (PS) reported that he
NASD had received a telephone complaint from a neighbor on
Osgood Street complaining of a loud whine from the HVAC
system. PS will forward to DDP a copy of the letter also
received.
DDP 08/24/04 B61.1 South Field Fences and Gates - Paul Szymanski
approved the proposed layout. JTC has
authorized Costco to proceed. DDP will issue a
work order for record.
DDP 08/27/04 B61.2.1 South Field Ramp Rails - JTC has authorized
fabricator to proceed. DDP will issue a work order
for record.
DDP 08/17/04 B62. Concession StandMater Fountain - Jack Stephenson
requested that a hose connection be added to the outside of
the concession stand for attachment of a drinking water
device during practices. DDP to further review with NASD
- and advise JTC of the plumbing change required.
-- 08/31/04 _ B65. South Field Completion - The following issues were
reviewed with Harry Harutunian and Jack Stephenson with
respect to the use of the south fields for practice and for an
upcoming home game on 09/10/04. Record item.
-- 08/31/04 B65.1 Scoreboard - The scoreboard will be completed
and fully operational today, 08/31/04. JTC stated
that the scoreboard control is wireless, and can
also be plugged into the scoreboard itself. JTC
stated that there is no"hard wire" control wiring.
Record item.
OBSERVATION REPORT NO. 126 North Andover High School Page 4
JTC 08/31/04 865.2 Goal Posts - JTC stated field goal screen will be
NASD completed on 09/01/04. NASD will furnish goal
post pads to be used temporarily until permanent
pads are delivered.
-- 08/31/04 865.3 P/A System - JTC advised that the specified P/A
System was deleted from the project scope when
value engineering the athletic complex charge
order. JTC will contact the vendor to see if the
specified system can be installed by 09/10/04.
Record item.
DDP 08/31/04 B65.3.1 P/A System (Postscript) - JTC advised DDP that
the specified system is portable (able to be used
at either the track or the south fields) and would
not be available until 09/17/04. DDP advised
NASD that DDP will investigate rental systems for
use on 09/10/04.
Gale 08/31/04 B65.4 Temporary Bleachers - Gale has been
investigating sources for portable bleachers for
09/10/04, and will advise when a vendor is found.
Gale noted the city of Quincy may be
approached to borrow their trailer mounted units.
DC 08/31/04 B65.4.1 Temporary Bleachers - JTC expects Dant
Clayton on site to complete remaining items any
day.
DDP 08/31/04 B65.5 Radio/Phone Line - NASD advised that a phone
3Si line is needed at the press box by the radio
station for broadcast of the 09/10/04 game. DDP
will review status with 3Si.
-- 08/31/04 B65.5.1 Phone Line (Postscript) - JTC advised that a
phone line has been run to the press box building
for the security system, which could be used by
the radio station.
-- 08/31/04 B65.6 Concession Stand - JTC expects the stand to be
inspected for occupancy this week (See Item
C124.1.1).
NASD 08/31/04 B65.6.1 Concession Stand Equipment - NASD has
identified some cooking equipment needed; DDP
stated to expedite delivery, NASD should issue
the purchase orders. Bob Nicetta confirmed that
equipment can be installed before the occupancy
permit is issued.
OBSERVATION REPORT NO. 126 North Andover High School Page 5
-- 08/31/04 865.7 Paving - JTC stated that, weather permitting, final
paving will be completed on 09/01/04, and
stripped on 09/07/04. Record item.
-- 08/31/04 865.8 Practice - JTC stated that the fence has been
relocated and the handrails installed today on the
stairs. If needed for the players, JTC will have a
porta-john located near the field until the toilets are
ready in the concession stand. Bob Nicetta will
inspect the field on 09/01/04 to determine if
practice may be held on the field.
NASD 08/31/04 B65.9 Fencing -Access to main field for paying
DDP spectators was reviewed. JTC stated there is
some flexibility in relocating fence not now in
place. NASD and DDP to review.
B66.
C. PERMITS & INSPECTIONS
-- 03/26/02 CO3. DPW Permits
JTC 08/17/04 C124.1 Concession Stand - Following the meeting, JTC
and DDP observed progress at the concession
stand itself. JTC will expedite completion with
consideration to a Health Department inspection.
DDP advised coved base should be installed on
the block walls.
JTC 08/31/04 C124.1.1 Inspections - NAFD has inspected the concession
NABC stand (See Item C126). JTC will schedule final
plumbing and electrical inspections this week, with
a final inspection by Bob Nicetta thereafter.
-- 08/31/04 C126. Concession Stand/NAFD Review - Chief Dolan distributed
a memo outlining issues as follows. Record item.
National 08/31/04 C126.1 Fire Alarm System - JTC stated that National will
comply with the NAFD comments for completing
the system as summarized in the NAFD memo
dated 08/30/04.
-- 08/31/04 C126.2 Fire Alarm Device Documentation - DDP will
09/03/04 forward to NAFD documentation (submittal cuts)
showing devices can withstand subzero
temperature, and confirmation that summer building
temperature will not exceed 135 degree heat
detection rating. TE to furnish DDP with this
information. Record item.
OBSERVATION REPORT NO. 126 North Andover High School Page 6
-- 09/03/04 C126.2.1 Fire Alarm Device Documentation (Postscript) -
Thompson Engineering letter forwarded to NAFD
via fax on 09/03/04.
-- 08/31/04 C126.3 Camera Platform - NAFD cautioned that the wood
platform on the roof could be a hazzard if smokers
are on the roof level. Record item.
-- 08/31/04 C126.4 Egress - NAFD noted that the single egress from
the concession stand will need to be kept clear,
especially for wheelchair users working in the
stand. Record item.
-- 08/31/04 C127. Erosion Controls - SBNE reported that while the site
performed well during the storms of the past week, needed
maintenance has not been done. JTC stated that the focus
has been in getting ready for final paving, and that the
maintenance will be addressed immediately thereafter.
Record item.
C128.
D. CONSTRUCTION SCHEDULE
-- 08/31/04 D145. Construction Progress - JTC reviewed progress as noted
under B65 and item P76.2.1. Record item.
D-146.
E. SUBMITTAL SCHEDULE
E16.
F. SUBMITTALS
DDP 04/13/04 F85.3.4 Laticrete Recommendation - PM recommends that
06/28/04 given the use and cleaning materials employed at
NAHS (which PM will confirm in a visit to the
kitchen), the Spectra Loc floor grout should remain.
CTI offered an extended warrantee; DDP stated a
bond may be required if this is accepted. Laticrete
must put their recommendation in writing.
(06/28/04) DDP received letter dated 04/23/04
directly from Laticrete on 06/28/04. DDP will
consider recommendations.
Musco 05/18/04 F100.1 Field Lights - Field lights returned "Approved as
noted/Resubmit items noted" (electrical control
panel components).
OBSERVATION REPORT NO. 126 North Andover High School Page 7
Musco 05/27/04 F100.1.1 Field Lights - Musco shall revise and re-submit for
record the structural calculations.
DDP 07/20/04 F100.1.2 Field Lights- Paul Szymanski reported that a
07/23/04 lighting submittal package had been forwarded to
the school department from Musco. PS will
forward a copy to DDP for processing (Received
by DDP 07/23/04).
F114.
G. COORDINATION DRAWINGS
G28.
H. PAYROLL REPORTS
H42.
I. REQUISITIONS
DDP 08/31/04 143. Requisition #30 -JTC forwarded a pencil copy of
MBC Application for Payment#30 for review by DDP, MBC and
Clerk the clerk.
144.
J. CHANGE ORDERS
DDP 06/29/04 J26. PCO LOG - JTC distributed a PCO Log updated as of
JTC 06/29/04. DDP and JTC reviewed outstanding PCO's that
JTC would like to clear. DDP and JTC to review further.
DDP 07/20/04 J27. Electrical PCO's - DDP and JTC will meet to review
JTC electrical PCO's in preparation for a meeting with the
bonding companies.
J28.
K. WORK ORDERS
K15.
L. FIELD ORDERS
L18.
OBSERVATION REPORT NO. 126 North Andover High School Page 8
M. PROPOSAL REQUESTS
Capital 08/05/03 M25.2.1 PCO #075 - DDP responded to Capital's letter
with regard to credit offered for VCT replaced by
terrazzo. Capital to revise credit per
specifications.
M36.
N. REQUEST FOR INFORMATION
DDP 04/01/03 N50. RFI #267 - DDP will issue letter to NAPD and Building
Department advising them that sprinkler heads in elevator
shaftway and the elevator shunt trip will be deleted in
accordance with the code moratorium still in effect.
DDP 12/02/03 N89. Clothes Dryers - JTC noted no vents are shown on HVAC
F&T drawings for dryer in Study Skills #2050 and the kitchen.
DDP to review with F&T and advise.
N96.
O. DEMOLITION
005.
P. SITE WORK
JTC 09/30/03 P41. Art Plaza Pavement- DDP reviewed CRJA site visit report
of 09/26/03. JTC stated radius will be cut. The clerk
observed that the puddles noted disappeared in less than
an hour, and low spots are very shallow.
DDP 1.0/08/03 P41.1 Arts Plaza Pavement (Postscript) - CRJA
Clerk followed up, advising DDP that low spots would
be an icing concern, and requested that the
tolerances be checked per the paving spec (See
Spec 02500-3.01-19). DDP to advise clerk to
confirm.
JTC 03/16/04 P49. Catch Basins - SBNE noted that JTC has yet to install the
hoods on the catch basin structures as required.
NASD 04/20/04 P52. Commemorative Plantings - Paul Szymanski advised that
DDP the school will be planting some memorial trees, and is
looking into some way to incorporate future memorials in an
orderly, planned fashion. DDP and NASD will coordinate.
OBSERVATION REPORT NO. 126 North Andover High School Page 9
NASD 07/20/04 P53.8.2 Track/Softball Scoreboard - It was discussed that
07/27/04 the track scoreboard could be fed from the
construction trailer service on Presscott. DDP will
consult with Thompson Engineering to provide
Paul Szymanski with the information needed to
obtain a permanent service from this location from
Mass Electric.
(07/27/04) Information forwarded to Paul
Szymanski by DDP on 07/26/04.
JTC 06/29/04 P56.3.3 Sand/Loam Mix Test- P&S will take samples of
07/20/04 stockpiled loam and will mix with samples of
08/10/04 Pitcherville Sand and will test for optimum
sand/loam/organic content.
(07/20/04) P&S test results forwarded'to JTC.
JTC questioned apparent reversal in
recommended sand mix ratio. Follow up with P&S
needed to clarify.
(08/10/04) It was discussed whether the P&S
recommendation for organics and mixing
constitutes an extra to the contract. DDP agreed
that the "means and methods" are up to JTC,
noting the "final product" is what JTC is
responsible for. As for adding organics to the top
soil, DDP interprets this as a specified
requirement; JTC will review the specifications
language and respond.
-- 06/29/04 P56.3.4 Mixing Sand and Loam - JTC noted that Section
02900 specifies mixing sand and loam by
harrowing, and at this time this is JTC's intent.
Bob Pine stated that more satisfactory results will
be achieved far more easily by mixing with loader
buckets after the loam is screened. P&S will come
to the site to monitor JTC's mixing of the sand and
loam to establish a procedure and consistant
result.
JTC 06/29/04: P56:3.6 Drainage - JTC and DD.P described how the field.
CRJA 08/24/04 sub grade for drainage as shown on the contract
drawings no longer reflects the final grades due to
changes made necessary by the athletic field
upgrades. CRJA agreed that adjustments to
J-drain and collector pipe layout would be
acceptable as long as "downhill" criteria is met.
CRJA will inspect subdrainage when completed,
and before being covered with sand, to see that
this criteria is met.
(08/24/04) In response to CRJA's inquiry as to
when the baseball field drainage work would
commence, JTC advised DDP that this work
would not begin before 09/07/04.
OBSERVATION REPORT NO. 126 North Andover High School Page 10
JTC 06/29/04 P68.1 Leaning Trees - CRJA expained that they do not
Emanouil require trees to be guyed because studies have
shown that unguyed trees are stronger. However,
the spec does require trees to be plumbed if
required. JTC will advise Emanouil to reset the
trees.
Emanouil 06/29/04 P70.1 Lawns at Arts Wing -JTC agreed that Emanouil
would repair the bare spots in the lawn between
the arts classrooms and the driveway.
DDP 07/23/04 P72.3 Pavement Grades at Concession Stand
(Postscript): DDP faxed sketch of revised grading
to JTC on 07/23/04. DDP to follow up with Work
Order.
DDP 08/24/04 P76.1.1 Painted Lines - NASD has requested that a
Gale proposal request be issued for painted practice
soccer lines and for painted field hockey lines at
the south field because the school department's
line painter is unavailable. Gale to provide DDP
with line drawing.
DDP 08/24/04 P76.1.2 Manhole Some rework is necessary at manhole
Gale outside the field of play. Gale reported that this is
not a safety concern, but rather that the manhole
outline is telegraphing through the turf.
NET 08/24/04 P76.1.3 O&M Instructions - NET to furnish O&M manuals
NASD and schedule owner instruction of turf field
maintenance.
NET 08/31/04 P76.2.1 North Fields - Gale has approved the stone sub
base. Northeast Turf will reportedly will have
three crews on site to install the week of 09/06/04.
JTC stated track surfacing is scheduled for week
of 09/20/04.
DC 08/31/04 P76.3.2 Bleachers and Pole - JTC stated that their
JTC expectation of how Dant Clayton would interface
with the pole was not met, and the additional cost
was not acceptable. It was agreed that DC
would be held responsible for extending the
bleacher system to the face of the concrete light
pole foundation. JTC would construct an
aluminum diamond plate closure around the light
pole flush with th upper walk surface. This upper
closure will be fenced in by DC.
OBSERVATION REPORT NO. 126 North Andover High School Page 11
JTC 08/31/04 P77. Sod at Bleachers - It was agreed that sod will be placed on
bleacher slope. Cost to the project will be approximately
$1,500 (one third the cost). NASD agreed to water sod.
P78.
Q. ARCHITECTURAL
Bass 04/27/04 Q30.8.03 Academic Wing Gravel Stop does not conform at
Stanley 07/20/04 south side, and is coming loose on north side (item
07/27/04
Q30.7.1
08/10/04 (08/19/03) - Gravel stop issues shared by JTC
(blocking), Bass (forming) and Stanley
(installation). DDP and JTC will inspect entire
roof perimeter and list areas be reworked.
(04/27/04) JTC advised that Bass will likely not
perform any of the repairs previously reviewed
without a formal punchlist.
(07/20/04) Bass, JTC, DDP and clerk met to
review outstanding cladding items. DDP
reviewed with Bass cladding issues from exterior
punchlist inspection. Bass will be on site the
week of 07/26/04 to address outstanding items.
Bass will forward to DDP a drawing of proposed
cladding between clerestory and curtainwall on
north side of arts wing. It was agreed that brake
metal backed by polystyrene insulation would be
used in this area.
(07/27/04) JTC advised that Bass will be on site
by 07/28/04.
(08/10/04) JTC reported that Bass has not yet
come to the site.
DDP 04/13/04 Q91. Auditorium Chair Lift- DDP will make calls to clarify Mass.
Elevator Board's position on whether the chair lift is to be
inspected.
Q92.
R. STRUCTURAL
R37.
S. FIRE PROTECTION
RWS 06/22/04 S20.1 System Pressure - It was reported that the
Hampshire technician on site feels the reported
180# pressure in the system is proper. DDP will
discuss with RWS.
S21.
OBSERVATION REPORT NO. 126 North Andover High School Page 12
T. PLUMBING
Grasseschi 05/18/04 T30.2.1 Gas Shutoff Valve - DDP has been informed by
RWS that all their conversations with Grasseschi
were with regard to Grasseschi's request to
substitute a standard access panel for a valve
cabinet (which was done). RWS at no time
instructed Grasseschi that the door should have a
lock. Grasseschi is to remove lock and install latch
per detail on 8.0.3.
Grasseschi 04/13/04 T33. Photo Dark Room - Greg Roberts advised that backflow
preventer has been installed, but exposed hot and cold
water piping must be insulated.
Grasseschi 05/04/04 T35. Push Button Faucets - Greg Roberts reported that kids have
been taking the push buttons off of the lavatory metering
faucets. Upon examination, NASD found that set screws
were not tightened. Grasseschi to tighten set screws, and
shall provide NASD with spare knobs.
Grasseschi 06/04/04 T36.1 Hot Water(Postscript) - RWS memo distributed
on 06/07/04. Grasseschi to advise on system
balancing.
DDP 06/08/04 T36.2 Hot Water- Greg Roberts questioned type of
RWS tanks and piping arrangement, wondering if this
would play some part in the hot water circulation
issue. JTC stated tanks were piped per RWS
directives in response to a question from
Grasseschi. DDP will review further with RWS.
T37.
U. HVAC
Maiuri 06/08/04 U30.1.2 Fume Hood Fans - ABP has ordered special
MCG 08/17/04 starter required for two fans.
08/31/04 (08/17/04)JTC advised MCG that starters are
required at two fume hood fans.
(08/31/04) MCG reported components for hoods
have been ordered.
Sagamore 06/15/04 1134.1.2 Mainstreet Fin Tube - DDP reviewed conditions
08/10/04 and found that fin tube cover has been
adequately screwed to support structure.
Sagamore shall consistently cope the end covers
tight to columns,concealing the piping.
(08/10/04) Sagamore has ordered end caps for
Main Street fin tube.
OBSERVATION REPORT NO. 126 North Andover High School Page 13
F&T 03/16/04 U35. Kitchen ElevatorShaft - It was discussed that even with
keeping the boiler room doors closed, a strong down draft is
keeping the elevator shaft cold in the kitchen. DDP will
review with F&T.
Sagamore 06/22/04 U43.1.1 Sagamore advised that the last of the filters are
07/13/04 due on site on 07/06/04 and will be installed on
07/27/04 delivery.(07/13/ 4) Filters are on site.
(07/27/04) Sagamore advised that filters on hand
were not correct, and that replacements have
been ordered.
-- 06/08/04 U45.1 Boiler Leak- Greg Roberts reported that
Sagamore has repaired the leak between
sections. However, the boiler has not since been
fired to determine if repair will hold.
Sagamore 07/20/04 046.5.2 Punchlist- Sagamore will start work on F&T
JTC 07/27/04 punchlist on 06/28/04, and will work on punchlist
DDP 08/10/04 items during down time of the valve
08/17/04 recommissioning effort.
(06/29/04) Greg Roberts reported Sagamore was
on site on 06/28/04, but was not on site on
06/29/04. JTC will contact Sagamore.
(07/13/04) Sagamore punchlist is completed to
date with the exception of the fin tube covers not
matching the fan coil units. Sagamore will be
replacing the fin tube covers in the w_ eeks to
come.
(07/20/04) JTC reported Sagamore is still
investigating mismatched cover color issue.
(07/27/04) Sagamore advised that both the fin
tube covers and fan coil units on the first floor
were the colors selected by DDP during shop
drawing review. Following the job meeting, DDP
and JTC confirmed that the fin tube cover color
was the off-white color selected by DDP.
However, DDP and JTC agreed that the fan coil -
units were not the off-white color selected by
DDP, but were insted the manufacturer's
"standard beige." As perviously stated by DDP,
the fin tube covers on the first floor must match the
adjacent FCU's. JTC will so advise Sagamore.
(08/10/04) JTC reiterated that Sagamore must
directly address the mismatched fin tube cover
color at the first floor.
(08/17/04) Following the meeting, DDP, JTC, and
Sagamore inspected first floor fin tube/fan coil
color match. Sagamore stated their opinion that
the fan coil color is closer to the color selected by
DDP than the"standard beige." DDP requested
that Sagamore confirm what was shipped. DDP
will take this information under advisement.
OBSERVATION REPORT NO. 126 North Andover High School Page 14
Sagamore 06/22/04 U46.5.3 Dust Collector- Panel voltage will be corrected on
07/13/04 06/29/04, and fittings completed.
(07/13/04) Dust collector controller is on site and
all that is left for completion is final electrical
connections.
Sagamore 06/22/04 U46.5.4 Water Treatment System - Sagamore stated
07/27/04 water was retested last week and found to have
08/10/04 29% glycol content (specified range.is 31-33%)
08/17/04 Sagamore is prepared to add more glycol with the
rust inhibitor and other chemical additives that are
on site, and startup the system. Greg Roberts
noted that the system only ran for 24 hours after
the last glycol was added, and recommended that
the system be run longer to more thoroughly mix
the glycol.
(07/27/04) Sagamore reported water treatment
system work is completed, and that subcontractor
will be called back to site to retest after coil in
ERU-2 is completed.
(08/10/04) Sagamore stated water treatment work
will be completed the week of 08/16/04.
(08/17/04) Sagamore stated water treatment work
will be completed by 08/20/04.
Sagamore 06/22/04 U46.5.5 As Built Drawings - Sagamore has piping `as
builts' on a cad disk, and has received a second
copy of ductwork 'as builts' to be added to disk.
Sagamore 07/27/04 U47.3.1 Burners - Greg Roberts reported that Power
Flame has been back to site, but Boiler#1
continues to"lock out."
Sagamore 07/27/04 U47.4.1 AHU-3 - Sagamore has replaced the pulley, but
must still provide Greg Roberts with replacement
belts.
-- 08/31/04 U50. HVAC Updates - Sagamore met with Ed Estabrook/F&T on
08/25/04, and reviewed F&T's memo of that site visit with
the following noted. Record item.
Sagamore 08/31/04 U50.01 ERU's - Sagamore reported that ERU's 1& 3 are
on and operating properly. ERU-2 will be running
on 09/01/04, and will have its damper activator
replaced a day or two thereafter.
OBSERVATION REPORT NO. 126 North Andover High School Page 15
Sagamore 08/31/04 U50.02 RTU 1 &2 - It has been determined that
condensation on the underside of deck may be
the result of roof insulation not running under the
units. JTC noted that there was a history of
discussion whether this was necessary; all other
BTU's have continuous insulation and
condensation on the deck is not a problem.
Sagamore will advise how insulation could be
installed at this time.
Sagamore 08/31/04 050.03 insulator ol insulate all supply diffuser plennums.
It was noted that this is a significant amount of
work, taking approximately two weeks to
complete. NASD stated that the work can be
done off hours once school starts.
Sagamore 08/31/04 050.04 Condensation Pans - Sagamore stated McQuay
rep will visit site to see conditions. Insulator has
been directed to insulated the underside of the
pans.
DDP 08/31/04 U50.04.1 Condensation Pans - DDP will confirm with F&T is
F&T insulation of pan underside is necessary if
humidity condition is addressed.
Sagamore 08/31/04 050.05 RTU/Outdoor Air Settings - Sagamore has
F&T confirmed that the operator sequences are per the
HVAC drawings. McQuay has reset the
enthalpy controlers. There is still a question
whether too much air is entering the wrestling room
unit during the unoccupied mode.
Sagamore 08/31/04 U50.06 RTU-8 - Sagamore stated the heat exchanger is
being replaced.
Sagamore 08/31/04 050.07 Khan e suggestion by &T to he unoccupied
sequence hlf speed using VFD).
Sagamore 08/31/04 U50.08 Humidity Control - Sagamore will price adding
humidity override controls for wrestling room and
auditorium units (to protect wood floors and the
grand piano). Sagamore stated this needs to be
coordinated with the McQuay controls.
Sagamore 08/31/04 050.09 completed on Report Final 9 /01/04, w with reports lready by
09/03/04.
OBSERVATION REPORT NO. 126 North Andover High School Page 16
-- 08/31/04 U50.10 Control Valves - All actuators will be replaced by
JCI as of 09/01/04. Record item.
U51.
V. ELECTRICAL
3Si 03/23/04 V59.3 Room 3011 -3Si has a recording meter on the
outlets in IDF 3011 due to three UPS units being
damages.
3Si 05/11/04 V59.3.1 Room 3044 - Paul Szymanski noted a power
TEC issue has also been observed at V/D room 3044.
DDP reported that 3Si and TEC are working to
isolate and identify the problem, but nothing has
been discovered that can be positively
addressed.
TE 05/04/04 V69.4 Gamewell Comments -TE will call Gamewell to
discuss questions as to system wiring, how
wiring can affect panel performance, and to confirm
Gamewell's recommendations and requirements.
RDK 08/24/04 V70.1.2 FA/Duct Smoke Test- Greg Roberts reported that
NAHS due to NAFD requirements, the testing of the duct
smoke/HVAC interface will be performed in
December with the yearly fire alarm testing.
-- 07/20/04 V71.7 ABP Default-The folowing ABP action items
have been deleted from the observation report
due to ABP's default, and will be addressed
outside of the observation report format:
A48.4.06 (security wiring); B33.2.4 (Studio
Doorbell); J18.1.3 (PR#21 Cost Proposal);
J21.1.4 (WO #33, 40 and 41 revised cost
proposal); K08 (WO#27 cost proposal); K08.1.1
(WO#28 revised cost proposal); V61 (Gym_
backboard switches); V64.4 (Gym lights ); V68
(Kitchen doorbell); V69.3.1 (Fire alarm wiring);
V71, V71.2 (Response to outstanding issues).
DDP 07/06/04 V72. Lamp List- Greg Roberts requested a list of lamps used on
TE the project. DDP noted this is to be part of the electrical
O&M manuals, but with ABP's default DDP will request a list
from Thompson Engineering.
OBSERVATION REPORT NO . 126 North Andover High School Page 17
DDP 07/27/04 V74. Consession Stand Data/Power - In response to DDP's
3Si question, JTC reported that Systems Contracting has not
yet pulled the fire alarm cable to the concession stand.
Before they do, DDP stated that a communications cable
should be pulled with it. DDP will consult with 3Si and
advise as to the type of cable needed.
3Si 08/10/04 V74.1 Concession Stand Video - NASD forwarded to
DDP cabling requests from the cable commission
for broadcasting events. DDP to review with M.
