HomeMy WebLinkAboutConsultant Review - 200 CHICKERING ROAD 8/6/1997 ® MMW d
MHF Design Consultants, Inc. 12-B Manor Parkway•Salem, NH 03079 •TEL(603)893-0720• FAX(603) 893-0733
August 6, 1997
Mr. a7,"
John Chessia, P.E.
Coler& Colontonio, Inc.
101 Accord Parr.Drive
Norwell, Massachusetts 02061-1685
Re: Rennie's Florists
North Andover Retail
MHF #45996
Dear Mr. Chessia:
Please find revised plans and drainage calculations for the above referenced project
located off Route 125 in North Andover. These plans have been revised to reflect the
comments outlined in your correspondence dated June 26, 1998 and July 21, 1998
regarding this project. Based on those comments, we offer the following:
June 26, 1998 Correspondence
1. The plan has been stamped by a Landscape Architect.
2. The proposed parcel is to be subdivided into two parcels (Parcels A&B as shown on
Sheet 4). Parcel a is for development of the retail center and Parcel B is proposed to
be deeded to the Trustees of Reservation.
3. Building square footage is listed in the zoning table.
4. See comments below for drainage responses.
5. The overall building height is listed on the plan and zoning table.
6. Building elevations are being supplied to the Town under separate cover by the
architect.
7. A amended Notice of Intent will be filed with the Conservation Commission.
ENGINEERS 0 PLANNERS 0 SURVEYORS
MHF Design Consultants, Inc.
8. There are no existing trees with diameters of 12" on the parcel.
9. Comment acknowledged.
10. A sewer line profile has been included in the revised plans.
.Tiny 211, 1998 Gamspondence
1. Subarea plans show flow paths.
2. Additional test pit information was gathered on the site in the proximity to the
detention basin and the infiltrator systems. Seasonal high groundwater elevations
were determined and the detention basin design was revised accordingly. The
detention basin design was revised and the design storm calculations revised based on
the new elevations. The seasonal Egli water elevation was calculated to be 190.83
and the detention basin design was revised accordingly.
3. Drainage manholes have been included to eliminate the catch basin to catch basin
connections.
4. The 6 inch orifice elevation has been raised above the outlet pipe elevation.
5. The retaining wall and pavement area have been revised.
Please review the attached information and should you have any questions, please feel free
to contact me at your convenience.
Sincerely yours,
MET D SIGN CO S TANTS, INC.
Mark S. Gross, P.E.
Principal
cc: Ms Kathleen Colwell,North Andover Planning Department
Mr. Joseph Scott, Scott Companies
Atty. Peter Shaheen
l�
,town of forth Andover �aORTFr
OFFICE OF 3r o•`• •° °•a�°
COMMUNITY DEVELOPMENT AND SERVICES a _ p
30 School Street
North Andover,Massachusetts 01845
WILLIAM J.SCOTT 9SSAcHUSe�
Director
June 25, 1998
Mr.Paul Hajec
375 Common Street
Lawrence,MA 01840
Re: 200 Chickering Road(Rennes)-site plan review
Dear Mr.Hajec,
As you may remember you reviewed a prior proposal for the Board located at this site. The plan has been revised to
include the adjacent land that was recently rezoned from residential to commercial at the May town meeting. This
allows the building to be oriented towards RT. 125 and allows the driveway to be placed as far as possible from
Farwood Ave.
As part of their application,the applicant has submitted a letter from Dermott J.Kelly,P.E. stating that the current
proposal would generate less traffic than the previous project. Please review this letter and the attached trip
generation summary for accuracy. The plans will be sent to you separately by the applicant.
The Planning Board will be holding the first public hearing on this project on July 21, 1998. Therefore,I will need
comments in writing from you by July 16, 1998 so that they may be placed into the Planning Board packets.
If you have any questions or need additional information please do not hesitate to contact me at 688-9535.
Very truly yours,
Kat�Bra lwell
Town Planner
CONSERVATION-(978)688 9530 - HEALTH-(978)688-9540 - PLANNING-(978)688-9535
*BUILDING OFFICE-(978)688-9545 - *ZONING BOARD OF APPEALS-(978)688-9541 - *146 MAIN STREET
i p
IT
COLANTONIOZ
ENGINEtRS AND SCiENTI515 -------.,.,: .
