Loading...
HomeMy WebLinkAboutConsultant Review - 200 CHICKERING ROAD 8/6/1997 ® MMW d MHF Design Consultants, Inc. 12-B Manor Parkway•Salem, NH 03079 •TEL(603)893-0720• FAX(603) 893-0733 August 6, 1997 Mr. a7," John Chessia, P.E. Coler& Colontonio, Inc. 101 Accord Parr.Drive Norwell, Massachusetts 02061-1685 Re: Rennie's Florists North Andover Retail MHF #45996 Dear Mr. Chessia: Please find revised plans and drainage calculations for the above referenced project located off Route 125 in North Andover. These plans have been revised to reflect the comments outlined in your correspondence dated June 26, 1998 and July 21, 1998 regarding this project. Based on those comments, we offer the following: June 26, 1998 Correspondence 1. The plan has been stamped by a Landscape Architect. 2. The proposed parcel is to be subdivided into two parcels (Parcels A&B as shown on Sheet 4). Parcel a is for development of the retail center and Parcel B is proposed to be deeded to the Trustees of Reservation. 3. Building square footage is listed in the zoning table. 4. See comments below for drainage responses. 5. The overall building height is listed on the plan and zoning table. 6. Building elevations are being supplied to the Town under separate cover by the architect. 7. A amended Notice of Intent will be filed with the Conservation Commission. ENGINEERS 0 PLANNERS 0 SURVEYORS MHF Design Consultants, Inc. 8. There are no existing trees with diameters of 12" on the parcel. 9. Comment acknowledged. 10. A sewer line profile has been included in the revised plans. .Tiny 211, 1998 Gamspondence 1. Subarea plans show flow paths. 2. Additional test pit information was gathered on the site in the proximity to the detention basin and the infiltrator systems. Seasonal high groundwater elevations were determined and the detention basin design was revised accordingly. The detention basin design was revised and the design storm calculations revised based on the new elevations. The seasonal Egli water elevation was calculated to be 190.83 and the detention basin design was revised accordingly. 3. Drainage manholes have been included to eliminate the catch basin to catch basin connections. 4. The 6 inch orifice elevation has been raised above the outlet pipe elevation. 5. The retaining wall and pavement area have been revised. Please review the attached information and should you have any questions, please feel free to contact me at your convenience. Sincerely yours, MET D SIGN CO S TANTS, INC. Mark S. Gross, P.E. Principal cc: Ms Kathleen Colwell,North Andover Planning Department Mr. Joseph Scott, Scott Companies Atty. Peter Shaheen l� ,town of forth Andover �aORTFr OFFICE OF 3r o•`• •° °•a�° COMMUNITY DEVELOPMENT AND SERVICES a _ p 30 School Street North Andover,Massachusetts 01845 WILLIAM J.SCOTT 9SSAcHUSe� Director June 25, 1998 Mr.Paul Hajec 375 Common Street Lawrence,MA 01840 Re: 200 Chickering Road(Rennes)-site plan review Dear Mr.Hajec, As you may remember you reviewed a prior proposal for the Board located at this site. The plan has been revised to include the adjacent land that was recently rezoned from residential to commercial at the May town meeting. This allows the building to be oriented towards RT. 125 and allows the driveway to be placed as far as possible from Farwood Ave. As part of their application,the applicant has submitted a letter from Dermott J.Kelly,P.E. stating that the current proposal would generate less traffic than the previous project. Please review this letter and the attached trip generation summary for accuracy. The plans will be sent to you separately by the applicant. The Planning Board will be holding the first public hearing on this project on July 21, 1998. Therefore,I will need comments in writing from you by July 16, 1998 so that they may be placed into the Planning Board packets. If you have any questions or need additional information please do not hesitate to contact me at 688-9535. Very truly yours, Kat�Bra lwell Town Planner CONSERVATION-(978)688 9530 - HEALTH-(978)688-9540 - PLANNING-(978)688-9535 *BUILDING OFFICE-(978)688-9545 - *ZONING BOARD OF APPEALS-(978)688-9541 - *146 MAIN STREET i p