-- 08/10/04 V75. Security Cameras - NASD will be reinstituting the installation
of security cameras under a separate contract. It was
discussed that the 120 volt power,for exterior cameras
mounted on light poles has not been completed, and that the
conduit routing is not as specified due to damage to
underground conduits. However, it was stated that a
conduit path exists to all three exterior locations.
-- 08/17/04 V76.1 Punchlist/General - Maiuri has been averaging
08/31/04 five workers per day, and has nearly completed
the DDP punchlist and is approximately 2/3rds
through the TE punchlist. MCG will be updating
the punchlist status letter previously submitted.
Record item.
DDP 08/17/04 V76.1.1 Disputed Items - DDP will advise as to items
listed as "N.I.C." MCG reported that they do not
have all work orders and other contract change
documents.
-- 08/31/04 V76.1.3 Punchlist- MCG met with TE on 08/30/04, and at
the 08/31/04 meeting, MCG provided an updated
punchlist status report (attached). Record item.
Maiuri 08/17/04 V76.4 Auditorium Step Lights - MCG advised
components to complete top steps not yet on
hand.
DDP 08/17/04 V76.5 Flagpole Lighting - In response to discussions,
DDP will review control specified with TE.
NASD 08/31/04 V77. Worker Background Checks - Paul Szymanski advised
MCG MCG that background checks will be necessary for any
electricians working in the building during the school day.
V78.
OBSERVATION REPORT NO. 126 North Andover High School Page 18
W. HAZARDOUS MATERIALS
JTC 04/27/04 W06.1 Existing Auditorium Soffit- DDP authorized
Clerk removal of asbestos containing soffit boards on a
time and materials basis.
W08.
X. MISCELLANEOUS
Bass .08/26/03 X48. Sarnafil Roof Flashing - DDP, JTC and Stanley discussed
Stanley roof edge detail. DDP explained that Work Order required
JTC, Stanley and Bass to coordinate respective work. It
was discussed and agreed that Boss would provide
Stanley with stock so Stanley can form "snap on"trim. DDP
stated, in principle, this would be additional work by
Stanley, and less work (credit) by Bass (but no net change
in cost to Owner).
JTC 05/04/04 X67.10 Roof Leak Status - In response to MBC's
questions, JTC stated that all leaks have been
permanently repaired, with the exception of
cupola doors, which are awaiting hardware and
weather stripping.
JTC 06/22/04 X67.11 Cafeteria Roof Leak - Greg Roberts reported that
a leak at the east end of the cafeteria has
reappeared. JTC will investigate.
.Stanley, 08/24/04 X67.11.1 Cafeteria Roof Leak - Greg Roberts reported that
JTC the leak over the cafeteria offices reappeared
during the rains of the past week. JTC has
advised Stanley.
Musco 05/11/04 X69.1.3 Lighting Submission -After discussion, it was
05/18/04 agreed that to expedite lighting installation, Musco
submission is "approved as noted- contingent on
satisfactory compliance with specified lighting
criteria". Musco shall re-submit for record.
(05/18/04) Musco to submit electrical controls per
TE comments.
X72.
Y. PROJECT CLOSEOUT
Clerk 04/27/04 Y12.4 As Built Drawings -JTC has furnished clerk with
RWS as built mark ups of fire protection and plumbing
drawings. Clerk and RWS to review.
OBSERVATION REPORT NO. 126 North Andover High School Page 19
Clerk 03/02/04 Y13. Inventory - The clerk will begin an inventory of spare
materials and parts to be forwarded per specifications.
JTC 06/22/04 Y13.3 Auditorium Seat Inventory - JTC passed along to
S-D DDP a transmittal from Slay Dale stating seating
maintenance has been delivered. Clerk is
unaware of any such delivery. JTC will advise
Slay Dale to deliver materials to clerk's attention.
JTC 07/27/04 Y14. Closeout Submittals - JTC furnished DDP with a
Subs spreadsheet showing the status of the various manuals,
as-builts, warranties, and maintenance stock specified.
Y15.
ZZ. CONSTRUCTION PROGRESS
-- 08/31/04 ZZ127.Construction Progress-The architect walked the site and
observed the following. Record item.
-- 08/31/04 ZZ127.1 South Fields- Fencing being installed along the
lower bleacher walkway, and is nearly completed.
Concrete flatwork around concession stand 50%
completed. Painting and millwork completion is
underway at concession stand. Loaming of
islands underway. Paint touch up ongoing in
concession stand. Record item.
-- 08/31/04 ZZ127.2 South Site - Pavement swept in preparation for
finish paving. Concrete walks at south stairs
completed. Record item.
ZZ 128.
OBSERVATION REPORT NO. 126 North Andover High School Page 20
The next job meeting will be held at 1:00 PM on Tuesday, 07 September 2004 at the
Contractor's Trailer.
The discussions of this meeting are recorded as understood by the writer, who should be notified of
any omissions or corrections. Unless the writer is notified to the contrary, these notes are presumed to
be correct.
Ri and N. Rice
DiNISCO DESIGN
RNR/dp
cc: Louis Minicucci Gene Kingman
Harry Harutunian Kevin Murphy
Frederick King Ed Estabrook
Nancy Kurtz Kevin Burke
Susan Nicholson Richard Weber
Evan Karalolos Mike DiBari
Department of Public Works Kenneth DiNisco
Julie Parrino Richard Greenlee
NA Planning Board Angel Khazadian
Doug Seaboldt Jon Oxman
Robert Feinberg, ESCOA Bill Sousa, RDK
Paul Szymanski
cc (hand): Philip Briselli
Patrick Saitta
v v d 0 C) �
0 C) o
'v p o rN�i o M cC
C a) o m m
� M
,O Ob
v �
C%. IC-1 c�
v
o Q c N d 0 O
m 0) o
o
a c ac m
C E O 89
rn -m ai c a v-
v a € af°i � a9CM a4) 'M a� ° o mc0 � m � 'm
-ate m `'_ � � a E ° x `r O
v `° '° ° CCeU ,o -�vc9a� � oo ° „oNOa �° �+i
d m u v, O 'c rn rn'0 N ° �
E ;� aai E fO ELF ci c > ;a 'C.- _ � s
o m E m = N o o ?° oo m a� m m a� E m m rnE
v � 8 � ov zU U > Saco a. a 3 3 � aa � 'S
N
E
0
c
o
n °
c m
c
N T-
- to
O y N 'C C G
+� ` ` m cN
m m +N O cu a
0 N m E C:
LM 0
a N a O p . N o E
C Q N m m 3
-�
= O N LL C N N
N w co . m C CCU N O •O E - LL LL
d
o 5a o
m
cD
0
Eo° E LO 09 oo E
E m E E E
V `p v c c m N m -m > o E n �> o E
m
.Q L v rn
E a� c
o o
tv c 8 m N
Q '- G
E a 0 Aa
od iv a) L- o
°m m Q Q
O E o =E . a a a
L 0mm c t c s c r c
c N
rn rn rn
Z :9 0 00 LL LL LL LL J J J J Co J _! J J J _l J
N N
M
E O
W C
O
V
<? O N N to M
O M C Q�p .0 � t Q0)
O O a N C ' C a N C .O._>...
N CO - m '> fl O N .d = C a
CL
pE CL > C CL � Tl O'CO'tn
U y0
O C
L o c oo 0 od c c oO c
C W
CM Y C 0 0 •p0 p V p 09 N � ,O
�. .
0 '9 c° aai E a��i y aUi c `.�. o..�
3 a d) Nam E =co 03
_ _ a
o >p,,oI O �'' ,°a E �� to � °? U .O `IIC (D
`p N N ''' 0 p rn v A y O D- O 'a
E o � E ,o
E 3m = ,0 o Lo° oa 3 ° N
E "_' m3 � aE .ate a aaio2m' 0) 6 (J)
_ a� m "0 .-
3 a� ca o omacv -
C1 ot. m z m b 00
c
o
t.
Q. N
_ O O
N
> 42 0
Q) C (Q
O C 4'
r- -2
N 0 `� .Q E C
cx C N 0)
C S O u
o 0 o. c0 0 6+ +,
d p ,j gyp, N (� �
V a CL a N
N E
o z 8 a � FE- a
E N E .
75 E O Q p
O Y '0 3 0 a t0 E c
VJ L
t O O Y
J Q U LL C9 > m d
N 0
r J o
O L,
to
E
cm
> c
0. c
"c rn o 0 C
o
o N
CD
O
Q z s Q
CO
►1ti� � � architects and planners
ted,
OBSERVATION REPORT NO. 127 . R
fl A
Project: North Andover High School '- j
Date: 07 September 2004 t'L R1 �1f C;�Ur�J ,
Location: Job Site
Present: North Andover School Department (NASD) Harry Harutunian (partial)
Greg,Roberts
Paul Szymanski
Jack Stephenson (partial)
North Andover School Building Committee (NASBC) Harold Dushame
John T. Callahan & Sons (JTC) Philip Briselli
Dave Anderson
Mike Callahan'
Phil Ricci
Shauna Callahan
Gale Associates Jim Boudreau (partial)
Schofield Brothers of New England (SBNE) Matt Smith
Clerk-of Works (COW) Richard Warner
DiNisco Design Partnership (DDP) Richard Rice
Action Date
A. SITE SAFETY AND SECURITY
-- 08/31/04 A48.4.15 Security System - MCG reported that the system
09/07/04 is operational. Maiuri has repaired chaffed wiring,
and Simplex has deactivated the LED's. Simplex
is to be on site Saturday, 09/04/04 to reprogram
devices without addresses or with duplicate
addresses. Record item.
Simplex 09/07/04 A48.4.16 Security System - Greg Roberts reported that
Maiuri Simplex was on site, but there were still shorts in
the system wiring which Maiuri is correcting.
Simplex is due back this afternoon'(09/07/04).
A52.
Kenneth DiNisco Richard N. Rice Gary E.Ainslie Christopher Huston Donna DiNisco
8 7 S u m m e r S t r e e t B o s t o n M A 0 2 1 1 0 6 1 7 . 4 2 6 . 2 8 5 8 f a x 4 2 6 1 4 5 7
w w w . d i n i s c o . c o m
OBSERVATION REPORT NO. 127 North Andover High School Page 2
B. OWNER ISSUES
DDP 07/27/04 847.1.3 Tech Ed Equipment- Greg Roberts questioned
3Si 07/29/04 whether all F&E (i.e. tables and chairs) have
been installed. DDP will review with 3Si.
(07/29/04) 3Si advised DDP that chairs and
"loose tables" were not provided with tech ed
equipment. DDP will order remaining furnishings.
-- 08/31/04 B47.1.5 Tech Ed Equipment-The clerk has been in
09/07/04 contact with the vendor, who promises to be on
site to complete the installation by 09/03/04.
Thompson Engineering has reviewed the electrical
connection questions with Maiuri, who will
complete work in fabrication shop by 09/10/04;
NASD stated that date will be acceptable.
Record item.
Maiuri 09/07/04 B47.1.6 Tech Ed Equipment-The clerk reported that the
installation of the equipment will be completed
today, 09/07/04. Maiuri will complete wiring on
09/10/04.
R&R 08/13/04 B49.2.2 Admin/Arts Windows (Postscript) - In a phone
conversation on 08/13/04, R&R advised DDP that
scissors arm operators will be adjusted so that
windows close at the small admin wing windows.
At the arts wing, A&A stated single arm operators
must be installed per sample. DDP agreed to this
approach.
DDP 03/30/04 B50. Gymnasium Switches - Greg Roberts requested that DDP
TE investigate substituting pushbutton switches for gym
lighting, curtain, and backboard counters. GR noted that the
key switches installed are all keyed differently and require a
good deal of time to operate individually. The pushbuttons
could be secured from unauthorized use by a surface
mounted locking cabinet. Also, GR requested that the gym
lighting only be operated by the center control point. DDP
and TE to review.
OBSERVATION REPORT NO. 127 North Andover High School Page 3
-- 08/31/04 B56.2.3 Field Lighting - JTC advised that the field lights
09/07/04 will be tested by MUSCO tonight, 08/31/04 at
9:OOPM. Until the replacement controller is
delivered, the lights can be operated manually,
using a key switch. JTC stated that if Jack
Stephenson is available this evening, he (or his
designee) can be instructed on turning on the
lights. After tonight's testing, JTC stated that the
lights would be fully operational and available.
(09/07/04) Testing of lights took place later(10:00
PM) than expected on 08/31/04. Jack
Stephenson will be instructed on how to turn on
the lights. Record item.
-- 08/31/04 B56.2.4 Field Lighting/Planning Board - DDP reported that
09/07/04 the town planner has been notified of the lighting
test at 9:OOPM on 08/31/04. Should the town
planner's evening meeting schedule allow, she
will take this opportunity to observe the lighting, in
accordance with the Order of Conditions.
(09/07/04) The planner advised DDP that she will
be observing the lights during the game on
09/10/04. Record item.
-- 08/24/04 B58.2.1 Space Numbering -JTC will have the north lot
09/07/04 numbered on 08/27/04. The south lot will be
finish paved, striped, and numbered by 09/13/04.
It was agreed that the school will arrange for
off-site parking through 09/14/04 for students who
would otherwise use the south lot. JTC was
made aware that the south lot will be needed for
the home football game on 09/10/04, and for town
voting on 09/14/04.
(09/07/04) Spaces are stripped and numbered.
Record item.
DDP 08/24/04 B58.2.2 Parking Signs -The school department has
NASD purchased signs (visitors parking, etc.). DDP,
JTC JTC and NASD will coordinate installation.
-- 08/17/04 B60. Noise Complaint- Paul Szymanski (PS) reported that he
09/07/04 had received a telephone complaint from a neighbor on
Osgood Street complaining of a loud whine from the HVAC
system. PS will forward to DDP a copy of the letter also
received. Record item.
-- 09/07/04 B60.1 Noise Complaint - Paul Szymanski advised that
there has been no specific complaint made to act
upon. Record item.
OBSERVATION REPORT NO. 127 North Andover High School Page 4
-- 08/24/04 861.1 South Field Fences and Gates - Paul Szymanski
09/10/04 approved the proposed layout. JTC has
authorized Costco to proceed. DDP will issue a
work order for record. Record item.
-- 09/10/04 861.1.1 South Field Fences and Gates (Postscript) - On
09/10/04, DDP issued for record W.O. #109 to
install the additional fences and gates requested
by NASD. Record item.
-- 08/27/04 861.2.1 South Field Ramp Rails - JTC has authorized
09/10/04 fabricator to proceed. DDP will issue a work order
for record. Record item.
-- 09/10/04 861.2.2 South Field Ramp Rails (Postscript) - On
09/10/04, DDP issued for record W.O. #110 to
install the additional ramp rails needed at the
bleachers. Record item.
-- 08/17/04 B62. Concession Stand/Water Fountain - Jack Stephenson
09/10/04 requested that a hose connection be added to the outside of
the concession stand for attachment of a drinking water
device during practices. DDP to further review with NASD
and advise JTC of the plumbing change required. Record
item.
Grasseschi 09/10/04 862.1 Concession Stand/Water Fountain (Postscript) -
On 09/10/04, DDP issued time and materials
W.O. #108 to install hose bibs for watering and
on field water fountain.
-- 08/31/04 B65.02 Goal Posts - JTC stated field goal screen will be
09/07/04 completed on 09/01/04. NASD will furnish goal
post pads to be used temporarily until permanent
pads are delivered. Record item.
-- 08/31/04 B65.03.1 P/A System (Postscript) - JTC advised DDP that
09/07/04 the specified system is portable (able to be used
at either the track or the south fields) and would
not be available until 09/17/04. DDP advised
NASD that DDP will investigate rental systems for
use on 09/10/04. Record item.
Valley 09/09/04 865.03.2 P/A System (Postscript) - Valley Communications
will be on site at 10:00 AM on 09/10/04 to set up
the P/A System.
OBSERVATION REPORT NO. 127 North Andover High School Page 5
-- 09/09/04 B65.04.1 Temporary Bleachers (Postscript) - NASD
secured the use of bleachers from Merrimack
College on 09/09/04. Record item.
-- 08/31/04 B65.04.2 Permanent Bleachers - JTC expects Dant
09/09/04 Clayton on site to complete remaining items any
(09/09/04) DDP observed all bleacher work to be
completed on 09/09/04. Record item.
-- 08/31/04 B65.05 Radio/Phone Line - NASD advised that a phone
09/09/04 line is needed at the press box by the radio
station for broadcast of the 09/10/04 game. DDP
will review status with 3Si. Record item.
-- 08/31/04 B65.05.1 Phone Line (Postscript) - JTC advised that a
09/09/04 phone line has been run to the press box building
for the security system, which could be used by
the radio station.
(09/09/04) Greg Roberts activated a phone line
for Radio Station use. Record item.
3Si 09/10/04 B65.05.2 Radio/Voice/Data Cabling (Postscript) - Systems
DDP contracting submitted quote for cabling the
NASD pressbox building. 3Si, DDP and NASD to
review.
NASD 08/31/04 B65.09 Fencing -Access to main field for paying
DDP spectators was reviewed. JTC stated there is
some flexibility in relocating fence not now in
place. NASD and DDP to review.
-- 09/07/04 B65.10 Status Meeting - DDP, NASD and JTC will meet
on 09/09/04 at 1:00 PM to review status of items
that must be in place for the game on 09/10/04.
Record item.
-- 09/07/04 865.11 Athletic Complex Inspection (Postscript) - On
09/10/04 NASD, DDP and JTC reviewed Athletic
Complex. All items needed for game on 09/10/04
were either completed or in progress. Record
item.
B66.
C. PERMITS & INSPECTIONS
-- 03/26/02 CO3. DPW Permits
OBSERVATION REPORT NO. 127 North Andover High School Page 6
-- 08/17/04 C124.1 Concession Stand - Following the meeting, JTC
09/09/04 and DDP observed progress at the concession
stand itself. JTC will expedite completion with
consideration to a Health Department inspection.
DDP advised coved base should be installed on
the block walls. Record item.
-- 08/31/04 C124.1.1 Inspections - NAFD has inspected the concession
09/09/04 stand (See Item C126). JTC will schedule final
plumbing and electrical inspections this week, with
a final inspection by Bob Nicetta thereafter.
Record item.
-- 09/10/04 C124.1.2 Inspections (Postscript) - Plumbing and Electrical
inspections took place, with a permit issued by
the Board of Health on 09/09/04. On 09/09/04,
DDP inspected the concession stand building,
and formally requested from the building
department a temporary certificate of occupancy.
Record item.
National 08/31/04 C126.1 Fire Alarm System -JTC stated that National will
comply with the NAFD comments for completing
the system as summarized in the NAFD memo
dated 08/30/04.
-- 09/07/04 C128. Erosion Control - SBNE reported that some work on
sedimentation barriers has been accomplished, but noted
more repair is needed. SBNE recommended that CB boots
be cleaned before the rains from tropical storm Frances
arrive. Record item.
C129.
D. CONSTRUCTION SCHEDULE
-- 09/07/04 D146. Construction Progress - JTC reviewed upcoming activities,
as follows. Record item.
-- 09/07/04 D146.1 Site Lighting - All lights will be up and operating
today. Record item.
-- 09/07/04 D146.2 Baseball Field - Work on field drainage will start
after 09/10/04. Record item.
-- 09/07/04 D146.3 North Fields - Turf shipped on 09/03/04. Jump
pits will be constructed the week of 09/13/04.
Track coating is scheduled for 09/20/04. Record
item.
D147.
OBSERVATION REPORT NO. 127 North Andover High School Page 7
E. SUBMITTAL SCHEDULE
E16.
F. SUBMITTALS
04/13/04 F85.3.4 Laticrete Recommendation - PM recommends that
06/28/04 given the use and cleaning materials employed at
09/07/04 NAHS (which PM will confirm in a visit to the
kitchen), the Spectra Loc floor grout should remain.
CTI offered an extended warrantee; DDP stated a
bond may be required if this is accepted. Laticrete
must put their recommendation in writing.
(06/28/04) DDP received letter dated 04/23/04
directly from Laticrete on 06/28/04. DDP will
consider recommendations.
(09/07/04) DDP stated that Laticrete's
recommendation that the Spectra Loc system
remain is accepted. However, DDP will seek a
$10,000 credit for the failure to install the originally
specified and approved product. Record item.
Musco 05/27/04 F100.1.1 Field Lights e structural shallrevise
calculations.and re-submit for
rd h
DDP 07/20/04 F100.1.2 Field Lights - Paul Szymanski reported that a
07/23/04 lighting submittal package had been forwarded to
the school department from Musco. PS will
forward a copy to DDP for processing (Received
by DDP 07/23/04).
F114.
G. COORDINATION DRAWINGS
G28.
H. PAYROLL REPORTS
H42.
I REQUISITIONS
-- 08/31/04 143. Requisition #30 - JTC forwarded a pencil copy of
09/08/04 Application for Payment#30 for review by DDP, MBC and
the clerk. Record item.
-- 09/10/04 143'1 t approved e requisition
for Requisition
ugu t a heir 09/10/ meeng Rco ditem.
144.
OBSERVATION REPORT NO. 127 North Andover High School Page 8
J. CHANGE ORDERS
DDP 06/29/04 J26. 06/29/0O4. DDP and JTC reviewed outsttandiing PCO's that
JTC
JTC would like to clear. DDP and JTC to review further.
DDP 07/20/04 J27. Electrical PCO's - DDP and JTC will meet to review
JTC electrical PCO's in preparation for a meeting with the
bonding companies.
J28.
K. WORK ORDERS
K15.
L. FIELD ORDERS
L18.
M. PROPOSAL REQUESTS
Capital 08/05/03 M25.2.1 PCO #075 - DDP responded to Capital's letter
with regard to credit offered for VCT replaced by
terrazzo. Capital to revise credit per
specifications.
M36.
N. REQUEST FOR INFORMATION
DDP 04/01/03 N50. . RFI #267 - DDP will issue letter to NAPD and Building
Department advising them that sprinkler heads in elevator
shaftway and the elevator shunt trip will be deleted in
accordance with the code moratorium still in effect.
DDP 12/02/03 N89. draw drawings dryer n Std Skills vents#2050rand the kitchen.
AC
F&T DDP to revie with F&T and advise.
N96.
O. DEMOLITION
005.
OBSERVATION REPORT NO. 127 North Andover High School Page 9
P. SITE WORK
JTC 09/30/03 P41. Art Plaza Pavement- DDP reviewed CRJA site visit report
of 09/26/03. JTC stated radius will be cut. The clerk
observed that the puddles noted disappeared in less than
an hour, and low spots are very shallow.
DDP 10/08/03 P41.1 Arts Plaza Pavement (Postscript) - CRJA
Clerk followed up, advising DDP that low spots would
be an icing concern, and requested that the
tolerances be checked per the paving spec (See
Spec 02500-3.01-19). DDP to advise clerk to
confirm.
JTC 03/16/04 P49. Catch Basins - SBNE noted that JTC has yet to install the
hoods on the catch basin structures as required.
NASD 04/20/04 P52. Commemorative Plantings - Paul Szymanski advised that
DDP the school will be planting some memorial trees, and is
looking into some way to incorporate future memorials in an
orderly, planned fashion. DDP and NASD will coordinate.
NASD 07/20/04 P53.8.2 Track/Softball Scoreboard - It was discussed that
07/27/04 the track scoreboard could be fed from the
construction trailer service on Presscott. DDP will
consult with Thompson Engineering to provide
Paul Szymanski with the information needed to
obtain a permanent service from this location from
Mass Electric.
(07/27/04) Information forwarded to Paul
Szymanski by DDP on 07/26/04.
JTC 06/29/04 P56.3.3 Sand/Loam Mix Test - P&S will take samples of
07/20/04 stockpiled loam and will mix with samples of
08/10/04 Pitcherville Sand and will test for optimum
09/07/04 sand/loam/organic content.
(07/20/04) P&S test results forwarded to JTC.
JTC questioned apparent reversal in
recommended sand mix ratio. Follow up with P&S
needed to clarify.
(08/10/04) It was discussed whether the P&S
recommendation for organics and mixing
constitutes an extra to the contract. DDP agreed
that the "means and methods" are up to JTC,
noting the "final product" is what JTC is
responsible for. As for adding organics to the top
soil, DDP interprets this as a specified
requirement; JTC will review the specifications
language and respond.
(09/07/04) It was discussed that the mix ratio that
has been determined by P&S is three parts loam,
two parts sand and one part organics. JTC
intends to harrow the mixture.
OBSERVATION REPORT NO. 127 North Andover High School Page 10
JTC 06/29/04 P56.3.6 Drainage -JTC and DDP described how the field
CRJA 08/24/04 sub grade for drainage as shown on the contract
09/07/04 drawings no longer reflects the final grades due to
changes made necessary by the athletic field
upgrades. CRJA agreed that adjustments to
J-drain and collector pipe layout would be
acceptable as long as "downhill"criteria is met.
CRJA will inspect subdrainage when completed,
and before being covered with sand, to see that
this criteria is met.
(08/24/04) In response to CRJA's inquiry as to
when the baseball field drainage work would
commence, JTC advised DDP that this work
would not begin before 09/07/04.
(09/07/04) JTC noted drainage board installation
will begin after site areas are touched up for the
09/10/04 game.
JTC 06/29/04 P68.1 Leaning Trees - CRJA expained that they do not
Emanouil require trees to be guyed because studies have
shown that unguyed trees are stronger. However,
the spec does require trees to be plumbed if
required. JTC will advise Emanouil to reset the
trees.
Emanouil 06/29/04 P70.1 Lawns at Arts Wing - JTC agreed that Emanouil
would repair the bare spots in the lawn between
the arts classrooms and the driveway.
-- 07/23/04 P72.3 Pavement Grades at Concession Stand
09/10/04 (Postscript): DDP faxed sketch of revised grading
to JTC on 07/23/04. DDP to follow up with Work
Order. Record item.
-- 09/10/04 P72.3.1 Pavement Grades at Concession Stand
(Postscript) - DDP issued on 09/10/04 for record
W.O. #112 revising grades and adding catch
basins.
