HomeMy WebLinkAboutCorrespondence - 486 OSGOOD STREET 5/14/2001 architects and planners Limited RECEIVED OBSERVATION REPORT NO. 37 Project: North Andover High School tvoR1"!-E AP41X?V€:p Date: 03 December 2002 PLANN►hO DVPAt1TMr-, [` Location: Job Site Present: North Andover School Bldg. Comm. (NASBC) Harold Dushame North Andover School Department (NASD) Paul Szymanski Municipal Building Consultants (MBC) Pat Saitta North Andover Building Commissioner (NABC) Bob Nicetta John T. Callahan & Sons (JTC) Philip Briselli David Anderson AB & Palumbo Electric (ABP) Nick Palumbo (partial) Clerk of Works (COW) Richard Warner Tim Willis Schofield Brothers of New England (SBNE) Bert Corey Thompson Engineering (TE) Kevin Murphy (partial) DiNisco Design Partnership (DDP) Rick Rice Action Date A. SITE SAFETY AND SECURITY JTC 12/03/02 A19.2 Fence - Bob Nicetta noted that the fence near the end of the new retaining wall adjacent to the existing parking lot needs repair. A20. B. OWNER ISSUES DDP 05/07/02 B06.2 Revised Site Phasing Drawing - JTC provided a site plan showing the proposed water and road work, and the limited parking that will be available in the south lot when the new school opens. DDP will investigate available parking, possible temporary parking, and options for bus/parent drop off routes for review with NASD. NASD 10/15/02 1312.1.1 Keying (Post script) - Keying schedule based on DDP discussions between HCI and NASD was submitted 10/14/02. DDP to review with NASD. Kenneth DiNisco Richard N. Rice Gary E.Ainslie Christopher Huston Donna DiNisco 8 7 S u m m e r S t r e e t Boston M A 0 2 1 1 0 6 1 7 . 4 2 6 . 2 8 5 8 f a x 4 2 6 . 1 4 5 7 w w w . d i n i s c o . c o m OBSERVATION REPORT NO. 37 North Andover High School Page 2 DDP 10/18/02 B12.2.4 Access Control (Post script) - NASD advised DDP that hand recognition access control shall be used at the two main street entries. DDP to prepare proposal request. -- 10/15/02 1316. Student Tour- It was discussed that 2 to 4 student representatives of the school paper would like to tour the site. The tour will be off hours, and would be guided by the clerk. NASD, COW and JTC to coordinate. JTC 10/18/02 1316.1 Photographs - JTC asked that they be given NASD prior approval of any photos taken of the site during the student tour. 1317. C. PERMITS & INSPECTIONS DDP 12/02/02 C01.3 Health Department (Post Script) - DDP submitted application to the Health Department 12/02/02. DDP will advise as to the date/time of any meeting. 03/26/02 CO3. DPW Permits 03/26/02 C04. North Andover Fire Department Permits Hampshire 10/29/02 C04.5.1 Sprinkler Permit- Hampshire has distributed copies of the sprinkler permit received from the fire department. JTC has been informed that the fire department takes no exception to the ongoing installation in the Academic Wing while Hampshire completes the hydraulic calculations for submission. -- 11/13/02 C04.5.2 Sprinkler Permit (Post Script) - Hydraulic 12/05/02 calculations received 11/13/02 and forwarded to RWS for review. Record item. Hampshire 12/05/02 C04.5.3 Sprinkler Permit (Post Script) - RWS returned hydraulic calculations submitted for Academic Wing 12/05/02. Hampshire to submit calculations for remainder of building. DDP 04/02/02 C12. Environmental Reports - DDP will distribute the weekly and monthly reports prepared by SBNE to Bob Nicetta, NASD, JTC, MBC and the clerk at the weekly job meetings. JTC 08/20/02 C28.1 Stormceptor Substitution - The Conservation CDS Commission has approved the CDS Technologies equipment submitted by JTC. CDS is to submit exact details and shop drawings to the Conservation Commission's outside consultant for review (Postcript- after approval by Conservation Commission reviewer, shop drawing package shall be submitted to SBNE for final approval; initial submittal was marked "revise and resubmit"). OBSERVATION REPORT NO. 37 North Andover High School Page 3 SBNE 11/26/02 C28.1.8 CDS Technology Submission - CDS was unable to attend the 11/26/02 meeting. JTC forwarded to DDP correspondence from CDS with regard to follow up submissions to con com. DDP forwarded to SBNE for review and comment. DDP 08/20/02 C33. Replication Area - SBNE advised that the replacement Zoppo blueberry plans were not well planted and have not survived. SBNE also advised that other wetland plants are fairing poorly with the dry weather. DDP will review with Zoppo. -- 11/19/02 C43.1 Erosion Controls - SBNE advised that the only 12/03/02 area of concern is at the southwest corner at the sewer line work, where the berm must be reformed. The only other items needing attention are silt boots requiring cleaning. Record item. JTC 12/03/02 C43.1.1 Erosion Controls - SBNE reported that while many items have been addressed, there remain some items that require attention. It was discussed that while the frozen site conditions at present work to stop erosion, JTC should address maintenance items before the spring. C46. D. CONSTRUCTION SCHEDULE -- 10/29/02 D37.1 Technology Cabling - JTC, DDP, and 3Si discussed cabling schedule. JTC advised ceiling grid is scheduled to start in the academic wing mid-February 2003. 3Si would prefer to cable before the grids are installed and will monitor project progress the next few weeks. 12/03/02 D43. Schedule Update - JTC reviewed the look ahead schedule through 12/15/02 (copy attached) with the following noted. Record item. -- 12/03/02 D43.1 Masonry - Mason staging and wrapping the Cafeteria/Arts Wing in preparation for start of brick veneer work next week. Record item. -- 12/03/02 D43.2 Steel - Three gym trusses have been assembled and have been inspected by T&L. Auditorium deck will be completed by 12/16/02, weather permitting. Record item. -- 12/03/02 D43.3 Drywall/Studs - Second floor Academic East drywall to be completed 12/09/02. Southeast Wing studs and sheathing to be completed 12/12/02. Record item. -- 12/03/02 D43.4 Roofing - Cafeteria/Kitchen work will be completed today. Weather permitting, the auditorium roof will be completed by 12/16/02. Record item. OBSERVATION REPORT NO. 37 North Andover High School Page 4 -- 12/03/02 D43.5 Temporary Heat - Meter has been set, and plumber is piping manifold. JTC will start heating Academic Wing mid-December, after clerestory windows have been installed. Record item. D44. E. SUBMITTAL SCHEDULE DDP 10/29/02 E15.1 Casework - Submittals received by DDP 10/29/02. E16. F. SUBMITTALS R&R 07/16/02 F14.1.1 Windows - R&R advised DDP that screens will be removable from the room side using a standard EFCO clip. R&R will provide a sample. -- 09/24/02 F20.4.1 Lighting Resumittal - was received 12/04/02 by DDP, TE and Lam to review. Record item. -- 12/04/02 F20.4.2 Lighting Resubmittal (Post Script) - Colors returned by DDP 12/04/02. Record item. V&G 10/01/02 F25.1.2 Stairs 1-4 - Returned "revise and resubmit" due to structural questions 09/30/02. V&G 11/19/02 F25.1.4 Stairs 1-4 (Post Script) - Revised structural calculations returned 11/19/02 with comments. Revised shop drawings must be submitted. Revised calculations show added members that are not included on stair components newly delivered to the field. V&G 08/14/02 F29.2.1 Boiler Room Stairs - Returned "revise and resubmit" (with structural calculations) 08/14/02. R&R 09/05/02 F29.4.1 Windows - (Postscript) DDP returned window shop drawings. R&R to resubmit as noted. JTC 10/08/02 F35. Submittals Status - DDP and JTC distributed copies of respective logs showing status as of 10/08/02. No critical items noted. JTC noted the following will soon be submitted, with review to be expedited: spray on fireproofing. JTC 12/02/02 F36.2.2 Gym Floor (Post Script) - Revised submission received. DDP advised JTC on 12/02/02 that additional information is required to complete review and approval. JTC 11/12/02 F41. Casework - Shop drawing under review by DDP. JTC to forward description of casework contruction. DDP 11/26/02 F41.1 Casework - DDP to advise JTC of further information that must be forwarded for review and approval. OBSERVATION REPORT NO. 37 North Andover High School Page 5 -- 11/19/02 F43. Submittal Status - DDP and JTC distributed respective logs 12/05/02 showing status as of 11/19/02. The following priorities were noted by JTC. Record item. -- 11/19/02 F43.1 Lights - DDP to return with color selections. 12/05/02 Record item. -- 11/19/02 F43.2 Tile -Ceramic tile colors needed for Academic 12/05/02 Wing. Record item. -- 12/05/02 F43.3 Lighting color selections returned 12/04/02 and tile colors 12/05/02. Record item. TE 11/26/02 F44. Submittal Status - DDP distributed log showing status as of 11/26/02. JTC requested return of science wing gas detection system. -- 11/26/02 F45. Nail Base Insulation - JTC to submit material specifications for 12/04/02 nail base insulation for gym and auditorium. DDP returned the fastening diagram "revise and resubmit" because it did not include the plywood overlayment. Record item. -- 12/04/02 F45.1 Nail Base Insulation (Post Script) - Returned approved as noted 12/04/02. Record item. DDP 12/03/02 F46. Submittal Status - DDP and JTC distributed respective logs showing status as of 12/03/02. JTC requested return of laboratory casework. F47. G. COORDINATION DRAWINGS JTC 04/09/02 G07. Coordination Drawings - JTC reported that work on the Subs coordination drawings has begun, and the process is expected to take 10-12 weeks. JTC 09/24/02 G17. Arts Wing AHU/Steel -JTC noted coordination issues at DDP openings for Rooftop Units. (Post script- Foley and Buhl visited the site 09/25/02. Report forwarded to JTC for discussion). DDP 11/26/02 G20. Roofing Gym AHU's - JTC noted that the solution discussed for flashing the auditorium RTU ductwork will be problematic at AHU-1 and AHU-2 because the ductwork is 96 inches wide. DDP will review and advise. DDP 12/03/02 G20.1 Roofing - JTC stated AHU7 will be set over TV JTC studio the week of 12/09/02. DDP to advise if JTC should raise curb for flashing as at auditorium. JTC noted a roof drain will be under the ductwork. DDP 12/03/02 G21. Coordination Drawings - Drawings CO-2-8, CO-2-SEC, and Consult 5216-1-9 received by DDP 12/05/02. G22. OBSERVATION REPORT NO. 37 North Andover High School Page 6 H. PAYROLL REPORTS -- 11/26/02 H11.1 Payroll Reports - V&G has submitted some 12/03/02 reports to the clerk; the clerk will review and update status. Record item. -- 12/03/02 H11.2 Payroll Reports - The clerk reported that V&G reports are up to date. Record item. H12. I. REQUISITIONS -- 04/30/02 107.1.1 Cash Flow - JTC has furnished DDP with a cash 12/03/02 flow for the first eight months of the project. DDP will add project costs and forward to town. Record item. JTC 11/26/02 117. Pencil Requisition - JTC will prepare pencil requisition for review at 12/03/02 job meeting. -- 12/03/02 117.1 Pencil Requisition - JTC distributed for review and comment on 12/03/02 the pencil requisition (Post Script- DDP returned comments to JTC 12/09/02.) Record item. 118. J. CHANGE ORDERS DDP 08/13/02 J04.1 Steel Change Order Proposals - Cape and Island Steel (C&I) explained their position that they intend to be compensated for their redetailing time resulting from revisions issued by DDP (Field order No. 32, 34 and 41) even though there are no "direct" (material and labor) costs involved with these changes. DDP noted that while the detailing expense is understandable, the hours claimed seem high, and that for the overall project it is DDP's belief that reduction in steel material, fabrication and erection makes up for addition time to redraw. C&I did not agree with DDP assessment. DDP will consider the discussion and issue a formal response. C 1 12/03/02 J04.1.1 Steel Change Order Proposals - JTC will see JTC that C&I submits any outstanding Change Order DDP Proposals for structural steel. JTC requested that C&I meet with JTC and DDP on 12/17/02. DDP 11/12/02 J08.2 Mechanical PCO's -All outstanding mechanical/plumbing have been approved by DDP and work orders have been issued. DDP will include these in the next change order. JTC 11/19/02 J10. PCO Log - JTC distributed a log showing status of Proposed Change Orders as of 11/18/02. JTC will forward to MBC copies of issued PCO's not received, and will forward PCO's for several of the open items. OBSERVATION REPORT NO. 37 North Andover High School Page 7 ABP 11/19/02 J11. Electrical PCO's - It was agreed that Thompson Engineering TE and AB & Palumbo shall attend the 12/03/02 job meeting. The purpose will be for TE and AB&P to review the pencil requisition, as well as for TE and AB&P to discuss electrical change order review and approval issues with JTC, DDP and MBC. Record item. -- 12/03/02 J11.1 Electrical PCO's - JTC, MBC, DDP and TE met with ABP to discuss Electrical PCO's. The following was discussed. ABP 12/03/02 J11.1.1 Mark-ups - JTC to confirm mark-ups of hourly wages and bond costs. -- 12/03/02 J11.1.2 Language Lab PCO's (W.O. #07) - ABP to formally submitt revised cost proposal in the (approximate) amount of$23,000.00. TE 12/03/02 J11.1.3 HVAC Power PCO (W.O. #19) - TE to formally ABP respond to PCO, noting credits offered are unbalanced in comparison to chanrges for additional work. Credit for starters discussed. ABP to submit for consideration wiring of three pieces of HVAC coordination items which may be a `wash' with credit for starters. TE 12/03/02 J11.1.4 Panel CP 1-9 PCO (PCO No. 34) - TE will respond to ABP claim, TE noted while the feeds got longer as a result of the relocation of the panel, all the branch circuits got shorter. ABP 12/03/02 J11.1.5 Credits - ABP to submit credit proposals for exterior light fixture revisions (W.O. #16), telephone man hole deletion (W.O. #11), service change (F.O. #28). -- 12/03/02 J11.1.6 Future Cost Proposals - DDP and MBC stated that if ABP cost proposals for additional work continue to be unjustifiably high, DDP will issue unilateral cost work orders in order to move the work forward. Record item. DDP 11/26/02 J12. Change Order No. 05 - DDP will prepare a change order to include all approved PCO's. J13. K. WORK ORDERS ABP 09/06/02 K06. Work Order No. 16 (postscript) - WO No. 16 deleting light fixtures (credit) issued on 09/06/02. K08. OBSERVATION REPORT NO. 37 North Andover High School Page 8 L. FIELD ORDERS -- 11/26/02 L16. Field Order No. 101 - Following the meeting, DDP explained 12/03/02 F.O. No. 101 to JTC and the mason, PCM, noting that the joist seat dimensions caused DDP to lower the top of the window opening at the top of the brick one inch at cafeteria. DDP stated that it is visually preferable to cut the top course of brick one inch to maintain a consistent fascia. PCM to review with their office. Record item. -- 12/03/02 L16.1 Field Order#101 - JTC reported that PCM will be cutting down the top brick. record item. L17. M. PROPOSAL REQUESTS JTC 05/07/02 M04. Proposal Request No. 1 - DDP issued PR No.1 for revisions to site utilities resulting from site utiltiy coordination by RWS. ABP' 06/04/02 M10. Proposal Request No. 3 - DDP noted PR No. 3, for electrical power to exhaust fan EF-60 (added under PR No. 4) was issued 05/07/02. JTC 11/19/02 M15. Proposal Request No. 12 - DDP has forwarded to JTC for pricing P.R. No. 12, which substitutes painted GWB ceilings for lay-in tile ceilings in student accessed toilet rooms (not staff toilet rooms). In discussing with JTC, DDP advised that the cost for access panels needed by the respective trades should be included. JTC 11/19/02 M16. Proposal Request No. 10 - DDP has forwarded to JTC for pricing P.R. No. 10 for additional gym "drop curtains" requested by the athletic department to completely separate the wood basketball courts from the track. JTC 12/02/02 M17. Proposal Request No. 15 (Post Script) - DDP forwarded to JTC for pricing P.R. No. 15 for revising condensate drainage for arts wing units AC-2 and AC-3. JTC 12/02/02 M18. Proposal Request No. 16 (Post Script) - DDP forwarded to JTC for pricing P.R. No. 16 for revisions to Trainer's Room 1141 requested by athletic department. M19. N. REQUEST FOR INFORMATION DDP 09/24/02 N29.1 RFI #153 - DDP stated third floor slab projection at upper end of Main Street will not be cut back (will remain flush with brick). DDP will formally respond to RFI #153 once architectural details are revised. -- 12/03/02 N38. RFI Log - DDP distributed log showing status as of 12/03/02. No critical BFI's outstanding. Record item. N39. OBSERVATION REPORT NO. 37 North Andover High School Page 9 O. DEMOLITION 03/26/02 001 . Building/Abatement Demolition is scheduled for August 2004 and prerequisites will be reviewed as that date approaches. NAFD 03/26/02 001 .1 Public safety training will take place in the vacated NAPD existing high school for two weeks after the school is vacated by the owner. 002. P. SITE WORK DDP 10/15/02 P11.2 Art Wing Storm Drainage - JTC advised that it would be significantly less work to core manhole 2B for piping entering from the southwest then to relocate manhole 2A. DDP to issue directive. JTC 10/22/02 P17. Road Subsoils - The clerk reported that a strip of the recently paved east driveway is exhibiting subgrade failure, and will need to be repaired. P18. Q. ARCHITECTURAL JTC 03/26/02 Q01 . Color Selection Submittals - DDP advised that materials Subs requiring color selection shall be submitted as soon as possible so the architect can prepare recommendations for the owner. DDP 10/08/02 Q01.3 Color Selection - JTC noted that, with drywall to begin in three weeks, ceramic tile colors will be needed soon thereafter. JTC 11/19/02 Q20. Sample Classroom - DDP and JTC discussed and agreed that DDP it would be beneficial to complete one east wing classroom as a `sample' for workmanship, etc. DDP and JTC will further discuss as work progresses. -- 11/19/02 Q21. Toilet Room Doorframes - Clerk advised that door frame 12/09/02 throats are not deep enough for plywood underlayment and wall board. U.S. Drywall proposes to install plywood flush with and between studs. DDP requested USD install at a sample door frame. Record item. -- 12/09/02 Q21.1 Toilet Room Door Frames - Sample approved 12/09/02. Record item. -- 11/19/02 Q22. Auditorium Masonry - MBC advised JTC that cavity at top of 12/03/02 brick veneer should be protected from water entering and freezing. Record item. -- 12/03/02 Q22.1 Auditorium Masonry - Top of cavity covered. Record item. OBSERVATION REPORT NO. 37 North Andover High School Page 10 JTC 11/26/02 Q23. Access Panel Review - MBC stated that access panel Clerk placement and size must be carefully coordinated so that Subs required access to above-ceiling items is achieved. DDP noted that this will be critical at hard toilet room ceilings (Proposal Request No. 12). The clerk will review ceiling openings as they are framed. Q26. R. STRUCTURAL JTC 05/21/02 R02.1.1 HVAC Screen - JTC, after review with metal panel sub and C&I, reported that panel will span verticals without the second TS 5X5 girt. DDP and F&B take no exception, and requested submittal of detail proposed. Bass 11/26/02 R02.1.2 HVAC Screen - DDP returned material submittal "not approved" noting steel panels were submitted, rather than aluminum as specified. Shop drawings with calculations have yet to be submitted. DDP 04/30/02 R04. Roof Rigging - NASD noted previous conversation with DDP F&B with regard to having a lift point on the roof for bringing up items that are too heavy or too large to go up the roof hatch. DDP noted that if one point was designated to lift a load of a few thousand pounds (i.e. HVAC equipment), the entire roof would need to be designed for that live load. DDP will investigate means of lifting items like a snow blower to the roof. T&L 11/05/02 R06.1.9 Plant Inspection -After no problems were found at the first plant inspection of the gym trusses, a follow up inspection