IT COLANTONIOZ ENGINEtRS AND SCiENTI515 -------.,.,: . Pq June 26, 1998 Ld9U Tel 61 � t Ms. Kathleen Colwell Planning Board Town Hall Annex 30 School Street North Andover, MA RE: Engineering Review Old Town Village Preliminary Site Review Dear Ms. Colwell: In response to your request, Coler&Colantonio,Inc.has reviewed the Site plm-is for the above referenced site. This review is for submission completeness only. A complete review of the design will follow. The submittal package included the following; information: Plans Entitled: • "Chickering Road—Route 125,North Andover"fifteen sheets dated June a 19, 1998,Prepared by M14F Design Consultants,Inc. Received June 23, 1998. Reports Entitled • "Stormwater Management Report for Old Town Village Retail Project", dated June 22, 1998. Prepared by MHF Design Consultants,Inc. p Received'June 23 1998. Information Required: 1. Section 8.3)5.)c.)—A Landscape Architect stamp may be required on the landscape plans. 2. Section 8.3)5.) c.)ii.) SURVEY OF LOT/PARCEL—A proposed lot line has been indicated. It is unclear the status of the lots. 3. Section 8.3)5.) e.)A.) ZONING INFORMATION—Building square footage should be listed in the zoning table. A 4. Section 8.3)5.)e.)vii.) STORMWATER DRAINAGE—A Stormwater Drainage review will follow. 101 Accord Park privo 781 982-5400 rill, Norwoil, MA 02061 1685 Fax: 781-982-5,190 r yi a 5. Section 8.3)5.) e.)vii.)BUILDING LOCATION—The overall height of the � r E�, ��, � d'� buildings are not indicated on the plans. �tN" i j' i ` C. Section.8.3)5.) e.) ix.)BUILDING ELEVATION—It is unclear if an elevation of � the exterior of the building was submitted to the Planning Board. 7. Section 8.3) 5.)e.) xi.) LOCATION OF WETLANDS/NOTICE OF INTENT—it is unclear if a Notice of Intent has been filed with the Conservation Commission. S. Section 8.3)5.) e.) w.)LANDSCAPING PLAN—Trees over 12 inches in diameter should be indicated on the plans. 4 9. Section 8.3) .) e.)xxii.) xxiii.)Ax.)—1t is our understanding that Town Staff typically reviews these sections. 10. Section 8.3.) 5.) e.)xxi.) UTILITIES—Sewer line profiles should be submitted. We appreciate the opportunity to assist the Planning Board on this project and hope that this information is sufficient for your needs. We would be pleased to meet with the Board or the design engineer to discuss this project at your convenience. If you have any questions please do not hesitate to contact us. { Very truly yours, COLER&COLANTONIO, INC. o1w.C. Chessia, RE.. cc: MHF Design Consultants, Inc. Jim Rand, DPW mce/J CC a K s 07/21/96 16:33 N0.090 ®05 u COLANTONIOZ GNGiNkkrlt3 ANM RCtENTISTO July 21, 1998 xl Ms. Kathleen Colwell Planning Board Town Hall Annex 30 School Street North Andover, MA RE: Engineering Review T Old Town Village—200 Chickening Road Preliminary Site Review Dear Ms. Colwell. In response to your request, Coler&Colantonio,Inc.has reviewed the Site plans for the above referenced site. The project has been reviewed for conformance with the r:= requirements of the"North Andover Zoning Bylaws". The submittal package included the following information: Plans Entitled: ® "Chickening Road--Route 125,North Andover"fifteen sheets dated June 19, 1998,Prepared by MHF Design Consultants,Inc. Received June 23, 1998. Y' Reports Entitled "Stormwater Management Report for Old Town Village Retail Project", ' dated June 22, 1998. Prepared by MHF Design Consultants, Inc. Received June 23 1998. W.I, The proposed project is located on the southwest corner of the intersection of Route 125 and Farrwood Avenue. The site is relatively level with a slight slope from Route 125 to SF the northern property line at Farrwood Avenue, Wetlands are present on the adjoining parcel south and west of the lot, k Refer to our letter of.Iuly 2, 1998 for Preliminary Review issues. k 1 Drainage Issues 1. The subarea plans should indicate flow paths. 