DDP 08/24/04 P76.1.1 Painted Lines - NASD has requested that a
Gale 09/07/04 proposal request be issued for painted practice
soccer lines and for painted field hockey lines at
the south field because the school department's
line painter is unavailable. Gale to provide DDP
with line drawing.
(09/07/04) Gale is attempting to see if Northeast
turf crew can line the fields as desired by NASD.
NET 08/24/04 P76.1.3 O&M Instructions - NET to furnish O&M manuals
NASD and schedule owner instruction of turf field
maintenance.
OBSERVATION REPORT NO. 127 North Andover High School Page 11
JTC 08/31/04 P76.3.2 Bleachers and Pole - JTC stated that their
09/07/04 expectation of how Dant Clayton would interface
with the pole was not met, and the additional cost
was not acceptable. It was agreed that DC
would be held responsible for extending the
bleacher system to the face of the concrete light
pole foundation. JTC would construct an
aluminum diamond plate closure around the light
pole flush with th upper walk surface. This upper
closure will be fenced in by DC.
(09/07/04) DC has extended deck and has
completed fencing around pole. JTC will pour
sloped concrete cap on pole pier.
JTC 08/31/04 P77. Sod at Bleachers - It was agreed that sod will be placed on
bleacher slope. Cost to the project will be approximately
$1,500 (one third the cost). NASD agreed to water sod.
P78.
Q ARCHITECTURAL
Bass 07/20/04 Q30.8.03 Academic Wing Gravel Stop does not conform at
Stanley 07/27/04 south side, and is coming loose on north side (item
08/10/04 Q30.7.1)
09/07/04 (08/19/03) - Gravel stop issues shared by JTC
(blocking), Bass (forming) and Stanley
(installation). DDP and JTC will inspect entire
roof perimeter and list areas be reworked.
(04/27/04) JTC advised that Bass will likely not
perform any of the repairs previously reviewed
without a formal punchlist.
(07/20/04) Bass, JTC, DDP and clerk met to
review outstanding cladding items. DDP
reviewed with Bass cladding issues from exterior
punchlist inspection. Bass will be on site the
week of 07/26/04 to address outstanding items.
Bass will forward to DDP a drawing of proposed
cladding between clerestory and curtainwall on
north side of arts wing. It was agreed that brake
metal backed by polystyrene insulation would be
used in this area.
(07/27/04) JTC advised that Bass will be on site
by 07/28/04. .JTC reported that Bass has not yet
come to the site. Record item.
JTC 09/07/04 Q30.8.11 Cladding nd s
responded and that JTC has issued to
Bass a termination letter.
OBSERVATION REPORT NO. 127 North Andover High School Page 12
DDP 04/13/04 Q91. Auditorium Chair Lift- DDP will make calls to clarify Mass.
Elevator Board's position on whether the chair lift is to be
inspected.
Q92.
R. STRUCTURAL
R37.
S. FIRE PROTECTION
RWS 06/22/04 S20.1 System Pressure - It was reported that the
Hampshire technician on site feels the reported
180# pressure in the system is proper. DDP will
discuss with RWS.
S21.
T. PLUMBING
Grasseschi 05/18/04 T30.2.1 Gas Shutoff Valve - DDP has been informed by
RWS that all their conversations with Grasseschi
were with regard to Grasseschi's request to
substitute a standard access panel for a valve
cabinet (which was done). RWS at no time
instructed Grasseschi that the door should have a
lock. Grasseschi is to remove lock and install latch
per detail on 8.0.3.
Grasseschi 04/13/04 T33. Photo Dark Room - Greg Roberts advised that backflow
preventer has been installed, but exposed hot and cold
water piping must be insulated.
Grasseschi 05/04/04 T35. Push Button Faucets - Greg Roberts reported that kids have
been taking the push buttons off of the lavatory metering
faucets. Upon examination, NASD found that set screws
were not tightened. Grasseschi to tighten set screws, and
shall provide NASD with spare knobs.
Grasseschi 06/04/04 T36.1 Hot Water(Postscript) - RWS memo distributed
on 06/07/04. Grasseschi to advise on system
balancing.
DDP 06/08/04 T36.2 Hot Water- Greg Roberts questioned type of
RWS tanks and piping arrangement, wondering if this
would play some part in the hot water circulation
issue. JTC stated tanks were piped per RWS
directives in response to a question from
Grasseschi. DDP will review further with RWS.
OBSERVATION REPORT NO. 127 North Andover High School Page 13
T37.
U. HVAC
Maiuri 06/08/04 U30.1.2 Fume Hood Fans -ABP has ordered special
MCG 08/17/04 starter required for two fans.
08/31/04 (08/17/04)JTC advised MCG that starters are
required at two fume hood fans.
(08/31/04) MCG reported components for hoods
have been ordered.
Sagamore 06/15/04 U34.1.2 Mainstreet Fin Tube - DDP reviewed conditions
08/10/04 and found that fin tube cover has been
adequately screwed to support structure.
Sagamore shall consistently cope the end covers
tight to columns, concealing the piping.
(08/10/04) Sagamore has ordered end caps for
Main Street fin tube.
F&T 03/16/04 U35. Kitchen ElevatorShaft - It was discussed that even with
keeping the boiler room doors closed, a strong down draft is
keeping the elevator shaft cold in the kitchen. DDP will
review with F&T.
Sagamore 06/22/04 U43.1.1 Sagamore advised that the last of the filters are
07/13/04 due on site on 07/06/04 and will be installed on
07/27/04 delivery.(07/13/ 4) Filters are on site.
(07/27/04) Sagamore advised that filters on hand
were not correct, and that replacements have
been ordered.
-- 06/08/04 045.1 Boiler Leak- Greg Roberts reported that
Sagamore has repaired the leak between
sections. However, the boiler has not since been
fired to determine if repair will hold.
Sagamore 06/22/04 U46.5.3 Dust Collector- Panel voltage will be corrected on
07/13/04 06/29/04, and fittings completed.
(07/13/04) Dust collector controller is on site and
all that is left for completion is final electrical
connections.
OBSERVATION REPORT NO. 127 North Andover High School Page 14
Sagamore 06/22/04 U46.5.4 Water Treatment System - Sagamore stated
07/27/04 water was retested last week and found to have
08/10/04 29% glycol content (specified range is 31-33%)
08/17/04 Sagamore is prepared to add more glycol with the
rust inhibitor and other chemical additives that are
on site, and startup the system. Greg Roberts
noted that the system only ran for 24 hours after
the last glycol was added, and recommended that
the system be run longer to more thoroughly mix
the glycol.
(07/27/04) Sagamore reported water treatment
system work is completed, and that subcontractor
will be called back to site to retest after coil in
ERU-2 is completed.
(08/10/04) Sagamore stated water treatment work
will be completed the week of 08/16/04.
(08/17/04) Sagamore stated water treatment work
will be completed by 08/20/04.
Sagamore 06/22/04 U46.5.5 As Built Drawings - Sagamore has piping 'as
builts' on a cad disk, and has received a second
copy of ductwork 'as builts' to be added to disk.
Sagamore 07/27/04 047.3.1 Burners - Greg Roberts reported that Power
Flame has been back to site, but Boiler#1
continues to"lock out."
Sagamore 07/27/04 U47.4.1 AHU-3 - Sagamore has replaced the pulley,but
must still provide Greg Roberts with replacement
belts.
Sagamore 08/31/04 U50.01 ERU's - Sagamore reported that ERU's 1& 3 are
on and operating properly. ERU-2 will be running
on 09/01/04, and will have its damper activator
replaced a day or two thereafter.
Sagamore 09/07/04 U50.01.1 ERU's - JTC reported that despite Sagamore's
statements to the contrary, the ERU's are not
functioning.
Sagamore 08/31/04 050.02 RTU 1 &2 - It has been determined that
condensation on the underside of deck may be
the result of roof insulation not running under the
units. JTC noted that there was a history of
discussion whether this was necessary; all other
BTU's have continuous insulation and
condensation on the deck is not a problem.
Sagamore will advise how insulation could be
installed at this time.
OBSERVATION REPORT NO. 127 North Andover High School Page 15
Sagamore 08/31/04 050.03 Sheetmetal Plennums -Sagamore has directed
insulator to insulate all supply diffuser plennums.
It was noted that this is a significant amount of
work, taking approximately two weeks to
complete. NASD stated that the work can be
done off hours once school starts.
Sagamore 08/31/04 U50.04 Condensation Pans - Sagamore stated McQuay
rep will visit site to see conditions. Insulator has
been directed to insulated the underside of the
pans.
Sagamore 08/31/04 U50.05 RTU/Outdoor Air Settings - Sagamore has
F&T confirmed that the operator sequences are per the
HVAC drawings. McQuay has reset the
enthalpy controlers. There is still a question
whether too much air is entering the wrestling room
unit during the unoccupied mode.
Sagamore 08/31/04 U50.06 RTU-8- Sagamore stated the heat exchanger is
being replaced.
Sagamore 08/31/04 U50.07 RTU-8 Sequence - Sagamore will price the
change suggestion by F&T to the unoccupied
sequence (half speed using VFD).
Sagamore 08/31/04 U50.08 Humidity Control - Sagamore will price adding
humidity override controls for wrestling room and
auditorium units (to protect wood floors and the
grand piano). Sagamore stated this needs to be
coordinated with the McQuay controls.
Sagamore 08/31/04 U50.09 Balancing Report- Final balancing will be
completed on 09/01/04, with reports ready by
09/03/04.
U51.
V. ELECTRICAL
3Si 03/23/04 V59.3 Room 3011 -3Si has a recording meter on the
outlets in IDF 3011 due to three UPS units being
damages.
3Si 05/11/04 V59.3.1 Room 3044 - Paul Szymanski noted a power
TEC issue has also been observed at V/D room 3044.
DDP reported that 3Si and TEC are working to
isolate and identify the problem, but nothing has
been discovered that can be positively
addressed.
OBSERVATION REPORT NO. 127 North Andover High School Page 16
is -TE will call Gamewell to
05/04/04 V69.4 Gamewell Comments
09/13/04 discuss questions as to system wiring, how
wirinewell's affect
recommendations and requirements.m
G am
Record item. - Gamewell
09/13/04 V69.4.1 G comment on system wiring Land pa
co panel performance
forwarded to JTC on 09/13/04. Record item.
V70.1.2 Greg Roberts t
RDK 08/24/04 due to requi ementste testing reported he duct
NAHS moke/HVAC
interface will be performed in
December with the yearly fire alarm testing.
07/20/04 V71.7 ABP Default-The folowing ABP action items
have been deleted from the observation report
due to ABP's default, and will be addressed
outside of the observation report 33.2.4 (Studio
A48.4.06 (security wiring);
Doorbell); J18.1.3 (PR#21 Cost Proposal);
J21.1.4 (WO #33, 40 and 41 revised cost
proposal); K08 (WO#27 cost proposal);
K08.1.1
(WO#28 revised cost proposal); V61 (Gym
backboard switches); V64.4 (Gym lights); V68
(Kitchen doorbell);V69.3.1 (Fire alarm wiring);
V71, V71.2 (Response to outstanding issues).
07/06/04 V72. Lamp List- Greg Roberts requested a list of lamps used on
DDP the project. DDP noted this is to be part of the electrical
TE O&M manuals, but with ABP's default DDP will request a list
from Thompson Engineering.
4 V74. Consession Stand Data/Po S r - in response tact to tin has D not
07/27/0 question, JTC reported that y
09/10/04 yet pulled the fire alarm cable to the concession stand.
Before they do, DDP stated that a communications cable
should be to with e of DDP
ble nelededSURecohd item.
' d
advise as type
08/10/04 V74.1 Concession Stand Video - NASD forwarded to
09/10/04 DDbro broadcasting events. DDP to review with commission
for 3Si.
Record item.
09/10/04 V74.2
Concession Stand Video (Postscript) - Systems
cost proposal for cabling under review. See item
665.5.2. Record item.
OBSERVATION REPORT NO. 127 North Andover High School
Page 17
08/10/04 V75. Security Cameras - NASD will be reinstituting the installation
of security cameras under a separate contract. It was
discussed that the 120 volt power for exterior cameras
mounted on light poles has not been completed, and that the
conduit routing is not as specified due to damage to
conduits.underground
conduit path exists to all However,
exterior locations. a
DDP 08/17/04 V76.1.1 Disputed Items - DDP will advise as to items
listed as "N.I.C." MCG reported that they do not
have all work orders and other contract change
documents.
Maiuri 08/17/04 V76.4 components topcomplete top steps not yet on
hand.
DDP 08/17/04 V76.5 Flagpole Lighting - In response to discussions,
DDP will review control specified with TE.advised
NASD 08/31/04 V77. Worker
CG that background d Checks -checks wall beZnecessary dfor any
MCG electricians working in the building during the school day.
V78.
W. HAZARDOUS MATERIALS
W08.
X. MISCELLANEOUS
Bass 08/26/03 X48. Sarnafil Roof Flashing - DDP,
JTC and Stanley discussed
Stanley roof edge detail. DDP explained that Work Order required
JTC, Stanley and Bass to coordinate respective work. It
was discussed and agreed that Boss would provide
Stanley with stock so Stanley can form"snap on" trim. DDP
stated, in principle, this would be additional work by
Stanley, and less work (credit) by Bass (but no net change
in cost to Owner).
JTC 05/04/04 X67.10 Roof Leak Status - In response to MBC's
questions, JTC stated that all leaks have been
permanently repaired, with the exception of
cupola doors, which are awaiting hardware and
weather stripping.
JTC 06/22/04 X67.11 Cafeteria Roof Leak- Greg Roberts reported that
a leak at the east end of the cafeteria has
reappeared. JTC will investigate.
Page 18
RVATION REPORT NO. 127 North Andover High School Roberts reported that
OBSE Cafeteria Roof Leak- Greg eared
08/24/04 X67.11.1
Stanley the leak over the cafeter'as�wieekr JTC has
JTC during the rams of the p
advised Stanley.
X72.
Y. PROJECT CLOSEOUT
As Built Drawings -JTC has furnished clerk with
04/27/04 Y12.4 as built mark ups of fire protection and plumbing
Clerk drawings. Clerk and RWS to review.
RWS
The clerk will begin an inventory of spare
Y13. Inventory -The to be forwarded per specifications.
Clerk 03/02/04 materials and parts
passed along to
Y13.3 Auditorium Seat Inventory, -Dale stating seating
JTC 06/22/04 DDP a transmittal from Slay
maintenance has been delivered.TC�w�l�advise
S-D unaware of any such delivery. ,
Slay Dale to deliver materials to clerks attention.
Y14. Closeout et showin- he status of he various specified.
ma
ls,
JTC 07/27/04 spreadsheet showing
Subs as-builts,warranties, and maintenance stock
Y15.
ZZ. CONSTRUCTION PROGThe architect walked the site and
09/07/04 ZZ128,observedithe following. Record item.
to complete
ZZ128.1 South Site - Crews working
cncession stand in
09/07/04 landscaping, paving, and
-- preparation for game 09/10/04. Record item.
ZZ129.
OBSERVATION REPORT NO. 127 North Andover High School Page 19
The next job meeting will be held at 1:00 PM on Tuesday, 14 September 2004 at the
Contractor's Trailer. understood by the writer, who should be notified of
The discussions of this meeting are recorded as ied to the contrary, these notes are presumed to
any omissions or corrections. Unless the writer is notit
be correct,
rl I--
Richard N. Rice
DiNISCO DESIGN
RNR/dp Gene Kingman
cc: Louis Minicucci Kevin Murphy
Harry Harutunian Ed Estabrook
Frederick King Kevin Burke
Nancy Kurtz Richard Weber
Susan Nicholson Mike DiBari
Evan Karalolos Kenneth DiNisco
Department of Pub lic Works Richard Greenlee
Julie Parrino Angel Khazadian
NA Planning Board Jon Oxman
Doug Seaboldt Bill Sousa, RDK
Robert Feinberg, ESC OA
Paul Szymanski
cc(hand): Philip Briselli
Patrick Saitta
{ �ted
architects a �� ��1� a n n: e r s
L
OBSERVATION REPORT NO. 128
t ttiO I t <<C�4�E
k k-�`t.N MN
Project: North Andover High School
Date: 14 September 2004
Location: Job Site
Present: North Andover School Department (NASD) Greg.Roberts
Jack Stephenson (partial)
Municipal Building Consultants (MBC) Pat Saitta
John T. Callahan & Sons (JTC) Dave Anderson
Mike Callahan
Raymond Crouteau Electric (RCE) Raymond Crouteau (partial)
Gale Associates Jim Boudreau (partial)
Dale Harris (partial)
Schofield Brothers of New England (SBNE) Matt Smith
Clerk of Works (COW) Richard Warner
DiNisco Design Partnership (DDP) Richard Rice
Action Date
A. SITE SAFETY AND SECURITY
Simplex 09/07/04 A48.4.16 Security System - Greg Roberts reported that
Maiuri Simplex was on site, but there were still shorts in
the system wiring which Maiuri is correcting.
Simplex is due back this afternoon (09/07/04).
Record item.
Simplex 09/14/04 A48.4.17 Security System- Greg Roberts reported that
Maiuri additional wiring problems at doors were found on
09/07/04, which Maiuri expects to have corrected
by 09/17/04, with-Simplex due on site Monday,
09/20/04. GR noted that the system is being
armed at night.
A52.
Kenneth DiNisco Richard N. Rice Gary E.Ainslie Christopher Huston Donna DiNisco
8 7 S u m m e r S t r e e t B o s t o n M A 0 2 1 1 0 6 1 7 . 4 2 6 . 2 8 5 8 f a x 4 2 6 . 1 415 7
w w w . d i n i s c o . c o m
OBSERVATION REPORT NO. 128 North Andover High School Page 2
B. OWNER ISSUES
DDP 07/27/04 847.1.3 Tech Ed Equipment- Greg Roberts questioned
3Si 07/29/04 whether all F&E (i.e. tables and chairs) have
been installed. DDP will review with 3Si.
(07/29/04) 3Si advised DDP that chairs and
"loose tables" were not provided with tech ed
equipment. DDP will order remaining furnishings.
-- 09/07/04 B47.1.6 Tech Ed Equipment- The clerk reported that the
09/14/04 installation of the equipment will be completed
today, 09/07/04. Maiuri will complete wiring on
09/10/04. Record item.
JTC 09/14/04 847.1.7 Tech Ed Equipment Wiring-All equipment is in
place. DDP has issued Field Order#195 for
wiring revisions. JTC will confirm if wiring has
been completed.
JTC 09/14/04 B47.1.8 Tech Ed Dust Collector System - JTC stated dust
Sagamore collector has been wired, but Sagamore has not
yet made connections to equipment. JTC will
press Sagamore to complete the dust collection
ductwork.
R&R 08/13/04 849.2.2 Admin/Arts Windows (Postscript) - In a phone
conversation on 08/13/04, R&R advised DDP that
scissors arm operators will be adjusted so that
..,windows close at the small admin wing windows.
At the arts wing, A&A stated single arm operators
must be installed per sample. DDP agreed to this
approach.
DDP 03/30/04 B50. Gymnasium Switches - Greg Roberts requested that DDP
TE investigate substituting pushbutton switches for gym
lighting, curtain, and backboard counters. GR noted that the
key switches installed are all keyed differently and require a
good deal of time to operate individually. The pushbuttons
could be secured from unauthorized use by a surface
mounted locking cabinet. Also, GR requested that the gym
lighting only be operated by the center control point. DDP
and TE to review.
DDP 08/24/04 B58.2.2 Parking Signs -The school department has
NASD purchased signs (visitors parking, etc.). DDP,
JTC JTC and NASD will coordinate installation.
Grasseschi 09/10/04 862.1 Concession Stand/Water Fountain (Postscript) -
On 09/10/04, DDP issued time and materials
W.O. #108 to install hose bibs for watering and
on field water fountain.
OBSERVATION REPORT NO. 128 North Andover High School Page 3
Valley 09/09/04 B65.03.2 P/A System (Postscript) - Valley Communications
09/14/04 will be on site at 10:00 AM on 09/10/04 to set up
the P/A System.
(09/14/04) Valley has installed a temporary P/A
System which will remain in place until the fixed,
permanent components can be installed. Once a
proposal is received from Valley, the work will be
done under a work order.
3Si 09/10/04 B65.05.2 Radio/Voice/Data Cabling (Postscript) - Systems
DDP contracting submitted quote for cabling the
NASD pressbox building. 3Si, DDP and NASD to
review.
NASD 08/31/04 865.09 Fencing -Access to main field for paying
DDP 09/14/04 spectators was reviewed. JTC stated there is
some flexibility in relocating fence not now in
place. NASD and DDP to review.
(09/14/04) Jack Stephenson stated that given the
experience of the 09/10/04 game, modifications
will be needed. Rick Rice, Paul Szymanski and
Jack Stephenson will walk the field area to
determine changes needed.
09/14/04 B66. Locker Room Revisions -JTC will begin demolition work this
week, coordinating with Jack Stephenson. Except for
specific instances to be discussed,work can be done during
the.school.day: JTC will be taking special precautions for
dust control, etc.
NASD 09/14/04 B66.1 Equipment Room Racks -JTC and Greg Roberts
JTC will be jointly suggesting to Vinny Valentino
substituting mobile two tier garment racks for the
fixed pipe racks. DDP agreed that this solution
would be more flexible and efficient.
NASD 09/14/04 B66.2 Second Floor Team Rooms - NASD to remove
JTC equipment from lockers so that wall demo,etc. can
begin. JTC estimated that the second floor locker
room renovations could be completed in a month
(mid-October). Record item.
JTC 09/14/04 B66.3 Boys and Girls General Locker Rooms -Work in
NASD these rooms must be coordinated with Jack
Stephenson, because they are used during the
day for P.E. classes.
OBSERVATION REPORT NO. 128 North Andover High School Page 4
JTC 09/14/04 B66.4 Lockers - JTC advised that HCI is considering
alternate locker manufacturers in order to approve
on time and cost. DDP takes no exception, as
long as the lockers are equal in size, type and
quality as those already installed. JTC to further
advise.
B77.
C. PERMITS & INSPECTIONS
-- 03/26/02 CO3. DPW Permits
National 08/31/04 C126.1 Fire Alarm System - JTC stated that National will
comply with the NAFD comments for completing
the system as summarized in the NAFD memo
dated 08/30/04.
JTC 09/14/04 C126.1.1 Fire Alarm System -JTC will confirm that work
was completed per NAFD requirements.
-- 09/14/04 C129. Erosion Control - SBNE reported that many of the previous
open items have been addressed, and conditions have
improved. SBNE noted that repairs at the outfield are
required, and gravel drainage courses need to be cleaned.
Record item.
C130.
D. CONSTRUCTION SCHEDULE
-- 09/14/04 D147. Construction Progress - JTC reviewed upcoming activities,
as follows. Record item.
-- 09/14/04 D147.1 South Fields - Landscaping underway at
bleachers, etc. Subgrading at baseball field
ongoing. Record item.
-- 09/14/04 D147.2 North Fields - Northeast Turf will work through
weekend, and be completed by the middle of next
week. NET has sand for fill on site, and will be
delivering rubber as the fill is placed. Record item.
-- 09/14/04 D147.3 Track- C&I will be working on long jump and pole
vault pits on 09/15/04, and will be starting in `D'
areas on 09/20/04. Record item.
D148.
OBSERVATION REPORT NO. 128 North Andover High School Page 5
E. SUBMITTAL SCHEDULE
E16.
F. SUBMITTALS
Musco 05/27/04 F100.1.1 Field Lights - Musco shall revise and re-submit for
record the structural calculations.
DDP 07/20/04 F100.1.2 Field Lights - Paul Szymanski reported that a
07/23/04 lighting submittal package had been forwarded to
the school department from Musco. PS will
forward a copy to DDP for processing (Received
by DDP 07/23/04).
F114.
G. COORDINATION DRAWINGS
G28.
H. PAYROLL REPORTS
H42.
I REQUISITIONS
144.
J. CHANGE ORDERS
DDP 06/29/04 J26. 06/29/0O4. DDP and JTCtreviewed outstanding g PCO's that
JTC
JTC would like to clear. DDP and JTC to review further.
DDP 07/20/04 J27. Electrical PCO's - DDP and JTC will meet to review
JTC electrical PCO's in preparation for a meeting with the
bonding companies.
J28.
K. WORK ORDERS
K15.
L. FIELD ORDERS
L18.
OBSERVATION REPORT NO. 128 North Andover High School Page 6
M PROPOSAL REQUESTS
Capital 08/05/03 M25.2.1 PCO #075 - DDP responded to Capital's letter
with regard to credit offered for VCT replaced by
terrazzo. Capital to revise credit per
specifications.
M36.
N. REQUEST FOR INFORMATION
DDP 04/01/03 N50. RFI #267 - DDP will issue letter to NAPD and Building
Department advising them that sprinkler heads in elevator
shaftway and the elevator shunt trip will be deleted in
accordance with the code moratorium still in effect.
DDP 12/02/03 N89. Clothes Dryers - JTC noted no vents are shown on HVAC
F&T drawings for dryer in Study Skills#2050 and the kitchen.
DDP to review with F&T and advise.
N96.
O. DEMOLITION
005.
P. SITE WORK
JTC 09/30/03 P41. Art Plaza Pavement - DDP reviewed CRJA site visit report
of 09/26/03. JTC stated radius will be cut. The clerk
observed that the puddles noted disappeared in less than
an hour, and low spots are very shallow.
DDP 10/08/03 P41.1 Arts Plaza Pavement (Postscript) - CRJA
Clerk followed up, advising DDP that low spots would
be an icing concern, and requested that the
tolerances be checked per the paving spec (See
Spec 02500-3.01-19). DDP to advise clerk to
confirm.
JTC 03/16/04 P49. SBNE noted that JTC has
hoods on the catch basin structures s required. instll the
NASD 04/20/04 P52. Commemorative Plantings - Paul Szymanski advised that
DDP the school will be planting some memorial trees, and is
looking into some way to incorporate future memorials in an
orderly, planned fashion. DDP and NASD will coordinate.