Pq June 26, 1998 Ld9U Tel 61 � t
Ms. Kathleen Colwell
Planning Board
Town Hall Annex
30 School Street
North Andover, MA
RE: Engineering Review
Old Town Village
Preliminary Site Review
Dear Ms. Colwell:
In response to your request, Coler&Colantonio,Inc.has reviewed the Site plm-is for the
above referenced site. This review is for submission completeness only. A complete
review of the design will follow. The submittal package included the following;
information:
Plans Entitled:
• "Chickering Road—Route 125,North Andover"fifteen sheets dated June
a 19, 1998,Prepared by M14F Design Consultants,Inc. Received June 23,
1998.
Reports Entitled
• "Stormwater Management Report for Old Town Village Retail Project",
dated June 22, 1998. Prepared by MHF Design Consultants,Inc.
p Received'June 23 1998.
Information Required:
1. Section 8.3)5.)c.)—A Landscape Architect stamp may be required on the landscape
plans.
2. Section 8.3)5.) c.)ii.) SURVEY OF LOT/PARCEL—A proposed lot line has been
indicated. It is unclear the status of the lots.
3. Section 8.3)5.) e.)A.) ZONING INFORMATION—Building square footage
should be listed in the zoning table.
A 4. Section 8.3)5.)e.)vii.) STORMWATER DRAINAGE—A Stormwater Drainage
review will follow.
101 Accord Park privo 781 982-5400
rill, Norwoil, MA 02061 1685 Fax: 781-982-5,190
r
yi
a
5. Section 8.3)5.) e.)vii.)BUILDING LOCATION—The overall height of the
� r E�, ��, � d'�
buildings are not indicated on the plans. �tN" i j' i `
C. Section.8.3)5.) e.) ix.)BUILDING ELEVATION—It is unclear if an elevation of �
the exterior of the building was submitted to the Planning Board.
7. Section 8.3) 5.)e.) xi.) LOCATION OF WETLANDS/NOTICE OF INTENT—it
is unclear if a Notice of Intent has been filed with the Conservation Commission.
S. Section 8.3)5.) e.) w.)LANDSCAPING PLAN—Trees over 12 inches in diameter
should be indicated on the plans.
4 9. Section 8.3) .) e.)xxii.) xxiii.)Ax.)—1t is our understanding that Town Staff
typically reviews these sections.
10. Section 8.3.) 5.) e.)xxi.) UTILITIES—Sewer line profiles should be submitted.
We appreciate the opportunity to assist the Planning Board on this project and hope that
this information is sufficient for your needs. We would be pleased to meet with the
Board or the design engineer to discuss this project at your convenience. If you have any
questions please do not hesitate to contact us.
{
Very truly yours,
COLER&COLANTONIO, INC.
o1w.C. Chessia, RE..
cc: MHF Design Consultants, Inc.
Jim Rand, DPW
mce/J CC
a
K
s
07/21/96 16:33 N0.090 ®05
u
COLANTONIOZ
GNGiNkkrlt3 ANM RCtENTISTO
July 21, 1998
xl
Ms. Kathleen Colwell
Planning Board
Town Hall Annex
30 School Street
North Andover, MA
RE: Engineering Review
T Old Town Village—200 Chickening Road
Preliminary Site Review
Dear Ms. Colwell.
In response to your request, Coler&Colantonio,Inc.has reviewed the Site plans for the
above referenced site. The project has been reviewed for conformance with the
r:=
requirements of the"North Andover Zoning Bylaws". The submittal package included
the following information:
Plans Entitled:
® "Chickening Road--Route 125,North Andover"fifteen sheets dated June
19, 1998,Prepared by MHF Design Consultants,Inc. Received June 23,
1998.
Y' Reports Entitled
"Stormwater Management Report for Old Town Village Retail Project",
' dated June 22, 1998. Prepared by MHF Design Consultants, Inc.
Received June 23 1998.
W.I, The proposed project is located on the southwest corner of the intersection of Route 125
and Farrwood Avenue. The site is relatively level with a slight slope from Route 125 to
SF the northern property line at Farrwood Avenue, Wetlands are present on the adjoining
parcel south and west of the lot,
k
Refer to our letter of.Iuly 2, 1998 for Preliminary Review issues.
k 1 Drainage Issues
1. The subarea plans should indicate flow paths.
2. No test pit data was provided for at location of the Detention Basin or infiltration
:y
systems. The seasonal groundwater depth should be identified at these locations.