2. No test pit data was provided for at location of the Detention Basin or infiltration :y systems. The seasonal groundwater depth should be identified at these locations. G �r 101 Accord Park Drive 731 082 5400 `;I Norwell, MA 02061-1686 Fax: 781-982-5490 07/21/98 16:34 NO.090 U06 M Test pit 2, approximately 60' from the detention basin, was :found to have l groundwater less than two feet below the surface, The bottom of the detention basin is at elevation 188, which is a cut of four and a half feet, If groundwater elevations are consistent, storage should not be accounted for below the seasonal water table. 3- We do not recomfnend that catch basins be linked because it reduces the e ffectiveness of the szunP. 4. The 6-inch orifice in Detention Basin 1 may not act as a free discharge due to the 18. inch outlet having the same invert elevation,especially under Iarger storm events. Other Issues 5. The retaining wall on the south side of the property appears to overlap the pavement tines. We appreciate; the opportunity to assist the Planning Board on this project and hope that this information is sufficient for your needs. We would be pleased to meet with the Board or the design engineer to discuss this project at your convenience. If you have any questions please do not hesitate to contact us. i Very truly yours, COLER& COLANTO.NIO, INC. J C. Chcssia,P.L. cc: MHP Design Consultants, Inc. Jun Rend,DPW mee/JCC i k a y U COLANTONIOZ ENGINE€t�G AND SGlENTISTS August 24, 1998 Ms. Kathleen Colwell Planning Board Town Hall Annex 30 School Street North Andover,MA RE: Supplemental Engineering Review Old Town Village—200 Chickering Road Site Review Dear Ms. Colwell: In response to your request, Coler&Colantonio,Inc.has reviewed the revised site plans and calculations for the above referenced site. The project has been reviewed for conformance with the requirements of the"North Andover Zoning Bylaws". The submittal package included the following information: Plans Entitled: ® "Chickering Road—Route 125,North Andover"fifteen sheets dated June 19, 1998,Revised August 6, 1998. Prepared by MHF Design Consultants,Inc. Received August 10, 1998. Reports Entitled "Stormwater Management Report for Old Town Village Retail Project", dated June 22, 1998, Revised August 4, 1998. Prepared by MHF Design Consultants,Inc. Received August 10, 1998. Our comments are as follows: Site Plan Review June 26, 1998: 1: Section 8.3)5.)c.)—A Landscape Architect staump-nay be required on the landscape plans.Landscape plans have been stamped by a Landscape Architect_ 2. Section 8.3)5.)e.)ii.) SURVEY OF LOT/PARCEL—A proposed lot line has been indicated. It is unclear the status of the lots.A formal plan will be required to divide lots. 101 Accord Park Drive 781 982-5400 Norwell, MA 02061-1685 Fax:781-982-5490 3, Section 8.3) 5.) e.)vi)ZONING INFORMATION—Building square footage should be listed in the zoning table.Building square footage has been listed in the zoning table. 4. Section 8.3)5.)e.)vii.)STORMWATER DRAINAGE—A Stormwater Drainage review will follow.Please refer to comments below relative to July 21, 1998 correspondence. 5. Section 8.3) 5.)c.) vii.)BUILDING LOCATION—The overall height of the buildings are not indicated on the plans. The overall height of the buildings has been included on the plans. 6 Section 8.3) 5.)c.)ix.)BUILDING ELEVATION—It is unclear if an elevation of the exterior of the building was submitted to the Planning Board. Reportedly, elevations are being supplied to the Town under separate cover by the architect 7. Section 8.3) 5.)e.)xi.)LOCATION OF WETLANDS/NOTICE OF INTENT—It is unclear if a Notice of Intent has been filed with the Conservation Commission. We understand that a Notice of Intent will be filed with Conservation Commission, 8. Section 8-3) 5.)e.)xv.)LANDSCAPING PLAN—Trees over 12 inches in diameter should be indicated on the plans.Reportedly, there are no trees over 12-inches in diameter. 9. Section 8.3) 5.)e.)xxii.)xxiii.)xix.)—It is our understanding that Town Staff typically reviews these sections. No further comment. 10. Section 8.3.)5.)e.)xxi.) UTILITIES—Sewer line profiles should be submitted. Sewer line profiles have been included. Additional comments July 21, 1998: 1. The subarea plans should indicate flow paths. Flow paths have been included on subarea plans. 