OBSERVATION REPORT NO. 128 North Andover High School Page 7
NASD 07/20/04 P53.8.2 Track/Softball Scoreboard - It was discussed that
07/27/04 the track scoreboard could be fed from the
construction trailer service on Presscott. DDP will
consult with Thompson Engineering to provide
Paul Szymanski with the information needed to
obtain a permanent service from this location from
Mass Electric.
(07/27/04) Information forwarded to Paul
Szymanski by DDP on 07/26/04.
JTC 06/29/04 P56.3.6 Drainage - JTC and DDP described how the field
CRJA 08/24/04 sub grade for drainage as shown on the contract
09/07/04 drawings no longer reflects the final grades due to
changes made necessary by the athletic field
upgrades. CRJA agreed that adjustments to
J-drain and collector pipe layout would be
acceptable as long as"downhill"criteria is met.
CRJA will inspect subdrainage when completed,
and before being covered with sand, to see that
this criteria is met.
(08/24/04) In response to CRJA's inquiry as to
when the baseball field drainage work would
commence, JTC advised DDP that this work
would not begin before 09/07/04.
(09/07/04) JTC noted drainage board installation
will begin after site areas are touched up for the
09/10/04 game.
JTC 06/29/04 P68.1 Leaning Trees - CRJA expained that they do not
Emanouil require trees to be guyed because studies have
shown that unguyed trees are stronger. However,
the spec does require trees to be plumbed if
required. JTC will advise Emanouil to reset the
trees.
Emanouil 06/29/04 P70.1 Lawns at Arts Wing- JTC agreed that Emanouil
would repair the bare spots in the lawn between
the arts classrooms and the driveway.
DDP 08/24/04 P76.1.1 Painted Lines - NASD has requested that a
Gale 09/07/04 proposal request be issued for painted practice
soccer lines and for painted field hockey lines at
the south field because the school department's
line painter is unavailable. Gale to provide DDP
with line drawing.
(09/07/04) Gale is attempting to see if Northeast
turf crew can line the fields as desired by NASD.
NET 08/24/04 P76.1.3 dn Instructions r to �field manuals
and schedule of t
NASD maintenance.
OBSERVATION REPORT NO. 128 North Andover High School Page 8
JTC 08/31/04 P76.3.2 Bleachers and Pole - JTC stated that their
09/07/04 expectation of how Dant Clayton would interface
with the pole was not met, and the additional cost
was not acceptable. It was agreed that DC
would be held responsible for extending the
bleacher system to the face of the concrete light
pole foundation. JTC would construct an
aluminum diamond plate closure around the light
pole flush with th upper walk surface. This upper
closure will be fenced in by DC.
(09/07/04) DC has extended deck and has
completed fencing around pole. JTC will pour
sloped concrete cap on pole pier.
DDP 09/14/04 P77.1 Soil at Bleachers - JTC has installed sod on
slope at the bleachers. DDP will issue for record
a work order for$1,500, as agreed.
-- 09/14/04 P78. Gale reviewed the following items at the 09/14/04 job
meeting.
C&I 09/14/04 P78.1 been marked where puddling was areas have
observed,
JTC stated C&I will be filling low spots.
Gale 09/14/04 P78.2 Pa Dimensions - Gale Stephenson and a confirm
advise JTC of layout of
jump and vault pit areas.
JTC 09/14/04 P78.3 onto t Field field should be emoved as shed
soon as
possible. JTC will address.
JTC 09/14/04 P79. Slope at Northeast Corner of Track- JTC recommended
placing rip rap on the slope at the corner of the track, noting
ongoing erosion and weeping. JTC will forward a PCO for
using a"large" stone as rip rap.
09/14/04 P80. Walk at Southwest Corner or Track- After review of grades
with JTC, DDP agreed that walk may be reduced in width to
48 inches wide at the southwest end of the track. Record
item.
DDP 09/14/04 P81. Berm Construction Status - DDP advised that a final
ConCom hearing is scheduled for 09/22/04. DDP will call
JTC on 09/23/04 if approved by ConCom, so trees can be
dug.
P82.
OBSERVATION REPORT NO. 128 North Andover High School Page 9
Q. ARCHITECTURAL
JTC 09/07/04 Q30.8.11 Cladding notrespond responded and that JTC has issued to
Bass a termination letter.
DDP 04/13/04 Q91 . Auditorium evator Board's position on whether the l ha rllft is to be
inspected.
Q92.
R. STRUCTURAL
R37.
S. FIRE PROTECTION
RWS 06/22/04 S20.1 System Pressure - It was reported that the
Hampshire technician on site feels the reported
180# pressure in the system is proper. DDP will
discuss with RWS.
S21.
T. PLUMBING
Grasseschi 05/18/04 T30.2.1 Gas Shutoff Valve - DDP has been informed by
RWS that all their conversations with Grasseschi
were with regard to Grasseschi's request to
substitute a standard access panel'for a valve
cabinet (which was done). RWS at no time
instructed Grasseschi that the door should have a
lock. Grasseschi is to remove lock and install latch
per detail on 8.0.3.
09/14/04 T33.1 Photo Dark Room - Greg Roberts reported that
piping at backflow preventer has been insulated.
Record item.
09/14/04 T35.1 Push Button Faucetts - Greg Roberts reported
that all missing push buttons have been replaced
and set screws tightened. Record item.
Grasseschi 06/04/04 T36.1 on Hot Water 06/07/04. Grasseschi o advise odnl system
d
balancing.
OBSERVATION REPORT NO. 128 North Andover High School Page 10
DDP 06/08/04 T36.2 Hot Water- Greg Roberts questioned type of
RWS tanks and piping arrangement, wondering if this
would play some part in the hot water circulation
issue. JTC stated tanks were piped per RWS
directives in response to a question from
Grasseschi. DDP will review further with RWS.
T37.
U. HVAC
Maiuri 06/08/04 030.1.2 Fume Hood Fans - ABP has ordered special
MCG 08/17/04 starter required for two fans.
08/31/04 (08/17/04)JTC advised MCG that starters are
required at two fume hood fans.
(08/31/04) MCG reported components for hoods
have been ordered.
Sagamore 06/15/04 U34.1.2 a i found that fiube- DDP evs s been conditions
08/10/04 adequately screwed to support structure.
Sagamore shall consistently cope the end covers
tight to columns, concealing the piping.
(08/10/04) Sagamore has ordered end caps for
Main Street fin tube.
F&T 03/16/04 U35. Kitchen ElevatorShaft- It was discussed that even with
keeping the boiler room doors closed, a strong down draft is
keeping the elevator shaft cold in the kitchen. DDP will
review with F&T.
Sagamore 06/22/04 043.1.1 Sagamore
ue on advised that
07 the last of
will filters r
installed on.
07/13/04 delivery.
07/27/.04 (07/13/04) Filters are on site.
09/14/04 (07/27/04) Sagamore advised that filters on hand
were not correct, and that replacements have
been ordered.
(09/14/04) Greg Roberts reported that
replacement filters have been delivered to the
site, and Sagamore must install them.
06/08/04 U45.1 Boiler Leak- Greg Roberts reported that
Sagamore has repaired the leak between
sections. However, the boiler has not since been
fired to determine if repair will hold.
OBSERVATION REPORT NO. 128 North Andover High School Page 11
Sagamore 06/22/04 U46.5.3 Dust Collector- Panel voltage will be corrected on
07/13/04 06/29/04, and fittings completed.
(07/13/04) Dust collector controller is on site and
all that is left for completion is final electrical
connections.
(09/14/04) Dust collector is wired, and Sagamore
must make ductwork connections at equipment.
Sagamore 06/22/04 046.5.4 Water Treatment System - Sagamore stated
07/27/04 water was retested last week and found to have
08/10/04 29% glycol content (specified range is 31-33%)
08/17/04 Sagamore is prepared to add more glycol with the
rust inhibitor and other chemical additives that are
on site, and startup the system. Greg Roberts
noted that the system only ran for 24 hours after
the last glycol was added, and recommended that
the system be run longer to more thoroughly mix
the glycol.
(07/27/04) Sagamore reported water treatment
system work is completed, and that subcontractor
will be called back to site to retest after coil in
ERU-2 is completed.
(08/10/04) Sagamore stated water treatment work
will be completed the week of 08/16/04.
(08/17/04) Sagamore stated water treatment work
will be completed by 08/20/04.
Sagamore 06/22/04 U46.5.5 As Built Drawings - Sagamore has piping `as
builts' on a cad disk, and has received a second
copy of ductwork `as builts' to be added to disk.
Sagamore 07/27/04 U47.3.1 Burners - Greg Roberts reported that Power
Flame has been back.to site, but Boiler#1
continues to"lock out."
Sagamore 07/27/04 047.4.1 AHU-3 - Sagamore has replaced the pulley, but
must still provide Greg Roberts with replacement
belts.
-- 08/31/04 U50.01 ERU's - Sagamore reported that ERU's 1& 3 are
09/14/04 on and operating properly. ERU-2 will be running
on 09/01/04, and will have its damper activator
replaced a day or two thereafter. Record item.
-- 09/07/04 U50.01.1 ERU's - JTC reported that despite Sagamore's
09/14/04 statements to the contrary, the ERU's are not
functioning. Record item.
OBSERVATION REPORT NO. 128 North Andover High School Page 12
NASD 09/14/04 U50.01.2 ERU's - Greg Roberts reported that crew was on
site to replace the damper actuator on ERU-2.
Greg Roberts will confirm whether ERU 1, 2 and 3
are all now functioning.
Sagamore 08/31/04 U50.02 RTU 1 & 2 - It has been determined that
condensation on the underside of deck may be
the result of roof insulation not running under the
units. JTC noted that there was a history of
discussion whether this was necessary; all other
RTU's have continuous insulation and
condensation on the deck is not a problem.
Sagamore will advise how insulation could be
installed at this time.
Sagamore 08/31/04 U50.03 Sheetmetal Plennums-Sagamore has directed
insulator to insulate all supply diffuser plennums.
It was noted that this is a significant amount of
work, taking approximately two weeks to
complete. NASD stated that the work can be
done off hours once school starts.
JTC 09/14/04 U50.03.1 Insulation - Greg Roberts reported that no
Sagamore insulation work has taken place the past week,
noting that there is a school holiday Thursday,
09/16/04 and the building could be kept open for
Sagamore. JTC will contact Sagamore.
Sagamore 08/31/04 U50.04 Condensation Pans - Sagamore stated McQuay
rep will visit site to see conditions. Insulator has
been directed to insulated the underside of the
pans.
Sagamore 08/31/04 U50.05 RTU/Outdoor Air Settings - Sagamore has
F&T confirmed that the operator sequences are per the
HVAC drawings. McQuay has reset the
enthalpy controlers. There is still a question
whether too much air is entering the wrestling room
unit during the unoccupied mode.
DDP 09/14/04 U50.05.1 RTU's - Greg Roberts stated humidity has
F&T improved with the resetting of enthalpy controls.
There is still some question as to the outside air
ratio at RTU-6 seving the wrestling room . DDP
will review with F&T.
Sagamore 08/31/04 U50.06 RTU-8 - Sagamore stated the heat exchanger is
09/15/04 being replaced.
(09/15/04) Greg Roberts reported that he was
informed that the heat exchanger is OK and will
not be replaced. Sagamore to clarify.
OBSERVATION REPORT NO. 128 North Andover High School Page 13
Sagamore 08/31/04 U50.07 RTU-8 Sequence - Sagamore will price the
change suggestion by F&T to the unoccupied
sequence (half speed using VFD).
Sagamore 08/31/04 050.08 Humidity Control - Sagamore will price adding
humidity override controls for wrestling room and
auditorium units (to protect wood floors and the
grand piano). Sagamore stated this needs to be
coordinated with the McQuay controls.
Sagamore 08/31/04 U50.09 Balancing Report- Final balancing will be
completed on 09/01/04, with reports ready by
09/03/04.
U51.
V. ELECTRICAL
3Si 03/23/04 V59.3 Room 3011 - 3Si has a recording meter on the
outlets in IDF 3011 due to three UPS units being
damages.
-- 05/11/04 V59.3.1 Room 3044- Paul Szymanski noted a power
09/15/04 issue has also been observed at V/D room 3044.
DDP reported that 3Si and TEC are working to
isolate and identify the problem, but nothing has
been discovered that can be positively
addressed.
(09/15/04) It was noted that UPS units have
been replaced. Record item.
RDK 08/24/04 V70.1.2 FA/Duct Smoke Test- Greg Roberts reported that
NAHS due to NAFD requirements, the testing of the duct
smoke/HVAC interface will be performed in
December with the yearly fire alarm testing.
07/20/04 V71.7 ABP Default- The folowing ABP action items
have been deleted from the observation report
due to ABP's default, and will be addressed
outside of the observation report format:
A48.4.06 (security wiring); B33.2.4 (Studio
Doorbell); J18.1.3 (PR#21 Cost Proposal);
J21.1.4 (WO #33, 40 and 41 revised cost
proposal); K08 (WO#27 cost proposal); K08.1.1
(WO#28 revised cost proposal); V61 (Gym
backboard switches); V64.4 (Gym lights); V68
(Kitchen doorbell);V69.3.1 (Fire alarm wiring);
V71, V71.2 (Response to outstanding issues).
OBSERVATION REPORT NO. 128 North Andover High School Page 14
DDP 07/06/04 V72. Lamp List- Greg Roberts requested a list of lamps used on
TE the project. DDP noted this is to be part of the electrical
O&M manuals, but with ABP's default DDP will request a list
from Thompson Engineering.
-- 08/,10/04 V75. Security Cameras - NASD will be reinstituting the installation
of security cameras under a separate contract. It was
discussed that the 120 volt power for exterior cameras
mounted on light poles has not been completed, and that the
conduit routing is not as specified due to damage to
underground conduits. However, it was stated that a
conduit path exists to all three exterior locations.
DDP 08/17/04 V76.1.1 Disputed Items - DDP will advise as to items
listed as "N.I.C." MCG reported that they do not
have all work orders and other contract change
documents.
Maiuri 08/17/04 V76.4 Auditorium Step Lights - MCG advised
components to complete top steps not yet on
hand.
DDP 08/17/04 V76.5 Flagpole Lighting - In response to discussions,
DDP will review control specified with TE.
NASD 08/31/04 V77. Worker Background Checks - Paul Szymanski advised
MCG MCG that background checks will be necessary for any
electricians working in the building during the school day.
RCE 09/14/04 V78. Incomplete Work Order Work- It was agreed that RCE
electric would perform additional work authorized, but not
undertaken by ABP. RCE will be issuing proposals for
Room 2050 washer/dryer power, generator power (WO
#70) and the TV station doorbell (PR #35).
V79.
W. HAZARDOUS MATERIALS
W08.
X. MISCELLANEOUS
Bass 08/26/03 X48. Sarnafil Roof Flashing - DDP, JTC and Stanley discussed
Stanley roof edge detail. DDP explained that Work Order required
JTC, Stanley and Bass to coordinate respective work. It
was discussed and agreed that Boss would provide
Stanley with stock so Stanley can form "snap on"trim. DDP
stated, in principle, this would be additional work by
Stanley, and less work (credit) by Bass (but no net change
in cost to Owner).
OBSERVATION REPORT NO. 128 North Andover High School Page 15
JTC 05/04/04 X67.10 Roof Leak Status - In response to MBC's
questions, JTC stated that all leaks have been
permanently repaired, with the exception of
cupola"doors, which are awaiting hardware and
weather stripping.
JTC 06/22/04 X67.11 Cafeteria Roof Leak- Greg Roberts reported that
a leak at the east end of the cafeteria has
reappeared. JTC will investigate.
Stanley 08/24/04 X67.11.1 Cafeteria Roof Leak- Greg Roberts reported that
JTC the leak over the cafeteria offices reappeared -
during the rains of the past week. JTC has
advised Stanley.
-- 09/14/04 X72. Meeting Schedule - Given the status of the work, it was
agreed that job meetings will hereafter be scheduled for
every two weeks. The next meeting will be on 09/28/04.
Record item.
X73.
Y. PROJECT CLOSEOUT
Clerk 04/27/04 Y12.4 As Built Drawings - JTC has furnished clerk with
RWS as built mark ups of fire protection and plumbing
drawings. Clerk and RWS to review.
Clerk 03/02/04 Y13. Inventory - The clerk will begin an inventory of spare
materials and parts to be forwarded per specifications.
JTC 06/22/04 Y13.3 Auditorium Seat Inventory - JTC passed along to
S-D DDP a transmittal from Slay Dale stating seating
maintenance has been delivered. Clerk is
unaware of any such delivery. JTC will advise
Slay Dale to deliver materials to clerk's attention.
JTC 07/27/04 Y14. Closeout Submittals - JTC furnished DDP with a
Subs spreadsheet showing the status of the various manuals,
as-builts, warranties, and maintenance stock specified.
Y15.
ZZ. CONSTRUCTION PROGRESS
-- 09/14/04 ZZ129.Construction Progress -The architect walked the site and
observed the following. Record item.
-- 09/14/04 ZZ129.1 North Field - Turf spread over entire area and
being seamed. Record item.
OBSERVATION REPORT NO. 128 North Andover High School Page 16
09/14/04 ZZ1 29.2 South Fields - Rough grading at baseball field.
Landscaping underway along south curb of
parking lot and along access drive. Concession
stand shutters delivered on 09/14/04. Record
item.
ZZ 130.
The next job meeting will be held at 1:00 PM on Tuesday, 28 September 2004 at the
Contractor's Trailer.
The discussions of this meeting are recorded as understood by the writer, who should be notified of
any omissions or corrections. Unless the writer is notified to the contrary, these notes are presumed to
be correct.
Rich rd N. Rice
DiNISCO DESIGN
RNR/dp
cc: Louis Minicucci Gene Kingman
Harry Harutunian Kevin Murphy
Frederick King Ed Estabrook
Nancy Kurtz Kevin Burke
Susan Nicholson Richard Weber
Evan Karalolos Mike DiBari
Department of Public Works Kenneth DiNisco
Julie Parrino Richard Greenlee
NA Planning Board Angel Khazadian
Doug Seaboldt Jon Oxman
Robert Feinberg, ESCOA Bill Sousa, RDK
Paul Szymanski
cc (hand): Mike Callahan
Patrick Saitta
,BS CII L T ERS
ENGINEERING • SUR�'EYINC= • PLANNING
Schofield Brothers of New England,Inc.
1071 Worcester Road
Framingham,MA 01701-5298
508-879-0030.1-800-696-2874
Fax 508-879-1797
September 20,2004 Website www.schofieldbros-corn
r `d
20217
TO: North Andover Conservation Commission
North Andover Planning Board
D. Robert Nicetta,Building Commissioner
DiNisco Design Partnership-Attn: Rick Rice
(for further distribution to applicable parties)
FROM: Matthew E Smith,Wetland Specialist.
: School Ins ection Report-Jul 2 8 2004 through Au uest
RE North Andover Hi h -Month
31, 200
DEP File No.242-1045
Planning Board Notice of Decision dated 5/14/01
Schofield Brothers of New England,Inc. has been designated as he purpose of the Environmental/the-Environmental/Erosion
Control Monitor"for the North Andover High School Project, t site to insure Erosion Control Monitor is to perform periodic inspections Commis Pon a d the Special Permpt fiance
with the Order of Conditions issued by the Conservation
issued by the Planning Board with respect to sedimentand controls,limit of work
compliance, wetland replication and stormwate g
This is the thirty-third monthly inspection report
28,2004 through August 31,31,2004. the
above referenced perm ats. it ccve.s the period J y
#134,#135, and#1.36)relative to the
Attached are copies of the Inspection Repol� (#132,4133,` and 315`,2004.
inspections performed on August 3 , 10th,
The month of August was warm with normal is functioned rainfall
roper property during the past month.
Overall, the erosion and sedimentation controls p
Considering the amount of site work and exposed soils in of the at athletic fields eo t
was proceeding in the
site remained in relatively good condition. Construction
southerly work area with the artificial turf being installed.The work is also continuing in the
northern athletic field.
Section A Items completed:
1. Sediment protection has been maintained on the catch sins to work wet side haul road an
on the catch basins by the southeastern entrance t o
2. Drainage manhole#12 has been repaired.
Two gaps in the sediment barrier along Chickering Road ha
th et fields has been
of
3. g p
the perimeter sedimentation barrier to east of the northerly
replaced. f the
4. The site was swept in been anticipation stalled in the Bout ern athletic field.
5. The artificial turf has
EBSCHOFIELD BROTHERS
ENGINEERING • SCR"EYING • PLANNI\(,
20217
North Andover High School
Mont y p
Monthly Inspection Report—July 28,2004 through August 31,2004
Page 2
6. The northern athletic field track has been paved.
Section B. Items from previous.reports and the most recent report that remain to
security fence n needs to be
1. The silt fence along the outfall extending along the sou Y
repaired or replaced. The sediment barrier along Chickering Road at the old entrance to the
school is in need of repair.
2. Prescott Street needs to be swept and the stone entrance needs maintenance.
3. Several catch basins around the site are in need of maintenance.
4. The hillside adjacent to Catch Basin#3 needs to be secured. Gully erosion and sediment
deposits on the driveway were observed.
5. Construction trash was observed and should be picked up.
Based on our inspections, we have found that the work on the project has been performed in the
general compliance with the Special and there have Obeen no observed adverse affects to the resource
controls have functioned properly
areas. The contractor needs to address some outstanding issues.
Over the next month, the southerly athletic fields and parking area will be continuing. It is
anticipated that the paving of the track and finishing.of the drainage system for the northerly
athletic fields and the installation of the artificial turf will be completed in September.
The attached inspection reports provide detailed information as to our findings.Please let us know'
of. If you have any questions or if you have any
if there are any issues that we are not aware .
elp us provide information you need,we would be
comments or recommendations that would h .
happy to hear from you.
Very truly yours, A roved:
Schofield Brothers of New E ngland,Inc. PP
Fredric W. King,P.E.
Matthew E Smith,M.L.F. Senior Engineer
Wetland Specialist Environmental Planner
Environmental Planner
enclosures
o°SCHOFIELD BROTHERS
Schofield Brothers of New England,Inc.
1071 Worcester Road
FraminOam,MA 01701-5293
508-879-0030 1-800-696-2874
Fax 508-879-1797
w ww.scho[ieldbros.com
20217
To: Mr.Rick Rice
DiNisco Design Partnership
87 Summer Street
Boston,MA 02110
Cc.: North Andover Conservation Commission
North Andover Planning Board
From: Matthew E Smith,Wetland Specialist
Date: August 4,2004
Re: North Andover High School(20217)
INSPECTION REPORT
Inspection No.: 132
Date of Inspection: August 3, 2004
By: Matthew E Smith
INTRODUCTION
The purpose of these inspections is to observe and review the project on.Comtive to
on and the ce.
with the Orders of Conditions issued by the North And
Special Permit issued by the North Andover Planning Board with respect to sediment and erosion
controls;limit of work compliance, and stormwater management.issues. For reference,xhe
Orders of Conditions issued for the project include:
® DEP File No.242-1045: Issued 2/21/01 with Amendment Approval 2/17/04 4
Planning Board Notice of Decision: Issued 5/14/01 Modification pP
Please contact Fred King or Matt Smith at Schofield:Brothers of New England,Inc. if you have
any questions regarding the information contained in this report.
During this inspection,it was sunny and clear. Construction of the e southerly stem ben g rthe nstalledrly
drainage
is proceeding with some of the northern athletic field g system
artificial turf on the southern athletic is being installed.Week.The drainage contractor stated
o that the
t paving of
the track in the northern athletic field should begin in
Cochichewick Brook were clear. The west side haul route thea
e and
meter sedimentation barrier to the
construction site are in need of maintenance. Some o p
east of the northerly athletic fields requires more work. A gap in the sediment barrier along
Chickering Road is in need of repair.
°°SCHOFIELD BROTHERS
Schofield Brothers of New England,Inc.
INSPECTION SUMMARY
1. Sediment control barriers around the perimeter of the current work area:
0 08/03/04—Several sections of sedimentation barrier along the entrance off Osgood
Street have been damaged from snowplowing operations and l barrier pa ast of the(carried
over on report since 03/02104). Some of the perimeter sedimentation
northerly athletic fields has been replaced. It is recommend that the remaining areas have
new hay bales installed.A short section of the haybale/silt fence barrier
along the new s ecurty
repaired adjacent to the westerly side of the sto ne filter
fence by the entrance of the southern work area.There is a gap in the sediment barrier
along Chickering Road at the old entrance to the school is.It is required that haybales
be replaced in this area.
2. Loam stockpile area in the northern portion of the site:
08/03/04—The loam pile is being removed and there are no sedimentation or erosion issues
with the loam pile at this time.
3. Ordinar borrow stock ile area in the northern portion of the site:
08/03/04—Construction of the northern athletic field is underway.
4. Main entrance gate near trailers:
drive to the southern work and the west side haul
08/03/04—The southeastern entrance
route needs to be swept.
5. Catch s:
08/03/04— Catch Basin#10 is in need of maintenance and protection needs field
be added
to Catch Basin#1 it appear s to be receiving runoff from th
construction.
Sediment Basins#2 and#3 and outlet structures:
06/15/04—Both of these sediment basins have now been taken out of service and are being
filled for the parking lot construction as planned. (Record Item).
6. Temporary Sediment Basins#5 outlet structures and diversion now eliminated to bring the
® 06/15/04—Sediment Basins 4 and 5, and the diversion berm are
areas to finished grade. Perimeter erosion controls including the stone filter berm will now
be effective for the southern area. (Record Item).
7. Other erosion control items.
08/03/04—Nothing to report.
8. Othe_ r d_ r_ a __nape structures:
08/03/04—Nothing to report.
9. Wetland replication areas: h was observed in the west side this was
04/20/04—Some newer construction tray contractor stated that deer at some of he wetland brought t
the attention of the contractor.The
plantings that need replacing and alternative plantings should be considered.