revealed several defects. All gym trusses will be inspected at the plant, and the auditorium and gym trusses will be further inspected by T&L in the field. DDP 10/08/02 R17. Headroom at Stair#8 -JTC has confirmed that headroom has JTC been reduced at Stair#8 (Boiler Room), noting that the next higher tread falls under the beam. JTC and DDP to develop corrective action. JTC 11/05/02 R17.1 Headroom at Stair No. 8 - Following the meeting, V&G JTC and DDP inspected conditions in field. It apears that the stair has been shifted south 3-4 inches, which resulted in headroom problem. DDP also noted discrepancy at upper landing. JTC to review with V&G. V&G 11/12/02 R17.1.1 Headroom at Stair#8 - JTC advises that stair can be shifted to the north enough to provide the required headroom. OBSERVATION REPORT NO. 37 North Andover High School Page 11 NABC 11/12/02 R17.1.2 Stair#8 Top Landing - V&G has not constructed the top landing with the required pull side door clearance. Bob Nicetta will observe conditions, given that this door is at the top of a stair. V&G 10/22/02 R18.1 Stair Structural Meeting - JTC, DDP, F&B, and V&G met 10/22/02 to review structural stair issues. (F&B memo of meeting has been distributed). V&G will resubmit shop drawings and calculations. V&G 11/19/02 R18.1.2 Stairs (Post Script) - Revised calculations returned to JTC 11/19/02. Submission of shop drawings revised to reflect V&G's engineer's calculations must be submitted. V&G 12/03/02 R18.1.3 Meeting (Post Script) - JTC, DDP, F&B, and F&B V&G to meet 9:00a.m. Tuesday 12/10/02. V&G JTC will have revised shop drawings and calculations. DDP JTC 11/19/02 R22. Auditorium Ceilings (Post Script) - In response to questions posed by JTC at the 11/19/02 job meeting, DDP advised JTC that layout drawings and engineering calculations for suspended stud auditorium ceilings shall be submitted for review (see 09250-1.05.13). Clerk 11/20/02 R23. Auditorium Trusses (Post Script) - In response to discussions JTC at 11/19/02 job meeting, DDP contacted Foley & Buhl, who clarified that T&L should do a visual inspection of shop welds of the auditorium trusses. The clerk and JTC will coordinate an expedited inspection by T&L when conditions allow, and most likely on a Saturday. -- 11/26/02 R24. Masonry Grout - It was discussed that the 28 day grout 12/03/02 breaks for the lower north section of the auditorium CMU walls was 80% of structural design strength (1700psi vs. the specified 2000psi). Foley & Buhl feels this is adequate. The seven day breaks for other areas will be compared to this area once they are available from T&L. JTC will have the supplier review and respond to the low test results. Record item. -- 12/03/02 R24.1 Masonry Grout - Subsequent grout breaks have all been in excess of design strength. No further action necessary. Record item. DDP 12/03/02 R25. Expansion Joint - It was noted by JTC that C&I had F&B mistakenly added a steel plate along D7 line, closing the gap at the auditorium wing expansion joint. JTC asked if this is a problem because it will be difficult to cut the plate off. DDP will review with F&B. R26. S. FIRE PROTECTION S08. OBSERVATION REPORT NO. 37 North Andover High School Page 12 T. PLUMBING -- 12/03/02 T09. Gas Service - JTC noted gas will be turned on 12/06/02. Record item. T10. U. HVAC -- 11/12/02 U06. Insulation - JTC advised that ductwork must be insulated 12/03/02 where tight to beam flanges, with particular care to be taken at rated chases. Record item. -- 12/03/02 006.1 Insulation - The clerk reported that Sagamore is insulating between beam flanges and the top of ductwork. Record item. JTC 11/19/02 U08. Fan Coil Covers - Fan coil units have been delivered to the SP&H site in advance of receiving color selection from DDP. Units do not match selected color or selected color for fin tube radiation. JTC to review with Sagamore. U09. V. ELECTRICAL MEC 06/11/02 VO4.3.3 New Service Pole - MEC will set the new pole in approximately two weeks. MEC 10/08/02 VO4.4.1 New Service (Post script) - The Building Committee approved direct payment in full of MEC backcharge at 10/10/02 meeting. MEC expected to install service once payment received. JTC 10/22/02 VO4.4.2 New Service - After MEC sign-offs on trench, etc. MEC on 10/23/02, service installation will start in two weeks, and be completed two weeks thereafter. JTCwill protect transformers as required by MEC. ABP 07/15/02 V07.1.1 Communications Manhole (Postscript) - AT&T JTC advised that manhole can be deleted. W.O. No. 11 (credit) issued 07/15/02. ABP 08/06/02 V07.2.4 Verizon Pole - Verizon representative was Verizon present at 08/06/02 job meeting. Verizon's position remains that ABP staff staked the location for pole on site. Pole must be relocated to right of way, as shown on the drawings. ABP will re-stake the location for Verizon, and will run conduits up to where pole will be relocated. After obtaining the right of way agreement, Verizon will reset the pole. ABP 10/10/02 V07.2.5 Verizon Pole - JTC noted pole has been removed Verizon for roadway grading, and must be reinstalled in its proper location. OBSERVATION REPORT NO. 37 North Andover High School Page 13 MEC 10/10/02 V16. Pole Relocation Backcharge (Post script) - The Building Committee approved payment to MEC to relocate three poles at the Osgood Street entry to accommodate the new turning lanes. The agreement has been sent to MEC, who shall perform the work in Spring `03. TE 11/19/02 V17.1.2 W.O. #19 - JTC submitted ABP pricing to DDP 11/19/02. TE to review. JTC 11/26/02 V20. Lightning Protection - MBC recommended that JTC, AB & ABP Palumbo and Stanley Roofing coordinate mounting of arrestors Stanley and cable so that roofing and roofing warranty is unaffected. V21. W. HAZARDOUS MATERIALS W01. X. MISCELLANEOUS Stanley 12/03/02 X22.2.5 Roof Inspection (Post Script) - Letter of initial Firestone inspection received by DDP. Copies of Firestone inspection reports for completed roof areas shall be submitted to DDP. DDP 11/26/02 X22.2.7 Ballast- Clerk reported that first loads of `triple washed stone' was acceptable, but later loads appeared `dirtier'than original loads. Ballast will be inspected in place. -- 12/03/02 X24. Cupola Roofing - Stanley has questioned if roofing under air intake cupolas would be an indoor air quality problem because roof insulation can off-gas. It was agreed that because the cupolas supply only combustion air, this is not an issue. Record item. Stanley 12/03/02 X25. Winter Roofing - MBC stated that care must be taken to follow JTC roof manufacuturer's cold weather precautions, particularly with regard to seaming and adhered membranes. Record item. JTC 12/03/02 X26. Heating and Slabs - MBC expressed concern that slab on grades be heated soon to prevent heaving. Of particular concern is the link, where retaining walls are exposed. -- 12/03/02 X27. December Meetings - It was agreed that there will not be a job meeting 12/24/02. There will be a meeting 12/31/02. X28. Y. PROJECT CLOSEOUT Consultants 09/10/02 Y12. As Built Drawings - DDP stated subcontractors should keep as built drawings up to date. DDP will advise consultants to view as builts each month. Y13. OBSERVATION REPORT NO. 37 North Andover High School Page 14 ZZ. CONSTRUCTION PROGRESS -- 12/03/02 ZZ38. Construction Progress -The architect walked the site and observed the following. Record item. -- 12/03/02 ZZ38.1 Steel - Three gym trusses being prepared for erection. Record item. -- 12/03/02 ZZ38.2 Drywall - Exterior studs being installed along south elevation of gym wing. Drywall installation nearly complete at second floor of east academic wing. Record item. -- 12/03/02 ZZ38.3 MEP - Roughing ongoing throughout. Record item. ZZ39. The next job meeting will be held at 1:00 PM on TUESDAY 10 DECEMBER 2002 at the Contractor's Trailer. The discussions of this meeting are recorded as understood by the writer, who should be notified of any omissions or corrections. Unless the writer is notified to the contrary, these notes are presumed to be correct. Richard Rice DiNISCO DESIGN RN R/krh cc: Louis Minicucci Gene Kingman William Allen Kevin Murphy Paul Szymanski Frederick King Nancy Kurtz Kevin Burke Susan Nicholson Richard Weber Robert Nicetta Evan Karalolos Robert Beshara Kenneth DiNisco Julie Parrino Rick Greenlee NA Planning Board Angel Khazadian Doug Seaboldt Richard Warner Ed Estabrook Jon Oxman 12/02/2002 15:28 JOHN T. CALLAHAN & SONS i 19786815218 NO.827 D001 o a o ® 9 7 m N 2 z z D O rn sx z I � � m Th_ V to in r 0 A a to� � m CD m ' U2 x va M o ? G)w y o Lul 0 S z —wjag N C m c i w Y n A p No x H 0 u s 3 co cr zi m a � a N I VI L o CD C L� �O w � a i 9 N S N � S � � m N J 12.-02i2002 15:28 JOHN T. CALLAHAN << SONS 19785815218 NO,827 D002 v m z = _ n 0 n p can z � z v Q m z M M n x 0 N 4 G z 1 O d m a _ > G rn o q 'Z to c 0 o � � � o D r z C � nN3 y p A P N 2 w 3 ro � m .a (1 N `A a a 4 @ �N O = S r w 2 cr v A J A m J � l N r � N O O � G N ao p a 5S V VIA J 4 A 0 M� y r C CL 4 � ro m H , ;P M os n N z SCHOFIELD BROTHERS \ �J i§Y \91, ENGINEERING • SURVEYING PLANNING C`J � }�' `� Schofield Brothers of New England. Inc. 1071 Worcester Road N Framingham,MA 01701-5298 �J 508-879-0030 1-800-696-2874 December 9, 2002 FAX 508-879-1797 'E 20217 DEC 1 6 2002 TO: North Andover Conservation Commission North Andover Planning Board NC3t �E 0�'lnt� F" NNINQ N� DEPARTMENT D. Robert Nicetta, Building Commissioner DiNisco Design Partnership — Attn: Rick Rice (for further distribution to applicable parties) FROM: Bert Corey, EIT RE: North Andover High School - Monthly Inspection Report — October 23, 2002 to November 19, 2002. DEP File No. 242-1045 Planning Board Notice of Decision dated 5/14/01 Schofield Brothers of New England, Inc. has been designated as the"Environmental / Erosion Control Monitor" for the North Andover High School Project. The purpose of the Environmental /Erosion Control Monitor is to perform periodic inspections of the project site to insure compliance with the Order of Conditions issued by the Conservation Commission and the Special Permit issued by the Planning Board with respect to sediment and erosion controls, limit of work compliance, wetland replication and stormwater management issues. This is the fifteenth monthly inspection report prepared and submitted in compliance with the above referenced permits. It covers the period October 23, 2002 through November 19, 2002. Attached are copies of the Inspection Reports (#51, #52, #53, and 954) relative to the inspections performed on October 29, November 5, November 13, and November 19, 2002, respectively. During this timeframe, the site experienced several rainfall events and three of the four inspections followed a significant amount of rain. Muddy conditions followed each rainfall event and the sedimentation controls were observed to be functioning properly. The cloudy discharge at the two drainage outfalls observed in the past is being successfully minimized by management of the site and maintenance of the erosion controls. The southeast work area seemed to experience the largest amount of erosion. The perimeter sedimentation controls and catch basin protection worked well to minimize the amount of sediment collecting on the parking lot and getting into the catch basins with filter fabric silt boots. During the installation of the retaining wall in this area, effluent from a dewatering system was observed to be too cloudy and was shut down. No other installation work is scheduled in this area during the winter. Additional haybale checkdams are planned for this area to slow runoff and to reduce erosion through the winter months. '[==SCHOFIELD BROTHERS ENGINEERING • SLR%E. ING • PLANNING 20217 MEN= North Andover High School— Monthly Inspection Report—October 23, 2002 through November 19, 2002 Page 2 The seepage inlet was installed at the east embankment to control the seepage coming from the"blowout" area observed earlier in the year. It appears to be functioning properly. A sewer connection and manhole were installed at the southwest and required a short-term disruption outside the perimeter controls. A combination of haybales, silt fence, catch basin protection, and mulch have been installed to stabilize the area. We have recommended that jute netting be applied to the disturbed area at the shoulder of Chickering Road to hold the mulch in place through the winter months. There were no major upsets to the controls and only the typical maintenance requirements were necessary. This included sediment removal from the parking lot next to the southeast work area and silt boot replacement. The stone construction entrance was maintained in reasonably good condition given the amount of rain and muddy conditions. Dirt and mud tracked onto Prescott Street was kept to minimum. Additional observations included: • The sedimentation basins remained in good condition and appeared to be functioning properly. There were visible indications that runoff was flowing towards them. • Maintenance to the swale and berm at the southwest corner was completed to make sure that runoff from that area travels toward Sedimentation Basin #2. • The area where the building subdrain exits the retaining wall remained in good condition. • The southeast entrance gate and the catch basin remained in good condition and there were no erosion issues. • Items carried forward: • Jute netting needs to be installed at the disturbed area where the sewer connection was completed. • In the southeast corner, haybale checkdams should be placed along the channel where stormwater runoff exits the drainage pipe. • The haybales separating the stockpile from Sedimentation Basin 93 should be replaced. • It is now the time for the excess sediment in Sedimentation Basin 92 to be removed. • The stockpiled materials in the small secondary sedimentation area immediately south of Sedimentation Basin #3 should be removed. Based on our inspections, we have found that the work on the project has been performed in compliance with the Special Permit and Order of Conditions. Please let us know if there are any issues that we are not aware of BBSCHOFIELD BROTHERS ENGINEERING • SCR%EYING • PLANNING October 23, 2002 through November 20217 ` North Andover High School— Monthly Inspection Report— 1 , 2002 Page 3 The attached inspection reports provide detailed information as to our findings. If you have any questions or if you have any comments or recommendations that would help us provide information you need, we would be happy to hear from you. Very truly yours, Approved: Schofield Brothers of New England, Inc. / Bert Corey, E.I.T. Fredric W. King, P.E. Staff Engineer Senior Engineer Environmental Planner enclosures 'BE')SCHOFIELD ENGINEERING • SURVEYING PLANNING Schofield Brothers of New England,Inc. FREEM 20217 1071 Worcester Road Framingham,MA 01701-5298 508-879-0030 1-800-696-2874 To: Mr. Rick Rice FAX 508-879-1797 DiNisco Design Partnership 87 Summer Street Boston, MA 02110 Cc.: North Andover Conservation Commission North Andover Planning Board From: Bert Corey, Staff Engineer' e j Date: November 4, 2002 Re: North Andover High School (20217) INSPECTION REPORT Inspection No.: 51 Date of Inspection: October 29, 2002 By: Bert Corey INTRODUCTION The purpose of these inspections is to observe and review the project work relative to compliance with the Orders of Conditions issued by the North Andover Conservation Commission and the Special Permit issued by the North Andover Planning Board with respect to sediment and erosion controls, limit of work compliance, and stormwater management issues. For reference, the Orders of Conditions issued for the project include: • DEP File No. 242-1045: Issued 2/21/01 • Planning Board Notice of Decision: Issued 5/14/01 Please contact Bert Corey or Fred King at Schofield Brothers of New England, Inc. if you have any questions regarding the information contained in this report. There was a significant amount of rain over the weekend preceding this inspection. Conditions on the site were muddy. The controls on the site appeared to be working properly although there was a cloudy appearance in the brook. A dewatering operation at the southeast work area was shut down and removed. 'E==SCIIOFIELD BROTHERS ENGINEERING - SURN EYING • PLA NN I NG PECTION SUMMARY 1. Sediment control barriers around the perimeter of the current work area: • 10/16/02 —Southeast vvork area: The perimeter haybales and silt fences were working properly. Runoff from the site was observed to pass through the barriers and exit with a cloudy appearance, which seemed to be the case in several areas where the haybales, silt fence, filter fabric, and sedimentation basins filtered the water as much as possible. The water, which passed through these controls, appears to be source of the cloudy water that discharges to the brook. Southvvest work area: This area was in good condition. • r,% 10/22/02 —Southeast work area: Sediment needs to be removed from the parking lot adjacent to the southeast work area. It is recommended that the southeast area be stabilized as much as possible prior to the winter conditions. • 10/29/02 —Southeast work area: Sediment needs to be removed from the parking lot adjacent to the southeast work area and the two silt boots need to be cleaned or replaced. Southwest work area: This area was in good condition. 2. Loam stockpile area in the northern portion of the site: • 10/16/02 —The loam stockpile has good grass and weed cover and appears to be stabilized. The perimeter silt fence is in good condition. 10/ 10/22/02 —The area was in good condition. • 10/29/02 —The area was in good condition. 3. Ordinary borrow stockpile area in the northern portion of the site: • 10/16/02 —The perimeter fence was in good condition. • 19/24/82 10/22/02—The area was in good condition. • 10/29/02 —The area was in good condition. 4. Main entrance gate near trailers: • 10/16/02 —More stone was placed at the entrance and there was a stockpile in the area, apparently to be used after the rainfall event. • 10,124,102 10/22/02—The area was in good condition. • 10/29/02—The area was in good condition; more stone was added to the entrance. 5. Southern emergency entrance: • 10/16/02 —The haybale and silt fence controls at the gate and surrounding the catch basin were working property. Only a small amount of erosion was occurring along the haul road. A puddle had formed on the parking lot at the gate. • 10/24/02 10/22/02 —The area was in good condition. There were no heavy deposits of sediment where the puddle had formed. • 10/29/02 — Same as previous report. 20217 DiNisco Design Partnership Inspection Report No. SI November 4, 2002 Page 2 �SCHOFIELD BROTHERS ENGINEERING SCRVEIING • PLANNING yi Catc : 10/1/02 —The two silt boots covering the catch basins in the parking lot near the southeast work area should be replaced with filter fabric (not silt fence). 10/8/02 —The two silt boots covering the catch basins in the parking lot near the southeast work area should be replaced with filter fabric (not silt fence) and a silt boot needs to be installed at the catch basin around the corner. 10/16/02 —The repairs mentioned above were completed; the catch basins were protected with new fabric silt boots. ® 1n/� 10/22/02 —The silt boots were in good condition. ® 10/29/02 — The two silt boots covering the catch basins in the parking lot near the southeast work area should be cleaned or replaced (mentioned in Item #1). Catch Basin #2 (beehive grate at the stone interceptor drain) needs a silt boot. 7. Sediment basins and outlet structures: 10/8/02 —The areas were in good condition. As mentioned above, the contractor plans to slightly deepen the diversion swale along the retaining wall to remove sediment that has collected in the swale and to prepare for future storm events. 