2. No test pit data was provided for at location of the Detention Basin or infiltration systems. The seasonal groundwater depth should be identified at these locations. Test pit 2, approximately 60' from the detention basin, was found to have groundwater less than two feet below the surface. The bottom of the detention basin is at elevation 188, which is a cut of four and a half feet. If groundwater elevations are consistent, storage should not be accounted for below the seasonal water table. Test pit data has been provided at the location of the proposed detention basin. The proposed finished grade of the basin is 190.00 feet. The seasonal high water elevation is indicated as 190.83 feet, which is also the outlet invert elevation. The proposed water In�g e sWitets,in. No asin desin will reupproximatey e . stanitqtet pit data wapovided at the location of the proposed drainage-re� though ground water information was used in design of system. 3. We do not recommend that catch basins be linked because it reduces the effectiveness of the sump. ,Satisfactorily addressed. 4. The 6-inch orifice in Detention Basin 1 may not act as a free discharge due to the 18- inch outlet having the same invert elevation, especially under larger storm events. Reportedly, the proposed detention basin outlet structure has been designed to provide free discharge from the orifices during the 100 year and lesser storm events. S. The retaining wall on the south side of the property appears to overlap the pavement lines. Comment has been addressed. We appreciate the opportunity to assist the Planning Board on this project and hope that this information is sufficient for your needs. We would be pleased to meet with the Board or the design engineer to discuss this project at your convenience. If you have any questions please do not hesitate to contact us. Very truly yours, COLER&COLANTONIO, INC. J hn C. Chessia, P.E. cc: MHF Design Consultants, Inc. Jim Rand,DPW jpl/JCC MWW A MMM MHF Design Consultants, Inc. 12-B Manor Parkway•Salem, NH 03079 -TEL(603)893-0720- FAX(603)893-0733 November 5, 1998 Mr. John Chessia Coler and Colantonio 101 Accord Park Drive Norwell, Massachusetts 02061 Re: Proposed Retail Center 200 Chickering Road Final Review Submission MHF #45996 Dear Mr. Chessia: Please find enclosed a final revised set of final plans for the above referenced project which was approved by the North Andover Planning Board in September 1998 with conditions. The attached plans have been revised based on those conditions of approval and include the following: 1. Additional test pits were performed in the area of the two roof infiltrator systems proposed for the project. This information has been included on the detail sheets as well as on the Grading, Drainage &Erosion Control Plans. These plans are being submitted to you as per the condition of approval listed in the decision. We are anticipating that the plans will be endorsed by the Planning Board on November 17, 1998 and would request a final letter to the Planning Board prior to that date. Please review the attached information and should you have any questions, please feel free to contact me at your convenience. Sincerely yo rs, EG ANTS, INC. ar ss, PE. Principal cc: Ms. Kathleen Colwell, North Andover Planning Department Mr. Michael Howard, Conservation Administrator Mr. Joseph Scott, Scott Companies Attorney Peter Shaheen ENGINEERS PLANNERS o SURVEYORS �-� 2CXD lc1 ® a AHF Design Consultants, Inc. 12-B Manor Parkway• Salem, NH 03079 •TEL(603)893-0720• FAX(603)893-0733 November 5, 1998 Mr. James Rand, Jr. Director of Engineering — --- _– North Andover Public Works Department �` �° i `' !� -_---- -_- 384 Osgood Street North Andover,Massachusetts 01845 r: NOU I '-0 Re: Proposed Retail Center 200 Chickng Road - MHF 4 45996 Dear Mr. Rand: Please find enclosed a final revised set of final plans for the above referenced project which was approved by the North Andover Planning Board in September 1998 with conditions. The attached plans have been revised based on those conditions of approval and include the following; 1. Additional test pits were conducted in the area of the proposed underground roof infiltrator systems to determine the estimated seasonal groundwater table. This information has been provided on the