20217
DiNisco Design ZPartnersh ip
INSPECTION RORT NO. 132(Inspection date 8/03/04). :Page 2
August 4,2004
°°SCH®FIELD BROTHERS
Schofield Brothers of New England,Inc.
• 08/03/04—Trash is not yet picked up along the area cited above.This should be attended
to.
10. Impermeable barrier and easterly embankment:
• 06/01/04—No seepage observed. Area appears stable at this time.(Record Item)
11. Dewatering:
• 08/03/04—No dewatering was observed.
12. Truck Washing Area:
• 08/03/04—No truck washing was observed.
13. Dust
• 08/03/04—Significant dust was observed during this inspection and is an issue at this
time.Measures need to be taken to minimize this.The west
haul route is in needs of
sweeping along with the entrances to the site to help contro l dust.
14. Wetland Delineation:
• 08/03/04—Nothing to report at this time.
15. Inspection Items by Others:
• 04/27/04—(Postscript)A meeting was held on Thursday 4/29/04 with Paul Szymanski
(NASD), John Cyr(DPW) and Fred King(SBNE)to review the preliminary Snow Disposal
Plan. Suggestions were made fog additions and modifications to the Plan. SBNE will
incorporate the recommendations into the plan for further review.
A plan was also reviewed that shows the locations for permanent markers along the 25-foot
no disturbance buffer zone. The plan showed that 96 markers would be necessary to comply
with the Condition 51 of the Order of Conditions. Due to the necessary locations,it was
suggested that this would be best done as one of the last items ofappears site
wo�bThis ps p ate in
be discussed with the Conservation Commission. In add
sts be used for"No Snow Disposal" signage.to comply with
some areas that these same po
Condition 52 of the OOC.
Also discussed were the installation of 35 Bird Boxes and the"non-invasive trail system"per
Conditions 35 and 37 of the OOC.
• 05/04/04—Postscript: Inspection by Arrow Environmental. The Items that needs to be
completed are as follows:
1 - Pre-construction requirements:
• Bird Boxes:This is a requirement for the Applicant to comply with prior to a
certificate of compliance.
• Snow Stockpiling Plan: A revised draft plan has been prepared for review.
(6/23/04)
■ No Disturbance Zone markers: Not completed at this time. A plan has been
prepared showing the locations for the markers. 6/23/04
See progress from previous report above.
08/03/04—Regarding the Snow Management Plan and Permanent Wetland Marker Plan,
communication from Paul ed t be forwarded to the Conservation CommissTion for plans re
formal
acceptable.These now ne
review.
EAugust
gn Partnership
N REPORT NO. 132(Inspection date 8/03/04). page 3
04
BBSCHOFIELD BROTHERS
Schofield Brothers of New England,Inc.
1071 Worcester Road
Framingham,MA 01701-5298
508-879-0030 1-800-696-2874
Fax 508-879-1797
www.schofieldbros.com
20217
To: Mr. Rick Rice
DiNisco Design Partnership
87 Summer Street
Boston,MA 02110
Cc.: North Andover Conservation Commission
North Andover Planning Board
From: Matthew E Smith,Wetland Specialist
Date: August 11,2004
Re: North Andover High School(20217)
INSPECTION REPORT
Inspection No.: 133
Date of Inspection: August 10,2004
By: Matthew E Smith
INTRODUCTION
The purpose of these inspections is to observe and review the project work relative to compliance
with the Orders of Conditions issued by the North Andover Conservation Commission and the
Special Permit issued by the North Andover Planning.Board with respect to sediment and erosion .
controls,limit of work compliance, and stormwater management issues For reference,the
Orders of Conditions issued for the project include:
• DEP File No. 242-1045: Issued 2/21/01 with Amendment 2/19/04 Extended 3/17/04 .
Planning Board Notice of Decision: Issued 5/14/01 Modification Approval 2/17/04
Please contact Fred King or Matt Smith at Schofield Brothers of New England,Inc. if you have
any questions regarding the information contained in this report.
During this inspection, it was sunny and clear. Construction of the southerly and northerly athletic
fields is proceeding. Loam is being spread in the southern athletic fields. The contractor stated
that the paving of the track in the northern athletic field would continue in to next week. Some of
the perimeter sedimentation barrier to the east of the northerly athletic fields requires more work.
The drainage outfalls to Cochichewick Brook were clear. The west side haul route and southern
entrance to the construction site are in need of maintenance.Two gaps in the sediment barrier
along Chickering Road are in need of repair. Manhole#12 has been damaged and is in
need of repair.
°°SCHOFIELD BROTHERS
Schofield Brothers of New England,Inc.
INSPECTION SUMMARY
1. Sediment control barriers around the perimeter of the current work area:
• 08/03/04—Several sections of sedimentation barrier along the entrance off Osgood
Street have been damaged from snowplowing operations and will need repair(carried
over on report since 03/02/04). Some of the perimeter sedimentation barrier to east of the
northerly athletic fields has been replaced. It is recommend that the remaining areas have
new hay bales installed.A short section of the haybale/silt fence barrier needs to be
repaired adjacent to the westerly side of the stone filter berm along the new security
fence by the entrance of the southern work area.There is a gap in the sediment barrier
along Chickering Road at the old entrance to the school is.It is required that haybales
be replaced in this area.
• 08/10/04—Same as previous report.In addition to those repairs,there is a new gap in
the sediment barrier along Chickering Road,near the northwestern corner of the
football field.This gap needs to be replaced.
2. Loam stockpile area in the northern portion of the site:
• 08/03/04—The loam pile is being removed and there are no sedimentation or erosion issues
with the loam pile at this time.
• 08/10/04—Same as previous report.
3. Ordinary borrow stockpile area in the northern portion of the site:
• 08/03/04—Construction of the northern athletic field is underway.
• 08/10/04—Same as previous report.
4. Main entrance gate near trailers:
• 08/03/04—The southeastern entrance drive to the southern work and the west side haul
route needs to be swept.
08/10/04—Same as previous report.
5. Catch Basins:
• 08/03/04—Catch Basin#10 is in need of maintenance and protection needs to be added
to Catch Basin#1 it appears to be receiving runoff from the new athletic field
construction.
• 08/10/04—Same as previous report.
Sediment Basins#2 and#3 and outlet structures:
• 06/15/04—Both of these sediment basins have now been taken out of service and are being
filled for the parking lot construction as planned. (Record Item).
6. Temporary Sediment Basins#5 outlet structures and diversion berm in south work area:
• 06/15/04—Sediment Basins 4 and 5, and the diversion berm are now eliminated to bring the
areas to finished grade. Perimeter erosion controls including the stone filter berm will now
be effective for the southern area. (Record Item).
7. Other erosion control items.
• 08/03/04—Nothing to report.
• 08/10/04—Same as previous report.
20217
D i is Design Partnership
INSPECTION REPORT NO 133 (Inspection date 8/10/04). page 2
August 11, 2004
Q°SCHOFIELD BROTHERS
Schofield Brothers of New England,Inc.
8. Other drainage structures:
• 08/03/04—Nothing to report.
• 08/10/04—Drainage manhole#12 has been damaged and is need of repair.
9. Wetland replication areas:
• 04/20/04—Some newer construction trash was observed in the west side this was brought to
the attention of the contractor.The contractor stated that deer ate some of the wetland
plantings that need replacing and alternative plantings should be considered.
• 08/03/04—Trash is not yet picked up along the area cited above.This should be attended
to.
• 08/10/04—Same as previous report.
10. Impermeable barrier and easterly embankment:
0 06/01/04—No seepage observed. Area appears stable at this time.(Record Item)
11. Dewatering:
• 08/03/04—No dewatering was observed.
• 08/10/04—Same as previous report.
12. Truck Washing Area:
• 08/03/04—No truck washing was observed.
• 08/10/04—Same as previous report.
13. Dust Control:
0 08/03/04—Significant dust was observed during this inspection and is an issue at this
time.Measures need to be taken to minimize this.The west side haul route is in needs of
sweeping along with the entrances to the site to help control dust.
0 08/10/04—Same as previous report.There was a watering truck being used to reduce
this issue.
14. Wetland Delineation:
• 08/03/04—Nothing to report at this time.
0 08/10/04—Same as previous report.
15. Inspection Items by Others:
eting was held
• 04/27/ti —(Postscript) e me on Thursday 4/29/04 with Paul Szymanski
(NASD),John Cyr(DPW) and Fred King (SBNE) to review the preliminary Snow Disposal
Plan. Suggestions were made for additions and modifications to the Plan. SBNE will
incorporate the recommendations into the plan for further review.
A plan was also reviewed that shows the locations for permanent markers along the 25-foot
no disturbance buffer zone. The plan showed that 96 markers would be necessary to comply
with the Condition 51 of the Order of Conditions. Due to the necessary locations,it was
suggested that this would be best done as one of the last items of site work. This will need to
be discussed with the Conservation Commission. In addition,it appears to be appropriate in
some areas that these same posts be used for"No Snow Disposal" signage to comply with
Condition 52 of the OOC.
Also discussed were the installation of 35 Bird Boxes and the"non-invasive trail system"per
Conditions 35 and 37 of the OOC.
20217
DiNisco Design Partnership
INSPECTION REPORT NO. 133 (Inspection date 8/10/04). page 3
August 11,2004
°oSCHOFIELD BROTHERS
Schofield Brothers of New England,Inc.
® 05/04/04—Postscript: Inspection by Arrow Environmental. The Items that needs to be
completed are as follows:
1 -Pre-construction requirements:
• Bird Boxes: This is a requirement for the Applicant to comply with prior to a
certificate of compliance.
• Snow Stockpiling Plan: A revised draft plan has been prepared for review.
(6/23/04)
• No Disturbance Zone markers: Not completed at this time. A plan has been
prepared showing the locations for the markers. 6/23/04
See progress from previous report above.
• 08/03/04—Regarding the Snow Management Plan and Permanent Wetland Marker Plan,
communication from Paul Szymanski has been received that the most recent draft plans are
acceptable. These now need to be forwarded to the Conservation Commission for formal
review.
• 08/10/04—See notes above. '...
20217
DiNisco Design Partnership
INSPECTION REPORT NO. 133 (Inspection date 8/10/04).
August 11,2004 Page 4
)SCHORELD BROTHERS
Schofield Brothers of New England,luc.
1071 Worcester Road
Franvngham,MA 01701-5298
508-879-00.30 1-800-696-2874
Fax 508-879-1797
www.schofieldbros.com
20217
To: Mr. Rick Rice
DiNisco Design Partnership
87 Summer Street
Boston,MA 02110
Cc.: North Andover Conservation Commission
North Andover Planning Board
From: Matthew E Smith, Wetland Specialist
Date: August 20,2004
Re: North Andover High School(20217)
INSPECTION REPORT
Inspection No.: 134
Date of Inspection: August 17, 2004
By: Matthew E Smith
INTRODUCTION
The purpose of these inspections is to observe and review the project work relative to compliance
with the Orders of Conditions issued by the North Andover Conservation Commission and the
Special Permit issued by the North Andover Planning Board with respect to sediment and erosion
controls,limit of work compliance, and stormwater management issues. For reference,the
Orders of Conditions issued for the project include:
• DEP File No. 242-1045: Issued 2/21/01 with Amendment 2/19/04 Extended 3/17/04
• Planning Board Notice of Decision: Issued 5/14/01 Modification Approval 2/17/04
Please contact Fred King or Matt Smith at Schofield Brothers of New England, Inc. if you have
any questions regarding the information contained in this report.
During this inspection, it was warm and cloudy. Construction of the southerly and northerly
athletic fields is proceeding. Loam continues to be spread in the southern athletic fields. The
contractor continues paving of the track in the northern athletic field. Some of the perimeter
sedimentation barrier to the east of the northerly athletic fields requires more work. The drainage
outfalls to Cochichewick Brook were clear. The west side haul route and southern entrance to the
construction site are in need of maintenance. Two gaps in the sediment barrier along
Chickering Road and Manhole#12 have been repaired.
.._....._..
EBEE.3SCHOFIELD BROTHERS
Schofield Brothers of New England,Inc.
INSPECTION SUMMARY
1. Sediment control barriers around the perimeter of the current work area:
• 08/03/04—Several sections of sedimentation barrier along the entrance off Osgood
Street have been damaged from snowplowing operations and will need repair(carried
over on report since 03/02/04).Some of the perimeter sedimentation barrier to east of the
northerly athletic fields has been replaced. It is recommend that the remaining areas have
new hay bales installed.A short section of the haybale/silt fence barrier needs to be
repaired adjacent to the westerly side of the stone filter berm along the new security
fence by the entrance of the southern work area.There is a gap in the sediment barrier
along Chickering Road at the old entrance to the school is.It is required that haybales
be replaced in this area.
• 08/10/04—Same as previous report.In addition to those repairs,there is a new gap in
the sediment barrier along Chickering Road,near the northwestern corner of the
football field.This gap needs to be replaced.
• 08/17/04—Two gaps in the sediment barrier along Chickering Road have been repaired.
Some of the perimeter sedimentation barrier to east of the northerly athletic fields has been
replaced. It is reconunend that the remaining areas have new hay bales installed.A short
section of the haybale/silt fence barrier needs to.be repaired adjacent to the westerly
side of the stone filter berm along the new security fence by the entrance of the southern
work area.
2. Loam stockpile area in the northern portion of the site:
• 08/03/04—The loam pile is being removed and there are no sedimentation or erosion issues
with the loam pile at this time.
• 08/10/04—Same as previous report.
• 08/17/04—Same as previous report. .
3. Ordinary borrow stockpile area in the northern portion of the site:
• 08/03/04—Construction of the northern athletic field is underway.
• 08/10/04—Same as previous report.
• 08/17/04—Same as previous report.
4. Main entrance pate near trailers:
ive to the southern work and the west side haul
• 08/03/04—The southeastern entrance dr
route needs to be swept.
• 08/10/04—Same as previous report.
• 08/17/04—Same as previous report.
5. Catch Basins:
• 08/03/04— Catch Basin#10 is in need of maintenance and protection needs to be added
to Catch Basin#1 it appears to be receiving runoff from the new athletic field
construction.
• 08/10/04—Same as previous report.
• 08/17/04—Several catch basins around the site are in need in maintenance.The
contractor was made aware of this and stated that all the catch basin on the site would
be inspected and address the catch basins that attention.
20217
DiNisco Design Partnership
INSPECTION REPORT NO. 134 (Inspection date 8/17/04). :Pa :e2
August 20,2004
EBSC®FIELD BROTHERS
Schofield Brothers of New England,Inc.
Sediment Basins#2 and#3 and outlet structures:
• 06/15/04—Both of these sediment basins have now been taken out of service and are being
filled for the parking lot construction as planned. (Record Item).
6. Temporary Sediment Basins#5 outlet structures and diversion berm in south work area:
• 06/15/04—Sediment Basins 4 and 5,and the diversion berm are now eliminated to bring the
areas to finished grade. Perimeter erosion controls including the stone filter berm will now
be effective for the southern area. (Record Item).
7. Other erosion control items.
• 08/03/04—Nothing to report.
• 08/10/04—Same as previous report. '....
• 08/17/04—Same as previous report.
8. Other drainage structures:
• 08/03/04—Nothing to report. '..
• 08/10/04—Drainage manhole#12 has been damaged and is need of repair.
• 08/17/04—Drainage manhole#12 has been repaired.
9. Wetland replication areas:
• 04/20/04—Some newer construction trash was observed in the west side this was brought to
the attention of the contractor. The contractor stated that deer ate some of the wetland
plantings that need replacing and alternative plantings should be considered.
• 08/03/04—Trash is not yet picked up along the area cited above.This should be attended
to.
• 08/10/04—Same as previous report.
• 08/17/04—Same as previous report. - -
10. Impermeable barrier and easterly embankment:
• 06/01/04-No seepage observed. Area appears stable at this time.(Record Item)
11. Dewatering:
• 08/03/04—No dewatering was observed.
• 08/10/04—Same as previous report.
• 08/17/04—Same as previous report.
12. Truck Washing Area:
• 08/03/04—No truck washing was observed. - -
• 08/10/04—Same as previous report.
• 08/17/04—Same as previous report.
13. Dust Control:
• 08/03/04—Significant dust was observed during this inspection and is an issue at this
time.Measures need to be taken to minimize this.The west side haul route is in needs of
sweeping along with the entrances to the site to help control dust.
• 08/10/04—Same as previous report.There was a watering truck being used to reduce
this issue.
• 08/17/04—Dust was not an issue during this inspection.
20217
DiNisco Design Partnership
INSPECTION REPORT NO. 134 (Inspection date 8/17/04). :Page 3
August 20,2004
o°SCHOFIELD BROTHERS
Schofield Brothers of New England,Inc.
14. Wetland Delineation:
0 08/03/04—Nothing to report at this time.
0 08/10/04—Same as previous report.
0 08/17/04—Same as previous report.
15. Inspection Items by Others:
0 04/27/04—(Postscript)A meeting was held on Thursday 4/29/04 with Paul Szymanski
(NASD),John Cyr(DPW) and Fred King (SBNE)to review the preliminary Snow Disposal
Plan. Suggestions were made for additions and modifications to the Plan. SBNE will
incorporate the recommendations into the plan for further review.
A plan was also reviewed that shows the locations for permanent markers along the 25-foot
no disturbance buffer zone. The plan showed that 96 markers would be necessary to comply
with the Condition 51 of the Order of Conditions. Due to the necessary locations,it was
suggested that this would be best done as one of the last items of site work. This will need to
be discussed with the Conservation Commission. In addition, it appears to be appropriate in
some areas that these same posts be used for"No Snow Disposal" signage to comply with
Condition 52 of the OOC.
Also discussed were the installation of 35 Bird Boxes and the "non-invasive trail system"per
Conditions 35 and 37 of the OOC.
0 05/04/04—Postscript: Inspection by Arrow Environmental. The Items that steeds to be
completed are as follows:
1 - Pre-construction rerluirennents;
• Bird Boxes:This is a requirement for the Applicant to comply with prior to a
certificate of compliance.
• Snow Stockpiling Plan: A revised draft Plan has been prepared for review.
(6/23/04)
® No Disturbance Zone markers: Not completed at this time. A plan has been
prepared showing the locations for the markers. 6/23/04
See progress from previous report above.
• 08/03/04—Regarding the Snow Management Plan and Permanent Wetland Marker Plan,
communication from Paul Szymanski has been received that the most recent draft plans are
acceptable. These now need to be forwarded to the Conservation Commission for formal
review.
• 08/10/04—See notes above.
0 08/17/04—See notes above.
20217
DiNisco Design Partnership
INSPECTION REPORT NO. 134 (Inspection date 8/17/04). Page 4
August 20, 2004
°=SCHOFIELD BROTHERS
Schofield Brothers of New England,Inc.
1071 Worcester Road
Framingham,MA 01701-5298
508-879-0030 1-800-696-2874
Fax 503-879-1797
www.schofieldbros.com
20217
To: Mr.Rick Rice
DiNisco Design Partnership
87 Summer Street
Boston,MA 02110
Cc.: North Andover Conservation Commission
North Andover Planning Board
From: Matthew E Smith,Wetland Specialist
Date: August 27,2004
Re: North Andover High School(20217)
INSPECTION REPORT
Inspection No.: 135
Date of Inspection: August 24,2004
By: Matthew E Smith
INTRODUCTION
The purpose of these inspections is to observe and review the project work relative to compliance
with the Orders of Conditions issued by the North Andover Conservation Commission and the
Special Permit issued by the North Andover Planning Board with respect to sediment and erosion
reference,the
controls, limit of work compliance, and stormwater management issues. For
Orders of Conditions issued for the project include:
DEP File No. 242-1045: Issued 2/21/01 with Amendment 2/19/04 Extended 3/17/04
Planning Board Notice of Decision: Issued 5/14/01 Modification Approval 2/17/04
Please contact Fred King or Matt Smith at Schofield Brothers of New England,Inc. if you have
any questions regarding the information contained in this report.
During this inspection,it was warm and sunny. The site held up fairly well during the rains of last
week. A few areas of the sediment barrier are in need of repair.The site Construction of the
southerly and northerly athletic fields is proceeding.Loam continues to be spread in the southern
athletic fields.The contractor continues paving of the track in the northern athletic field. Some of
the perimeter sedimentation
Coch chew ck Brook were northerly
athletic fields requires
haul rout and outfa to
The drainage southern
entrance to the construction site are in need of maintenance.
x=SCHOFIELD BROTHERS
Schofield Brothers of New England,Inc.
INSPECTION SUMMARY
1. Sediment control barriers around the perimeter of the current work area:
• 08/03/04—Several sections of sedimentation barrier along the entrance off Osgood
Street have been damaged from snowplowing operations and will need repair(carried
over on report since 03/02/04).Some of the perimeter sedimentation barrier to east of the
northerly athletic fields has been replaced. It is recommend that the remaining areas have
new hay bales installed. A short section of the haybale/silt fence barrier needs to be
repaired adjacent to the westerly side of the stone filter berm along the new security
fence by the entrance of the southern work area.There is a gap in the sediment barrier
along Chickering Road at the old entrance to the school.It is required that haybales be
replaced in this area.
• 08/10/04—Same as previous report.In addition to those repairs,there is a new gap in
the sediment barrier along Chickering Road,near the northwestern corner of the
football field.This gap needs to be replaced.
•
08/17/04—Two gaps in the sediment barrier along Chickering Road have been repaired.
Some of the perimeter sedimentation barrier to east of the northerly athletic fields has been
replaced. It is recommend that the remaining areas have new hay bales installed. A short
section of the haybale/silt fence barrier needs to be repaired adjacent to the westerly
side of the stone filter berm along the new security fence by the entrance of the southern
work area.
• 08/24/04—The silt fence along the outfall extending along the southern security fence
needs to be repaired or replaced.The sediment barrier along Chickering Road at the
old entrance to the school is in need of repair. Some of the perimeter sedimentation barrier
to east of the northerly athletic fields has been replaced. It is recommend that the
remaining areas have new hay bales installed. ,.
2. Loam stockpile area in the northern portion of the site:
• 08/03/04—The loam pile is being removed and there are no sedimentation or erosion issues
with the loam pile at this time.
• 08/10/04—Same as previous report.
• 08/17/04—Same as previous report.
• 08/24/04—Same as previous report.
3. Ordinary borrow stockpile area in the northern portion of the site:
• 08/03/04—Construction of the northern athletic field is underway.
• 08/10/04—Same as previous report.
• 08/17/04—Same as previous report.
• 08/24/04—Same as previous report. -
4. Main entrance gate near trailers:
• 08/03/04—The southeastern entrance drive to the southern work and the west side haul
route needs to be swept.
• 08/10/04—Same as previous report..
• 08/17/04—Same as previous report.
• 08/24/04—Same as previous report.
20217
DiNisco Design Partnership
INSPECTION REPORT NO. 135 (Inspection date 8/24/04). page 2
August 27,2004
°EDSCHOFIELD BROTHERS
Schofield Brothers of New England,Inc.
5. Catch Basins:
• 08/03/04—Catch Basin#10 is in need of maintenance and protection needs to be added
to Catch Basin#1 it appears to be receiving runoff from the new athletic field
construction.
• 08/10/04—Same as previous report.
• 08/17/04—Several catch basins around the site are in need in maintenance.The
contractor was made aware of this and stated that all the catch basin on the site would
be inspected and address the catch basins that attention.
• 08/24/04—Several catch basins around the site are in need of maintenance.The
contractor was made aware of this and stated that all the catch basins on the site would
be inspected and will address the catch basins that need attention.Protection needs to
be added to Catch Basin#7
Sediment Basins#2 and#3 and outlet structures:
• 06/15/04—Both of these sediment basins have now been taken out of service and are being
filled for the parking lot construction as planned. (Record Item).
6. Temporary Sediment Basins#5 outlet structures and diversion berm in south work area:
• 06/15/04—Sediment Basins 4 and 5, and the diversion berm are now eliminated to bring the
areas to finished grade. Perimeter erosion controls including the stone filter berm will now
be effective for the southern area. (Record Item).
7. Other erosion control items.
• 08/03/04—Nothing to report.
• 08/10/04—Same as previous report.
• 08/17/04—Same as previous report.
• 08/24/04—The hillside adjacent to Catch Basin#3 needs to be secured...Gully erosion
and sediment deposits on the driveway were observed.
8. Other drainage structures:
• 08/03/04—Nothing to report.
• 08/10/04—Drainage manhole#12 has been damaged and is need of repair.
• 08/17/04—Drainage manhole#12 has been repaired. _
• 08/24/04—Nothing to report.
9. Wetland replication areas:
• 04/20/04—Some newer construction trash was observed in the west side this was brought to
the attention of the contractor.The contractor stated that deer ate some of the wetland
plantings that need replacing and alternative plantings should be considered.
• 08/03/04—Trash is not yet picked up along the area cited above.This should be attended
to.
• 08/10/04—Same as previous report.
• 08/17/04—Same as previous report.
• 08/24/04—Same as previous report.
10. Impermeable barrier and easterly embankment:
• 06/01/04—No seepage observed. Area appears stable at this time.(Record Item)
11. Dewatering:
20217
DiNisco Design Partnership
INSPECTION REPORT NO. 135 (Inspection date 8/24/04).
August 27, 2004 Page 3
=,SCROFIELT) BROTHERS
Schofield Brothers of New England,Inc.
• 08/03/04—No dewatering was observed.
• 08/10/04—Same as previous report.
• 08/17/04—Same as previous report.
• 08/24/04—Same as previous report.
12. Truck Washing Area:
• 08/03/04—No truck washing was observed.
• 08/10/04—Same as previous report.
• 08/17/04—Same as previous report.
• 08/24/04—Same as previous report.
13. Dusts QOn_trOl:
• 08/03/04—Significant dust was observed during this inspection and is an issue at this
time.Measures need to be taken to minimize this.The ws haul route is in needs of
sweeping along with the entrances to the site to help control du
• 08/10/04—Same as previous report.There was a watering truck being used to reduce
this issue.
• issue during this inspection.