G
�r
101 Accord Park Drive 731 082 5400
`;I Norwell, MA 02061-1686 Fax: 781-982-5490
07/21/98 16:34 NO.090 U06
M
Test pit 2, approximately 60' from the detention basin, was :found to have
l groundwater less than two feet below the surface, The bottom of the detention basin
is at elevation 188, which is a cut of four and a half feet, If groundwater elevations
are consistent, storage should not be accounted for below the seasonal water table.
3- We do not recomfnend that catch basins be linked because it reduces the e ffectiveness
of the szunP.
4. The 6-inch orifice in Detention Basin 1 may not act as a free discharge due to the 18.
inch outlet having the same invert elevation,especially under Iarger storm events.
Other Issues
5. The retaining wall on the south side of the property appears to overlap the pavement
tines.
We appreciate; the opportunity to assist the Planning Board on this project and hope that
this information is sufficient for your needs. We would be pleased to meet with the
Board or the design engineer to discuss this project at your convenience. If you have any
questions please do not hesitate to contact us.
i
Very truly yours,
COLER& COLANTO.NIO, INC.
J C. Chcssia,P.L.
cc: MHP Design Consultants, Inc.
Jun Rend,DPW
mee/JCC
i
k
a
y
U
COLANTONIOZ
ENGINE€t�G AND SGlENTISTS
August 24, 1998
Ms. Kathleen Colwell
Planning Board
Town Hall Annex
30 School Street
North Andover,MA
RE: Supplemental Engineering Review
Old Town Village—200 Chickering Road
Site Review
Dear Ms. Colwell:
In response to your request, Coler&Colantonio,Inc.has reviewed the revised site plans
and calculations for the above referenced site. The project has been reviewed for
conformance with the requirements of the"North Andover Zoning Bylaws". The
submittal package included the following information:
Plans Entitled:
® "Chickering Road—Route 125,North Andover"fifteen sheets dated June 19,
1998,Revised August 6, 1998. Prepared by MHF Design Consultants,Inc.
Received August 10, 1998.
Reports Entitled
"Stormwater Management Report for Old Town Village Retail Project",
dated June 22, 1998, Revised August 4, 1998. Prepared by MHF Design
Consultants,Inc. Received August 10, 1998.
Our comments are as follows:
Site Plan Review June 26, 1998:
1: Section 8.3)5.)c.)—A Landscape Architect staump-nay be required on the landscape
plans.Landscape plans have been stamped by a Landscape Architect_
2. Section 8.3)5.)e.)ii.) SURVEY OF LOT/PARCEL—A proposed lot line has been
indicated. It is unclear the status of the lots.A formal plan will be required to divide
lots.
101 Accord Park Drive 781 982-5400
Norwell, MA 02061-1685 Fax:781-982-5490
3, Section 8.3) 5.) e.)vi)ZONING INFORMATION—Building square footage should
be listed in the zoning table.Building square footage has been listed in the zoning
table.
4. Section 8.3)5.)e.)vii.)STORMWATER DRAINAGE—A Stormwater Drainage
review will follow.Please refer to comments below relative to July 21, 1998
correspondence.
5. Section 8.3) 5.)c.) vii.)BUILDING LOCATION—The overall height of the
buildings are not indicated on the plans. The overall height of the buildings has been
included on the plans.
6 Section 8.3) 5.)c.)ix.)BUILDING ELEVATION—It is unclear if an elevation of the
exterior of the building was submitted to the Planning Board. Reportedly, elevations
are being supplied to the Town under separate cover by the architect
7. Section 8.3) 5.)e.)xi.)LOCATION OF WETLANDS/NOTICE OF INTENT—It is
unclear if a Notice of Intent has been filed with the Conservation Commission. We
understand that a Notice of Intent will be filed with Conservation Commission,
8. Section 8-3) 5.)e.)xv.)LANDSCAPING PLAN—Trees over 12 inches in diameter
should be indicated on the plans.Reportedly, there are no trees over 12-inches in
diameter.