10/16/02 —The diversion swale mentioned above was completed and runoff was observed to be flowing towards the two sedimentation basins. }892 10/22/02 —Grading and rolling operations along the east haul road required that the diversion berm be removed. It appears that subgrade material will be placed and compacted in this area. 10/29/02—Runoff followed the diversion swale towards the sediment basins. The entrance to the trap rock chute leading into Sediment Basin #3 needs regrading. 8. Other erosion control items. 10{24/02 10/22/02 —Nothing to report. • 10/29/02—Nothing to report. 9. Other drainage structures: 10/16/02— A puddle formed around the building subdi•ain outlet. The catch basin, was protected with a silt boot and crushed stone and was in good condition. No flow was observed at the discharge end of the subtirain at the easterly embankment. i 10/24/02 10/22/02— Same as previous report. • 10/29/02— Same as previous report. 10. Wetland replication areas: 10/16/02—The condition of the wetland replication plants that"dried up" has remained the same. 18/24/02 10/22/02 — Same as previous report. The architect mentioned that the previous site contractor would be contacted. • 10/29/02 — Same as previous report. 20217 DiNisco Design Partnership Inspection Report No. 51 Page 3 Noventber 4, 2002 �SCI-IOFIEI.D BROTHERS ENGINEERING • St RFE.YING • PLANNING f� Impermeable barrier and easterly embankment: 'r .10/24/02- 10/22/02—No seepage was observed. 10/29/02 — Same as previous report. 12. Dewaterin : 10,124,102 10/22/02 —No dewatering operations were observed. ® 10/29/02 —The discharge from a dewatering operation for the retaining wall installation at the southeast corner was directed towards the brook. Although the contractor used filter fabric and stone at the inlet, this was not acceptable and it was shut down and removed during the inspection. 13. Truck Washing Area: ® 1019 4 109 10/22/02 —The basin was in good condition. 10/29/02 — Same as previous report. 14. Dust Control: 10/24,102 10/22/02 —Dust was not an issue during this inspection. 10/29/02— Same as previous report. 20217 DiNisco Design Partnership Inspection Report No. 51 page 4 November d, 2002 ,==)SCHOFIELD BROTHERS ENGINEERING • SURVEYING PLANNING Schofield Brothers of New England, Inc. 20217 1071 Worcester Road Framingham,MA 01701-5298 508-879-0030 1-800-696-2874 To: Mr. Rick Rice FAX 508-879-1797 DiNisco Design Partnership 87 Summer Street Boston, MA 02110 Cc.: North Andover Conservation Commission North Andover Planning Board From: Bert Corey, Staff Engineer Date: November 8, 2002 Re: North Andover High School (20217) INSPECTION REPORT Inspection No.: 52 Date of Inspection: November 5, 2002 By: Bert Corey INTRODUCTION The purpose of these inspections is to observe and review the project work relative to compliance with the Orders of Conditions issued by the North Andover Conservation Commission and the Special Permit issued by the North Andover Planning Board with respect to sediment and erosion controls, limit of work compliance, and stormwater management issues. For reference, the Orders of Conditions issued for the project include: ® DEP File No. 242-1045: Issued 2/21/01 • Planning Board Notice of Decision: Issued 5/14/01 Please contact Bert Corey or Fred King at Schofield Brothers of New England, Inc. if you have any questions regarding the information contained in this report. The site was in good condition. There were no new issues. Items carried forward from the previous report were reviewed with the site foreman. EBSCHOUIELD BROTHERS Evct�r:eai�c • si�a�Fti'�vc vca��i�<: �M PECTION SUMMARY 1. Sediment control barriers around the perimeter of the current work are ® 4 n/ 10/22/02—Southeast tivork area: Sediment needs to be removed from the parking lot adjacent to the southeast work area. It is recommended that the southeast area be stabilized as much as possible prior to the winter conditions. 10/29/02 —Southeast tivork area:work Sediment rea and the two silt boots need eed to be cleaned leaned lot adjacent to the southeast or replaced. Southwest tivork area: This area was in good condition. ® 11/05/02 - Southeast work area: Items mentioned above were carried forward. The retaining wall installation is complete. Other than stabilizing this area for the winter, no other work is scheduled. Southwest tivork area: This area was in good condition. The swale was regraded and in good condition 2. Loam stock ile area in the northern portion of the site: 11/05/02 —The loam stockpile has good vegetative cover and the perimeter silt fence was in good condition. 3. Ordin ry borrow stockpile area in the northern portion of the site: 11/05/02 —The perimeter fence was in good condition. 4. Main entrance gate near trailers: 10/29/02 —The area was in good condition; more stone was added to the entrance. ndition but there was some tracking of dirt onto 11/05/02 —The stone was in good co Prescott Street. 5. Southern emergency entrance: 10/29/02 —This area and the controls were in good condition 6. Catch basins: 10/29/02—The two silt boots covering the catch basins in the parking lot near the southeast work area should be cleaned or replaced (mentioned in Item 0). Catch Basin#2 (beehive grate at the stone interceptor drain) needs a silt boot. 11/05/02 —Items mentioned above were carried forward. 7. Sediment basins and outlet structures: 1024/02 10/22/02—Grading and rolling operations along the east haul road required that the diversion berm be removed. It appears that subgrade material will be placed and compacted in this area. 10/29/02 —Runoff followed the diversion Swale towards the sediment basins. The entrance to the trap rock chute above was garried forwardBBoth 3 sedim needs t bbasin dsw e 11/05/02—Item mentioned e in good condition and channels indicate that runoff travels towards them. 20217 DiNisco Design Partn:eh ip Inspection Report No2 Page 2 November I1, 2002 o°SCHOFIELD BROTHERS ENG TIN EERING • SCRI hI1I 11 PLAVNtNG g. Other erosion control items. 11/05/02 —Nothing to report. 9. Other drainage structures: ® 11/05/02 —The area around the building subdrain outlet is in good condition. 10. Wetland eplicatOn areas: tland replication plants that"dried up" has 11/05/02 —The condition of the we ioned that the previous site contractor would remained the same. The architect ment be contacted. 11. Impermeable barrier and easterl embankment: 11/05/02—The seepage inlet was in the process of being installed. 12. Dew_at_erin : ® e from a dewatering operation for the retaining wall 10/29/02 —The discharg installation at the southeast corner was dthe inlet, thas was not a�ceptableuand t t was contractor used filter fabric and stone shut down and removed during the inspection. 11/05/02—No dewatering operations were observed. 13. Truck Washing Area: 11/05/02 —The basin was in good condition. 14. Dust Control: 11/05/02 —Dust was not an issue during this inspection. I E ign Partnership eport No. 52 Page 3 1, 2002 LIE ENGINEERING • SURVEYING PLANNING Schofield Brothers of New England,Inc. 1071 Worcester Road 20217 Framingham,MA 01701-5298 508-879-0030 1-800-696-2874 To: Mr. Rick Rice FAX 508-879-1797 DiNisco Design Partnership 87 Summer Street Boston, MA 02110 Cc.: North Andover Conservation Commission North Andover Planning Board From: Bert Corey, Staff Engineer � L' Date: November 15, 2002 Re: North Andover High School (20217) INSPECTION REPORT Inspection No.: 53 Date of Inspection: November 13, 2002 By: Bert Corey INTRODUCTION The purpose of these inspections is to observe and review the project work relative to compliance with the Orders of Conditions issued by the North Andover Conservation Commission and the Special Permit issued by the North Andover Planning Board with respect to sediment and erosion controls, limit of work compliance, and stormwater management issues. For reference, the Orders of Conditions issued for the project include: DEP File No. 242-1045: Issued 2/21/01 • Planning Board Notice of Decision: Issued 5/14/01 Please contact Bert Corey or Fred King at Schofield Brothers of New England, Inc. if you have any questions regarding the information contained in this report. This inspection followed a significant rainfall event (approximately 1-1/4"). Although the conditions internal to the site were muddy, the erosion and sedimentation controls were functioning properly and no adverse conditions to the resource areas were observed. There was some cloudy water discharging from the drainage outfalls, but to a lesser extent than observed during previous rainfall events of similar size. oE'D'SCHOFIELD BROTHERS ENGINEERING • SURVEYING • PLANNING v , INSPECTION SUMMARY 1. Sediment control barriers around the perimeter of the current work area: • 10/29/02 —Southeast work area: Sediment needs to be removed from the parking lot adjacent to the southeast work area and the two silt boots need to be cleaned or replaced. Southwest work area: This area was in good condition. • 11/05/02 - Southeast work area: Items mentioned above were carried forward. The retaining wall installation is complete. Other than stabilizing this area for the winter, no other work is scheduled. Southtivest iwork area: This area was in good condition. The Swale was regraded and in good condition • 11/13/02 —Southeast work area: Sediment needs to be removed from the parking lot adjacent to the southeast work area and the two silt boots need to be cleaned or replaced. Haybale checkdams should be placed along the channel where stormwater runoff exits a drainage pipe and travels towards the perimeter sediment barrier where it passes through to the parking lot. Southi,vest work area: This area was in good condition. A berm was installed along the west side of the haul road. 2. Loam stockpile area in the northern portion of the site: • 11/05/02 —The loam stockpile has good vegetative cover and the perimeter silt fence was in good condition. • 11/13/02 — Same as previous report. 3. Ordinary borrow stockpile area in the northern portion of the site: • 11/05/02 —The perimeter fence was in good condition. • 11/13/02 —Hauling operations were performed at the south side of the stockpile, which required the silt fence to be removed. The silt fence must be reinstalled. 4. Main entrance gate near trailers: • 10/29/02 —The area was in good condition, more stone was added to the entrance. • 11/05/02 —The stone was in good condition but there was some tracking of dirt onto Prescott Street. • 11/13/02 —The area was in good condition. 5. Southern emergency entrance: • 10/29/02 —This area and the controls were in good condition • 11/13/02 — Same as previous report. 6. Catch basins: • 10/29/02 —The two silt boots covering the catch basins in the parking lot near the southeast work area should be cleaned or replaced (mentioned in Item#1). Catch Basin #2 (beehive grate at the stone interceptor drain) needs a silt boot. 20217 DiNisco Design Partnership Inspection Report No. 53 November 15, 2002 Page 2 =1=:)=SCHOFIELD BROTHERS ENGINEERING • SCRt EYING • PLANNING �Yp 0 11/05/02—items mentioned above were carried forward. • 11/13/02 — Silt boot was installed at the beehive grate. See Item #l. 7. Sediment basins and outlet structures: 0 10/29/02 —Runoff followed the diversion swale towards the sediment basins. The entrance to the trap rock chute leading into Sediment Basin #3 needs regrading. ® 11/05/02—Item mentioned above was carried forward. Both sediment basins were in good condition and channels indicate that runoff travels towards them. ® 11/13/02 —The entrance to the trap rock chute leading into Sediment Basin #3 needs to be reformed. Prior to winter conditions, the haybales separating SB 43 from the stockpile need to be replaced and the excess sediment in SB#2 needs to be removed. 8. Other erosion control items. • 11/13/02 —Nothing to report. 9. Other drainage structures: • 11/13/02 —The area around the building subdrain outlet is in good condition. 10. Wetland replication areas: 11/05/02 —The condition of the wetland replication plants that"dried up" has remained the same. The architect mentioned that the previous site contractor would be contacted. • 1 1/13/02 —Because of the season, it is difficult to determine the condition of the plantings. Nothing to report. 11. Impermeable barrier and easterly embankment: • 11/05/02 —The seepage inlet was in the process of being installed. • 11/13/02 —Final grading and stabilization is needed to complete the seepage inlet installation. 12. Dewatering: • 10/29/02 —The discharge from a dewatering operation for the retaining wall installation at the southeast corner was directed towards the brook. Although the contractor used filter fabric and stone at the inlet, this was not acceptable and it was shut down and removed during the inspection. • 11/05/02—No dewatering operations were observed. • 11/13/02 —No dewatering operations were observed. 13. Truck Washing Area: • 11/13/02 —The basin was in good condition. 14. Dust Control: ® 11/13/02—Dust was not an issue during this inspection. 20217 DiNisco Design Partnership Inspection Report No. 53 November 15, 2002 Page 3 HP Fax K1220 Sc Lo h for ofield Brothers 5088791797 Nov 18 2002 5:06pm Last Transaction Date Time Type Identification Duration Pages Re ul Nov 18 5:05pm Fax Sent 16174261457 1:10 4 OK SCHOFIELD BROTHERS ENGINEERING • SURVEYING PLANNING Schofield Brothers of New England. Inc. 20217 1071 Worcester Road Framingham,MA 01701-5298 508-879-0030 To: Mr. Rick Rice 1-800-696-2874 DiNisco Design Partnership FAX 508-879-1797 87 Summer Street Boston, MA 02110 Cc.: North Andover Conservation Commission North Andover Planning Board From: Fred King, Senior Engineer Date: November 21, 2002 Re: North Andover High School INSPECTION REPORT Inspection No.: 54 Date of Inspection: November 19, 2002 By: Fred King INTRODUCTION The purpose of these inspections is to observe and review the project work relative to compliance with the Orders of Conditions issued by the North Andover Conservation Commission and the Special Permit issued by the North Andover Planning Board with respect to sediment and erosion controls, limit of work compliance, and stormwater management issues. For reference, the Orders of Conditions issued for the project include: • DEP File No. 242-1045: Issued 2/21/01 • Planning Board Notice of Decision: Issued 5/14/01 Please contact Bert Corey or Fred King at Schofield Brothers of New England, Inc. if you have any questions regarding the information contained in this report. This inspection followed significant rainfall over the previous weekend. Conditions internal to the site were muddy but the erosion and sedimentation controls were functioning properly and no adverse conditions to the resource areas were observed. Cloudy water discharging from the outfalls was minimal and Cochichewick Brook was relatively clear. The installation of a Sewer Connection and manhole at the southwest corner of the work area at Chickering Road was underway. This work is a short-term alteration that is beyond the limit of the erosion controls and will need to be stabilized immediately upon completion of the installation. C�SC1i0EIEI.D BROTHERS ENGIVEERISG • St R FYI\G • PLANN1\G INSPECTION SUMMARY 1. Sediment control barriers around the perimeter of the current work area: • 10/29/02 —Southeast work area: Sediment needs to be removed from the parking lot adjacent to the southeast work area and the two silt boots need to be cleaned or replaced. Southwest work area: This area was in good condition. • 11/05/02 - Southeast work area: Items mentioned above were carried forward. The retaining wall installation is complete. Other than stabilizing this area for the winter, no other work is scheduled. Southwest work area: This area was in good condition. The Swale was regraded and in good condition • 11/13/02 —Southeast tivork area: Sediment needs to be removed from the parking lot adjacent to the southeast work area and the two silt boots need to be cleaned or replaced. Haybale checkdams should be placed along the channel where stormwater runoff exits a drainage pipe and travels towards the perimeter sediment barrier where it passes through to the parking lot. Southwest work area: This area was in good condition. A berm was installed along the west side of the haul road. • 11/19/02 —Southeast work area: The parking lot appeared to be relatively clean adjacent to the southeast work area. The silt boot at the corner of the parking lot needs to be cleaned or replaced. Haybale checkdams should be placed along the channel where stormwater runoff exits a drainage pipe and travels towards the perimeter sediment barrier where it passes through to the parking lot. Southwest work area: The installation of the sewer manhole and connection to Chickering Road was underway during the inspection. It is our understanding that this is a short-term alteration that is beyond the limit of the perimeter erosion controls and required the temporary removal of the perimeter haybales and silt fence. Immediately upon completion of the installation, the disturbed area at the shoulder of Chickering Road must be stabilized and the perimeter silt barrier must be re-set. Also, the swale/berm that diverts the site runoff to Sediment Basin #2 must be re-established. For stabilization of the disturbed area beyond the perimeter erosion controls, the contractor stated that they would apply straw mulch. Covering the mulch with a jute netting will be needed to hold the mulch in place against the wind, and from melting snow banks, which tend to wash away the mulch and erode the surface. Also, snow banks will make it difficult to maintain the mulch through the winter. 2. Loam stockpile area in the northern portion of the site: • 11/05/02 —The loam stockpile has good vegetative cover and the perimeter silt fence was in good condition. 20217 DiNisco Design Partnership Inspection Report No. 54 November 21, 2002 Page 2 ':::D:E_)SCIIOEIELD BROTHERS ENGINEERING • SCRI EYING • PLANNING • 11/13/02 — Same as previous report. • 11/19/02 — Same as previous report. 3. Ordinary borrow stockpile area in the northern portion of the site: • 11/05/02 —The perimeter fence was in good condition. • 11/13/02 —Hauling operations were performed at the south side of the stockpile, which required the silt fence to be removed. The silt fence must be reinstalled. • 11/19/02 —The silt fence at the south end of the stockpile was repaired. A portion of the silt fence adjacent to the concrete truck washing pit needs to be repaired. 4. Main entrance gate near trailers: • 10/29/02 —The area was in good condition; more stone was added to the entrance. • 11/05/02 —The stone was in good condition but there was some tracking of dirt onto Prescott Street. • 11/13/02 —The area was in good condition. • 11/19/02 —The stone was in reasonably good condition but there was some tracking of dirt onto Prescott Street. The operator of a concrete truck was observed washing mud off his truck near the entrance before leaving the site (a good practice). 5. Southern emergency entrance: • 10/29/02 —This area and the controls were in good condition • 11/13/02 — Same as previous report. • 11/19/02— Same as previous report. 6. Catch basins: • 10/29/02 —The two silt boots covering the catch basins in the parking lot near the southeast work area should be cleaned or replaced (mentioned in Item #1). Catch Basin#2 (beehive grate at the stone interceptor drain) needs a silt boot. • 11/05/02 —Items mentioned above were carried forward. • 11/13/02 — Silt boot was installed at the beehive grate. See Item 91. • 11/19/02 —See Item #1. 