08/17/04—Dust was not an
• 08/24/04—Dust was not an issue during this inspection.
14. Wetland Delineation:
• 08/03/04—Nothing to report at this time.
• 08/10/04—Same as previous report.
• 08/17/04—Same as previous report.
• 08/24/04—Same as previous report.
15. Inspection Items by Others:
• 04/27/04—(Postscript) A meeting was held on Thursday review the prel Paul urinary Snow Dlisposal
(NASD),John Cyr(DPW) and Fred King(SBNE)
Plan. Suggestions were made for additions and modifications to the Plan. SBNE.will
incorporate the recommendations into the plan for further review.
A plan was also reviewed that shows the locations for
permanent Would ben cl
P essary to comply
no disturbance buffer zone. The plan showed that 96 markers
with the Condition 51 of the Order done asnone of the last i ems of site work. This will need to
suggested that this would be best
be discussed with the Conservation Commission.e No Snow addition,it 'pp gnage o comply within
some areas that these same posts be used
Condition 52 of the OOC.
tallation of 35 Bird Boxes and the."non-invasive trail system"per
Also discussed were the ins
Conditions 35 and 37 of the OOC.
• 05/04/04—Postscript: Inspection by Arrow Environmental. The Items that needs to be
completed are as follows:
I - Pre-constn•iiction requirenzents:
• Bird Boxes:This is a requirem ent for the Applicant to comply with prior to a
certificate of compliance.
• Snow Stockpiling Plan: A revised draft Plan has been prepared for review.
(6/23/04)
■ No Disturbance Zone markers: Not completed at this time. A plan has been
20217
DiNisco Design Partnership
INSPECTION REPORT NO. 135 (Inspection date 8/24/04). page 4
August 27,2004
BSCHOFIELD BROTHERS
Schofield Brothers of New England,Inc.
prepared showing the locations for the markers. 6/23/04
See progress from previous report above.
08/03/04—Regarding the Snow Management Plan and Permanent Wetland Marker Plan,
communication from Paul Szymanski has been received that the most recent draft plans are
acceptable. These now need to be forwarded to the Conservation Commission for formal
review.
08/10/04—See notes above.
• 08/17/04—See notes above.
08/24/04—(Postscript 8/25/04) Snow Management Plan and Permanent Wetland Marker Plan
have been sent to the conservation commission for review and comment.
20217
DiNisco Design Partnership
INSPECTION REPORT NO 135 (Inspection date 8/24/04). Page 5
August 27,2004
°oSCHOFIELD BROMR
Schofield Brothers of New England,Inc.
1071 worcester Road
Framingham,NIA 01701-5298
508-879-0030 1-800-696-2874
Fax 508-879-1797
W WW.schofieldbros.coin
20217
To: Mr.Rick Rice
DiNisco Design Partnership
87 Summer Street
Boston,MA 02110
Cc.: North Andover Conservation Commission
North Andover Planning Board
From: Matthew E Smith,Wetland Specialist
Date: September 2,2004
Re: North Andover High School(20217)
INSPECTION REPORT
Inspection No.: 136
Date of Inspection: August 31,2004
By: Matthew E Smith
INTRODUCTION
The purpose of these inspections is to observe and review the project work relative to compliance
with the Orders of Conditions issued by the North Andover Conservation Commission and the
Special Permit issued by the North Andover Planning Board with respect to sediment and erosion
controls,limit of work compliance, and stormwater management issues. For reference,the
Orders of Conditions issued for the project include:
DEP File No.242-1045: Issued 2/21/01 with Amendment 2/19/04 Extended 3/17/04
Planning Board Notice of Decision: Issued 5/14/01 Modification Approval 2/17/04
Please contact Fred King or Matt Smith at Schofield Brothers of New England,Inc. if you have
any questions regarding the information contained in this report.
During this inspection, it was overcast and raining lightly. It appears that no progress has been
made on the erosion control recommendations from the previous report aside from sweeping the
site. The contractor plans on the final parking lot and ro paving to e of the southerly and A
few areas of the sediment barrier are in need of repair. The
northerly athletic fields is proceeding. Spreading of loam and grading continues in the southern
athletic fields and fine grading in the northern athletic track field is completed. Some of the
perimeter sedimentation barrier to the east of the northerly athletic fields requires more work. The
drainage outfalls to Cochichewick Brook were clear. The west side haul route and southern
entrance to the construction site are in need of maintenance.
HHSCHOFIELD BROTHERS
Schofield Brothers of New England,Inc.
INSPECTION SUMMARY
1. Sediment control barriers around the perimeter of the current work area:
• 08/03/04—Several sections of sedimentation barrier along the entrance off Osgood
Street have been damaged from snowplowing operations and will need repair(carried
over on report since 03/02/04).Some of the perimeter sedimentation barrier to east of the
northerly athletic fields has been replaced. It is recommend that the remaining areas have
new hay bales installed.A short section of the haybale/silt fence barrier needs to be
repaired adjacent to the westerly side of the stone filter berm along the new security
fence by the entrance of the southern work area.There is a gap in the sediment barrier
along Chickering Road at the old entrance to the school.It is required that haybales be
replaced in this area.
• 08/10/04—Same as previous report.In addition to those repairs,there is a new gap in
the sediment barrier along Chickering Road,near the northwestern corner of the
football field.This gap needs to be replaced.
• 08/17/04—Two gaps in the sediment barrier along Chickering Road have been repaired.
Some of the perimeter sedimentation barrier to east of the northerly athletic fields has been
replaced. It is recommend that the remaining areas have new hay bales installed.A short
section of the haybale/silt fence barrier needs to be repaired adjacent to the westerly
side of the stone filter berm along the new security fence by the entrance of the southern
work area.
• 08/24/04—The silt fence along the outfall extending along the southern security fence
needs to be repaired or replaced.The sediment barrier along Chickering Road at the
old entrance to the school is in need of repair.Some of the perimeter sedimentation barrier
to east of the northerly athletic fields has been replaced. It is recommend that the
remaining areas have new hay bales installed.
• 08/31/04—Same as previous report.
2. Loam stockpile area in the northern portion of the site:
• 08/03/04—The loam pile is being removed and there are no sedimentation or erosion issues
with the loam pile at this time.
• 08/10/04—Same as previous report.
• 08/17/04—Same as previous report.
• 08/24/04—Same as previous report. '.....
• 08/31/04—Same as previous report.
3. Ordinary borrow stockpile area in the northern portion of the site:
• 08/03/04—Construction of the northern athletic field is underway.
• 08/10/04—Same as previous report.
• 08/17/04—Same as previous report.
• 08/24/04—Same as previous report.
• 08/31/04—Same as previous report. The ordinary borrow pile is essentially gone at this point.
(Record Item)
20217
DiNisco Design Partnership
INSPECTION REPORT NO. 136 (Inspection date 8/31/04).
September 2,2004 Page 2
=�SCHOFIELD BROTHERS
Schofield Brothers of New England,Inc.
4. Main entrance gate near trailers:
• 08/03/04—The southeastern entrance drive to the southern work and the west side haul
route needs to be swept.
• 08/10/04—Same as previous report.
• 08/17/04—Same as previous report.
• 08/24/04—Same as previous report.
• 08/31/04—The site has been swept although,Prescott Street needs to be swept and the
stone entrance needs maintenance.
5. Catch Basins:
• 08/03/04—Catch Basin#10 is in need of maintenance and protection needs to be added
to Catch Basin#1 it appears to be receiving runoff from the new athletic field
construction.
• 08/10/04—Same as previous report.
• 08/17/04—Several catch basins around the site are in need in maintenance.The
contractor was made aware of this and stated that all the catch basin on the site would
be inspected and address the catch basins that attention.
• 08/24/04—Several catch basins around the site are in need of maintenance.The
contractor was made aware of this and stated that all the catch basins on the site would
be inspected and will address the catch basins that need attention.Protection needs to
be added to Catch Basin#7
• 08/31/04—Same as previous report.
Sediment Basins#2 and#3 and outlet structures:
• 06/15/04—Both of these sediment basins have now been taken out of service and are being
filled for the parking lot construction as planned. (Record Item).
6. Temporary Sediment Basins#5 outlet structures and diversion berm in south work area:
• 06/15/04—Sediment Basins 4 and 5, and the diversion berm are now eliminated to bring the
areas to finished grade. Perimeter erosion controls including the stone filter berm will now
be effective for the southern area. (Record Item).
7. Other erosion control items.
• 08/03/04—Nothing to report.
• 08/10/04—Same as previous report.
• 08/17/04—Same as previous report.
• 08/24/04—The hillside adjacent to Catch Basin#3 needs to be secured. Gully erosion
and sediment deposits on the driveway were observed.
• 08/31/04—Same as previous report.
8. Other drainage structures:
• 08/03/04—Nothing to report.
• 08/10/04—Drainage manhole#12 has been damaged and is need of repair.
• 08/17/04—Drainage manhole#12 has been repaired.
• 08/24/04—Nothing to report.
• 08/31/04—Nothing to report.
9. Wetland replication areas:
20217
DiNisco Design Partnership
INSPECTION REPORT NO. 136 (Inspection date 8/31/04).
September 2,2004 Page 3
o°SCHOFIELD BROTHERS
Schofield Brothers of New England,Inc.
6 04/20/04—Some newer construction trash was observed in the west side this was brought to
the attention of the contractor.The contractor stated that deer ate some of the wetland
plantings that need replacing and alternative plantings should be considered.
• 08/03/04—Trash is not yet picked up along the area cited above.This should be attended
to.
• 08/10/04—Same as previous report.
• 08/17/04—Same as previous report.
6 08/24/04—Same as previous report. '..
6 08/31/04—Same as previous report.
10. Impermeable barrier and easterly embankment:
6 06/01/04—No seepage observed. Area appears stable at this time.(Record Item)
11. Dewatering:
6 08/03/04—No dewatering was observed.
6 08/10/04—Same as previous report.
6 08/17/04—Same as previous report.
6 08/24/04—Same as previous report.
• 08/31/04—Same as previous report.
12. Truck Washing Area:
6 08/03/04—No truck washing was observed.
6 08/10/04—Same as previous report.
• 08/17/04—Same as previous report.
6 08/24/04—Same as previous report.
• 08/31/04—Same as previous report.
13. Dust Control:
6. 08/03/04—Significant dust was observed during this inspection and is an issue at this .
time.Measures need to be taken to minimize this.The west side haul route is in needs of
sweeping along with the entrances to the site to help control dust.
6 08/10/04—Same as previous report.There was a watering truck being used to reduce
this issue.
• 08/17/04—Dust was not an issue during this inspection.
• 08/24/04—Dust was not an issue during this inspection.
e 08/31/04—Dust was not an issue during this inspection.
14. Wetland Delineation:
e 08/03/04—Nothing to report at this time.
• 08/10/04—Same as previous report.
• 08/17/04—Same as previous report.
• 08/24/04—Same as previous report.
• 08/31/04—Same as previous report.
15. Inspection Items by Others:
20217
DiNisco Design Partnership
INSPECTION REPORT NO. 136 (Inspection date 8/31/04).
September 2,2004 Page 4
cSCHOFIELD BROTHERS
Schofield Brothers of New England,Inc.
• 04/27/04—(Postscript)A meeting was held on Thursday 4/29/04 with Paul Szymanski
(NASD),John Cyr (DPW) and Fred King(SBNE) to review the preliminary Snow Disposal
Plan. Suggestions were made for additions and modifications to the Plan. SBNE will
incorporate the recommendations into the plan for further review.
A plan was also reviewed that shows the locations for permanent markers along the 25-foot
no disturbance buffer zone. The plan showed that 96 markers would be necessary to comply
with the Condition 51 of the Order of Conditions. Due to the necessary locations,it was
suggested that this would be best done as one of the last items of site work. This will need to
be discussed with the Conservation Commission. In addition, it appears to be appropriate in
some areas that these same posts be used for"No Snow Disposal"signage to comply with
Condition 52 of the OOC.
Also discussed were the installation of 35 Bird Boxes and the "non-invasive trail system"per
Conditions 35 and 37 of the OOC.
• 05/04/04—Postscript: Inspection by Arrow Environmental. The Items that needs to be
completed are as follows:
1 -Pre-construction requirements:
• Bird Boxes: This is a requirement for the Applicant to comply with prior to a
certificate of compliance.
• Snow Stockpiling Plan: A revised draft plan has been prepared for review..
(6/23/04)
• No Disturbance Zone markers: Not completed at this time. A plan has been
prepared showing the locations for the markers. 6/23/04
See progress from previous report above.
• 08/03/04—Regarding the Snow Management Plan and Permanent Wetland Marker Plan,
communication from Paul Szymanski has been received that the most recent draft plans are
acceptable. These now need to be forwarded to the Conservation Commission for formal
review.
• 08/10/04—See notes above.
• 08/17/04—See notes above.
• 08/24/04—(Postscript 8/25/04) Snow Management Plan and Permanent Wetland Marker Plan
have been sent to the Conservation Commission for review and comment.
• 08/31/04—See notes above.
20217
DiNisco Design Partnership
INSPECTION REPORT NO. 136 (Inspection date 8/31/04).
September 2,2004 Page 5
r ' T a
N arch- it e c t s and
n n e r s
Limited
OBSERVATION REPORT NO. 129 j
Project: North Andover High School -
,,lc -
Date: 28 September 2004
Location: Job Site
Present: North Andover School Department (NASD) Greg Roberts
Paul Szymanski
North Andover School Building Committee (NASBC) Harold Dushame
Municipal Building Consultants (MBC) Pat Saitta
John T. Callahan & Sons (JTC) Dave Anderson
Mike Callahan..
Sagamore Plumbing &Heating John Herald
Schofield Brothers of New England (SBNE) Matt Smith
Clerk of Works (COW) Richard Warner
DiNisco Design Partnership (DDP)
Richard Rice
,Action Date
A. SITE SAFETY AND SECURITY
09/14/04 A48.4.17 Security System - Greg Roberts reported that
09/28/04 additional wiring problems at doors were found on
09/07/04, which Maiuri expects to have corrected
by 09/17/04, with Simplex due on site Monday,
09/20/04. GR noted that the system is being
armed at night. Record item.
Simplex 09/28/04 A48.4.18 Security System - Greg Roberts reported that,
while the system is armed at night, approximately
Maiuri sixty (60) devices have been deleted, mostly at
doors. GR noted that in some cases entire trunks
have been disconnected, making it impossible t
know what portions of the building are not
secured. It was discussed that this is not
acceptable, and JTC was advised that if Maiuri
and Simplex cannot have the security system
fully functional by 15 October 2004, the owner
will undertake the work and backcharge,JTC the
costs. Paul_Szymanski also noted that there is
potential exposure for significant loss should the
building's security be breached.
Kenneth DiNisco Richard N. Rice Gary E.Ainslie Christopher Huston Donna DiNisco
8 7 S u m m e r S t r e e t B o s t o n M A 0 2 1 1 0 6 1 7 . 4 2 6 . 2 8 5 8 f a x 4 2 6 . 1 4 5 7
w w w . d i n i s c 0 . c 0 m
OBSERVATION REPORT NO. 129 North Andover High School Page 2
A52.
B. OWNER ISSUES
DDP 07/27/04 B47.1.3 Tech Ed Equipment- Greg Roberts questioned
3Si 07/29/04 whether all F&E (i.e.tables and chairs) have
NASD 09/30/04 been installed. DDP will review with 3Si.
(07/29/04) 3Si advised DDP that chairs and
"loose tables" were not provided with tech ed
equipment. DDP will order remaining furnishings.
(09/30/04) As discussed at the 09/30/04 meeting
with NASD and 3Si, NAHS will advise what
furnishings will be needed after confirming
curriculum.
JTC 09/14/04 B47.1.8 Tech Ed Dust Collector System - JTC stated dust
Sagamore collector has been wired, but Sagamore has not
yet made connections to equipment. JTC will
press Sagamore to complete the dust collection
ductwork.
R&R 08/13/04 B49.2.2 Admin/Arts Windows (Postscript) - In a phone
conversation on 08/13/04, R&R advised DDP that
scissors arm operators will be adjusted so that
windows close at the small admin wing windows.
At the arts wing, A&A stated single arm operators
must be installed per sample. DDP agreed to this
approach.
DDP 03/30/04 B50. Gymnasium Switches - Greg Roberts requested that DDP
TE investigate substituting pushbutton switches for gym
lighting, curtain, and backboard counters. GR noted that the
key switches installed are all keyed differently and require a
good deal of time to operate individually. The pushbuttons
could be secured from unauthorized use by a surface
mounted locking cabinet. Also, GR requested that the gym
lighting only be operated by the center control point. DDP
and TE to review.
DDP 08/24/04 B58.2.2 Parking Signs -The school department has
NASD purchased signs (visitors parking, etc.). DDP,
JTC JTC and NASD will coordinate installation.
09/28/04 B62.1.1 Concession Stand Water Fountain - JTC
confirmed that the hose bibs have been installed.
Record item.
OBSERVATION REPORT NO. 129 North Andover High School Page 3
09/10/04 B65.05.2 Radio/Voice/Data Cabling (Postscript) - Systems
09/28/04 contracting submitted quote for cabling the
pressbox building. 3Si, DDP and NASD to
review.
(09/28/04) Paul Szymanski has advised DDP that
there are three existing analog lines that can be
used for radio broadcast phones. No further
voice/data video cabling will be undertaken by
the project. Record item.
NASD 08/31/04 B65.09 Fencing -Access to main field for paying
DDP 09/14/04 spectators was reviewed. JTC stated there is
some flexibility in relocating fence not now in
place. NASD and DDP to review.
(09/14/04) Jack Stephenson stated that given the
experience of the 09/10/04 game, modifications
will be needed. Rick Rice, Paul Szymanski and
Jack Stephenson will walk the field area to
determine changes needed.
09/14/04 B66.1 Equipment Room Racks - JTC and Greg Roberts
09/28/04 will be jointly suggesting to Vinny Valentino
substituting mobile two tier garment racks for the
fixed pipe racks. DDP agreed that this solution
would be more flexible and efficient. Record item.
09/28/04 B66.1.1 Equipment Room Racks - Mobile racks and
- shelving requested by Vinny Valentino are in
place. Record item.
09/28/04 B66.4.1 Lockers - JTC has reviewed selection and colors
with NASD and DDP. New"knock down" lockers
have been ordered and are expected on site in
three weeks.
09/28/04 B77. Turf Fields/Helicopter Landings - Paul Szymanski reported
that the local public safety agencies Will be advised that the
synthetic fields shall not be used for Medflight landings, etc.
This is due to the nature of the turf fill. Record item.
B78.
C. PERMITS & INSPECTIONS
03/26/02 CO3. DPW Permits
09/14/04 C126.1.1 Fire Alarm System - JTC will confirm that work
09/28/04 was completed per NAFD requirements.
(09/28/04) JTC confirmed that the concession
stand work was completed per NAFD. Record
item.
OBSERVATION REPORT NO. 129 North Andover High School Page 4
09/28/04 C130. Erosion Control - SBNE reported that the site has performed
very well during the recent tarn. Repair of the filter fabric is
needed at CB45, as is some general cleanup. Record item.
JTC 09/28/04 C131. Pressbox Knox Box- Per NAM request, JTC has ordered
a surface mounted knox box for the pressbox. JTC to
advise the Fire Department when the box is installed.
09/28/04 C132. North Field Acceptance -The North Turf field has been
10/01/04 inspected by Gale on 09/27/04 and they recommend
acceptance. DDP will sign and fax the acceptance form to
JTC. Record item. Acceptance
10/01/04 C132.1 to North Field JTC the certificate of acceptancce DDP faxed
on 10/01/04.
Record item.
09/28/04 C133. Loam Testing - JTC reported that Pine & Swallow was on
09/30/04 site taking loam samples today. Lab results are expected
Thursday. JTC requested that DDP fax the results to the
field. Record item.
09/30/04 C133.1 Loam Testing (Postscript) - Pine & Swallow test
results faxed to JTC 09/30/04. Record item.
C134.
D. CONSTRUCTION SCHEDULE
09/28/04 D148. Construction Progress - JTC reviewed upcoming activities,
as follows. Record item.
09/28/04 . D148.1 Baseball Field -JTC estimated that the loam is
'- approximately 30% placed as of today, and it is
expected to be 50% placed as of Friday. At that
time Emanouil will be called to the site to begin
raking. JTC expects the baseball field to be
seeded by 10/01/04. Record item.
09/28/04 D148.2 North Fields - Field Turf is completed. Record item.
09/28/04 D148.3 Track- C&I on site doing layout. Thursday,
weather permitting, surfacing con commence. JTC
noted surfacing will be a ten day process, during
which time the fencing will also be installed.
Record item.
OBSERVATION REPORT NO. 129 North Andover High School Page 5
09/28/,04 D148.4 Locker Rooms - Demolition will be completed
today. Mason now doing infills, and will be done
by Friday. Soffits have been rebuilt, and paint
expected to start next week. Record item.
D149.
E. SUBMITTAL SCHEDULE
E16.
F. SUBMITTALS
Musco 05/27/04 F100.1.1 Field Lights e structural shall)revise
calculations.
and re-submit for
rd h
DDP 07/20/04 F100.1.2 Field Lights - Paul Szymanski reported that a
07/23/04 lighting submittal package had been forwarded to
the school department from Musco. PS will
forward a copy to DDP for processing (Received
by DDP 07/23/04).
F114.
G. COORDINATION DRAWINGS
G28.
H. PAYROLL REPORTS
H42.
I REQUISITIONS
144.
J. CHANGE ORDERS
DDP 06/29/04 J26. 06/29/0O4. DDP and JTCtrev reviewed outstanding g PCO's that
JTC
JTC would like to clear. DDP and JTC to review further.
DDP 07/20/04 J27. Electrical PCO's - DDP and JTC will meet to review
JTC electrical PCO's in preparation for a meeting with the
bonding companies.
09/28/04 J28. Locker Room PCO - JTC will forward to DDP a final PCO
for the locker room renovations, so that the work can be
incorporated into a change order for partial payment this
month.
OBSERVATION REPORT NO. 129 North Andover High School Page 6
J29.
K. WORK ORDERS
DDP 09/28/04 K15. Work Order#96 -WO #96, for completing the gym roof
snow guards, was discussed. WO #96 is based on PCO
#119; JTC's recent PCO #200, in the amount of$55,141, is
to DDP's recollection, Stanley's originial quote for a double
row of snow fencing, which is not what is needed at this
time. DDP will review the project records to clarify.
DDP 09/28/04 K16. Study Skills Drier- DDP will issue a work order for wiring the
electric driver in Study Skills 2050. JTC has forwarded a
PCO for this work.
K17.
L. FIELD ORDERS
L18.
M. PROPOSAL REQUESTS
Capital 08/05/03 M25.2.1 PCO #075 - DDP responded to Capital's letter
with regard to credit offered for VCT replaced by
terrazzo. Capital to revise credit per
specifications.
M36.
N. REQUEST FOR INFORMATION
DDP 04/01/03 N50. RFI #267 - DDP will issue letter to NAPD and Building
Department advising them that sprinkler heads in elevator
shaftway and the elevator shunt trip will be deleted in
accordance with the code moratorium still in effect.
-- 12/02/03 N89. Clothes Dryers - JTC noted no vents are shown on HVAC
09/28/04 drawings for dryer in Study Skills#2050 and the kitchen.
DDP to review with F&T and advise. Record item.
DDP 09/28/04 N89.1 Clothes Drier- Due to length of ductwork run from
either the outside wall or to the roof from second
floor, DDP recommends an"in the room"type
vent. It has been discussed that this type of
vent would be appropriate given the drier's
usage, DDP will forward cuts to NASD.
N96.
OBSERVATION REPORT NO. 129 North Andover High School Page 7
O. DEMOLITION
005.
P. SITE WORK
JTC 09/30/03 P41. Art Plaza Pavement - DDP reviewed CRJA site visit report
of 09/26/03. JTC stated radius will be cut. The clerk
observed that the puddles noted disappeared in less than
an hour, and low spots are very shallow.
DDP 10/08/03 P41.1 followed up, adv s ng DDP that low Clerk w spots would
be an icing concern, and requested that the
tolerances be checked per the paving spec (See
Spec 02500-3.01-19). DDP to advise clerk to
confirm.
JTC 03/16/04 P49. Catch ods on the catch basin structures srequired. install the
NASD 04/20/04 P52. Commemorative Plantings - Paul Szymanski advised that
DDP the school will be planting some memorial trees, and is
looking into some way to incorporate future memorials in an
orderly, planned fashion. DDP and NASD will coordinate.
NASD .07/20/04 P53.8.2 Track/Softball Scoreboard - It was discussed that
07/27/04 the track scoreboard could be fed from the
construction trailer service on Presscott. DDP will
consult with Thompson Engineering to provide
Paul Szymanski with the information needed to
obtain a permanent service from this location from
Mass Electric.
(07/27/04) Information forwarded to Paul
Szymanski by DDP on 07/26/04.
OBSERVATION REPORT NO. 129 North Andover High School Page 8
-- 06/29/04 P56.3.6 Drainage - JTC and DDP described how the field
08/24/04 sub grade for drainage as shown on the contract
09/07/04 drawings no longer reflects the final grades due to
09/28/04 changes made necessary by the athletic field
upgrades. CRJA agreed that adjustments to
J-drain and collector pipe layout would be
acceptable as long as"downhill"criteria is met.
CRJA will inspect subdrainage when completed,
and before being covered with sand, to see that
this criteria is met.
(08/24/04) In response to CRJA's inquiry as to
when the baseball field drainage work would
commence, JTC advised DDP that this work
would not begin before 09/07/04.
(09/07/04) JTC noted drainage board installation
will begin after site areas are touched up for the
09/10/04 game.
(09/28/04) CRJA was on site to inspect drain
installation last week. Record item.
JTC 06/29/04 P68.1 Leaning Trees - CRJA expained that they do not
Emanouil require trees to be guyed because studies have
shown that unguyed trees are stronger. However,
the spec does require trees to be plumbed if
required. JTC will advise Emanouil to reset the
trees.