9. Section 8.3) 5.)e.)xxii.)xxiii.)xix.)—It is our understanding that Town Staff
typically reviews these sections. No further comment.
10. Section 8.3.)5.)e.)xxi.) UTILITIES—Sewer line profiles should be submitted.
Sewer line profiles have been included.
Additional comments July 21, 1998:
1. The subarea plans should indicate flow paths. Flow paths have been included on
subarea plans.
2. No test pit data was provided for at location of the Detention Basin or infiltration
systems. The seasonal groundwater depth should be identified at these locations.
Test pit 2, approximately 60' from the detention basin, was found to have
groundwater less than two feet below the surface. The bottom of the detention basin
is at elevation 188, which is a cut of four and a half feet. If groundwater elevations
are consistent, storage should not be accounted for below the seasonal water table.
Test pit data has been provided at the location of the proposed detention basin. The
proposed finished grade of the basin is 190.00 feet. The seasonal high water elevation
is indicated as 190.83 feet, which is also the outlet invert elevation. The proposed
water In�g e sWitets,in. No asin desin will reupproximatey e . stanitqtet pit data wapovided at the location of the proposed drainage-re�
though ground water information was used in design of system.
3. We do not recommend that catch basins be linked because it reduces the effectiveness
of the sump. ,Satisfactorily addressed.
4. The 6-inch orifice in Detention Basin 1 may not act as a free discharge due to the 18-
inch outlet having the same invert elevation, especially under larger storm events.
Reportedly, the proposed detention basin outlet structure has been designed to
provide free discharge from the orifices during the 100 year and lesser storm events.
S. The retaining wall on the south side of the property appears to overlap the pavement
lines. Comment has been addressed.
We appreciate the opportunity to assist the Planning Board on this project and hope that
this information is sufficient for your needs. We would be pleased to meet with the Board
or the design engineer to discuss this project at your convenience. If you have any
questions please do not hesitate to contact us.
Very truly yours,
COLER&COLANTONIO, INC.
J hn C. Chessia, P.E.
cc: MHF Design Consultants, Inc.
Jim Rand,DPW
jpl/JCC
MWW A MMM
MHF Design Consultants, Inc. 12-B Manor Parkway•Salem, NH 03079 -TEL(603)893-0720- FAX(603)893-0733
November 5, 1998
Mr. John Chessia
Coler and Colantonio
101 Accord Park Drive
Norwell, Massachusetts 02061
Re: Proposed Retail Center 200 Chickering Road
Final Review Submission
MHF #45996
Dear Mr. Chessia:
Please find enclosed a final revised set of final plans for the above referenced project
which was approved by the North Andover Planning Board in September 1998 with
conditions. The attached plans have been revised based on those conditions of approval
and include the following:
1. Additional test pits were performed in the area of the two roof infiltrator systems
proposed for the project. This information has been included on the detail sheets as
well as on the Grading, Drainage &Erosion Control Plans.
These plans are being submitted to you as per the condition of approval listed in the
decision. We are anticipating that the plans will be endorsed by the Planning Board on
November 17, 1998 and would request a final letter to the Planning Board prior to that
date. Please review the attached information and should you have any questions, please
feel free to contact me at your convenience.
Sincerely yo rs,
EG ANTS, INC.
ar ss, PE.
Principal
cc: Ms. Kathleen Colwell, North Andover Planning Department
Mr. Michael Howard, Conservation Administrator
Mr. Joseph Scott, Scott Companies
Attorney Peter Shaheen
ENGINEERS PLANNERS o SURVEYORS
�-� 2CXD lc1
® a
AHF Design Consultants, Inc. 12-B Manor Parkway• Salem, NH 03079 •TEL(603)893-0720• FAX(603)893-0733
November 5, 1998
Mr. James Rand, Jr. Director of Engineering — --- _–
North Andover Public Works Department �` �° i `' !�
-_---- -_-
384 Osgood Street
North Andover,Massachusetts 01845 r: NOU I '-0
Re: Proposed Retail Center 200 Chickng Road -
MHF 4 45996
Dear Mr. Rand:
Please find enclosed a final revised set of final plans for the above referenced project
which was approved by the North Andover Planning Board in September 1998 with
conditions. The attached plans have been revised based on those conditions of approval
and include the following;
1. Additional test pits were conducted in the area of the proposed underground roof
infiltrator systems to determine the estimated seasonal groundwater table. This
information has been provided on the detail sheets as well as the Grading,Drainage&
Erosion Control Plans.