7. Sediment basins and outlet structures: • 10/29/02—Runoff followed the diversion swale towards the sediment basins. The entrance to the trap rock chute leading into Sediment Basin #3 needs regrading. • 11/05/02— Item mentioned above was carried forward. Both sediment basins were in good condition and channels indicate that runoff travels towards them. • 11/13/02 —The entrance to the trap rock chute leading into Sediment Basin #3 needs to be reformed. Prior to winter conditions, the haybales separating SB#3 from the stockpile need to be replaced and the excess sediment in SB#2 needs to be removed. • 11/19/02 —Re-grading work to repair the entrance to the trap rock chute was underway during the inspection. Needs to be completed. The haybales separating 20217 DiNisco Design Partnership Inspection Report No. 54 November 21, 2002 Page 3 a°SCHOEIELD BROTHERS ENGINEERING • SL'R%EYING • PLANNING SB#3 from the stockpile need to be replaced and the excess sediment in SB#2 needs to be removed. The small secondary sediment area at the overflow for S13#3 needs to be repaired soon (maintain haybales and silt fencing as necessary and remove stockpiled materials before winter conditions). 8. Other erosion control items. • 11/13/02 —Nothing to report. • 11/19/02 —Nothing to report. 9. Other drainage structures: • 11/13/02 —The area around the building subdrain outlet is in good condition. • 11/19/02 — Same as previous report. 10. Wetland replication areas: • 11/05/02 —The condition of the wetland replication plants that "dried up" has '.. remained the same. The architect mentioned that the previous site contractor would be contacted. • 11/13/02—Because of the season, it is difficult to determine the condition of the plantings. Nothing to report. • 11/19/02 — Same as previous report. '.... 11. Impermeable barrier and easterly embankment: • 11/05/02—The seepage inlet was in the process of being installed. • 11/13/02—Final grading and stabilization is needed to complete the seepage inlet installation. • 11/19/02 —The installation appears to be functioning properly. No seepage was observed at the bank. 12. Dewatering: • 10/29/02 —The discharge from a dewatering operation for the retaining wall installation at the southeast corner was directed towards the brook. Although the contractor used filter fabric and stone at the inlet, this was not acceptable and it was shut down and removed during the inspection. • 11/05/02 —No dewatering operations were observed. • 11/13/02—No dewatering operations were observed. 11/19/02 -Dewatering of the excavation for the sewer manhole in the southwest work area (see Item 1 above) was being discharged to Sediment Basin 42, which was functioning properly. 13. Truck Washing Area: • 11/19/02 —The basin was in good condition. 14. Dust Control: • 11/19/02 —Dust was not an issue during this inspection. 20217 DiNisco Design Partnership Inspection: Report No. 54 November 21, 2002 Page 4 s�o o e architects and p l a n n e r s Limited OBSERVATION REPORT NO. 38 Project: North Andover High School Date: 10 December 2002 Location: Job Site Present: North Andover School Department (NASD) Paul Szymanski Municipal Building Consultants (MBC) Pat Saitta North Andover Building Commissioner (NABC) Bob Nicetta John T. Callahan & Sons (JTC) Philip Briselli David Anderson Clerk of Works (COW) Richard Warner Tim Willis DiNisco Design Partnership (DDP) Rick Rice Action Date A. SITE SAFETY AND SECURITY -- 12/03/02 All 9.2 Fence - Bob Nicetta noted that the fence near the 12/10/02 end of the new retaining wall adjacent to the existing parking lot needs repair. Record item. -- 12/10/02 A19.2.1 Fence - JTC reported fence has been repaired at end of the new retaining wall. Record item. -- 12/10/02 A20. OSHA Inspection - JTC reported that OSHA recently spent a day on site and noted some minor violations, the most significant being modified staging used by the mason. Record item. A21. B. OWNER ISSUES DDP 05/07/02 B06.2 Revised Site Phasing Drawing - JTC provided a site plan showing the proposed water and road work, and the limited parking that will be available in the south lot when the new school opens. DDP will investigate available parking, possible temporary parking, and options for bus/parent drop off routes for review with NASD. NASD 10/15/02 B12.1.1 Keying (Post script) - Keying schedule based on DDP discussions between HCI and NASD was submitted 10/14/02. DDP to review with NASD. Kenneth DiNisco Richard N.Rice Gary E.Ainslie Christopher Huston Donna DiNisco 8 7 S u m m e r S t r e e t B o s t o n M A 0 2 1 1 0 6 1 7 . 4 2 6 . 2 8 5 8 f a x 4 2 6 . 1 4 5 7 w w w . d i n i s c o . c o m OBSERVATION REPORT NO. 38 North Andover High School Page 2 DDP 10/18/02 B12.2.4 Access Control (Post script) - NASD advised DDP that hand recognition access control shall be used at the two main street entries. DDP to prepare proposal request. -- 10/15/02 1316. Student Tour- It was discussed that 2 to 4 student representatives of the school paper would like to tour the site. The tour will be off hours, and would be guided by the clerk. NASD, COW and JTC to coordinate. JTC 10/18/02 1316.1 Photographs - JTC asked that they be given NASD prior approval of any photos taken of the site during the student tour. B17. C. PERMITS & INSPECTIONS DDP 12/02/02 C01.3 Health Department (Post Script) - DDP submitted application to the Health Department 12/02/02. DDP will advise as to the date/time of any meeting. 03/26/02 CO3. DPW Permits 03/26/02 C04. North Andover Fire Department Permits Hampshire 12/05/02 C04.5.3 Sprinkler Permit (Post Script) - RWS returned hydraulic calculations submitted for Academic Wing 12/05/02. Hampshire to submit calculations for remainder of building. DDP 04/02/02 C12. Environmental Reports - DDP will distribute the weekly and monthly reports prepared by SBNE to Bob Nicetta, NASD, JTC, MBC and the clerk at the weekly job meetings. -- 08/20/02 C28.1 Stormceptor Substitution - The Conservation 12/11/02 Commission has approved the CDS Technologies equipment submitted by JTC. CDS is to submit exact details and shop drawings to the Conservation Commission's outside consultant for review (Postcript- after approval by Conservation Commission reviewer, shop drawing package shall be submitted to SBNE for final approval; initial submittal was marked "revise and resubmit"). Record item. SBNE 11/26/02 C28.1.8 CDS Technology Submission - CDS was unable to attend the 11/26/02 meeting. JTC forwarded to DDP correspondence from CDS with regard to follow up submissions to con com. DDP forwarded to SBNE for review and comment. -- 12/11/02 C28.1.9 CDS Technology Submission (postscript) - Bob Nicetta forwarded 12/09/02 letter ConComm approval of CDS data on 12/11/02. Record item. OBSERVATION REPORT NO. 38 North Andover High School Page 3 DDP 08/20/02 C33. Replication Area - SBNE advised that the replacement Zoppo blueberry plans were not well planted and have not survived. SBNE also advised that other wetland plants are fairing poorly with the dry weather. DDP will review with Zoppo. JTC 12/03/02 C43.1.1 Erosion Controls - SBNE reported that while many items have been addressed, there remain some items that require attention. It was discussed that while the frozen site conditions at present work to stop erosion, JTC should address maintenance items before the spring. 12/10/02 C43.1.2 Erosion Controls - SBNE stated that due to frozen conditions there are no erosion control issues, but JTC will need to address some items when the weather warms up. Record item. -- 12/10/02 C46. Mason's Enclosure - In response to concerns noted by Bob Nicetta, JTC stated mason's enclosure has been adequately tethered against wind. Record item. C47. D. CONSTRUCTION SCHEDULE -- 10/29/02 D37.1 Technology Cabling - JTC, DDP, and 3Si discussed cabling schedule. JTC advised ceiling grid is scheduled to start in the academic wing mid-February 2003. 3Si would prefer to cable before the grids are installed and will monitor project progress the next few weeks. -- 12/10/02 D44. Schedule Update - JTC distributed copies of an updated project schedule. The work through the next week was noted as follows. Record item. -- 12/10/02 D44.1 Plumbing - Rain leader piping on the west side of Main Street will be done by 12/13/02. Record item. -- 12/10/02 D44.2 Masonry - Brick veneer at cafeteria will be completed 12/11/02. Record item. -- 12/10/02 D44.3 Steel - Three gym trusses have been erected, with a fourth to be in place tomorrow AM. Auditorium roof deck will be completed by 12/13/02. Record item. -- 12/10/02 D44.4 Windows - Curtainwall panning nearly completed. Windows and curtainwall installation underway at stairs #1 and 4. Record item. -- 12/10/02 D44.5 Studs/Drywall - Drywall now underway at first floor. Studs ongoing along south side of gym wing. Record item. -- 12/10/02 D44.6 HVAC - Units 6, 7, 8 and 9 will be set in the coming week. Record item. OBSERVATION REPORT NO. 38 North Andover High School Page 4 12/10/02 D44.7 Electrical - MEC set transformers and pulled - =item,cables. Meter to be installed 12/11/02. 12/10/02 D44.8 Roofing roWill. ecord to/13/02 on the high Main Street D45. E. SUBMITTAL SCHEDULE DDP 10/29/02 E15.1 1 asew 2k - Submittals received by DDP E16. F. SUBMITTALS R&R 07/16/02 F14.1.1 Windows f advised removable from the room side using screens standard EFCO clip. R&R will provide a sample. 10/01/02 F25.1.2 structuralq estions 09/30/02. Record f it" due to 12/10/02 em 11/19/02 F25.1.4 Stairs 1-4 (Post Script) - Revised structural 12/10/02 calculations returned 11/19/02 with comments. Revised shop drawings must be submitted. Revised calculations show added members that are not included on stair components newly delivered to the field. Record item. V&G 08/14/02 F29.2.1 Boiler Room Stairs - Returned "revise and resubmit" (with structural calculations) 08/14/02. Record item. F&B 12/10/02 F29.2.3 Stair Resubmittals - V&G distributed revised DDP drawings and calculations at meeting held prior to 12/10/02 job meeting (see item R18.2). F&B and DDP to review. R&R 09/05/02 F29.4.1 Windows hop drawings. R&Rtto resubmit asdn tied. JTC 10/08/02 F35. Submittals Status - DDP and JTC distributed copies of respective logs showing status as of 10/08/02. No critical items noted. JTC noted the following will soon be submitted, with review to be expedited: spray on fireproofing. JTC 12/02/02 F36.2.2 Gym Floor (Post Script) - Revised submission received. DDP advised JTC on 12/02/02 that additional information is required to complete review and approval. 11/12/02 F41. Casework - Shop drawing under review by DDP. JTC to 12/16/02 forward description of casework contruction. Record item. -- 11/26/02 F41.1 information that must belforward d fortreview and 12/16/02 approval. Record item. OBSERVATION REPORT NO. 38 North Andover High School Page 5 Henry 12/16/02 F41.2 Casework (postscript) - DDP returned submittals 12/16/02. Henry to submit items noted. TE 11/26/02 F44. Submittal Status - DDP distributed log showing status as of 11/26/02. JTC requested return of science wing gas detection system. -- 12/03/02 F46. Submittal Status - DDP and JTC distributed respective logs 12/16/02 showing status as of 12/03/02. JTC requested return of laboratory casework. Record item. -- 12/16/02 F46.1 Laboratory Casework (postscript) - Returned by DDP 12/16/02. Record item. -- 12/10/02 F47. Submittal Status - DDP and JTC distributed respective logs showing status as of 12/10/02. No critical items noted. Record item. F48. G. COORDINATION DRAWINGS JTC 04/09/02 G07. Coordination Drawings - JTC reported that work on the Subs coordination drawings has begun, and the process is expected to take 10-12 weeks. JTC 09/24/02 G17. Arts Wing AHU/Steel -JTC noted coordination issues at DDP openings for Rooftop Units. (Post script- Foley and Buhl visited the site 09/25/02. Report forwarded to JTC for discussion). -- 11/26/02 G20. Roofing Gym AHU's - JTC noted that the solution discussed 12/10/02 for flashing the auditorium RTU ductwork will be problematic at AHU-1 and AHU-2 because the ductwork is 96 inches wide. DDP will review and advise. Record item. -- 12/03/02 G20.1 Roofing - JTC stated AHU7 will be set over TV 12/10/02 studio the week of 12/09/02. DDP to advise if JTC should raise curb for flashing as at auditorium. JTC noted a roof drain will be under the ductwork. Record item. DDP 12/10/02 G20.2 Roofing at AHU's - JTC stated unit curbs will be JTC raised with blocking to allow roof to be flashed under ductwork; DDP takes no exception. Waterproof covering of ductwork to be further coordinated with Sagamore and Stanley. DDP 12/03/02 G21. Coordination Drawings - Drawings CO-2-8, CO-2-SEC, and Consult 5216-1-9 received by DDP 12/05/02. G22 H. PAYROLL REPORTS JTC 12/10/02 H12. Payroll Reports - JTC to submit reports for this pay period. H13. OBSERVATION REPORT NO. 38 North Andover High School Page 6 I. REQUISITIONS 118. J. CHANGE ORDERS DDP 08/13/02 J04.1 Steel Change Order Proposals - Cape and Island Steel (C&I) explained their position that they intend to be compensated for their redetailing time resulting from revisions issued by DDP (Field order No. 32, 34 and 41) even though there are no "direct" (material and labor) costs involved with these changes. DDP noted that while the detailing expense is understandable, the hours claimed seem high, and that for the overall project it is DDP's belief that reduction in steel material, fabrication and erection makes up for addition time to redraw. C&I did not agree with DDP assessment. DDP will consider the discussion and issue a formal response. CI 12/03/02 J04.1.1 Steel Change Order Proposals - JTC will see JTC that C&I submits any outstanding Change Order DDP Proposals for structural steel. JTC requested that C&I meet with JTC and DDP on 12/17/02. DDP 11/12/02 J08.2 Mechanical PCO's - All outstanding mechanical/plumbing have been approved by DDP and work orders have been issued. DDP will include these in the next change order. JTC 11/19/02 J10. PCO Log - JTC distributed a log showing status of Proposed Change Orders as of 11/18/02. JTC will forward to MBC copies of issued PCO's not received, and will forward PCO's for several of the open items. -- 12/03/02 111.1 Electrical PCO's - JTC, MBC, DDP and TE met with ABP to discuss Electrical PCO's. The following was discussed. ABP 12/03/02 111.1.1 Mark-ups - JTC to confirm mark-ups of hourly wages and bond costs. -- 12/03/02 J11.1.2 Language Lab PCO's (W.O. #07) - ABP to formally submitt revised cost proposal in the (approximate) amount of$23,000.00. TE 12/03/02 J11.1.3 HVAC Power PCO (W.O. #19) - TE to formally ABP respond to PCO, noting credits offered are unbalanced in comparison to chanrges for additional work. Credit for starters discussed. ABP to submit for consideration wiring of three pieces of HVAC coordination items which may be a `wash' with credit for starters. OBSERVATION REPORT NO. 38 North Andover High School Page 7 TE 12/03/02 J11.1.4 Panel CP 1-9 PCO (PCO No. 34) - TE will respond to ABP claim, TE noted while the feeds got longer as a result of the relocation of the panel, all the branch circuits got shorter. ABP 12/03/02 111.1.5 Credits - ABP to submit credit proposals for exterior light fixture revisions (W.O. #16), telephone man hole deletion (W.O. #11), service change (F.O. #28). DDP 11/26/02 J12. Change Order No. 05 - DDP will prepare a change order to include all approved PCO's. JTC 12/10/02 J13. Proposal Request # 12 - JTC noted cost for PR#12 (GWB DDP toilet room ceilings) will be submitted shortly, and requested that DDP expedite review of the pricing, so that the additional work can be performed in sequence. J14. K. WORK ORDERS ABP 09/06/02 K06. Work Order No. 16 (postscript) - WO No. 16 deleting light fixtures (credit) issued on 09/06/02. K08. L. FIELD ORDERS L17. M. PROPOSAL REQUESTS JTC 05/07/02 M04. Proposal Request No. 1 - DDP issued PR No.1 for revisions to site utilities resulting from site utiltiy coordination by RWS. ABP' 06/04/02 M10. Proposal Request No. 3 - DDP noted PR No. 3, for electrical power to exhaust fan EF-60 (added under PR No. 4) was issued 05/07/02. JTC 11/19/02 M15. Proposal Request No. 12 - DDP has forwarded to JTC for pricing P.R. No. 12, which substitutes painted GWB ceilings for lay-in tile ceilings in student accessed toilet rooms (not staff toilet rooms). In discussing with JTC, DDP advised that the cost for access panels needed by the respective trades should be included. JTC 11/19/02 M16. Proposal Request No. 10 - DDP has forwarded to JTC for pricing P.R. No. 10 for additional gym "drop curtains" requested by the athletic department to completely separate the wood basketball courts from the track. JTC 12/02/02 M17. Proposal Request No. 15 (Post Script) - DDP forwarded to JTC for pricing P.R. No. 15 for revising condensate drainage for arts wing units AC-2 and AC-3. JTC 12/02/02 M18. Proposal Request No. 16 (Post Script) - DDP forwarded to JTC for pricing P.R. No. 16 for revisions to Trainer's Room 1141 requested by athletic department. OBSERVATION REPORT NO. 38 North Andover High School Page 8 M19. N. REQUEST FOR INFORMATION DDP 09/24/02 N29.1 RFI #153 - DDP stated third floor slab projection at upper end of Main Street will not be cut back (will remain flush with brick). DDP will formally respond to RFI #153 once architectural details are revised. -- 12/10/02 N39. RFI Log - DDP and JTC distributed respective logs showing status as of 12/10/02. No critical RFI's outstanding. Record item. N40. O. DEMOLITION 03/26/02 001 . Building/Abatement Demolition is scheduled for August 2004 and prerequisites will be reviewed as that date approaches. NAFD 03/26/02 001.1 Public safety training will take place in the vacated NAPD existing high school for two weeks after the school is vacated by the owner. 002. P. SITE WORK DDP 10/15/02 P11.2 Art Wing Storm Drainage - JTC advised that it would be significantly less work to core manhole 2B for piping entering from the southwest then to relocate manhole 2A. DDP to issue directive. JTC 10/22/02 P17. Road Subsoils - The clerk reported that a strip of the recently paved east driveway is exhibiting subgrade failure, and will need to be repaired. P18. Q. ARCHITECTURAL JTC 03/26/02 Q01 . Color Selection Submittals - DDP advised that materials Subs requiring color selection shall be submitted as soon as possible so the architect can prepare recommendations for the owner. -- 10/08/02 001.3 Color Selection - JTC noted that, with drywall to 12/10/02 begin in three weeks, ceramic the colors will be needed soon thereafter. Record item. DDP 12/10/02 001.4 Color Selection - DDP has forwarded ceramic the colors. JTC has requested prime/paint colors and vinyl flooring colors for academic wing. JTC 11/19/02 Q20. Sample Classroom - DDP and JTC discussed and agreed that DDP it would be beneficial to complete one east wing classroom as a `sample'for workmanship, etc. DDP and JTC will further discuss as work progresses. OBSERVATION REPORT NO. 38 North Andover High School Page 9 JTC 11/26/02 023. Access Panel Review - MBC stated that access panel Clerk placement and size must be carefully coordinated so that Subs required access to above-ceiling items is achieved. DDP noted that this will be critical at hard toilet room ceilings (Proposal Request No. 12). The clerk will review ceiling openings as they are framed. 