detail sheets as well as the Grading,Drainage& Erosion Control Plans. These plans are being submitted to you as per the condition of approval listed in the decision. We are looking to have the plans endorsed by the Planning Board on November 17, 1998 and would request a final letter to the Planning Board prior to that date. Please review the attached information and should'you have any questions, please feel free to contact me at your convenience. Sincere y urs, G ANTS, INC. r s, Principal cc: Ms. Kathleen Colwell,North Andover Planning Department Mr. Michael Howard, Conservation Administrator Mr. Joseph Scott, Scott Companies Attorney Peter Shaheen ENGINEERS PLANNERS • SURVEYORS systems. The seasonal groundwater depth should be identified at these locations. Test pit 2, approximately 60' fiom. the detention basin, was found to have groundwater less than two feet below the surface. The bottom of the detention basin is at elevation 188, which is a cut of four and a half feet. If groundwater elevations are consistent, storage should not be accounted for below the seasonal water table. Test pit data has been provided at the location of the proposed detention basin.The proposed finished grade of the basin is 190.00 feet, The seasonal high water elevation is indicated as 190.83 feet,which is also the outlet invert elevation.The proposed basin design will result in approximately 9-inches of standing water in the basin, No test pit data was provided at the location of the proposed drainage recharge systems,though ground water Wormation was used in design of system. Test pats in the vicinity of the Proposed roof infiltrator system were provided and indicate a two foot groundwater separation. We appreciate the opportunity to assist the Planning Board on this project and hope that this information is sufficient for your needs. We would be pleased to meet with the Board or the design engineer to discuss this project at your convenience. If you have any questions please do not hesitate to contact us. Very truly yours, COLEk&COLANTONIO,INC. ohn C. Chessia, P.E. xc: MHF Design Consultants, Inc. Jim Rand,DPW Xnee/JCC 021 2 /1992 0 .29 6889573 N.A. DPW i (1G �-: X31 air' m Z), lEurf 9W R " �( � . c, WTI " Noah Andover,MA 0113 � Khl ..n Cowen, Town plan r Ftwo Jim Rand, Jr., Dir,Of EnQqlneerint . J.William Hmurniak,01 IWovarnl ;r 1 , 1998 This Department has mviewsd the folloWng plans and find them sMisfactory. 1. Country Club Estater .Subdiviskm Plan . Retail Cantor 200 Chickedna Road M Site Plan If you havO any questions.Plem Call, CAWORDW1EIVOCOLW E1 l01 Pugs 7 COLANTONIOZ 0 ENGINEERS ANO sar=NTiGYS November 17, 1998 Ms.Kathleen Colwell Town Hall Annex 30 School Street North Andover,MA 01845 RE: Decision vs. Plans Review 200 Chickering Road Planning Board Conditional Approval Dear Ms. Colwell: In response to your request, Coler& Colantonio, Inc. has reviewed the revised Definitive Subdivision Plans the above referenced site. This correspondence follows the format of the Country Club Estates Definitive Subdivision Conditional Approval. The revised submittal package included the following information: Dear Ms. Colwell: In response to your request,Coler& Colantonio,Inc. has reviewed the revised site plans and calculations for the above referenced site. The project has been reviewed for conformance with the requirements of the"Site Plan—Site Review Conditions" set forth by the North Andover Planning Board on September 3, 1998. The submittal package included the following information: Plans Entitled: "Chickening Road—Route 125,North Andover"fifteen sheets dated June 19, 1998,Revised November 4, 1998. Prepared by MHF Design Consultants, Inc. Received November 6, 1998. Reports Entitled ® "Stormwater Management Report for Old Town Tillage Retail Projeef ,, dated June 22, 1998, Revised August 4, 1998.Prepared by MBF Design Consultants,Inc.Received,August 10, 1998. Our current comments are is italics: Flanni g Board Conditional Annroval: Prior to start of construction 2.)b.)No test pit data was provided for at location of the Detention Basin or infiltration 101 Accord Park Drive 781-982-5400 Norwell,AAA 02061-1685 Fax: 781-982-5490