These plans are being submitted to you as per the condition of approval listed in the
decision. We are looking to have the plans endorsed by the Planning Board on November
17, 1998 and would request a final letter to the Planning Board prior to that date. Please
review the attached information and should'you have any questions, please feel free to
contact me at your convenience.
Sincere y urs,
G ANTS, INC.
r s,
Principal
cc: Ms. Kathleen Colwell,North Andover Planning Department
Mr. Michael Howard, Conservation Administrator
Mr. Joseph Scott, Scott Companies
Attorney Peter Shaheen
ENGINEERS PLANNERS • SURVEYORS
systems. The seasonal groundwater depth should be identified at these locations. Test pit
2, approximately 60' fiom. the detention basin, was found to have groundwater less than
two feet below the surface. The bottom of the detention basin is at elevation 188, which
is a cut of four and a half feet. If groundwater elevations are consistent, storage should
not be accounted for below the seasonal water table.
Test pit data has been provided at the location of the proposed detention basin.The
proposed finished grade of the basin is 190.00 feet, The seasonal high water elevation is
indicated as 190.83 feet,which is also the outlet invert elevation.The proposed basin
design will result in approximately 9-inches of standing water in the basin, No test pit
data was provided at the location of the proposed drainage recharge systems,though
ground water Wormation was used in design of system. Test pats in the vicinity of the
Proposed roof infiltrator system were provided and indicate a two foot groundwater
separation.
We appreciate the opportunity to assist the Planning Board on this project and hope that
this information is sufficient for your needs. We would be pleased to meet with the
Board or the design engineer to discuss this project at your convenience. If you have any
questions please do not hesitate to contact us.
Very truly yours,
COLEk&COLANTONIO,INC.
ohn C. Chessia, P.E.
xc: MHF Design Consultants, Inc.
Jim Rand,DPW
Xnee/JCC
021 2 /1992 0 .29 6889573 N.A. DPW i (1G
�-: X31
air' m Z),
lEurf 9W R " �( � . c,
WTI "
Noah Andover,MA 0113 �
Khl ..n Cowen, Town plan r
Ftwo Jim Rand, Jr., Dir,Of EnQqlneerint
. J.William Hmurniak,01
IWovarnl ;r 1 , 1998
This Department has mviewsd the folloWng plans and find them sMisfactory.
1. Country Club Estater .Subdiviskm Plan
. Retail Cantor 200 Chickedna Road M Site Plan
If you havO any questions.Plem Call,
CAWORDW1EIVOCOLW E1 l01
Pugs 7
COLANTONIOZ
0
ENGINEERS ANO sar=NTiGYS
November 17, 1998
Ms.Kathleen Colwell
Town Hall Annex
30 School Street
North Andover,MA 01845
RE: Decision vs. Plans Review
200 Chickering Road
Planning Board Conditional Approval
Dear Ms. Colwell:
In response to your request, Coler& Colantonio, Inc. has reviewed the revised Definitive
Subdivision Plans the above referenced site. This correspondence follows the format of
the Country Club Estates Definitive Subdivision Conditional Approval. The revised
submittal package included the following information:
Dear Ms. Colwell:
In response to your request,Coler& Colantonio,Inc. has reviewed the revised site plans
and calculations for the above referenced site. The project has been reviewed for
conformance with the requirements of the"Site Plan—Site Review Conditions" set forth
by the North Andover Planning Board on September 3, 1998. The submittal package
included the following information:
Plans Entitled:
"Chickening Road—Route 125,North Andover"fifteen sheets dated June 19,
1998,Revised November 4, 1998. Prepared by MHF Design Consultants, Inc.
Received November 6, 1998.
Reports Entitled
® "Stormwater Management Report for Old Town Tillage Retail Projeef ,,
dated June 22, 1998, Revised August 4, 1998.Prepared by MBF Design
Consultants,Inc.Received,August 10, 1998.
Our current comments are is italics:
Flanni g Board Conditional Annroval:
Prior to start of construction
2.)b.)No test pit data was provided for at location of the Detention Basin or infiltration
101 Accord Park Drive 781-982-5400