12/10/02 Q23.1 Access Panels/Toilet Rooms -JTC advised that there will need to be access panels to reach junction boxes in toilet rooms (PR#12) which were installed before proposed ceiling change. Record item. Q26. R. STRUCTURAL JTC 05/21/02 R02.1.1 HVAC Screen - JTC, after review with metal panel sub and C&I, reported that panel will span verticals without the second TS 5X5 girt. DDP and F&B take no exception, and requested submittal of detail proposed. Bass 11/26/02 802.1.2 HVAC Screen - DDP returned material submittal "not approved" noting steel panels were submitted, rather than aluminum as specified. Shop drawings with calculations have yet to be submitted. DDP 04/30/02 R04. Roof Rigging - NASD noted previous conversation with DDP F&B with regard to having a lift point on the roof for bringing up items that are too heavy or too large to go up the roof hatch. DDP noted that if one point was designated to lift a load of a few thousand pounds (i.e. HVAC equipment), the entire roof would need to be designed for that live load. DDP will investigate means of lifting items like a snow blower to the roof. -- 11/05/02 R06.1.9 Plant Inspection - After no problems were found 12/10/02 at the first plant inspection of the gym trusses, a follow up inspection revealed several defects. All gym trusses will be inspected at the plant, and the auditorium and gym trusses will be further inspected by T&L in the field. Record item. 10/08/02 R17. Headroom at Stair#8 - JTC has confirmed that headroom has 12/10/02 been reduced at Stair#8 (Boiler Room), noting that the next higher tread falls under the beam. JTC and DDP to develop corrective action. Record item. 11/05/02 R17.1 Headroom at Stair No. 8 - Following the meeting, 12/10/02 JTC and DDP inspected conditions in field. It apears that the stair has been shifted south 3-4 inches, which resulted in headroom problem. DDP also noted discrepancy at upper landing. JTC to review with V&G. Record item. OBSERVATION REPORT NO. 38 North Andover High School Page 10 -- 11/12/02 R17.1.1 Headroom at Stair#8 -JTC advises that stair can 12/10/02 be shifted to the north enough to provide the required headroom. Record item. NABC 11/12/02 R17.1.2 Stair#8 Top Landing - V&G has not constructed the top landing with the required pull side door clearance. Bob Nicetta will observe conditions, given that this door is at the top of a stair. -- 12/16/02 R17.1.3 Stair#8 Headroom - At 12/10/02 meeting with F&B and V&G, it was agreed that a column could be placed in the generator room to allow the beam to be coped for headroom, rather than reworking the stair. (Postscript- Field Order#114 forwarded 12/16/02.) Record item. -- 10/22/02 R18.1 Stair Structural Meeting - JTC, DDP, F&B, and 12/10/02 V&G met 10/22/02 to review structural stair issues. (F&B memo of meeting has been distributed). V&G will resubmit shop drawings and calculations. Record item. -- 11/19/02 R18.1.2 Stairs (Post Script) - Revised calculations 12/10/02 returned to JTC 11/19/02. Submission of shop drawings revised to reflect V&G's engineer's calculations must be submitted. Record item. -- 12/03/02 R18.1.3 Meeting (Post Script) - JTC, DDP, F&B, and 12/10/02 V&G to meet 9:OOa.m. Tuesday 12/10/02. V&G will have revised shop drawings and calculations. Record item. -- 12/10/02 R18.2 Stair Meeting - V&G and their engineer, SCDT, met with DDP, F&B and JTC 12/10/02. V&G distributed revised shop drawings and calculations. V&G will follow up directly via fax to F&B regarding any outstanding items. F&B's report has been distributed under separate cover. Record item. JTC 11/19/02 R22. Auditorium Ceilings (Post Script) - In response to questions posed by JTC at the 11/19/02 job meeting, DDP advised JTC that layout drawings and engineering calculations for suspended stud auditorium ceilings shall be submitted for review (see 09250-1.05.13). -- 11/20/02 R23. Auditorium Trusses (Post Script) - In response to discussions 12/10/02 at 11/19/02 job meeting, DDP contacted Foley & Buhl, who clarified that T&L should do a visual inspection of shop welds of the auditorium trusses. The clerk and JTC will coordinate an expedited inspection by T&L when conditions allow, and most likely on a Saturday. Record item. OBSERVATION REPORT NO. 38 North Andover High School Page 11 -- 12/10/02 R23.1 Auditorium Trusses - The Clerk advised that T&L inspected the auditorium trusses and found no deficiencies. A handwritten report was left at the site, and T&L will be forwarding a formal report for record. Record item. -- 12/03/02 R25. Expansion Joint - It was noted by JTC that C&I had 12/10/02 mistakenly added a steel plate along D7 line, closing the gap at the auditorium wing expansion joint. JTC asked if this is a problem because it will be difficult to cut the plate off. DDP will review with F&B. Record item. C&I 12/16/02 R25.1 Expansion Joint (postscript) - F&B reviewed JTC condition in field 12/10/02 and on 12/16/02 issued SKS-34 to relocate the beam/plate to regain expansion joint clearance at masonry wall. F&B advises that the steel plate will act as a shear during a seismic event, and expansion joint gap is necessary. Work of SK is assumed to be done from underside, with r f in place. JTC and C&I to review. C&I 12/10/02 R26. Damaged Roof Deck - Following the meeting, JTC was advised that Main Street roof deck is exposed to view and damaged sections must be replaced/repaired. JTC 12/10/02 R27. Auditorium Wall Opening - Following the meeting, DDP questioned JTC as to what internal structure is framing the masonry over a temporary access opening in the south wall. R28. S. FIRE PROTECTION S08. T. PLUMBING T10. U. HVAC JTC 11/19/02 U08. Fan Coil Covers - Fan coil units have been delivered to the SP&H site in advance of receiving color selection from DDP. Units do not match selected color or selected color for fin tube radiation. JTC to review with Sagamore. U09. V. ELECTRICAL -- 06/11/02 VO4.3.3 New Service Pole - MEC will set the new pole in 12/10/02 approximately two weeks. Record item. -- 10/08/02 VO4.4.1 New Service (Post script) - The Building 12/10/02 Committee approved direct payment in full of MEC backcharge at 10/10/02 meeting. MEC expected to install service once payment received. Record item. OBSERVATION REPORT NO. 38 North Andover High School Page 12 -- 10/22/02 VO4.4.2 New Service - After MEC sign-offs on trench, etc. 12/10/02 on 10/23/02, service installation will start in two weeks, and be completed two weeks thereafter. JTCwill protect transformers as required by MEC. Record item. MEC 12/10/02 VO4.4.3 New Service - JTC noted MEC has installed primaries and transformers and will install meters 12/11/02. -- 12/10/02 VO4.4.4 New Service - JTC reported that one new transformer was slightly damaged by MEC. JTC has so advised MEC, for the record. Record item. ABP 07/15/02 V07.1.1 Communications Manhole (Postscript) - AT&T JTC advised that manhole can be deleted. W.O. No. 11 (credit) issued 07/15/02. ABP 08/06/02 V07.2.4 Verizon Pole - Verizon representative was Verizon present at 08/06/02 job meeting. Verizon's position remains that ABP staff staked the location for pole on site. Pole must be relocated to right of way, as shown on the drawings. ABP will re-stake the location for Verizon, and will run conduits up to where pole will be relocated. After obtaining the right of way agreement, Verizon will reset the pole. ABP 10/10/02 V07.2.5 Verizon Pole - JTC noted pole has been removed Verizon for roadway grading, and must be reinstalled in its proper location. ABP 12/10/02 V07.2.6 Verizon Pole - JTC noted Verizon is scheduled to Verizon reset the pole this week. MEC 10/10/02 V16. Pole Relocation Backcharge (Post script) - The Building Committee approved payment to MEC to relocate three poles at the Osgood Street entry to accommodate the new turning lanes. The agreement has been sent to MEC, who shall perform the work in Spring `03. TE 11/19/02 V17.1.2 W.O. #19 - JTC submitted ABP pricing to DDP 11/19/02. TE to review. JTC 11/26/02 V20. Lightning Protection - MBC recommended that JTC, AB & ABP Palumbo and Stanley Roofing coordinate mounting of arrestors Stanley and cable so that roofing and roofing warranty is unaffected. JTC 12/10/02 V21. Switchgear Protection -The Clerk recommended care be taken ABP in energizing the switchgear, because condensation has been forming on the cold floor deck above the switchgear. V22. W. HAZARDOUS MATERIALS W01. OBSERVATION REPORT NO. 38 North Andover High School Page 13 X. MISCELLANEOUS Stanley 12/03/02 X22.2.5 Roof Inspection (Post Script) - Letter of initial Firestone inspection received by DDP. Copies of Firestone inspection reports for completed roof areas shall be submitted to DDP. DDP 11/26/02 X22.2.7 Ballast - Clerk reported that first loads of `triple washed stone' was acceptable, but later loads appeared `dirtier'than original loads. Ballast will be inspected in place. JTC 12/03/02 X26. Heating and Slabs - MBC expressed concern that slab on grades be heated soon to prevent heaving. Of particular concern is the link, where retaining walls are exposed. -- 12/03/02 X27. December Meetings - It was agreed that there will not be a job meeting 12/24/02. There will be a meeting 12/31/02. DDP 12/10/02 X28. Pipe Firestopping - Bob Nicetta asked DDP to clarify whether pipe installation is to run through sleeves or stop at wall/floor construction, with firestopping in contact with pipe insulation or with pipe, respectively. X29. Y. PROJECT CLOSEOUT Consultants 09/10/02 Y12. As Built Drawings - DDP stated subcontractors should keep as built drawings up to date. DDP will advise consultants to view as builts each month. Y13. ZZ. CONSTRUCTION PROGRESS -- 12/10/02 ZZ39. Construction Progress -The architect walked the site and observed the following. Record item. -- 12/10/02 ZZ39.1 Steel - Three gym trusses erected. Record item. -- 12/10/02 ZZ39.2 Drywall - Now underway at academic wing at first floor. Record item. -- 12/10/02 ZZ39.3 Windows - Clerestory windows 50% complete in Library and Stair#1. -- 12/10/02 ZZ39.4 Masonry - CMU nearly complete in basement. Brickwork nearly completed at cafeteria courtyard. Record item. ZZ40. OBSERVATION REPORT NO. 38 North Andover High School Page 14 The next job meeting will be held at 1:00 PM on TUESDAY 17 DECEMBER 2002 at the Contractor's Trailer. The discussions of this meeting are recorded as understood by the writer, who should be notified of any omissions or corrections. Unless the writer is notified to the contrary, these notes are presumed to be correct. lic—hard ice DiNISCO DESIGN RNR/dp cc: Louis Minicucci Gene Kingman William Allen Kevin Murphy Paul Szymanski Frederick King Nancy Kurtz Kevin Burke Susan Nicholson Richard Weber Robert Nicetta Evan Karalolos Robert Beshara Kenneth DiNisco Julie Parrino Rick Greenlee NA Planning Board Angel Khazadian Doug Seaboldt Richard Warner Ed Estabrook Jon Oxman Municipal R Building Consultants, Inc. DEC 1 03 2002 NOR-'f AIJf"V�v Dec. 16, 2002 PLANNIN To: Louis Minicucci, Chairman North Andover School Building Committee Re: North Andover High School—Project Report 12/16/2002 CC: N. A. Planning Board From: Pat Saitta 1. Permits: Mass. Highway permit for work on Route 125 has been received. Building permit has been received. DPW utility permits have been received and utility work is in progress. A water ban waiver has been obtained from the North Andover DPW. Health Department review of the kitchen is in progress with all required information supplied. 2. Project Meetings: Construction meetings are being held weekly at 1:00 p.m. on Tuesdays and are being conducted in a professional and co-operative atmosphere. Issues emphasized at recent meetings: Enclosure of the Cafeteria, Art/Tech Ed, Auditorium and link to maintain expedited schedule(see sketch). Ramping up the number of subcontractors and trades as additional areas of the building become available. Activation of the Academic temporary heating system to allow weather susceptible activity to commence. 3. Work in Progress: Work force is up to approxim4tely 85 workers Shop drawing approval process Concrete foundation is substantially complete 200 Sutton Street,North Andover,MA 01845 Tel: (978)686-5766 • Fax: (978)685-2357 1 Erosion protection maintenance Masonry Roof blocking Drywall studs Ductwork Site drainage Rough Plumbing Steel erection Rough fire protection Light gage framing Roof membrane Window installation Stair installation Rough electric conduit Gas service&temp heat equipment Fire taping& safing Gypsum board & insulation 4. Upcoming Milestones: Temporary heat in Academic wing week of 12/16/02 Commence academic interior weather susceptible work week of 12/16/02 Complete steel erection week of 12/16/02 Art/Cafe/Aud enclosed week of 3/17/03 Unsuitable soil remediation measures within the building footprint are complete in all previously noted areas. 5. Change Proposals: Four change orders have been processed. Other proposed change orders (PCO's) continue to be solicited and reviewed. (See attached change order log). 6. Schedule: Phase I—new school 7/15/04 Phase II—Demo and site 5/5/05 Contractor has submitted the required updated schedule dated 12/02. The project continues to maintain a pace consistent with the early delivery of the new building. Enclosure of the auditorium, arts/link and cafeteria is in progress. The temporary�eating system is scheduled for activation in early December to allow interior work to continue in the above referenced areas along with the Academic building. 7. Construction Issues: a. The mason contractor and General Contractor have agreed to mutually acceptable terms to continue masonry operations under winter protection procedures. b. The contractor continues effectively maintain erosion control measures with minimal migration of soil offsite. 2 c. One area of the upper parking lot adjacent to the east wing of the Academic wing will require additional under drainage. Sketches have been prepared by the Engineers and the G.C. is processing. d. Topping off ceremony and the student signing of steel beams was held the week of 11/18/02. e. Technology cabling and telecommunications systems are currently being designed by SSS Inc. and will be procured through the State Bid List Program. Recent correspondence addressing the protest of VOX communication is attached. 3 ? ll� L —, , T -011 t=Np-tum� 1m e— 30YrDNY1 E e--- I 3tog 1 YnONVI Ivc cl OxA7A3cvDV (3, s owo H3tog ARH ------ 13< 9 Royflo, 3, 0 3�4309 D 0 3ovnowi .11-NiUs 9;'Yq 0'- 1A IkLnog VI-A vl;rtjv4oj IV 13 0 , 7 0A S� 00 MMIVU l Ono 4io �k ld/10 4 9,2 zccc Y I ON, "aOm- oo, ?�Il y 133 e,-4 ,im A" ............ ...... Nn'.Lr05 390dVA-LO0N .......... T4 Q1 ------------- 019 l4ruGAL Y015 x015 )1019 N34 1160 YO k P ............. er 43 ........... OIG 9 40 kv 3 er Nip A ols YJ Yd 110 -1 S.:Xv 13-V3 nl-•- CNYQ awnvYCNO M NoI--Yo-%Qyj —13 'yd .1131M 01'q 9\'M SII3 G.-- -* LONJ H-rcs xv iL I I 6 4t N.Andover High School 12/16/02 PCO# DESCRIPTION SUBMITTED STATUS CO AMT PROPOSAL 1 Floor contractor substitute -- CO#1 $ 107,037 2 Sanitary line -- CO#2 $ 4,701 3 Site phasing --- --- --- 4 Seepage inlet --- CO#3 $ 3,300 5 Video survey of drain -- CO#3 $ 1,618 6-'steel revisions --- --- --- 7 Sub drain piping --- CO#2 $ 26,273 8 Unsuit replacement -- CO#2 $ 20,315 9 Misc HVAC $ 10,448 Approved --- 10 Unsuit soil &drain -- CO#3 $ 45,248 11 Roof power east --- --- --- 12 Language lab electric $ 35,533 In review --- 13 Paint parking lines -- CO#3 $ 5,304 14 Unsuit soil#2 -- CO#3 $ 47,775 15 Unsuit soil#3 --- CO#3 $ 26,331 16 Framing @ stairs --- --- --- 17 Consumer science power $ 5,967 In review --- 18 Metal plate @ mech screen $ 9,430 In review --- 19 Unsuit soil @ water --- --- --- 20 Delete M.H. $ (500) In review --- 21 Auditorium truss brace $ 2,672 22 Auditorium beam revision --- Not received --- 23 Roof drain piping Not received 24 Plumbing change Not received 25 Elec.transformer& poles --- By owner --- 26 Condensate pipe rev $ 3,312 In review 28 Locker additions Not received 29 Unsuitable replacement#4 CO#4 $ 28,580 30 Relocate power&data $ 2,895 In review 31 Auditorium stage found Not received 32 HVAC elec revisions Not received 33 Parking sub drain Not received 34 Relocate electric panel CP-1 $ 4,784 In review 35 Electric service credit CO#4 $ (16,125) 36 Relocate data outlets $ 2,030 In review 37 Parking lot upgrade Not received 38 GWB cell @ elec room Not received 39 Parking lot wet base Not received 40 Greenhouse galvy angle Not received 41 Stl mods @ canopy drain Not received 42 Parking lot drainage Not received 43 Smoke detectors Not received 44 Gym dividers Not received 45 Gang toilet ceilings a Not received 46 1 Unsuit replacement#5 $ 9,325 In review PCO# DESCRIPTION SUBMITTED STATUS CO AMT PROPOSAL 47 Not identified 48 Not identified 49 Roof insulation substation $ (22,800) In review TOTALS $ 63,096 $ 300,357 Total Activity Activity Orig Rem % Early Early Late Late - ID Description Dur Dur Comp Start Finish Start Finish Float D4 MILESTONES , • : �v... � ..� .. �T'<tJr'.. .... .. .. i Yv.0 ?'. � :.h..0..}� :�:� ./•:•..<! :v:J::}rL.vi 4 100 I NOTICE TO PROCEED I 01 0i 100 1 15NIAR02A MAR02A 105 iPHASE 1BEGIN 01 0 100 15MAR02A 115NIAR02A 185 (START UNDERGROUND UTILITIES 1 01 01 100i01MAYWA 01hAAY02A j 1I 95 START ROOFING-ACADEMIC WING 01 0 0111SEP02 16SEP02' sl 200 iSTART WINDOWS•ACADEMIC WING 0; 0; O 2� 6SEP02 11OCT02_ ( t5, f- 190 STRUCTURAL STEEL COMPLETE-PROJECT 0 0. 0 13P1OV02 13NOV02' C, 145 6OILERROOM /HEAT OPERATIONAL Oi 0. 01 01SEP03' 101SEP03' 150 i BUILDING ELECTRICAL OPERATIONAL 0! 0' 0� I01SEP03' 101SEP03- Oi —� 3265 !OCCUPANY -_ -_--_0' - _0-- 01 j19DEC03__- --_ 19DEC03' --- CI 110 SCHEDULE RECONCILIATION '194. 19a' _-O�i20—DEC-03-�3oJUPl04 2oDEC03 30JUN04' i 0: ---- L -----=--— —------ - ------ ----- - — 115 'PHASE 1 COMPLETE/PHASE 2A BEGIN _ --_0: - 0 0'01JUL04' OIJUL04 I G 120 PHASE 2A FINISH/PHASE 2B BEGIN 0j 0 0; 01SEP04' 01SEP04- I 0, 170 PHASE 2B COMPLETE 0 l 0, G 25h1A'f05' 25MAY05 OI SITEWORK PHASE 1 :k Kr :yss% ..c:•`•s ,�..`; s; ,.0 :'rte,, sis^ zi>. mac- �z � ![�+z`r-�,-{�-'S'� r"=sue. _�} ��G`�,'.,za .� µ�.. �+� �� :• ..�� ".. t.�71 x - Y •� �. '°r C � — L >:..� .r:.i-ui•. ]"c iiy2' r �t. 1 • y f a — NORTH AREA 3000 NORTH STORM DRAIN - ----_ -- ?101 - 0 - 100291 APR02A 15MAY02A !29APR02A 15MAY02A 3010 NORTH WATER 151 0' 100 20MAY02A I30MAY02A 20MAY02A 30MAY02A 3040 STELE 8 COMM DUCT 5i 0 95 29MAY02A I30AUG02 !29MAY02A 14OCT02 ! 30�i 3050 'NORTH GRADING 5 5, 0'03SEP02 109SEP02 !04OCT02 10OCT02 23 3060 NORTH BASE l 3 3 0�10SEP02 12SEP02 114NOV02 18NOV02 �- 471 3125 GAS SERVICE&TIE IN @NORTH END 10� 10', 0 10SEP02 23SEP02 105NOV02 18NOV02 431( 3075 1NORTH BINDER PAVEMENT 2i 2. 0122OCT02 23OCT02 j 19NOV02 20NOV02 1 20 3090 NORTH SITE LIGHTING 711 7 0 24OCT02 01 NOV02 21 NOV02 02DECO2 I 20 SOUTH AREA 3020 ACCESS ROAD WATER 51 O: 100124NIAY02A 31MA;f02A 24MAY02A 31MAY02A 3015 iSOUTH WATER ' 101 0. 100;28MAY02A 131MAY02A 2t 8MAY02A 31MAY02A 3005 (SOUTH STOP,P.1 DRAIN--- — -_ 151 -0 100 30MAY02A I07JUi 102A 30t�1AY02A 07JUN02A 3025 !SEWER @ BUILDING 5 0. 100 17JUN02A I24JUN02A i 17JUN02A 24JUN02A 3030 iSOUTH SEWER 10i S 50�28JUN02A09SEP02 122JUN02A 15NOV02 t 3045 ELECTRICAL DUCT 101 0 99'01JUL02A 130AUG02 0IJUL02A 14OCT02 j 33i 3275 PARALLEL SITE LIGHTNG TO DUCT BANK 51 0 i0GI08JUL02A JISJUL02A �O8JUL02A 19JUL02A (� 3115 BOULDER RETAINING WALL 15' 15 0 03SEP02 123SEP02 '24S;-:P02 14OCT02 �C CONCRETE RETAINING WALL O'03SEP02' 30SEP02 13S-P02- 1GOCT02 -- j 3035 SEWER TIE-IN 10 10 0:10SEP02 123SEP02 1 SNOV02 102DECO2 ' 3055 SOUTH GRADING - _ 10' 10 0 24SEP02 1070CT02 15OCT02 28OCT02 3,356 ACCESS ROAD GRADE 15 154 0�01OCT02 21OCT02 1,OCT02 131OCT02 1; 3295 ACCESS ROAD BASE 3 3 0:08OCT02 �100CT02 129OCT02 I31OCT02 3065 SOUTH BASE 31 3' O�08OCT02 �100CT02 11111OV02- 113NOV02 2 3080 (SOUTH BINDER PAVEMENT 21 2i 0111OCT02 11400T02 i j•NOV02 115NOV02 - 3085 ACCESS ROAD BINDER,PAVEMENT 11 1 11' 0122OCT02 O5N0V02 I01NOV02 15NOV02 --1 3095 !SOUTH SITE LIGHTING 10 10. OI06NOV02 19rJOV02 112t4OV02 IO2DECO2 3325 SITE COMPLETE FOR 2002 01 0i 01 119NOV02 I IO2DEECO2' 8i Start Dare 15MAR02 NA04 Finish Date 25MAYOS Early Bar N Data Dave 03SEP02 Progress Bar Run Date 10SEP0209:12 Critical Activity Activity Orig Rem I 4 Early Early Late Late I Total Description Dur Dur Comp Start Finish Start Finish Float' ERECT METAL STAIRS(MIDDLE) 1 5 51 0 10SEP02 16SEP02 0100702 107ocT02 1 15 1430 ERECT METAL STAIR(WEST) 5 51 0 tOSEP02 116SEP02 1800702 1240CT02 -� --281 1320 FORM&POUR CONCRETE STAIR PANS(MIDDLE) 3 31 0 17SEP02 19SEP02 08OCT02 I 1 OOCT02 I 51 i 1435 FORM&POUR CONCRETE STAIR PANS(WEST) ( 31 31 0 17SEP02 119SEP02 25OCT02 129OCT02 28; 1250 FORM&POUR CONCRETE STAIR PANS(EAST) 1 31 31 0 240CT02 28OCT02 114NOV02 116NOV02 ( t 5I "t'i^'�i,,.. ::Y:YX";<:� ;.