Emanouil 06/29/04 P70.1 Lawns at Arts Wing - JTC agreed that Emanouil
would repair the bare spots in the lawn between
the arts classrooms and the driveway.
DDP 08/24/04 P76.1.1 Painted Lines - NASD has requested that a
Gale 09/07/04 proposal request be issued for painted practice
soccer lines and for painted field hockey lines at
the south field because the school department's
line painter is unavailable. Gale to provide DDP
with line drawing.
(09/07/04) Gale is attempting to see if Northeast
turf crew can line the fields as desired by NASD.
NET 08/24/04 P76.1.3 O&M Instructions - NET to furnish O&M manuals
NASD and schedule owner instruction of turf field
maintenance.
OBSERVATION REPORT NO. 129 North Andover High School Page 9
JTC 08/31/04 P76.3.2 Bleachers and Pole - JTC stated that their
09/07/04 expectation of how Dant Clayton would interface
with the pole was not met, and the additional cost
was not acceptable. It was agreed that DC
would be held responsible for extending the
bleacher system to the face of the concrete light
pole foundation. JTC would construct an
aluminum diamond plate closure around the light
pole flush with th upper walk surface. This upper
closure will be fenced in by DC.
(09/07/04) DC has extended deck and has
completed fencing around pole. JTC will pour
sloped concrete cap on pole pier.
DDP 09/14/04 P77.1 Soil at Bleachers - JTC has installed sod on
slope at the bleachers. DDP will issue for record
a work order for$1,500, as agreed.
-- 09/14/04 P78. Gale reviewed the following items at the 09/14/04 job
meeting.
-- 09/14/04 P78.1 Track Surfacing - Gale noted that areas have
09/28/04 been marked where puddling was observed,
JTC stated C&I will be filling low spots. Record
item.
-- 09/28/04 P78.1.1 Track Surfacing - In response to Paul
Szymanski's question, JTC explained that two
areas in the D areas have been patched with
pavement, because C&I was of the opinion that
the depressions were too deep for them to fill with
the surfacing system. JTC advised that C&J will
blend the edges of the bituminous patches with a
trowelled fill before the surfacing is applied.
Record item.
JTC 09/14/04 P78.3 South Field - Gale advised that sediment washed
onto the field should be removed as soon as
possible. JTC will address.
JTC 09/14/04 P79. Slope at Northeast Corner of Track-JTC recommended
placing rip rap on the slope at the corner of the track, noting
ongoing erosion and weeping. JTC will forward a PCO for
using a "large" stone as rip rap.
-- 09/14/04 P81. Berm Construction Status - DDP advised that a final
09/28/04 ConCom hearing is scheduled for 09/22/04. DDP will call
JTC on 09/23/04 if approved by ConCom, so trees can be
dug. Record item.
OBSERVATION REPORT NO. 129 North Andover High School Page 10
DDP 09/28/04 P81.1 Berm Construction Status - DDP stated that the
berm construction has been approved by
ConCom, and by 09/30/04 DDP expects to
deliver the stamped easement drawing to the
town counsel. DDP to adivise JTC on sizes of
trees to be planted.
P82.
Q. ARCHITECTURAL
BASS 09/28/04 Q30.8.12 Cladding Completion - JTC reported that Bass
has been on site completing HVAC screens and
installing Main Street down spouts. Bass has yet
to address fascia at the tech ed curtainwall
system.
Q92.
R. STRUCTURAL
R37.
S. FIRE PROTECTION
RWS 06/22/04 S20.1 System Pressure - It was reported that the
Hampshire technician on site feels the reported
180# pressure in the system is proper. DDP will
discuss with RWS.
S21.
T. PLUMBING
Grasseschi 05/18/04 T30.2.1 Gas Shutoff Valve - DDP has been informed by
RWS that all their conversations with Grasseschi
were with regard to Grasseschi's request to
substitute a standard access panel for a valve
cabinet (which was done). RWS at no time
instructed Grasseschi that the door should have a
lock. Grasseschi is to remove lock and install latch
per detail on 8.0.3.
Grasseschi 06/04/04 T36.1 Hot Water(Postscript) - RWS memo distributed
on 06/07/04. Grasseschi to advise on system
balancing.
OBSERVATION REPORT NO. 129 North Andover High School Page 11
DDP 06/08/04 T36.2 Hot Water- Greg Roberts questioned type of
RWS tanks and piping arrangement, wondering if this
would play some part in the hot water circulation
issue. JTC stated tanks were piped per RWS
directives in response to a question from
Grasseschi. DDP will review further with RWS.
T37.
U. HVAC
Maiuri 06/08/04 030.1.2 Fume Hood Fans-ABP has ordered special
MCG 08/17/04 starter required for two fans.
08/31/04 (08/17/04)JTC advised MCG that starters are
required at two fume hood fans.
(08/31/04) MCG reported components for hoods
have been ordered.
Sagamore 06/15/04 U34.1.2 Mainstreet Fin Tube - DDP reviewed conditions
08/10/04 and found that fin tube cover has been
09/21/04 adequately screwed to support structure.
09/28/04 Sagamore shall consistently cope the end covers
tight to columns, concealing the piping.
(08/10/04) Sagamore has ordered end caps for
Main Street fin tube.
(09/21/04) Sagamore has been informed that end
caps will be in the week of 09/20/04.
(09/28/04) Sagamore has been informed that the
end covers will ship this week. Sagamore will
install them as soon as they are on site, after
school (2:00 PM).
F&T 03/16/04 U35. Kitchen ElevatorShaft - It was discussed that even with
keeping the boiler room doors closed, a strong down draft is
keeping the elevator shaft cold in the kitchen. DDP will
review with F&T.
Sagamore 07/27/04 043.1.1 Sagamore advised that the last of the filters are
09/14/04 due on site on 07/06/04 and will be installed on
delivery.
09/28/04 (07/13/ 4) Filters are on site.
(07/27/04) Sagamore advised that filters on hand
were not correct, and that replacements have
been ordered.
(09/14/04) Greg Roberts reported that
replacement filters have been delivered to the
site, and Sagamore must install them.
(09/21/04) Sagamore stated filters will be installed
on 09/22/04.
(09/28/04) All filters have been installed. Record
item.
OBSERVATION REPORT NO. 129 North Andover High School Page 12
-- 06/08/04 U45.1 Boiler Leak- Greg Roberts reported that
Sagamore has repaired the leak between
sections. However, the boiler has not since been
fired to determine if repair will hold.
-- 09/28/04 U45.1.2 Sagamore clarified that the leak in Boiler#3
stopped as the sections were tightened. Record
item.
Sagamore 07/13/04 U46.5.3 Dust Collector- Panel voltage will be corrected on
09/21/04 06/29/04, and fittings completed.
09/28/04 (07/13/04) Dust collector controller is on site and
09/30/04 all that is left for completion is final electrical
connections.
(09/14/04) Dust collector is wired, and Sagamore
must make ductwork connections at equipment.
(09/21/04) Worcester Air has been advised that
they may complete the connections during the
school day.
(09/28/04) Sagamore reported that Worcester Air
was on site to measure on 09/24/04. Sagamore
shall email DDP when they will be out to make
final connections. Greg Roberts advised that
some balancing will need to be done.
(09/30/04) Sagamore advised DDP that
Worcester Air will be on site on 09/30/04 to
complete connections.
Sagamore 08/10/04 U46.5.4 Water Treatment System - Sagamore stated
.08/17/04 water was retested last week and found to have
09/21/04 29% glycol content (specified range is 31-33%)
09/28/04 Sagamore is prepared to add more glycol with the
rust inhibitor and other chemical additives that are
on site, and startup the system. Greg Roberts
noted that the system only ran for 24 hours after
the last glycol was added, and recommended that
the system be run longer to more thoroughly mix
the glycol.
(07/27/04) Sagamore reported water treatment
system work is completed, and that subcontractor
will be called back to site to retest after coil in
- ERU-2 is completed.
(08/10/04) Sagamore stated water treatment work
will be completed the week of 08/16/04.
(08/17/04) Sagamore stated water treatment work
will be completed by 08/20/04.
(09/21/04) Sagamore will verify water treatment
work has been completed, and will forward report
to DDP.
(09/28/04) Sagamore has forwarded treatment
report showing 32% glycol content. Record item.
OBSERVATION REPORT NO. 129 North Andover High School Page 13
DDP 06/22/04 U46.5.5 As Built Drawings - Sagamore has piping `as
F&T 09/21/04 builts' on a cad disk, and has received a second
copy of ductwork `as builts' to be added to disk.
(09/21/04) As-Built ductwork prints and piping
CAD disk turned over to DDP and F&T for review.
Sagamore 07/27/04 U47.3.1 Burners - Greg Roberts reported that Power
09/21/04 Flame has been back to site, but Boiler#1
09/28/04 continues to"lock out."
(09/21/04) Sagamore reported that Power Flame
was back on site in August. F&T inquired
whether the problem is a JCI controls
communication issue Sagamore to confirm.
(09/28/04) Greg Roberts reported that Power
Flame was on site on 09/27/04, and that burner
has been operating since. Sagamore shall submit
technician's report.
Sagamore 07/27/04 U47.4.1 AHU-3 - Sagamore has replaced the pulley, but
09/28/04 must still provide Greg Roberts with replacement
belts.
(09/28/04) Greg Roberts clarified that the belts
that are required are not spares, but that the
multiple belt pulleys does not have all the needed
belts installed. Sagamore to address. .
-- 09/14/04 U50.01.2 ERU's - Greg Roberts reported that crew was on
09/21/04 site to replace the damper actuator on ERU-2.
Greg Roberts will confirm whether ERU 1, 2 and 3
are all now functioning. Record item.
(09/21/04) E-mail from Greg Roberts stating that
problems still exist with ERU's was distributed.
Sagamore 09/28/04 U50.01.3 Sagamore reported that damper actuator has
been replaced and covers on valves installed.
ERU 1 and 2 will be hardwired by JCI on
09/29/04-09/30/04. Greg Roberts advised that
ERU-2 is still going into alarm. Sagamore stated
that Heat tech will be on site 10/04/04-10/05/04.
JTC 09/21/04 U50.02.1 RTU 1 & 2 Insulation - The relative merits of
09/28/04 various types of insulation was discussed. It
was agreed that the best approach was to use a
spray expandable foam applied from both the
curb and underside the deck. JTC and Sagamore
will further investigate.
(09/28/04) JTC expects to be hearing from
Stanley Roofing who may be able to furnish JTC
with a name of an insulator who can apply the
spray foam.
OBSERVATION REPORT NO. 129 North Andover High School Page 14
Sagamore 09/28/04 U50.03.2 Plennum Insulation - Sagamore has slips
indicating that the plennums in 18 room have been
insulated. This is a small percentage of the total
number to be insulated, and no others were
completed since the 09/21/04 meeting with
Sagamore. MBC stated that Sagamore must
increase the pressure on the insulator to complete
this work.
Sagamore 09/21/04 U50.04.2 Condensation Pans - Sagamore has been
informed by McQuay that the pans have been
factory-insulated on the top side. Sagamore to
submit confirmation from McQuay in writing.
(09/28/04) Sagamore stated written confirmation
from McQuay is forthcoming.
-- 08/31/04 U50.05 RTU/Outdoor Air Settings - Sagamore has
09/28/04 confirmed that the operator sequences are per the
HVAC drawings. McQuay has reset the
enthalpy controlers. There is still a question
whether too much air is entering the wrestling room
unit during the unoccupied mode. Record item.
-- 09/14/04 050.05.1 RTU's - Greg Roberts stated humidity has
09/28/04 improved with the resetting of enthalpy controls.
There is still some question as to the outside air
ratio at RTU-6 seving the wrestling room . DDP
will review with F&T. Record item.
-- 09/28/04 U50.05.2 RTU's - Greg Roberts reported that units have
been functioning well since enthalpy controls
have been reset. Record item.
Sagamore 09/28/04 U50.05.3 RTU-7 - Greg Roberts advised Sagamore that
Circuit#1 of RU-7 is still tripping out on high head.
Sagamore to advise McQuay.
Sagamore 09/28/04 U50.06.1 RTU-8 - Sagamore will address balancing issue
with RTU-8 evidenced in latest reports distributed
on 09/21/04.
Sagamore 09/28/04 U50.07.1 RTU-8 Sequence - Sagamore stated JCI has
been requested to submit a price. Greg Roberts
suggested that McQuay should also be contacted
in revising the control sequence to go to half
speed during the unoccupied cycle using the units
VFD.
OBSERVATION REPORT NO. 129 North Andover High School Page 15
Sagamore 09/28/04 050.08.1 Humidity Control - Sagamore stated JCI has
been requested to price adding humidistat control
to the auditorium and wrestling room units. It was
again noted that McQuay should be contacted
also, since the units already read humidity via the
enthalpy controls.
F&T 09/21/04 U50.09.01 Balancing Reports - Sagamore brought the
RDK revised balancing reports to the 09/21/04 meeting.
DDP distributed copy to F&T and RDK at the
meeting for review.
Sagamore 09/28/04 U50.11 HVAC Punchlist- DDP requested that Sagamore
bring to the 10/05/04 meeting a copy of F&T's
punchlist with all corrected items crossed off.
Sagamore 09/28/04 U50.12 Corrective Action Log- At the 09/28/04 meeting
copies of RDK's corrective action log (copy
attend) with status marked off the open items.
MBC noted that there have been no new entries
since June, and still far less than half the action
items have been addressed. DDP and MBC
stressed to Sagamore that for any retaining to be
released, a significant effort must be made to
address all open items. Sagamore will attend the
10/05/04 meeting with an update.
U51.
V. ELECTRICAL
3Si 03/23/04 V59.3 Room 3011 -3Si has a recording meter on the
outlets in IDF 3011 due to three UPS units being
damages.
-- 05/11/04 V59.3.1 Room 3044- Paul Szymanski noted a power
09/15/04 issue has also been observed at V/D room 3044.
DDP reported that 3Si and TEC are working to
isolate and identify the problem, but nothing has
been discovered that can be positively
addressed.
(09/15/04) It was noted that UPS units have
been replaced. Record item.
RDK 08/24/04 V70.1.2 FA/Duct Smoke Test- Greg Roberts reported that
NAHS due to NAFD requirements, the testing of the duct
smoke/HVAC interface will be performed in
December with the yearly fire alarm testing.
OBSERVATION REPORT NO. 129 North Andover High School Page 16
-- 07/20/04 V71.7 ABP Default-The folowing ABP action items
have been deleted from the observation report
due to ABP's default, and will be addressed
outside of the observation report format:
A48.4.06 (security wiring); B33.2.4 (Studio
Doorbell); J18.1.3 (PR#21 Cost Proposal);
J21.1.4 (WO #33, 40 and 41 revised cost
proposal); K08 (WO#27 cost proposal); K08.1.1
(WO#28 revised cost proposal); V61 (Gym
backboard switches); V64.4 (Gym lights); V68
(Kitchen doorbell); V69.3.1 (Fire alarm wiring);
V71, V71.2 (Response to outstanding issues).
DDP 07/06/04 V72. Lamp List- Greg Roberts requested a list of lamps used on
TE the project. DDP noted this is to be part of the electrical
O&M manuals, but with ABP's default DDP will request a list
from Thompson Engineering.
-- 08/10/04 V75. Security Cameras - NASD will be reinstituting the installation
of security cameras under a separate contract. It was
discussed that the 120 volt power for exterior cameras
mounted on light poles has not been completed, and that the
conduit routing is not as specified due to damage to
underground conduits. However, it was stated that a
conduit path exists to all three exterior locations.
DDP 08/17/04 V76.1.1 Disputed Items - DDP will advise as to items
listed as "N.I.C." MCG reported that they do not
have all work orders and other contract change
documents.
Maiuri 08/17/04 V76.4 Auditorium Step Lights - MCG advised
components to complete top steps not yet on
hand.
DDP 08/17/04 V76.5 Flagpole Lighting - In response to discussions,
DDP will review control specified with TE.
NASD 08/31/04 V77. Worker Background Checks - Paul Szymanski advised
MCG MCG that background checks will be necessary for any
electricians working in the building during the school day.
RCE 09/14/04 V78. Incomplete Work Order Work- It was agreed that RCE
electric would perform additional work authorized, but not
undertaken by ABP. RCE will be issuing proposals for
Room 2050 washer/dryer power, generator power (WO
#70) and the TV station doorbell (PR #35).
V79.
OBSERVATION REPORT NO. 129 North Andover High School Page 17
W. HAZARDOUS MATERIALS
W08.
X. MISCELLANEOUS
Bass 08/26/03 X48. Sarnafil Roof Flashing - DDP, JTC and Stanley discussed
Stanley roof edge detail. DDP explained that Work Order required
JTC, Stanley and Bass to coordinate respective work. It
was discussed and agreed that Boss would provide
Stanley with stock so Stanley can form "snap on"trim. DDP
stated, in principle, this would be additional work by
Stanley, and less work (credit) by Bass (but no net change
in cost to Owner).
JTC 05/04/04 X67.10 Roof Leak Status - In response to MBC's
questions, JTC stated that all leaks have been
permanently repaired, with the exception of
cupola doors, which are awaiting hardware and
weather stripping.
JTC 06/22/04 X67.11 Cafeteria Roof Leak- Greg Roberts reported that
a leak at the east end of the cafeteria has
reappeared. JTC will investigate.
Stanley 08/24/04 X67.11.1 Cafeteria Roof Leak- Greg Roberts reported that
JTC the leak over the cafeteria offices reappeared
during the rains of the past week. JTC has
advised Stanley.
-- 09/28/04 X72.1 Meeting Schedule- The next job meeting will be
in two weeks (10/12/04) at 1:00 PM. There will
be a meeting on 10/05/04 at 1:00 PM to meet with
Meridian to review electrical progress, and at 2:00
PM with Sagamore to review HVAC progress.
JTC 09/28/04 X73. Wood Floor- JTC reported that F.J. Roberts has cut the
wrestling room floor free where binding, and that JTC has
corrected a threshold installation at the doors to the gym.
JTC reported that Aacer inspected the floor last week, and
stated that the floor will settle down. Aacer will be issuing a
report.
X74.
Y. PROJECT CLOSEOUT
Clerk 03/02/04 Y13. Inventory - The clerk will begin an inventory of spare
materials and parts to be forwarded per specifications.
OBSERVATION REPORT NO. 129 North Andover High School Page 18
JTC 06/22/04 Y13.3 Auditorium Seat Inventory - JTC passed along to
S-D DDP a transmittal from Slay Dale stating seating
maintenance has been delivered. Clerk is
unaware of any such delivery. JTC will advise
Slay Dale to deliver materials to clerk's attention.
JTC 07/27/04 Y14. Closeout Submittals - JTC furnished DDP with a
Subs spreadsheet showing the status of the various manuals,
as-builts, warranties, and maintenance stock specified.
Y15.
ZZ. CONSTRUCTION PROGRESS
-- 09/28/04 ZZ130.Construction Progress -The architect walked the site and
observed the following. Record item.
-- 09/28/04 ZZ130.1 North Fields-Turf completed. No work on track
due to rains. Record item.
-- 09/28/04 ZZ130.2 South Fields - Loam being mixed and spread at
ballfield. Record item.
ZZ131.
OBSERVATION REPORT NO. 129 North Andover High School Page 19
The next job meeting will be held at 1:00 PM on Tuesday, 12 October 2004 at the Contractor's
Trailer.
The discussions of this meeting are recorded as understood by the writer, who should be notified of
any omissions or corrections. Unless the writer is notified to the contrary, these notes are presumed to
be correct.
IT Z
Riard N. Rice
DiNISCO DESIGN
RNR/dp
cc: Louis Minicucci Gene Kingman
Harry Harutunian Kevin Murphy
Frederick King Ed Estabrook
Nancy Kurtz Kevin Burke
Susan Nicholson Richard Weber
Evan Karalolos Mike DiBari
Department of Public Works Kenneth DiNisco
Julie Parrino Richard Greenlee
NA Planning Board Angel Khazadian
Doug Idt Jon Oxman
Robert Feinberg, ESCOA Bill Sousa, RDK
Paul Szymanski
cc (hand): Mike Callahan
Patrick Saitta
�
^
�
(=C=) ELD BROTHERS
' ^---- - --
Schofield Brothers of New England,Inc. �������� 7 7~��
mr1 Worcester Road
Framingham,wmn17n1-5ooe
---�
508'879-0030^J'80*696'287* N0
Fax 508-879-1797 �'~.
November l, 2004 Website wwmmmvnomumu.o«m
20217
�
TO: North Andover Conservation Commission �
Noob}\udover ~Board
�
--_ �
D. Robert Nic ettu'BnUdin-Commissioner
DONisco Design Partnership
- \ttu. Rick Rice |
(for further distribution(napplicable parties) �
FROM: Matthew E Smith,Wetland Specialist. |
RE: North Andover High S hool—Monthly Inspection Report—September 29, 2004 through
October 26,2004.
DEP File No.%4%'1W45
Planning Board Notice eY Decision dated 5/l4/OI
Schofield Brothers of New England Inc. has been designated uo the "Environmental/Erosion
Control Monitor"for the North Andover b School Pr U eot. The purpose of the Environmental
l/
li
Erosion Cootro\D�ouituriutoperforo�periodic iooyoob oz
inspections 'octxiL�Loioaur�uop auce
zm »n
with the Order ofCoudidouxioouedbytbeCunservudooC000uixoiouuuddbu3ycoiu\Peozdt�
issued by the Planning Board with respect to sediment and erooioncoutroi»`
Uodt»fwork
compliance, wodundn:yUcudooand utoonwuter management ixuuou.
This is the thirty-fifth monthly inspection report prepared and submitted in compliance with the 04
uh f�rouo�dpcooi�n 8covcmtb� pobodboou3epte oob�r2g, 2004 �bzou�bOc�ohor�0,�o .
above � \4l #\42 #143 uud#�44)�c|utiv��odho
��ttucbedare copies of the IuopeohouReports (# ` e ` ,
inspections performed on(]ctohoc5ffi, 12ffi, 19m` and 20".2UO4.
The month of October was seasonally normal with no excessive rain events, Overall, the erosion
�dyduriu��be past month. The site work isnearing
and sedimentation«ou i' i u functioned prop
southern athletic fields. The work in the
completion with work focused ou both the northern and
southern athletic fields included spreading of loam,hydro seeding and construction of the baseball
field.
Section A.--------�Items comPleted:
l� Maintenance of Catch Basins uod#2
' must
2. The site pavement was swept to minimize dust and sediment load,but sweeping
continued.
3 The hillside by Catch Basin#S uypeus to be stabilized.
4 Hydro seeding has continued in various locations around the site.
�SCHOFIELD BROTHERS
ENGINEERING SGR''EYfNG PLANNING
20217
North Andover High School
tember 29,2004 through October 26,2004
Monthly Inspection Report—Sep
Page 2
Section E.items from Previous reports and the most recent report that remain to be need s be
1. The stone interceptor sub drains at the base of the northern athletics fields
cleaned out and repaired as necessary.
2. The site was swept 3 and#45 a n sweeping need must o be
3. Catch Basins# maintenance- nd 4. There is a gap in silt fence by the eastern stream o east sideton the northern athletic damaged field was
area. This should be repaired.The silt fence on
damaged during the spreading of loam.This must be repaired and maintained until the area is
stabilized.
5. Construction trash was observed and should be picked up.This has been in outstanding issue
for 6 months and should be addressed. in
Based on our inspections, we have found that the Ordercof Conditions.We have found that d the
general compliance with the Special functioned and
sediment controls have generally functioned preds to address somevoubtstanding issues.observed adverse
affects to the resource areas. The contractor ne continuing. It is
Over the next month,the work in southerly and northern atof the fields
ccess road in northern fields and
anticipated that the installation of the track and the paving
construction of the baseball field in the southern athllet io rel will be com l Street�ork is also
expected to begin soon on the landscape berms at p P
The attached inspection reports provide detailed information as to uestionsdor if Please
if there are any issues that we are not aware know
el a you have any q
Y
comments us provide information you need, we would be
or recommendations that would hel
happy to hear from you.
Very truly yours, approved:
Schofield Brothers of New England,Inc.
Fredric W.King,P.E.
Matthew E Smith,M.L.F. Senior Engineer/
Wetland Specialist/ Environmental Planner
Environmental Planner
enclosures
EEDEED)SCHOFIELD BROTHERS
Schofield Brothers of New England,Inc.
1071 Worcester Road
Framingham,MA 01701-5298
508-879-0030 1-800-696-2874
Fax 508-879-1797
w ww.schof icldbros.com
20217
To: Mr.Rick Rice
DiNisco Design Partnership
87 Summer Street
Boston,MA 02110
Cc.: North Andover Conservation Commission
North Andover Planning Board
From: Matthew E Smith,Wetland Specialist
Date: October 6,2004
Re: North Andover High School(20217)
INSPECTION REPORT
Inspection No.: 141
Date of Inspection: October 5, 2004
By: Matthew E Smith
INTRODUCTION
The purpose of these inspections is to observe and review the project work relative to compliance
with the Orders of Conditions issued by the North Andover Conservation Commission and the
Special Permit issued by the North Andover Planning Board with respect to sediment and erosion
controls, limit of work compliance, and stormwater management issues. For reference,the
Orders of Conditions issued for the project include:
• DEP File No. 242-1045: Issued 2/21/01 with Amendment 2/19/04 Extended 3/17/04
• Planning Board Notice of Decision: Issued 5/14/01 Modification Approval 2/17/04
Please contact Fred King or Matt Smith at Schofield Brothers of New England, Inc. if you have
any questions regarding the information contained in this report.
During this inspection,it was clear and sunny. The past week has been dry for the most part and
the site has shown very little erosion. Construction work continues on the athletic fields.The
contractor has begun to spread material on the northern athletic fields' track. Spreading of loam
and grading continues in the southern athletic fields along with the preliminary work on the
baseball field. It is anticipated the majority of the southern athletic field area will be hydro seeded
soon.The eastern drainage outfalls to Cochichewick Brook were clear.