�;," ;.cL`,GZ...:';Sg.;.*;`'•: i%,.`'•.-�`•'<r!: ..>tsi� afi�%:•: .;Y, Y.7:/;ii ?', ..i.f ,� � eat" -NOW ` L MI met; 1260 ERECT EXTERIOR FRAMING!SHEATHING(EAST) ' 301 0 100I16JUL02A 16P.UG02A I16JUL02A ;16AUG02A 1375 1INSTALL ROOF DRAINS&RISERS 20 6 70122JUL02A 110SEP02 22JUL02A .13SEP02 3 2235 ';ROUGH PLUMIBING MAINS&RISERS FOR ENTIRE 401 16i 60 22JUL02A 124SEEP02 122JUL02A 11NOV02 3a �-1265 (ERECT MASONRY VENEER(EAST) 17; 0 100 29JUL02A !30AUG02A 129JUL02A '30AUG02A L 1' 270 ;INSTALL ROOF BLOCKING(EAST) 101 2 80129JUL02A 104SEP02 129JUL02A 113SEP02 7, 1275 INSTALL CURBS @ ROOF(EAST) --- 5 0` 100:19AUG02A ;30AUG02A 119AUG02A 30AUG02A 1335 ERECT EXTERIOR FRAMING/SHEATHING( 20: 5; 75119AUG02A 109SEP02 ,19AUG02A 116SEP02 5. --'--�-- t ----7 ----- ---- -----....... ._......... 1395 (ERECT EXTERIOR FRAMING/SHEATHING(WEST) ; 30; 22 2-7�2-3AU—G0-2A-1�030CT02 23AUG02A 2400702 1340 ERECT MASONRY VENEER(MIDDLE) ! 22 11 50'26AUG02A 17SEP02 26AUG02A :24SEP02 s' 1380 EXTERIOR OPENING WOOD BLOCKING(MIDDLE) 10: 101 0110SEP02 I23SEP02 29OCT02 11tJOV02 1 3 1280 INSTALL ROOFING(EAS-0 5 5 0 11SEP02 17SEP02 16SEP02 ;20SEP02 3 1345 INSTALL ROOF BLOCKING(MIDDLE) i 101 10 0 18SEP02 101 OCT02 01 OCT02 140070 9 I 1285 INSTALL ROOF FLASHING(EAST) I 15 15 0 18SEP02 08OCT02 129OCT02 18NOV02 i 29 i 1400 JERECT MASONRY VENEER(WEST) 1 171 17; 0118SEP02 I 10OCT02- 25SEP02 1170CT02 1 5, 1295 INSTALL EXTERIOR OPENING WOOD BLOCKING_ 15 ' 15' ! 0119SEP02 0900702 040CT02 240CT02 ' ( ( 1300 1INSTALL EXTERIOR WINDOWS(EAST) 15. 15; 0 26SEP02 11 60.,t 02 111 OCTO2 1350 (INSTALL CUP,BS @ROOF(MIDDLE) S I 51 0 0200702 10800702 11500702 !21 OCT02 j 9' 1355 INSTALL ROOFING(MIDDLE) 5 5j 01090CT02 1500702 1220CT02 128OCT02 9' 1440 1INSTALL EXTERIOR OPENING WOOD BLOCKING( 151 15i 0'090 TC 02 2900702 112NOV02 103DECO2 i 2- �- - ----I---- - (WEST) — 1 1 -0 - o 12y 2 � _2._._11 ..._ .. 1405 INSTALL ROOF BLOCKING 10 10 0 110070_ - OCTO_ 26MJOV0 10DECO2 32 1305 1WEATHER TIGHT-ACADEMIC WING EAST 01 Oi 0� 11600702 1 118NOV02 2� 1360 INSTALL ROOF FLASHING(MIDDLE) 1 15;1 15 0 of 0CT02 '05M.OV02 129OCT02 18NOV02 j 5 1356 1INSTALL ROOF TOP EQUIPMENT i 151 15; 0 1600702 �05'lOV02 05N1AR03-!25M AR03 l `-•7 1385 INSTALL EXTERIOR WINDOWS(MIDDLE) 10 10 700702 13000702 105NOV02 _j 18NOV02 13 L1410 INSTALL CURBS @ROOF(WEST) i 51 5 01250CT02 13100T02 11DECO2 .17DECO2 j 32 1445 INNSTALL EXTERIOR WINDOWS(WEST) 15i 15 0131OCT02 20%0`)02 104DECO2- 124DECO2 23 1415 11NSTALL P.00FING(WEST) 51- 5; 0 01NOV02 071.0!02 118DECO2 i24DECO2 4` ----------- -- --- _- - ---- ---t—- I ` 1365 'WEATHER TIGHT-ACADEMIC WING MIDDLE 0 0;, 01 05%,OV02 18NOV02 = 1 1420 !INSTALL METAL CLADDING(WEST) 15; 15. _ 0'08NOV02 29',OV02 112FEB03 .04M,AAR03 1 1450 !WEATHER TIGHT•ACADEMIC WING WEST 0. 0, 0 1 - - 0':03 -� 24DECO2 1290 INSTALL t,'ETAL CLAODING(EAST) 15 15 0129NOV02 1_-�ECG2 i12FEB03 04MAR03 L-1 290 i 11' 1325 ;INSTALL%'ETAL CLADDING(MIDDLE) 151 15; '*9NOV02 7S =002 12FEB03 04MIAR03 :�., :..,.,..,L. .;giq v"' %.o°l:%Ii:SY.S:• ;!L::%%: �LbGa;i ::�>.S <Sy;:.•SS%;' ::%S:°.:<:. '. s:" ':,SZ. .r�^ ;:.1it ?a s. ; i,. .-: . i•f. c s is ;f c ti>.^t 2 ".r' raos' INTEMO)Z FITPU-K x s.,. ? = ,s " max auz r M CLASSROOMS 1455 INTERIOR METAL STUD FRAMING(3RD FLOOR) 251 13 -48 25JUL02A 03? TG2 25JUL02A 2900702- ' j 1450 OVERHEAD ELECTRICAL ROUGH IN(3RD FLOOR) 201 2 90129JUL02A '1045=P02 129JUL02A 111 NOV02_, 1500 OVERHEAD DUCTWORK ROUGH IN(3RD FLOOR) 70; 8 60129JUL02A 112 SEPG2 129JUL02A 12SOCT02 V_ . 1 1540 OVERHEAD PLUMBING ROUGH IN(39D FLOOR) ' 251 21 16101AUG02A 101CCT02 101AUG02A 111NOV02 = Start Date 15MAR02 -7 MAN Finish Date 25MAY05 / ''c="'"' ' 'c"' -"°''�! Early Bar Data Date 03SEP02 Procress Bar Run Date 10SEP02 09.13 4 w r Critical Activity C� ©Primavera SystemS,Inc. NORTH ANDOVER HIGH SCHOOL Winter Heating Plan ACADEMIC BUILDING: The Building is currently 100% weather tight with the completion of the Curtain Wall Work and installation of Clear Story Windows at the beginning of December. A Temporary Closure Wall will be installed at the Connector and a Temp Roof at the Coupla. Heating will be accomplished utilizing two (2) 1,800,000 BTU Babfar natural gas fired forced air heaters, operating 24 hours per day. One each will be located at the east and west Building Faces, with ducting into the I"floor building hallways. 36 Inch Fans will be setup in the Hallways to provided secondary air circulation as determined necessary to provide a satisfactory Heat Distribution. Hot Air will be returned from the 3rd to the 1"Floor utilizing the Elevator Shaft and a Propeller Ventilation Fan. Building Temperatures and heat distribution will be monitored utilizing local thennometers. ARTS BUILDING AND MECHANICAL PIT: The Mechanical Pit will be sealed with Temporary Closures and the Arts Wing will be isolated and sealed with Temporary Closures incrementally as Construction Progress permits. Heating of the Mechanical Pit will be accomplished utilizing a 450 BTU Babfar natural gas fired forced air heater, operating 24 hours per day. Heating of the Arts Wing will be accomplished utilizing a 900 BTU Babfar natural gas fired forced air heater, operating 24 hours per day. Secondary circulation will be utilized if and as necessary. Building Temperatures will not be of concern until, and if Finish `Fork is initiated after Structure and Rough In Activities. Masonry Constriction: Temporary Enclosure and Heat will be provided per the Specifications and Local Codes with Propane Gas and small Forced Air Heaters. Propane Gas will not be utilized for the Building Heating. 4,d architects and planners Lim 04 December 2002 Commonwealth of Massachusetts Operational Services Division One Ashburton Place, Room 1017 Boston, MA 02108-1552 Attn: Marge MacEvitt Reference: North Andover High School —Telecom/Data Systems Procurement North Andover, MA Subject: VOX Communication v. Town of North Andover Dear Ms. MacEvitt: After our recent phone conversation regarding the above referenced project, we forwarded to OSD a copy of our 22 November 2002 submission to the Attorney General's office in regard to VOX Communication's protest of the applicability of OSD statewide contracts ITC 09 and ITT 11. While the AG's office has yet to formally respond, they have forwarded to Urbelis & Fieldsteel, town counsel for North Andover, a copy of a 23 September 1997 AG decision in the matter of data and video system cabling for the Dedham Middle School. This matter is similar to that of our North Andover project, in that a bidder protested the use of the "State Blanket Contract" procured by the Bureau of Information Technology Acquisitions of the Department of Procurement and General Services. In the Dedham decision, the Attorney General found that technology wiring must be bid pursuant to.MGL 149, not procured via the "Blanket Contract" in force at that time. This decision brings into question the very existence of the "Blanket Contract" (and by extension, ITC 09 and ITT 11). The reasoning being: • Cable "installation" constitutes construction work subject to MGL c149. • All construction work having an estimated cost of more than $25,000.00 must be bid subject to MGL c149. • For contracts less than $25,000, quotes may be solicited from any three contractors in accordance with Section 30B of the Uniform Procurement Act. Therefore, noting that there is no differentiation in the law between public schools (which happen to be the building type for which the referenced protests have been filed) and any other public building, there would seem to be no practical and/or legal application of ITC 09 and ITT 11. Since OSD has continued to establish new statewide contracts since the 23 September 1997 AG decision, we can only assume that this is not the case. By this letter, we Kenneth DiNisco . Richard N. Rice Gary E. Ainslie Christopher Huston Donna DiNisco 8 7 S u m m e r S t r e e t B o s t o n M A 0 2 1 1 0 6 1 7 . 4 2 6 . 2 8 5 8 f a x 4 2 6 . 1 4 5 7 w w w . d i n i s c o . c o m Marge MacEvitt, 04 December 2002 Page 2 request that OSD's counsel provide information on the applicability of these contracts to public buildings. Thank you in advance for your assistance with this matter. Please feel free to contact me with any questions or comments. Sincerely, Richard Rice DiNISCO DESIGN RNR/krh cc: Thomas J. Urbelis, Esq., Town Counsel Dr. William Allen, NASD Paul Szymanski, NASD Patrick Saitta, MBC Enclosure: Urbelis letter 12/02/02 AG Decision 09/23/97 Meltzer letter 11/26/02 99430.0 CorLegal 06 ° ° architects a n d p l a n n e r s Lunited RECEIVED OBSERVATION REPORT NO. 39 Project: North Andover High School DEC 2 7 2002 Date: 17 December 2002 NORTH ANOOV'ER PLANNING DEPARTMCNT Location: Job Site Present: North Andover School Department Paul Szymanski Municipal Building Consultants (MBC) Pat Saitta North Andover Building Commissioner (NABC) Bob Nicetta John T. Callahan & Sons (JTC) Philip Briselli David Anderson Schofield Brothers of New England (SBNE) Bert Corey Clerk of Works Richard Warner Tim Willis DiNisco Design Partnership (DDP) Rick Rice Action Date A. SITE SAFETY AND SECURITY 12/17/02 A21. Gate - Bob Nicetta noted that the gate was open over the weekend. JTC has addressed this issue. Record Item. A22. B. OWNER ISSUES DDP 05/07/02 B06.2 Revised Site Phasing Drawing - JTC provided a site plan showing the proposed water and road work, and the limited parking that will be available in the south lot when the new school opens. DDP will investigate available parking, possible temporary parking, and options for bus/parent drop off routes for review with NASD. NASD 10/15/02 B12.1.1 Keying (Post script) - Keying schedule based on DDP discussions between HCI and NASD was submitted 10/14/02. DDP to review with NASD. DDP 10/18/02 B12.2.4 Access Control (Post script) - NASD advised DDP that hand recognition access control shall be used at the two main street entries. DDP to prepare proposal request. -- 10/15/02 B16. Student Tour- It was discussed that 2 to 4 student representatives of the school paper would like to tour the site. The tour will be off hours, and would be guided by the clerk. NASD, COW and JTC to coordinate. Kenneth DiNisco Richard N. Rice Gary E.Ainslie Christopher Huston Donna DiNisco 8 7 S u m m e r S t r e e t B o s t o n M A 0 2 1 1 0 6 1 7 . 4 2 6 . 2 8 5 8 f a x 4 2 6 . 1 4 5 7 w w w . d i n i s c o . c o m OBSERVATION REPORT NO. 39 North Andover High School Page 2 JTC 10/18/02 B16.1 Photographs - JTC asked that they be given NASD prior approval of any photos taken of the site during the student tour. B17. C. PERMITS & INSPECTIONS DDP 12/02/02 C01.3 Health Department (Post Script) - DDP submitted application to the Health Department 12/02/02. DDP will advise as to the date/time of any meeting. 03/26/02 CO3. DPW Permits 03/26/02 C04. North Andover Fire Department Permits Hampshire 12/05/02 C04.5.3 Sprinkler Permit (Post Script) - RWS returned hydraulic calculations submitted for Academic Wing 12/05/02. Hampshire to submit calculations for remainder of building. DDP 04/02/02 C12. Environmental Reports - DDP will distribute the weekly and monthly reports prepared by SBNE to Bob Nicetta, NASD, JTC, MBC and the clerk at the weekly job meetings. SBNE 11/26/02 C28.1.8 toDattend he 11//2 02 meeting. JTC forwarded to DDP correspondence from CDS with regard to follow up submissions to con com. DDP forwarded to SBNE for review and comment. DDP 08/20/02 C33. Replication Area - SBNE advised that the replacement Zoppo blueberry plans were not well planted and have not survived. SBNE also advised that other wetland plants are fairing poorly with the dry weather. DDP will review with Zoppo. JTC 12/03/02 C43.1.1 Erosion Controls - SBNE reported that while many items have been addressed, there remain some items that require attention. It was discussed that while the frozen site conditions at present work to stop erosion, JTC should address maintenance items before the spring. JTC 12/17/02 C43.1.3 Erosion Controls - It was discussed that the heavy rains of the past weekend demonstrated the need to address the outstanding erosion control maintenance items. JTC had on Monday addressed the immediate priority items noted by Bob Nicetta. It was agreed JTC would address all outstanding items on SBNE's list now, while the weather is favorable, to be ready for the next storm. OBSERVATION REPORT NO. 39 North Andover High School Page 3 NABC 12/17/02 C47. Electrical Inspections - Bob Nicetta explained that the electrical inspector's workload is making it difficult to provide the inspections requested in order to close wall construction, etc. Bob Nicetta stated one side of stud walls may be boarded before an inspection; Bob Nicetta will himself inspect branch wiring within wall construction. TE 12/17/02 C47.1 Switchgear Inspection - Thompson Engineering will inspect the switchgear installation by 12/20/02 and will issue a report to be forwarded to the Building Department. C48. D. CONSTRUCTION SCHEDULE -- 10/29/02 D37.1 Technology Cabling - JTC, DDP, and 3Si discussed cabling schedule. JTC advised ceiling grid is scheduled to start in the academic wing mid-February 2003. 3Si would prefer to cable before the grids are installed and will monitor project progress the next few weeks. -- 12/17/02 D45. Schedule Update - JTC distributed copies of a two week "look ahead" through 12/19/02 for discussion (copy attached). Record Item. D46. E. SUBMITTAL SCHEDULE DDP 10/29/02 E15.1 Casework - Submittals received by DDP 12/16/02 10/29/02. Record Item. El 6. F. SUBMITTALS R&R 07/16/02 F14.1.1 Windows - R&R advised DDP that screens will be removable from the room side using a standard EFCO clip. R&R will provide a sample. 08/14/02 F29.2.1 Boiler Room Stairs - Returned "revise and 12/10/02 resubmit" (with structural calculations) 08/14/02. Record item. F&B 12/10/02 F29.2.3 Stair Resubmittals - V&G distributed revised DDP drawings and calculations at meeting held prior to 12/10/02 job meeting (see item R18.2). F&B and DDP to review. R&R 09/05/02 F29.4.1 Windows - (Postscript) DDP returned window shop drawings. R&R to resubmit as noted. JTC 10/08/02 F35. Submittals Status - DDP and JTC distributed copies of respective logs showing status as of 10/08/02. No critical items noted. JTC noted the following will soon be submitted, with review to be expedited: spray on fireproofing. OBSERVATION REPORT NO. 39 North Andover High School Page 4 JTC 12/02/02 F36.2.2 Gym Floor (Post Script) - Revised submission received. DDP advised JTC on 12/02/02 that additional information is required to complete review and approval. Henry 12/16/02 F41.2 Casework (postscript) - DDP returned submittals 12/16/02. Henry to submit items noted. 11/26/02 F44. Submittal Status - DDP distributed log showing status as of 12/11/02 11/26/02. JTC requested return of science wing gas detection system. Record Item. ABP 12/11/02 F44.1 Gas Detection System - The gas detection system submittal was again returned "Revise and Resubmit". ABP to address TE comments in resubmittal. -- 12/17/02 F48. Submittal Status - DDP and JTC distributed respective logs showing status as of 12/17/02. No critical items noted. Record Item. F49. G. COORDINATION DRAWINGS JTC 04/09/02 G07. Coordination Drawings - JTC reported that work on the Subs coordination drawings has begun, and the process is expected to take 10-12 weeks. JTC 09/24/02 G17. Arts Wing AHU/Steel - JTC noted coordination issues at DDP openings for Rooftop Units. (Post script - Foley and Buhl visited the site 09/25/02. Report forwarded to JTC for discussion). DDP 12/10/02 G20.2 Roofing at AHU's - JTC stated unit curbs will be JTC raised with blocking to allow roof to be flashed under ductwork; DDP takes no exception. Waterproof covering of ductwork to be further coordinated with Sagamore and Stanley. DDP 12/03/02 G21. Coordination Drawings - Drawings CO-2-8, CO-2-SEC, and Consult 5216-1-9 received by DDP 12/05/02. G22. H. PAYROLL REPORTS -- 12/10/02 H12. Payroll Reports - JTC to submit reports for this pay period. 12/17/02 Record Item. Clerk 12/17/02 H12.1 Payroll Reports - Latest submission to be reviewed by Clerk. H13. I. REQUISITIONS 118. OBSERVATION REPORT NO. 39 North Andover High School Page 5 J. CHANGE ORDERS DDP 08/13/02 J04.1 Steel Change Order Proposals - Cape and Island Steel (C&I) explained their position that they intend to be compensated for their redetailing time resulting from revisions issued by DDP (Field order No. 32, 34 and 41) even though there are no "direct' (material and labor) costs involved with these changes. DDP noted that while the detailing expense is understandable, the hours claimed seem high, and that for the overall project it is DDP's belief that reduction in steel material, fabrication and erection makes up for addition time to redraw. C&I did not agree with DDP assessment. DDP will consider the discussion and issue a formal response. C 1 12/03/02 J04.1.1 Steel Change Order Proposals - JTC will see JTC that C&I submits any outstanding Change Order DDP Proposals for structural steel. JTC requested that C&I meet with JTC and DDP on 12/17/02. DDP 11/12/02 J08.2 Mechanical PCO's - All outstanding mechanical/plumbing have been approved by DDP and work orders have been issued. DDP will include these in the next change order. JTC 11/19/02 J10. PCO Log - JTC distributed a log showing status of Proposed Change Orders as of 11/18/02. JTC will forward to MBC copies of issued PCO's not received, and will forward PCO's for several of the open items. -- 12/03/02 111.1 Electrical PCO's JTC, MBC, DDP and TE met with ABP to discuss Electrical PCO's. The following was discussed. ABP 12/03/02 J11.1.1 Mark-ups - JTC to confirm mark-ups of hourly wages and bond costs. -- 12/03/02 J11.1.2 Language Lab PCO's (W.O. #07) - ABP to formally submitt revised cost proposal in the (approximate) amount of$23,000.00. TE 12/03/02 J11.1.3 HVAC Power PCO (W.O. #19) - TE to formally ABP respond to PCO, noting credits offered are unbalanced in comparison to chanrges for additional work. Credit for starters discussed. ABP to submit for consideration wiring of three pieces of HVAC coordination items which may be a `wash' with credit for starters. TE 12/03/02 J11.1.4 Panel CP 1-9 PCO (PCO No. 34) - TE will respond to ABP claim, TE noted while the feeds got longer as a result of the relocation of the panel, all the branch circuits got shorter. OBSERVATION REPORT NO. 39 North Andover High School Page 6 ABP 12/03/02 J11.1.5 Credits - ABP to submit credit proposals for exterior light fixture revisions (W.O. #16), telephone man hole deletion (W.O. #11), service change (F.O. #28). DDP 11/26/02 J12. Change Order No. 05 - DDP will prepare a change order to include all approved PCO's. 12/10/02 J13. Proposal Request # 12 - JTC noted cost for PR#12 (GWB 12/17/02 toilet room ceilings) will be submitted shortly, and requested that DDP expedite review of the pricing, so that the additional work can be performed in sequence. Record Item. -- 12/20/02 J13.1 Proposal Request#12 (Postscript) - DDP approved Proposal Request#12 on 12/20/02. Record Item. J14. K. WORK ORDERS ABP 09/06/02 K06. Work Order No. 16 (postscript) - WO No. 16 deleting light fixtures (credit) issued on 09/06/02. K08. L. FIELD ORDERS L17. M. PROPOSAL REQUESTS JTC 05/07/02 M04. Proposal Request No. 1 - DDP issued PR No.1 for revisions to site utilities resulting from site utiltiy coordination by RWS. ABP' 06/04/02 M10. Proposal Request No. 3 - DDP noted PR No. 3, for electrical power to exhaust fan EF-60 (added under PR No. 4) was issued 05/07/02. -- 11/19/02 M15. Proposal Request No. 12 - DDP has forwarded to JTC for 12/17/02 pricing P.R. No. 12, which substitutes painted GWB ceilings for lay-in tile ceilings in student accessed toilet rooms (not staff toilet rooms). In discussing with JTC, DDP advised that the cost for access panels needed by the respective trades should be included. Record Item. JTC 11/19/02 M16. Proposal Request No. 10 - DDP has forwarded to JTC for pricing P.R. No. 10 for additional gym "drop curtains" requested by the athletic department to completely separate the wood basketball courts from the track. JTC 12/02/02 M17. Proposal Request No. 15 (Post Script) - DDP forwarded to JTC for pricing P.R. No. 15 for revising condensate drainage for arts wing units AC-2 and AC-3. JTC 12/02/02 M18. Proposal Request No. 16 (Post Script) - DDP forwarded to JTC for pricing P.R. No. 16 for revisions to Trainer's Room 1141 requested by athletic department. M19. OBSERVATION REPORT NO. 39 North Andover High School Page 7 N. REQUEST FOR INFORMATION DDP 09/24/02 N29.1 RFI #153 - DDP stated third floor slab projection at upper end of Main Street will not be cut back (will remain flush with brick). DDP will formally respond to RFI #153 once architectural details are revised. DDP 12/17/02 N40. RFI Log - DDP and JTC distributed respective logs showing status as of 12/17/02. DDP to respond to RFI 205 (scoreboard location). N41. O. DEMOLITION 03/26/02 001. Building/Abatement Demolition is scheduled for August 2004 and prerequisites will be reviewed as that date approaches. NAFD 03/26/02 001.1 Public safety training will take place in the vacated NAPD existing high school for two weeks after the school is vacated by the owner. 002. P. SITE WORK DDP 10/15/02 P11.2 Art Wing Storm Drainage - JTC advised that it would be significantly less work to core manhole 213 for piping entering from the southwest then to relocate manhole 2A. DDP to issue directive. JTC 10/22/02 P17. Road Subsoils - The clerk reported that a strip of the recently paved east driveway is exhibiting subgrade failure, and will need to be repaired. P18. Q. ARCHITECTURAL JTC 03/26/02 Q01. Color Selection Submittals - DDP advised that materials Subs requiring color selection shall be submitted as soon as possible so the architect can prepare recommendations for the owner. DDP 12/10/02 Q01.4 Color Selection - DDP has forwarded ceramic the colors. JTC has requested prime/paint colors and vinyl flooring colors for academic wing. JTC 11/19/02 Q20. Sample Classroom - DDP and JTC discussed and agreed that DDP it would be beneficial to complete one east wing classroom as a `sample' for workmanship, etc. DDP and JTC will further discuss as work progresses. DDP 12/17/02 Q20.1 Sample Classroom - JTC advised DDP that color selection is needed for marker board, tack board, floor the and wall paint in order to prepare a sample classroom. OBSERVATION REPORT NO. 39 North Andover High School Page 8 JTC 11/26/02 Q23. Access Panel Review - MBC stated that access panel Clerk placement and size must be carefully coordinated so that Subs required access to above-ceiling items is achieved. DDP noted that this will be critical at hard toilet room ceilings (Proposal Request No. 12). The clerk will review ceiling openings as they are framed. -- 12/10/02 Q23.1 Access Panels/Toilet Rooms - JTC advised that there will need to be access panels to reach junction boxes in toilet rooms (PR#12) which were installed before proposed ceiling change. Record item. DDP 12/17/02 023.2 Access Panels/Toilet Rooms - DDP, JTC, and RWS MBC reviewed conditions requiring access panels at proposed hard toilet room ceilings. DDP to confirm with RWS the possibliity of deleting panel at shocktrol for water piping. 026. R. STRUCTURAL JTC 05/21/02 R02.1.1 HVAC Screen - JTC, after review with metal panel sub and C&I, reported that panel will span verticals without the second TS 5X5 girt. DDP and F&B take no exception, and requested submittal of detail proposed. Bass 11/26/02 R02.1.2 HVAC Screen - DDP returned material submittal "not approved" noting steel panels were submitted, rather than aluminum as specified. Shop drawings with calculations have yet to be submitted. DDP 04/30/02 R04. Roof Rigging - NASD noted previous conversation with DDP F&B with regard to having a lift point on the roof for bringing up items that are too heavy or too large to go up the roof hatch. DDP noted that if one point was designated to lift a load of a few thousand pounds (i.e. HVAC equipment), the entire roof would need to be designed for that live load. DDP will investigate means of lifting items like a snow blower to the roof. NABC 11/12/02 R17.1.2 Stair#8 Top Landing - V&G has not constructed the top landing with the required pull side door clearance. Bob Nicetta will observe conditions, given that this door is at the top of a stair. -- 12/10/02 R18.2 Stair Meeting - V&G and their engineer, SCDT, met with DDP, F&B and JTC 12/10/02. V&G distributed revised shop drawings and calculations. V&G will follow up directly via fax to F&B regarding any outstanding items. F&B's report has been distributed under separate cover. Record item. OBSERVATION REPORT NO. 39 North Andover High School Page 9 JTC 11/19/02 R22. Auditorium Ceilings (Post Script) - In response to questions posed by JTC at the 11/19/02 job meeting, DDP advised JTC that layout drawings and engineering calculations for suspended stud auditorium ceilings shall be submitted for review (see 09250-1.05.13). -- 12/16/02 R25.1 Expansion Joint (postscript) - F&B reviewed 12/17/02 condition in field 12/10/02 and on 12/16/02 issued SKS-34 to relocate the beam/plate to regain expansion joint clearance at masonry wall. F&B advises that the steel plate will act as a shear during a seismic event, and the expansion joint gap is necessary. Work of SKS-34 is assumed to be done from underside, with roof in place. JTC and C&I to review. Record Item. C&I 12/10/02 R26. Damaged Roof Deck- Following the meeting, JTC was advised that Main Street roof deck is exposed to view and damaged sections must be replaced/repaired. -- 12/10/02 R27. Auditorium Wall Opening - Following the meeting, DDP 12/17/02 questioned JTC as to what internal structure is framing the masonry over a temporary access opening in the south wall. Record Item. F&B 12/17/02 827.1 Auditorium Wall Opening - JTC advised that a tripple bond beam has been installed over the opening, and the grout and reinforcing extend through the control joints. JTC stated infill will have bars lapped 30 diameters, and head will be fully grouted (using one faced unit) for continuity. MBC requested F&B review and advise. R28. S. FIRE PROTECTION DDP 12/17/02 S08. Sprinklerhead/Elevator- Noting that the"temporary moratorium" RWS on installation of heads in elevator shafts has expired, MBC inquired if final code requirement is yet known. DDP will consult with RWS. S09. T. PLUMBING RWS 12/17/02 T10. Condensate Drain Connection - JTC advised that Grassechi and RWS have agreed that condensate drains should be low or risers. RWS is to confirm direction in writing. DDP 12/17/02 T11. Scupper Drain Piping Insulation - MBC requested DDP review insulation method to prevent freezing. T12. OBSERVATION REPORT NO. 39 North Andover High School Page 10 U. HVAC JTC 11/19/02 U08. Fan Coil Covers - Fan coil units have been delivered to the SP&H site in advance of receiving color selection from DDP. Units do not match selected color or selected color for fin tube radiation. JTC to review with Sagamore. DDP 12/17/02 U09. Chemical Cabinet Venting - Henry Woodworking questioned F&T venting arrangement of under counter cabinet. DDP to review with F&T. U10. V. ELECTRICAL ABP 07/15/02 V07.1.1 Communications Manhole (Postscript) - AT&T JTC advised that manhole can be deleted. W.O. No. 11 (credit) issued 07/15/02. ABP 08/06/02 V07.2.4 Verizon Pole - Verizon representative was Verizon present at 08/06/02 job meeting. Verizon's position remains that ABP staff staked the location for pole on site. Pole must be relocated to right of way, as shown on the drawings. ABP will re-stake the location for Verizon, and will run conduits up to where pole will be relocated. After obtaining the right of way agreement, Verizon will reset the pole. ABP 10/10/02 V07.2.5 Verizon Pole - JTC noted pole has been removed Verizon for roadway grading, and must be reinstalled in its proper location. ABP 12/10/02 V07.2.6 Verizon Pole - JTC noted Verizon is scheduled to Verizon reset the pole this week. MEC 10/10/02 V16. Pole Relocation Backcharge (Post script) -The Building Committee approved payment to MEC to relocate three poles at the Osgood Street entry to accommodate the new turning lanes. The agreement has been sent to MEC, who shall perform the work in Spring `03. TE 11/19/02 V17.1.2 W.O. #19 - JTC submitted ABP pricing to DDP 11/19/02. TE to review. JTC 11/26/02 V20. Lightning Protection - MBC recommended that JTC, AB & ABP Palumbo and Stanley Roofing coordinate mounting of arrestors Stanley and cable so that roofing and roofing warranty is unaffected. JTC 12/10/02 V21. Switchgear Protection -The Clerk recommended care be taken ABP in energizing the switchgear, because condensation has been forming on the cold floor deck above the switchgear. V22. W. HAZARDOUS MATERIALS W01. OBSERVATION REPORT NO. 39 North Andover High School Page 11 X. MISCELLANEOUS Stanley 12/03/02 X22.2.5 Roof Inspection (Post Script) - Letter of initial Firestone inspection received by DDP. Copies of Firestone inspection reports for completed roof areas shall be submitted to DDP. DDP 11/26/02 X22.2.7 Ballast- Clerk reported that first loads of `triple washed stone' was acceptable, but later loads appeared `dirtier' than original loads. Ballast will be inspected in place. JTC 12/03/02 X26. Heating and Slabs - MBC expressed concern that slab on grades be heated soon to prevent heaving. Of particular concern is the link, where retaining walls are exposed. -- 12/03/02 X27. December Meetings - It was agreed that there will not be a job 12/17/02 meeting 12/24/02. There will be a meeting 12/31/02. Record Item. -- 12/17/02 X27.1 December Meeting - It was agreed that the next job meeting will be 8:00 am, Monday 30 December 2002. There will not be a meeting 24 December 2002. Record Item. DDP 12/10/02 X28. Pipe Firestopping - Bob Nicetta asked DDP to clarify whether pipe installation is to run through sleeves or stop at wall/floor construction, with firestopping in contact with pipe insulation or with pipe, respectively. NASD 12/17/02 X29. Gas Service - JTC advised that gas is on and a phone line is available for meter. Paul Szymanski will call the gas company. DDP 12/17/02 X30. Concrete Finish - JTC requested that DDP inspect the JTC basement walls and advise on suitability of exposed concrete surfaces. X31. Y. PROJECT CLOSEOUT Consultants 09/10/02 Y12. As Built Drawings - DDP stated subcontractors should keep as built drawings up to date. DDP will advise consultants to view as builts each month. Y13. ZZ. CONSTRUCTION PROGRESS -- 12/10/02 ZZ40. Construction Progress - The architect walked the site and observed the following. Record item. -- 12/17/02 ZZ40.1 Steel - Six gym tresses erected, with one ready to set 12/18/02. Record Item. -- 12/17/02 ZZ40.2 Drywall - Nearly complete at first floor academic east. Record Item. OBSERVATION REPORT NO. 39 North Andover High School Page 12 -- 12/17/02 ZZ40.3 Windows - Stair 1 and 4 complete - Library clerestory complete, with cupola windows left to install. Record Item. -- 12/17/02 ZZ40.4 Masonry - Brick work complete at cafeteria courtyard. Record Item. The next job meeting will be held at 8:00 AM on MONDAY 30 DECEMBER 2002 at the Contractor's Trailer. The discussions of this meeting are recorded as understood by the writer, who should be notified of any omissions or corrections. Unless the writer is notified to the contrary, these notes are presumed to be correct. Richard Rice DiNISCO DESIGN RN R/dp cc: Louis Minicucci Gene Kingman William Allen Kevin Murphy Paul Szymanski Frederick King Nancy Kurtz Kevin Burke Susan Nicholson Richard Weber Robert Nicetta Evan Karalolos Robert Beshara Kenneth DiNisco Julie Parrino Rick Greenlee NA Planning Board Angel Khazadian Doug Seaboldt Richard Warner Ed Estabrook Jon Oxman 12/19/2002 02:22 9786815218 _ C PAGE 02 r �j cal w h� • pC Vi r LL Is 71f r S a i 1006 Oz£'ON 8YZS1090aT t 0N00 I NHHUlIdD '1 WOt 0060 MW/2,1/Z1 12/19/2002 02:22 9786815218 C PAGE 03 cli ct H U 'C LL � A a �00a 0��"ON Bti�Sti898t,6ti F SNOS S NHHWrHO '1 NHOt 00:60 Z00e/LTIEI 12/19/2002 02:22 9786815218 C PAGE 05 LL S9 r w w � a s � I 6ZZSt8982.61 F SNOS 13 N1714H11dD '1 NHOf 08!60 e002/LT/Fl 12/19/2002 0_2:22 9786815218 C PAGE 04 w 'C 0. �i t LL. w h s h = m .J a � 7. ol x r zI j + w 20061 oe. 'pad 8I�5I�9gL6t F SNOS '8 NHHU- ND 'i NHOI 00:60 ?05?/LT/2T 'dam'M s 11 architects and planners Limited OBSERVATION REPORT NO. 40 nECEIVED Project: North Andover High School JAN 0 9 2003 Date: 30 December 2002 Location: Job Site IVCRTI-I AND0VI:R p[_ANNiN p�;,PA ATMF-NT Present: Municipal Building Consultants (MBC) Pat Saitta ohn T. Callahan & Sons (JTC) David Anderson Schofield Brothers of New England (SBNE) Bert Corey Clerk of Works Richard Warner Tim Willis DiNisco Design Partnership (DDP) Rick Rice Action Date A. SITE SAFETY AND SECURITY -- 12/30/02 A22. OSHA Inspection - JTC noted OSHA visited this site last week upon a complaint that the auditorium deck was improperly loaded; no citation was issued. Record item. A23. B. OWNER ISSUES DDP 05/07/02 B06.2 Revised Site Phasing Drawing - JTC provided a site plan showing the proposed water and road work, and the limited parking that will be available in the south lot when the new school opens. DDP will investigate available parking, possible temporary parking, and options for bus/parent drop off routes for review with NASD. NASD 10/15/02 1312.1.1 Keying (Post script) - Keying schedule based on DDP discussions between HCI and NASD was submitted 10/14/02. DDP to review with NASD. DDP 10/18/02 B12.2.4 Access Control (Post script) - NASD advised DDP that hand recognition access control shall be used at the two main street entries. DDP to prepare proposal request. -- 10/15/02 B16. Student Tour- It was discussed that 2 to 4 student representatives of the school paper would like to tour the site. The tour will be off hours, and would be guided by the clerk. NASD, COW and JTC to coordinate. JTC 10/18/02 B16.1 Photographs - JTC asked that they be given NASD prior approval of any photos taken of the site during the student tour. Kenneth DiNisco Richard N. Rice Gary E.Ainslie Christopher Huston Donna DiNisco 8 7 S u m m e r S t r e e t B o s t o n M A 0 2 1 1 0 6 1 7 . 4 2 6 . 2 8 5 8 f a x 4 2 6 . 1 4 5 7 w w w . d i n i s c o . c o m OBSERVATION REPORT NO. 40 North Andover High School Page 2 B17. C. PERMITS & INSPECTIONS DDP 12/02/02 C01.3 Health Department (Post Script) - DDP submitted application to the Health Department 12/02/02. DDP will advise as to the date/time of any meeting. 03/26/02 CO3. DPW Permits 03/26/02 C04. North Andover Fire Department Permits Hampshire 12/05/02 C04.5.3 Sprinkler Permit (Post Script) - RWS returned hydraulic calculations submitted for Academic Wing 12/05/02. Hampshire to submit calculations for remainder of building. DDP 04/02/02 C12. Environmental Reports - DDP will distribute the weekly and monthly reports prepared by SBNE to Bob Nicetta, NASD, JTC, MBC and the clerk at the weekly job meetings. -- 11/26/02 C28.1.8 CDS Technology Submission - CDS was unable CDS 12/30/02 to attend the 11/26/02 meeting. JTC forwarded to DDP correspondence from CDS with regard to follow up submissions to con com. DDP forwarded to SBNE for review and comment. (12/30/02) Postscript: The NACC has approved the substitution of the CDS units 12/09/02. On 12/30/02 DDP advised JTC that CDS is to submit stamped engineering drawings of the CDS installation for final shop drawing approval, per Schofield Brothers 05/15/02 memo. DDP 08/20/02 C33. Replication Area- SBNE advised that the replacement Zoppo blueberry plans were not well planted and have not survived. SBNE also advised that other wetland plants are fairing poorly with the dry weather. DDP will review with Zoppo. -- 12/03/02 C43.1.1 Erosion Controls - SBNE reported that while 12/30/02 many items have been addressed, there remain some items that require attention. It was discussed that while the frozen site conditions at present work to stop erosion, JTC should address maintenance items before the spring. Record item. JTC 12/17/02 C43.1.3 Erosion Controls - It was discussed that the 12/30/02 heavy rains of the past weekend demonstrated the need to address the outstanding erosion control maintenance items. JTC had on Monday addressed the immediate priority items noted by Bob Nicetta. It was agreed JTC would address all outstanding items on SBNE's list now, while the weather is favorable, to be ready for the next storm. Record item. OBSERVATION REPORT NO. 40 North Andover High School Page 3 -- 12/30/02 C43.1.4 Erosion Controls - SBNE reported that the site is in good shape following the latest storm events, noting that before Christmas JTC has intalled stone and hay bale check dams. Record item. -- 12/17/02 C47. Electrical Inspections - Bob Nicetta explained that the electrical 12/30/03 inspector's workload is making it difficult to provide the inspections requested in order to close wall construction, etc. Bob Nicetta stated one side of stud walls may be boarded before an inspection; Bob Nicetta will himself inspect branch wiring within wall construction. Record item. -- 12/17/02 C47.1 Switchgear Inspection - Thompson Engineering 12/30/02 will inspect the switchgear installation by 12/20/02 and will issue a report to be forwarded to the Building Department. Record item. -- 12/30/02 C47.2 Switchgear Inspection - TE inspected switchgear 12/19/02, and on 12/20/02 report was forwarded to the Building Department and JTC. JTC advised that the temporary heat and closure work required to energize the switchgear is being done now, and the permanent power is expected to be on the week of 01/06/02. Record item. -- 12/30/02 C47.3 Electrical Inspections - JTC stated that between the inspections performed by Bob Nicetta and those by Thompson Engineering, there have been no delays in the progress of the work. Record item. JTC 12/30/02 C48. Auditorium Trusses - It was agreed that in order to confirm that T&L the shop welds are as required, a sampling of welds will be wire brushed to facilitate testing by Thompson & Lichtner. C49. D. CONSTRUCTION SCHEDULE -- 10/29/02 D37.1 Technology Cabling - JTC, DDP, and 3Si discussed cabling schedule. JTC advised ceiling grid is scheduled to start in the academic wing mid-February 2003. 