°EEBE'SCHOFIELD BROTHELS
Schofield Brothers of New England,Inc.
INSPECTION SUMMARY
1. Sediment control barriers around the perimeter of the current work area:
• 10/05/04—There is a gap in the perimeter silt fence by stream outfall by the construction
entrance for the southern athletic fields. This does not appear to be discharging any sediment
off site due to the current topography of the construction entrance.
2. Loam stockpile area in the northern portion of the site:
• 10/05/04—The loam pile is being removed and there are no sedimentation or erosion issues
with the loam pile at this time.
3. Main entrance gate near trailers:
• 10/05/04—The entrance to the school has been swept but maintenance must continue
and the stone entrance needs maintenance.
4. Catch Basins:
• 09/07/04—Maintenance Catch Basins#1-3 and#45 is required.
5. Other erosion control items.
• 10/05/04—Nothing to report.
6. Other drainage structures:
• 10/05/04—The stone interceptor sub drain(gravel drain) at the base of the northern
athletics fields will need to be cleaned out and repaired.
7. Wetland replication areas:
• 04/20/04—Some newer construction trash was observed in the west side this was brought to
the attention of the contractor. The contractor stated that deer ate some of the wetland
plantings that need replacing and alternative plantings should be considered.
• 10/05/04—Trash is not yet picked up along the area cited above.This should be attended
to.
8. Impermeable barrier and easterly embankment:
• 06/01/04—No seepage observed. Area appears stable at this time.(Record Item)
9. Dewatering:
• 10/05/04—No dewatering was observed.
10. Truck Washing Area:
• 10/05/04—No truck washing was observed.
11. Dust Control:
• 10/05/04—Dust was not an issue during this inspection
12. Wetland Delineation:
• 10/05/04—Nothing to report at this time.
13. Inspection Items by Others:
• 04/27/04—(Postscript)A meeting was held on Thursday 4/29/04 with Paul Szymanski
(NASD), John Cyr(DPW) and Fred King(SBNE)to review the preliminary Snow Disposal
20217
DiNisco Design Partnership
INSPECTION REPORT NO. 141 (Inspection date 10/05/04).
:Page
October 6, 2004
°EDSCHOFIELD BROTHERS
Schofield Brothers of New England,Inc.
Plan. Suggestions were made for additions and modifications to the Plan. SBNE will
incorporate the recommendations into the plan for further review.
A plan was also reviewed that shows the locations for permanent markers along the 25-foot
no disturbance buffer zone. The plan showed that 96 markers would be necessary to comply
with the Condition 51 of the Order of Conditions. Due to the necessary locations,it was
suggested that this would be best done as one of the last items of site work. This will need to
be discussed with the Conservation Commission. In addition, it appears to be appropriate in
some areas that these same posts be used for"No Snow Disposal" signage to comply with
Condition 52 of the OOC.
Also discussed were the installation of 35 Bird Boxes and the"non-invasive trail system"per
Conditions 35 and 37 of the OOC.
0 05/04/04—Postscript: Inspection by Arrow Environmental. The Items that needs to be
completed are as follows:
I -Pre-construction requirements:
■ Bird Boxes: This is a requirement for the Applicant to comply with prior to a
certificate of compliance.
■ Snow Stockpiling Plan: A revised draft plan has been prepared for review.
(6/23/04)
■ No Disturbance Zone markers: Not completed at this time. A plan has been
prepared showing the locations for the markers. 6/23/04
See progress from previous report above.
08/03/04—Regarding the Snow Management Plan and Per
Wetland Marker Plan,
communication from Paul Szymanski has been received that the most recent draft plans are
acceptable.These now need to be forwarded to the Conservation Commission for formal
review.
0 08/24/04—(Postscript 8/25/04) Snow Management Plan and Permanent Wetland Marker Plan
have been sent to the Conservation Commission for review and comment.
0 10/05/04—See notes above.
20217
DiNisco Design Partnership
INSPECTION REPORT NO. 141 (Inspection date 10/05/04).
October 6,2004 Page 3
°°SCHOFIELD BROTHERS
Schofield Brothers of New England,Inc.
1071 Worcester Road
Framingham,MA 01701-5298
508-879-0030 1-800-696-2874
Fax 508-879-1797
www.schofieldbros.com
20217
To: Mr. Rick Rice
DiNisco Design Partnership
87 Summer Street
Boston,MA 02110
Cc.: North Andover Conservation Commission
North Andover Planning Board
From: Matthew E Smith,Wetland Specialist
Date: October 13,2004
Re: North Andover High School(20217)
INSPECTION REPORT
Inspection No.: 142
Date of Inspection: October 12,2004
By: Matthew E Smith
INTRODUCTION
The purpose of these inspections is to observe and review the project work relative to compliance
with the Orders of Conditions issued by the North Andover Conservation Commission and the
Special Permit issued by the North Andover Planning Board with respect to sediment and erosion
controls, limit of work compliance, and stormwater management issues. For reference,the
Orders of Conditions issued for the project include:
• DEP File No.242-1045: Issued 2/21/01 with Amendment 2/19/04 Extended 3/17/04
• Planning Board Notice of Decision: Issued 5/14/01 Modification Approval 2/17/04
Please contact Fred King or Matt Smith at Schofield Brothers of New England,Inc. if you have
any questions regarding the information contained in this report.
During this inspection, it was raining which allowed me to see how the site was holding up.
Overall,the site has shown very little erosion and appears to be stable.There are some
maintenance items that remain to be addressed from the previous report. Construction work
continues on the athletic fields.The contractor has continued to spread material on the northern
athletic fields' track and anticipates that this work will be completed by the end of the week.
Spreading of loam and grading continues in the southern athletic fields along with the continued
work on the baseball field. The majority of the southern athletic field area has been hydro seeded.
The eastern drainage outfalls to Cochichewick Brook were lightly cloudy.
O°�SCHOFIELD BROTHERS
Schofield Brothers of New England,Inc.
INSPECTION SUMMARY
1. Sediment control barriers around the perimeter of the current work area:
® 10/05/04—There is a gap in the perimeter silt fence by stream outfall by the construction
entrance for the southern athletic fields. This does not appear to be discharging any sediment
off site due to the current topography of the construction entrance.
• 10/12/04—Same as previous report.
2. Loam stockpile area in the northern portion of the site:
• 10/05/04—The loam pile is being removed and there are no sedimentation or erosion issues
with the loam pile at this time.
10/12/04—Same as previous report.Much of the loam stockpile has been removed.
3. Main entrance pate near trailers:
• 10/05/04—The entrance to the school has been swept but maintenance must continue
and the stone entrance needs maintenance.
• 10/12/04—Same as previous report.
4. Catch Basins:
• 09/07/04—Maintenance Catch Basins#1-3 and#45 is required.
• 10/12/04—Same as previous report.Some haybales have been installed around Catch
Basin#45 but the fabric protection is in need of repair.
5. Other erosion control items.
• 10/05/04—Nothing to report.
10/12/04—Nothing to report.
6. Other drainage structures:
• 10/05/04—The stone interceptor sub drain(gravel drain) at the base of the northern
athletics fields will need to be cleaned out and repaired.
• 10/12/04—Same as previous report.
7. Wetland replication areas:
• 04/20/04—Some newer construction trash was observed in the west side this was brought to
the attention of the contractor. The contractor stated that deer ate some of the wetland
plantings that need replacing and alternative plantings should be considered.
• 10/05/04—Trash is not yet picked up along the area cited above.This should be attended
to.
• 10/12/04—Same as previous report.
8. Impermeable barrier and easterly embankment:
• 06/01/04—No seepage observed. Area appears stable at this time. (Record Item)
9. Dewatering:
• 10/05/04—No dewatering was observed.
• 10/12/04—No dewatering was observed.
20217
DiNisco Design Partnership
INSPECTION REPORT NO. 142(Inspection date 10/12/04). pa:ge
October 13,2004
°°SCOEIELD BROTHERS
Schofield Brothers of New England,Inc.
10. Truck Washing Area:
• 10/05/04—No truck washing was observed.
• 10/12/04—No truck washing was observed.
11. Dust Control:
• 10/05/04—Dust was not an issue during this inspection.
• 10/12/04—Dust was not an issue during this inspection.
12. Wetland Delineation:
• 10/05/04—Nothing to report at this time.
• 10/12/04—Nothing to report at this time.
13. Inspection Items by Others:
• 04/27/04—(Postscript)A meeting was held on Thursday 4/29/04 with Paul Szymanski
(NASD),John Cyr(DPW) and Fred King (SBNE) to review the preliminary Snow Disposal
Plan. Suggestions were made for additions and modifications to the Plan. SBNE will
incorporate the recommendations into the plan for further review.
A plan was also reviewed that shows the locations for permanent markers along the 25-foot
no disturbance buffer zone. The plan showed that 96 markers would be necessary to comply
with the Condition 51 of the Order of Conditions. Due to the necessary locations, it was
suggested that this would be best done as one of the last items of site work. This will need to
be discussed with the Conservation Commission. In addition, it appears to be appropriate in
some areas that these same posts be used for"No Snow Disposal" signage to comply with
Condition 52 of the OOC.
Also discussed were the installation of 35 Bird Boxes and the "non-invasive trail system"per
Conditions 35 and 37 of the OOC.
• 05/04/04—Postscript: Inspection by Arrow Environmental. The Items that needs to be
completed are as follows:
I -Pre-construction requirements:
■ Bird Boxes:This is a requirement for the Applicant to comply with prior to a
certificate of compliance.
■ Snow Stockpiling Plan: A revised draft plan has been prepared for review.
(6/23/04)
■ No Disturbance Zone markers: Not completed at this time. A plan has been
prepared showing the locations for the markers. 6/23/04
See progress from previous report above.
• 08/03/04—Regarding the Snow Management Plan and Permanent Wetland Marker Plan,
communication from Paul Szymanski has been received that the most recent draft plans are
acceptable.These now need to be forwarded to the Conservation Commission for formal
review.
08/24/04—(Postscript 8/25/04) Snow Management Plan and Permanent Wetland Marker Plan
have been sent to the Conservation Commission for review and comment.
• 10/05/04—See notes above.
• 10/12/04—See notes above.
14 Landscape Berms at 584 and 586 Osgood Street:
• 10/12/04—Work is expected to begin on this item in the near future. The first item will be the
installation of erosion controls.
20217
DiNisco Design Partnership
INSPECTION REPORT NO. 142 (Inspection date 10/12/04).
October 13, 2004 Page 3
°°SCHOFIELD BROTHERS
Schofield Brothers of New England,Inc.
1071 Worcester Road
Framingham,MA 01701-529S
508-879-0030 1-800-696-2871
Fax 503-879-1797
www.scbo f ieldbros.coin
20217
To: Mr.Rick Rice
DiNisco Design Partnership
87 Summer Street
Boston,MA 02110
Cc.: North Andover Conservation Commission
North Andover Planning Board
From: Matthew E Smith,Wetland Specialist
Date: October 20,2004
Re: North Andover High School(20217)
INSPECTION REPORT
Inspection No.: 143
Date of Inspection: October 19,2004
By: Matthew E Smith
INTRODUCTION
The purpose of these inspections is to observe and review the project work relative to compliance
with the Orders of Conditions issued by the North Andover Conservation Commission and the
Special Permit issued by the North Andover Planning Board with respect to sediment and erosion
controls, limit of work compliance, and stormwater management issues. For reference,the
Orders of Conditions issued for the project include: ndment
• DEP File No.242-1045: Issued on: I01 d with Arne
5/14/01 Modification/ Approval Extended ��004
Planning Board Notice of
Please contact Fred King or Matt Smith at Schofield Brothers of New England,Inc. if you have
any questions regarding the information contained in this report.
During this inspection,it was raining which allowed me to see how the site erosion controls were
functioning. Overall, the site has shown very little erosion and appears to be relatively stable.The
maintenance items from the previous report remain to be addressed.There were no construction
activities observed during this inspection. Site construction work is concentrated on the athletic
fields.The contractor has continued to spread topsoil material on the northern athletic fields'
track and anticipates that this work will be completed by the end of the week. Spreading of loam
and grading continues eof the southern athletiicsfield area has been hydro seeded.The
baseball field.The majority
drainage outfalls to Cochichewick Brook were clear.
°°SC®FIELD BROTHERS
Schofield Brothers of New England,Inc.
INSPECTION SUMMARY
1. Sediment control barriers around the perimeter of the current work area:
• 10/05/04—There is a gap in the perimeter silt fence by stream outfall by the construction
entrance for the southern athletic fields.This does not appear to be discharging any sediment
off site due to the current topography of the construction entrance.
10/12/04—Same as previous report.
10/19/04—Same as previous report.
2. Loam stock ile area in the northern portion of the site:
• 10/05/04—The loam pile is being removed and there are no sedimentation or erosion issues
with the loam pile at this time.
• 10/12/04—Same as previous report.Much of the loam stockpile has been removed.
• 10/19/04—Same as previous report.
3. Main entrance gate near trailers:
has been swept but maintenance must continue
10/05/04—The entrance to the school
and the stone entrance needs maintenance.
10/12/04—Same as previous report.
10/19/04—Same as previous report.
4. Catch h Basins:
9/07/04—Maintenance Catch Basins#1-3 and#45 is required.
• 09/07/04 report.Some haybales have been installed around Catch
04—Same as previou
Basin#45 but the fabric protection is in need of repair.
10/19/04—Same as previous report.
5. Other erosion control items.
• 10/05/04—Nothing to report.
10/12/04—Nothing to report.
10/19/04—Nothing to report.
6. Other drainage structures:
10/05/04—The stone interceptor sub drain(gravel drain) at the base of the northern
® athletics fields will need to be cleaned out and repaired.
• 10/12/04—Same as previous report.
• 10/19/04—Same as previous report.
7. Wetland replication areas:
• was observed in the west side this was brought to
04/20/04—Some newer construction trash
the attention of the contractor. The contractor stated that deer ate some of the wetland
plantings that need replacing and alternative plantings should be considered.
10/05/04—Trash is not yet picked up along the area cited above.This should be attended
to.
• 10/12/04—Same as previous report.
• 10/19/04—Same as previous report. Contractor stated that they were working with the
owners to address this issue.
20217
DiNisco Design Partnership
INSPECTION REPORT NO. 143 (Inspection date 10/19/04). page 2
October 20, 2004
°°SCHOFIELD BROTHERS
Schofield Brothers of New England,Inc.
8. Impermeable barrier and easterly embankment:
• 06/01/04—No seepage observed. Area appears stable at this time.(Record Item)
9. Dewatering:
• 10/05/04—No dewatering was observed.
10/12/04—No dewatering was observed.
• 10/19/04—No dewatering was observed.
10. Truck Washing Area:
• 10/05/04—No truck washing was observed.
10/12/04—No truck washing was observed.
• 10/19/04—No truck washing was observed.
11. Dust_ Control:
10/05/04—Dust was not an issue during this inspection.
• 10/12/04—Dust was not an issue during this inspection.
• 10/19/04—Dust was not an issue during this inspection.
12. Wetland Delineation:
• 10/05/04—Nothing to report at this time.
• 10/12/04—Nothing to report at this time.
10/19/04—Nothing to report at this time.
13. Inspection Items by Others:
• 04/27/04—(Postscript) A meeting was held on Thursday evie/w the preliminary Snow D lisposal
(NASD),John Cyr(DPW) and Fred King(SBNE)
Plan. Suggestions were made for additions and modifications to the Plan. SBNE will
incorporate the recommendations into the plan for further review. the 25-foot
A plan was also reviewed that the locations for permanent markers alon
that 96 markers would be nece sa y to comply
no disturbance buffer zone. The pia
with the Condition 51 of the Order done Conditions.
of the l st iitemes of site work.aThis will need to
suggested that this would be best
be discussed with the Conservation
be ffors"No addition,it
o comply within
some areas that these same posts b u
Condition 52 of the OOC.
allation of 35 Bird Boxes and the"non-invasive trail system"per
Also discussed were the inst
Conditions 35 and 37 of the OOC.
05/04/04—Postscript: Inspection by Arrow Environmental. The Items that needs to be
completed are as follows:
1 -Pre-construction requirements:
nt for the Applicant to com 1 with prior to a
• Bird Boxes: This is a re uireme
certificate of co mpliane.
c
• Snow Stockpiling Plan: A revised draft plan has been prepared for review.
(6/23/04)
■ No Disturbance Zone markers: Not completed at this time. A plan has been
prepared showing the locations for the markers. 6/23/04
20217
DiNisco Design Partnership
INSPECTION REPORT NO. 143 (Inspection date 10/19/04). page 3
October 20, 2004
B SCHOFIELD BROTHERS
Schofield Brothers of New England,Inc.
See progress from previous report above. Plan and
08/03/04—Regarding the Snow Management
received that the nmost recent n draft plans are
communication from Paul Szymanski
acceptable.These now need to be forwarded to the Conservation Commission for formal
review.
08/24/04—(Postscript 8/25/04) Snow Management Plan and Permanent Wetland Marker Plan
have been sent to the Conservation Commission for review and comment.
10/05/04—See notes above.
10/12/04—See notes above.
14 Landscape Berms at 584 and 586 Osgood Street:
10/12/04—Work is expected to begin on thus item in the near future.The first item will be the
installation of erosion controls. (Record item till work begins)
20217
DiNisco Design Partnership
INSPECTION REPORT NO. 143 (Inspection date 10/19/04). page 4
October 20, 2004
SCHOFIELD BROTIERS
Schofield Brothers of New England,Inc.
1071 worcester Road
Frunin.-ham,MA 01701-5298
508-879-0030 1-800-696-2871
Fax 508-879-1797
w ww.schofieldbros.com
20217
To: Mr. Rick Rice
DiNisco Design Partnership
87 Summer Street
Boston,MA 02110
Cc.: North Andover Conservation Commission
North Andover Planning Board
From: Matthew E Smith,Wetland Specialist
Date: October 28,2004
Re: North Andover High School(20217)
INSPECTION REPORT
Inspection No.: 144
Date of Inspection: October 26,2004
By: Matthew E Smith
INTRODUCTION
The purpose of these inspections is to observe North AndoverhConservation Commission and the compliance
with the Orders of Conditions issued by th
Special Permit issued by the North Andover Plannina
maBoa ement issues.tFor reference,the
rosion
controls,limit of work compliance, and stormw g
Orders of Conditions issued for the project include: ndment
• DEP File No.242-1045:Issued 2/21/01 ssued h Ame Ol Modification� Approval 2/17/04 4
• Planning Board Notice of Decision:
Please contact Fred King or Matt Smith at Schofield Brothers of New England, Inc. if you have
any questions regarding the information contained in this report.
During this inspection, it was overcast,1Overall,is concentrated on the athletic fields. The contpactor
to be relatively stable. Site constructs
s and
has continued to spread topsoil material hydro-seed hSpreading of am nd
anticipates that this work will be completed by the end of the week
grading continues in the southern athletic fields
area has been hydrohseedednThe site was somewhatll
field. More of the southern athletic field ar gravel drain)
dusty, and sweeping is recommended. One
to be removed and both stone interceptor sub
has had loam spread over it. This needs
drains (gravel drain) need to be cleaned out and brought to finished condition. The
drainage outfalls to Cochichewick Brook were clear.
EBSCHOFIELD BROTHERS
Schofield Brothers of New England,Inc.
INSPECTION SUMMARY
1. Sediment control barriers around theperimeter of the current work area:eter silt fence by stream outfall by the construction
10/05/04—There is a gap in the penm
entrance for the southern athletic fields.This does nt the construct on ear to be discharging any sediment
off site due to the current topography of
10/12/04—Same as previous report.
10/19/04—Same as previous report.
10/26/04—There is a gap in silt fence by the east side aged
de on the northern
in this area,this should be repaired.The si lt fence on th
athletic field was damaged during the spreading of loam.This must be repaired until
the area is stabilized.This area has also been hydro-seeded.
2. Loam stockpile area in the northern portion of the site:
10/05/04—The loam pile is being removed and there are no sedimentation or erosion issues
with the loam pile at this time.
10/12/04—Same as previous report.Much of the loam stockpile has been removed.
10/19/04—Same as previous report.
10/26/04—Same as previous report.
3 rain entrance gate near trailers:
has been swept but maintenance must continue
10/05/04—The entrance to the school
and the stone entrance needs maintenance.
10/12/04—Same as previous report.
10/19/04—Same as previous report.
eeds sweeping and the stone entrance needs
10/26/04—The entrance to the school n
maintenance.
4. Catch h Basins:
09/07/04—Maintenance Catch Basins#1-3 and#45 is required.
10/12/04—Same as previous report. Some haybales have been installed around Catch
Basin#45 but the fabric protection is in need of repair.
10/19/04—Same as previous report.
10/26/04—Catch basins#1 and#2 have been maintained. Catch Basin#3 and#45 are in
need of maintenance.
5. Other erosion control items.
10/05/04—Nothing to report.
10/12/04—Nothing to report.
10/19/04—Nothing to report.
10/26/04—Nothing to report.
E esign Partnership ION REPORT NO. 144 (Inspection date 10/26/04). page 2
8,2004
SBS Clio�IELD BROg E16
Schotiekl Brothers If
ther drains e structures: ravel drain) at the base of the northern
6. O for sub drain(g aired.
10/05/04—The stone intercep
® athletics fields will need to be cleaned out and rep
previous report. ravel
10/12/04—Same as revious report. for sub drain(g
10/19/04—Same as p
e ravel has not been cleaned d hydro-seeded.The
® 10/26/04
_New rock has been added to the western stone interceptor n stated that
drain) has been covered with loam a
but the contractoravel drain)
e for sub drain(g drain Vas not to be covered`br ng moafninished he
interc p
contractor was informed that this
'n both drains needs to be cleaned out and reinstalled o
gravel i
condition. to
7.
Wetland re lication areas: ruction trash was observed in the ai some of this was he wetland
brought
04/20/04—Some newer const
• s should be considered.
d alternative planting above-This should be attended
e
the attention of the contractors he contractor stated that
plantings that need replacing of yet icked up along the area cited
10/05/04—Trash is not y P
to. ort* were working With the
10/12/04—Same as previous rep
e as previous report.Contractor stated that they
10/19/04—Sam ears that no effort has been made to clean up
owners to address this issue. ort.It aPP
previous rep
10/26/04—Same asp issue for more then 6 months now and this needs to e
the trash.This has been an
addressed.
ent: Record Item)
g Ira ermeable barrieaae observed.0" ea appears stable at this time.
06/01/04—No seepage
9. De Q. was observed.
10/05/04—No dewatering Was observed.
10/12/04—No dew aterin g
No dewatering was observed.
10/19104— was observed.
10/26/04—No dewatering
10. TruckWashin Area:
No track washing Was observed.
10/05/04— was observed.
10/12/04—No truck washing was observed.
10/19/04—No truck`Hashing was observed.
® 10/26/04—No truck washing
• this inspection.
11. Dust'
10/05/04—Dust was not an issue during this inspection.
10/12/04—Dust was not an issue during this inspection.
10119/04—Dust was not so mewissue during hat dusty and should be swept.
• 10/19/04—The site was so
20217 :Pag:e3]
DiNisco Desigfi partnership 144(Inspection date 10/26104).
INSPECTION REPORT NO.
October 28,2004
a� KOFIELD BROTI�E RS
Gch ieeld Brothers of New Engl
12. Wetland Delineation: report at this time'
Nothing to
• 10/05/04—
10/12/04—Nothing to report at this time.
0
Nothing to report at this time'
• 10/19/04— to report at this time.
• 10/26/04—Nothing
manski
Others: 4129104 with Paul S Snow Disposal
13. Ins ection Items b A meeting was held on Thursday preliminary
will
(Postscript) and Fred King(SBNE)to review the
• 04/27/04 Jhn Cyr(DPW)
SD), for additions and modificati°eview he Plan. SB 25-foot
(NA fan for further
Plan. Suggestions were made to comply
the recommendations into the p permanent markers along the
incorporate markers would be necessary it was
o the necessary locations,
The plan showed that 96 nit will need to
fan was also reviewed that shows the locations o e s
Ap
no disturbance buffer zone. appropriate in
addition,it appears to be app l with
Due i
e best done as one of the 1 addtems of site work• m
with the Condition 51 of the Order of Conditions. comply suggested that this would ssion. „ si nage to P
same
oats be used for 4No Snow Disposal g
be discussed with the sa Conservation posb Comma asive trail system' per
some areas that these ,non-invasive
Condition 52 of the OOC. ems that needs to be
Conditions 35 a
Also discuss
were the inst
e allation of 35 Bird Boxes and the
d `
ri t: Inspection by Arrow Environmental. The It
postsco postscript: OOC.
0 05/04/04 ollorvs: 1 with rior to a
completed are as f uireinents: licant to co
m
1 _pYe-constriction This. a re uirement for the A
Bird Boxes: fan has been fiance. re ared for review•
certificate of co evised draft
m
Snow Stockpiling Plan: A r A fan has been
(6/23104) feted at this time. plan
Zone markers:Not com
No Dist"
the locations for the markers. 612310
pTepare d showing
above. anent W etland Marker Pans are
ro ress from previous report anagement Plan and Perri
Seep g the Snow M has been received that the most recent
for formal
08/03/04 c Regarding
• communication from Paul Szymanski Marker Plan
now need to be forwarded to the Conservation Co `Vetland M
acceptable.These n anent
review.
Snow Managerne Plan and Perm comment.
08/24104—(Postscript 8/25/04) ssion for review and co
i
• have been sent to the Conservation Comma
10/05/04—See notes above.
• 10/12/04—See notes above.
• 10/19104—See notes above.
10/26/04—See notes above.
ood Street: The first item will be the
14. Landsca e Berms at 584 and 586 Os ins)
in on this item in the near uture.
Work is expected to beg till work beg
10/12/04— Record item
installation of erosion controls.
20217 page 4
DiNisco Design Partnership 144(Inspection date 10/26104).
INSPECTION REPORT NO,