3Si would prefer to cable before the grids are installed and will monitor project progress the next few weeks. -- 12/30/02 D46. Schedule Update - JTC reviewed the two week "look ahead" through 12/29/02, with the following noted. (Record item.) -- 12/30/02 D46.1 Plumbing - Science wing roughing lagging behind by about a week. JTC noted Grasseschi has recently added two plumbers to the workforce. Record item. -- 12/30/02 D46.2 Masonry - CMU underway at east end of gym, to provide closure. Record item. OBSERVATION REPORT NO. 40 North Andover High School Page 4 -- 12/30/02 D46.3 Steel - Crane is setting last gym truss today. Decking at locker room ongoing. Gym should be decked in two weeks. Record item. -- 12/30/02 D46.4 Windows - Installation now underway in Arts Wing. Record item. -- 12/30/02 D46.5 Drywall - Ongoing at east and west wings. Record item. -- 12/30/02 D46.6 Roofing -Auditorium roof stocked. Record item. -- 12/30/02 D46.7 HVAC -Auditorium duct hangers to start 01/02/03. Record item. -- 12/30/02 D46.8 Fire Protection - Auditorium hangers to start 01/02/03. Record item. -- 12/30/02 D46.9 Electrical - East wing feeders being pulled to closets from basement. Record item. D47. E. SUBMITTAL SCHEDULE E16. F. SUBMITTALS R&R 07/16/02 F14.1.1 Windows - R&R advised DDP that screens will be removable from the room side using a standard EFCO clip. R&R will provide a sample. -- 12/10/02 F29.2.3 Stair Resubmittals - V&G distributed revised 12/19/02 drawings and calculations at meeting held prior to 12/10/02 job meeting (see item R18.2). F&B and DDP to review. Record item. -- 12/19/03 F29.2.4 Stair Resubmittals (postscript) - Stair shop drawings and structural calculations returned "Approved as Noted" 12/19/02. Record item. 09/05/02 F29.4.1 Windows - (Postscript) DDP returned window shop drawings. R&R to resubmit as noted. Record item. -- 12/23/02 F29.4.2 Window Resubmittal (Postscript) - DDP returned Resubmitted shop drawings. -- 10/08/02 F35. Submittals Status - DDP and JTC distributed copies of 12/19/02 respective logs showing status as of 10/08/02. No critical items noted. JTC noted the following will soon be submitted, with review to be expedited: spray on fireproofing. Record item. -- 12/19/02 F35.2 Spray on Fireproofing (Postcript) - spray on fireproofing was submitted 12/18/02 and returned approved 12/19/02. Record item. OBSERVATION REPORT NO. 40 North Andover High School Page 5 JTC 12/02/02 F36.2.2 Gym Floor (Post Script) - Revised submission received. DDP advised JTC on 12/02/02 that additional information is required to complete review and approval. Henry 12/16/02 F41.2 Casework (postscript) - DDP returned submittals 12/16/02. Henry to submit items noted. ABP 12/11/02 F44.1 Gas Detection System - The gas detection system submittal was again returned "Revise and Resubmit". ABP to address TE comments in resubmittal. DDP 12/30/02 F49. Lighting - JTC requested that DDP look into status of follow-up lighting submittal. F50. G. COORDINATION DRAWINGS JTC 04/09/02 G07. Coordination Drawings - JTC reported that work on the Subs coordination drawings has begun, and the process is expected to take 10-12 weeks. JTC 09/24/02 G17. Arts Wing AHU/Steel - JTC noted coordination issues at DDP openings for Rooftop Units. (Post script- Foley and Buhl visited the site 09/25/02. Report forwarded to JTC for discussion). DDP 12/10/02 G20.2 Roofing at AHU's - JTC stated unit curbs will be JTC raised with blocking to allow roof to be flashed under ductwork; DDP takes no exception. Waterproof covering of ductwork to be further coordinated with Sagamore and Stanley. DDP 12/03/02 G21. Coordination Drawings - Drawings CO-2-8, CO-2-SEC, and Consult 5216-1-9 received by DDP 12/05/02. G22. H. PAYROLL REPORTS -- 12/17/02 H12.1 Payroll Reports - Latest submission to be 12/30/02 reviewed by Clerk. Record item. -- 12/30/02 H12.2 Payroll Reports - The Clerk reported that the latest submission is in order. Record item. H13. I. REQUISITIONS -- 12/30/02 118. Pencil Requisition (postscript) - JTC forwarded filed contractor requisitions to DDP 12/30/02. Record item. Consultants 12/30/02 118.1 MEP Requisitions - RWS, F&T and TE to review Clerk and advise DDP by 01/07/02. The clerk shall confirm offsite HVAC equipment. OBSERVATION REPORT NO. 40 North Andover High School Page 6 J. CHANGE ORDERS DDP 08/13/02 J04.1 Steel Change Order Proposals - Cape and Island Steel (C&I) explained their position that they intend to be compensated for their redetailing time resulting from revisions issued by DDP (Field order No. 32, 34 and 41) even though there are no "direct" (material and labor) costs involved with these changes. DDP noted that while the detailing expense is understandable, the hours claimed seem high, and that for the overall project it is DDP's belief that reduction in steel material, fabrication and erection makes up for addition time to redraw. C&I did not agree with DDP assessment. DDP will consider the discussion and issue a formal response. C 1 12/03/02 J04.1.1 Steel Change Order Proposals - JTC will see JTC that C&I submits any outstanding Change Order DDP Proposals for structural steel. JTC requested that C&I meet with JTC and DDP on 12/17/02. DDP 11/12/02 J08.2 Mechanical PCO's - All outstanding mechanical/plumbing have been approved by DDP and work orders have been issued. DDP will include these in the next change order. JTC 11/19/02 J10. PCO Log - JTC distributed a log showing status of Proposed Change Orders as of 11/18/02. JTC will forward to MBC copies of issued PCO's not received, and will forward PCO's for several of the open items. -- 12/03/02 111.1 Electrical PCO's - JTC, MBC, DDP and TE met with ABP to discuss Electrical PCO's. The following was discussed. ABP 12/03/02 J11.1.1 Mark-ups - JTC to confirm mark-ups of hourly wages and bond costs. -- 12/03/02 J11.1.2 Language Lab PCO's (W.O. #07) - ABP to formally submitt revised cost proposal in the (approximate) amount of$23,000.00. TE 12/03/02 J11.1.3 HVAC Power PCO (W.O. #19) - TE to formally ABP respond to PCO, noting credits offered are unbalanced in comparison to chanrges for additional work. Credit for starters discussed. ABP to submit for consideration wiring of three pieces of HVAC coordination items which may be a `wash'with credit for starters. TE 12/03/02 J11.1.4 Panel CP 1-9 PCO (PCO No. 34) - TE will respond to ABP claim, TE noted while the feeds got longer as a result of the relocation of the panel, all the branch circuits got shorter. OBSERVATION REPORT NO. 40 North Andover High School Page 7 ABP 12/03/02 111.1.5 Credits - ABP to submit credit proposals for exterior light fixture revisions (W.O. #16), telephone man hole deletion (W.O. #11), service change (F.O. #28). DDP 11/26/02 J12. Change Order No. 05 - DDP will prepare a change order to include all approved PCO's. ABP 12/30/02 J13.2 Proposal Request No. 12 - ABP to submit breakdown substantiating $2,000 charge for access panels and lighting trim required for hard ceilings in toilet rooms. J14. K. WORK ORDERS ABP 09/06/02 K06. Work Order No. 16 (postscript) - WO No. 16 deleting light fixtures (credit) issued on 09/06/02. K08. L. FIELD ORDERS L17. M. PROPOSAL REQUESTS JTC 05/07/02 M04. Proposal Request No. 1 - DDP issued PR No.1 for revisions to site utilities resulting from site utiltiy coordination by RWS. ABP' 06/04/02 M10. Proposal Request No. 3 - DDP noted PR No. 3, for electrical power to exhaust fan EF-60 (added under PR No. 4) was issued 05/07/02. JTC 11/19/02 M16. Proposal Request No. 10 - DDP has forwarded to JTC for pricing P.R. No. 10 for additional gym "drop curtains" requested by the athletic department to completely separate the wood basketball courts from the track. JTC 12/02/02 M17. Proposal Request No. 15 (Post Script) - DDP forwarded to JTC for pricing P.R. No. 15 for revising condensate drainage for arts wing units AC-2 and AC-3. JTC 12/02/02 M18. Proposal Request No. 16 (Post Script) - DDP forwarded to JTC for pricing P.R. No. 16 for revisions to Trainer's Room 1141 requested by athletic department. M19. N. REQUEST FOR INFORMATION DDP 09/24/02 N29.1 RFI #153 - DDP stated third floor slab projection at upper end of Main Street will not be cut back (will remain flush with brick). DDP will formally respond to RFI #153 once architectural details are revised. DDP 12/17/02 N40. RFI Log - DDP and JTC distributed respective logs showing status as of 12/17/02. DDP to respond to RFI 205 (scoreboard location). OBSERVATION REPORT NO. 40 North Andover High School Page 8 N41. O. DEMOLITION 03/26/02 001. Building/Abatement Demolition is scheduled for August 2004 and prerequisites will be reviewed as that date approaches. NAFD 03/26/02 001.1 Public safety training will take place in the vacated NAPD existing high school for two weeks after the school is vacated by the owner. 002. P. SITE WORK DDP 10/15/02 P11.2 Art Wing Storm Drainage - JTC advised that it would be significantly less work to core manhole 2B for piping entering from the southwest then to relocate manhole 2A. DDP to issue directive. JTC 10/22/02 P17. Road Subsoils - The clerk reported that a strip of the recently paved east driveway is exhibiting subgrade failure, and will need to be repaired. P18. Q. ARCHITECTURAL JTC 03/26/02 001. Color Selection Submittals - DDP advised that materials Subs requiring color selection shall be submitted as soon as possible so the architect can prepare recommendations for the owner. DDP 12/10/02 Q01.4 Color Selection - DDP has forwarded ceramic tile colors. JTC has requested prime/paint colors and vinyl flooring colors for academic wing. JTC 11/19/02 Q20. Sample Classroom - DDP and JTC discussed and agreed that DDP it would be beneficial to complete one east wing classroom as a `sample' for workmanship, etc. DDP and JTC will further discuss as work progresses. DDP 12/17/02 Q20.1 Sample Classroom - JTC advised DDP that color selection is needed for marker board, tack board, floor tile and wall paint in order to prepare a sample classroom. JTC 11/26/02 Q23. Access Panel Review - MBC stated that access panel Clerk placement and size must be carefully coordinated so that Subs required access to above-ceiling items is achieved. DDP noted that this will be critical at hard toilet room ceilings (Proposal Request No. 12). The clerk will review ceiling openings as they are framed. -- 12/17/02 Q23.2 Access Panels/Toilet Rooms - DDP, JTC, and 12/30/02 MBC reviewed conditions requiring access panels at proposed hard toilet room ceilings. DDP to confirm with RWS the possibliity of deleting panel at shocktrol for water piping. Record item. OBSERVATION REPORT NO. 40 North Andover High School Page 9 -- 12/30/02 Q23.2.1 Access Panels/Toilet Rooms (Postcript) - RWS advised DDP on 12/30/02 that access should be provided to shocktol units. Record item. -- 12/30/03 Q26. Stair 1 and 4 Ceiling Heights - Following the meeting, DDP observed conditions that impinge on specified ceiling heights in Stair 1 and 4. Issues include placement of frame for roof drain that necessitates leader passing under a beam, sprinkler lines not installed tight to structure, and at Stair 4, revised roof drain connection to conductor that is lower than 7'-6" ceiling height. DDP will review and advise. -- 12/30/02 Q27. Library Tube Girt - Following the meeting, DDP observed conditions at the tube steel girt bracing the tall central curtainwall. The east welded connection is visibly higher than the west connection, and the girt is bent near its center. DDP will consider cladding the girt and will advise. Q28. R. STRUCTURAL JTC 05/21/02 R02.1.1 HVAC Screen - JTC, after review with metal panel sub and C&I, reported that panel will span verticals without the second TS 5X5 girt. DDP and F&B take no exception, and requested submittal of detail proposed. Bass 11/26/02 R02.1.2 HVAC Screen - DDP returned material submittal "not approved" noting steel panels were submitted, rather than aluminum as specified. Shop drawings with calculations have yet to be submitted. DDP 04/30/02 R04. Roof Rigging - NASD noted previous conversation with DDP F&B with regard to having a lift point on the roof for bringing up items that are too heavy or too large to go up the roof hatch. DDP noted that if one point was designated to lift a load of a few thousand pounds (i.e. HVAC equipment), the entire roof would need to be designed for that live load. DDP will investigate means of lifting items like a snow blower to the roof. NABC 11/12/02 R17.1.2 Stair#8 Top Landing - V&G has not constructed the top landing with the required pull side door clearance. Bob Nicetta will observe conditions, given that this door is at the top of a stair. JTC 11/19/02 R22. Auditorium Ceilings (Post Script) - In response to questions posed by JTC at the 11/19/02 job meeting, DDP advised JTC that layout drawings and engineering calculations for suspended stud auditorium ceilings shall be submitted for review (see 09250-1.05.13), C&I 12/10/02 R26. Damaged Roof Deck - Following the meeting, JTC was advised that Main Street roof deck is exposed to view and damaged sections must be replaced/repaired. OBSERVATION REPORT NO. 40 North Andover High School Page 10 F&B 12/17/02 R27.1 Auditorium Wall Opening - JTC advised that a tripple bond beam has been installed over the opening, and the grout and reinforcing extend through the control joints. JTC stated infill will have bars lapped 30 diameters, and head will be fully grouted (using one faced unit) for continuity. MBC requested F&B review and advise. R28. S. FIRE PROTECTION -- 12/17/02 S08. Sprinklerhead/Elevator- Noting that the "temporary moratorium" 12/30/02 on installation of heads in elevator shafts has expired, MBC inquired if final code requirement is yet known. DDP will consult with RWS. Record item. -- 12/30/03 S08.1 Sprinkler Head/Elevator (postscript) - On 12/30/02 RWS informed DDP that the "temporary moratorium" has been extended to 06/30/03. Record item. S09. T. PLUMBING RWS 12/17/02 T10. Condensate Drain Connection - JTC advised that Grassechi and RWS have agreed that condensate drains should be low on risers. RWS is to confirm direction in writing. Record item. DDP 12/17/02 T11. Scupper Drain Piping Insulation - MBC requested DDP review insulation method to prevent freezing. T12. U. HVAC JTC 11/19/02 U08. Fan Coil Covers - Fan coil units have been delivered to the SP&H site in advance of receiving color selection from DDP. Units do not match selected color or selected color for fin tube radiation. JTC to review with Sagamore. DDP 12/17/02 U09. Chemical Cabinet Venting - Henry Woodworking questioned F&T venting arrangement of under counter cabinet. DDP to review with F&T. Henry 12/30/02 U09.1 Chemical Cabinet Venting - DDP has advised F&T of Henry's question as to the ganging of chemical cabinet vents. F&T requested Henry furnish specific NFPA reference so that an adequate response may be drafted. U10. V. ELECTRICAL ABP 07/15/02 V07.1.1 Communications Manhole (Postscript) -AT&T JTC advised that manhole can be deleted. W.O. No. 11 (credit) issued 07/15/02. OBSERVATION REPORT NO. 40 North Andover High School Page 11 ABP 08/06/02 V07.2.4 Verizon Pole - Verizon representative was Verizon present at 08/06/02 job meeting. Verizon's position remains that ABP staff staked the location for pole on site. Pole must be relocated to right of way, as shown on the drawings. ABP will re-stake the location for Verizon, and will run conduits up to where pole will be relocated. After obtaining the right of way agreement, Verizon will reset the pole. ABP 10/10/02 V07.2.5 Verizon Pole - JTC noted pole has been removed Verizon for roadway grading, and must be reinstalled in its proper location. ABP 12/10/02 V07.2.6 Verizon Pole - JTC noted Verizon is scheduled to Verizon reset the pole this week. MEC 10/10/02 V16. Pole Relocation Backcharge (Post script) - The Building Committee approved payment to MEC to relocate three poles at the Osgood Street entry to accommodate the new turning lanes. The agreement has been sent to MEC, who shall perform the work in Spring `03. TE 11/19/02 V17.1.2 W.O. #19 - JTC submitted ABP pricing to DDP 11/19/02. TE to review. JTC 11/26/02 V20. Lightning Protection - MBC recommended that JTC, AB & ABP Palumbo and Stanley Roofing coordinate mounting of arrestors Stanley and cable so that roofing and roofing warranty is unaffected. JTC 12/10/02 V21. Switchgear Protection -The Clerk recommended care be taken ABP in energizing the switchgear, because condensation has been forming on the cold floor deck above the switchgear. V22. W. HAZARDOUS MATERIALS W01. X. MISCELLANEOUS Stanley 12/03/02 X22.2.5 Roof Inspection (Post Script) - Letter of initial Firestone inspection received by DDP. Copies of Firestone inspection reports for completed roof areas shall be submitted to DDP. DDP 11/26/02 X22.2.7 Ballast- Clerk reported that first loads of `triple washed stone' was acceptable, but later loads appeared `dirtier'than original loads. Ballast will be inspected in place. JTC 12/03/02 X26. Heating and Slabs - MBC expressed concern that slab on grades be heated soon to prevent heaving. Of particular concern is the link, where retaining walls are exposed. OBSERVATION REPORT NO. 40 North Andover High School Page 12 JTC 12/30/02 X26.1 Heating and Slabs - MBC reiterated concern with regard to unheated Administration slab on grade. MBC noted that a gychol/blanket system could keep subgrade from freezing without the need to enclose and heat the entire area. -- 12/10/02 X28. Pipe Firestopping - Bob Nicetta asked DDP to clarify whether 12/30/02 pipe installation is to run through sleeves or stop at wall/floor construction, with firestopping in contact with pipe insulation or with pipe, respectively. Record item. -- 12/30/03 X28.1 Pipe Firestopping (postscript) - DDP reviewed with both RWS and F&T, who agree that pipe insulation shall pass through sleeves. The Hilti fire stop system submitted and approved is UC rated when applied to insulated piping. Record item. NASD 12/17/02 X29. Gas Service - JTC advised that gas is on and a phone line is available for meter. Paul Szymanski will call the gas company. -- 12/17/02 X30. Concrete Finish -JTC requested that DDP inspect the 12/30/03 basement walls and advise on suitability of exposed concrete surfaces. Record item. -- 12/30/02 X30.1 Concrete Finish - DDP approved the west end of the basement as a representative sample for concrete finish. Record item. DDP 12/30/02 X31. Toilet Room 1134 - DDP observed exposed foundation and pier in Men's 1134. DDP will issue SK based on cladding concrete with glazed soap units; plumbing underground will need to shift. X32. Y. PROJECT CLOSEOUT Consultants 09/10/02 Y12. As Built Drawings - DDP stated subcontractors should keep as built drawings up to date. DDP will advise consultants to view as builts each month. Y1 3. ZZ. CONSTRUCTION PROGRESS -- 12/30/02 ZZ41. Construction Progress -The architect walked the site and observed the following. Record item. -- 12/30/02 ZZ41.1 Steel - Final gym truss being lifted into place. Crew at work on locker room roofdeck. Record item. -- 12/30/02 ZZ41.2 Masonry - Underway in basement and at east end of gym. Record item. -- 12/30/02 ZZ41.3 Windows - Underway at arts wing. Record item. -- 12/30/02 ZZ41.4 MEP - Ongoing throughout. Record item. OBSERVATION REPORT N[). 40 North Andover High School Page 13 -' 12/30/02 ZZ41.5 [)p/vV8U ' Finish taping begun 8t third floor east. Record item. ZZ42. The next job meeting will be held 818:0OAKUoU Tuesday, O7 January 20O3mt the Contractor's Trailer. The discussions O(this meeting are recorded 8Sunderstood by the writer, who should be notified [f any omissions O[corrections. Unless the writer is notified tO the contrary, these notes are presumed t0 be correct. F7-4 nichard Rice' DiN|SCO DESIGN RNR/dp cc: Louis K4iDicUoci Gene Kingman William Allen Kevin Murphy Paul Szymanski FnadehckKing Nancy Kurtz Kevin Burke Susan Nicholson Richard Weber Robert Nioeft8 Evan R8ra|o|oa Robert Beohara K8Dn8thDiNiSco JU|ieP8[hD0 Rick Greenlee NA Planning Board Angel Khaz@di8D DoUgSe8bo|dt Richard Warner � Ed EatahroOk Jon Oxman � � � � 12/17i2£1�2 09.00 JOHN T. CRLLRHRN & SONS 4 19`7868].5218 NO.320 P001 ISD i s r y 4 j � 1 J j s j Z8 �Jtd O 8TZSTB98L6 ZZ ZB ZBBZ/6TiZ� 12/17/2002 09:00 JOHN T. CALLRHAN & SONS 19`786815218 NO.320 D002 i (S) IL L3 J Ea 39Vd 8TZST898L6 ZZ ZB ZaOZ:'6T�Z 12/17/2002 09:00 JOHN T. CALLAHAN $ SONS 19796915216 N0,320 P004 ' c G a a a C a I 58 dJ'�d 8 8ZZ5T898L6 ZZ�Za Z9aZ16t!Zt 12�17i2002 09.00 JOHN T. CHLLAHHN & SONS 4 19780815218 PL0.320 1003 I ! � I ..1 M;u in s r s L ro v � b9 �Jdd 0 8T7,5T898LG ZZ:ZB ZOOZ/6T/ZT