HomeMy WebLinkAboutSoil Testing Results - 730 WINTER STREET 12/5/2011 TOWN OF NORTH ANDOVER
Office of COMMUNITY DEVELOPMENTAND SERVICES
HEAI,TH DEPARTMEN"I'
1600 OSGOOD STREET; BUILDING 20; SUITE 2•36
NORTH AN 'S 01845
S S
usan V.Sawyer, REHS,RS 97 .688.9540 Phone
Public Health Director
97 .688.8476 - FAX
he tilde pE qgfijoLqhandovercorn
1'4" F t4ORI'11 MMOVE�V 'olArnol"northandover.com
APPLICATION FOR SOIL KAL.Tli 0,EPARTMENI" I
DATE: DEC. 5, 2011 MAP& PARCEL- 1 04.A / 8
dp
LOCATION OF SOIL TESTS: Front Yard
)7 '
OWNER: William- Bonnell, tr Contact#: 978-888-7134
APPLICANT:William Bonnell Contact#:--
ADDRESS: 14 London St, Apt 2, Lowell
ENGINEER: Atlantic Engineering Contact#: 978-352-7870
CERTIFIED SOIL EVALUATOR: John Paulson SE1871
Intended Use of Land: Residential Subdivision Single Family Florne Commercial
Is This: Repair Testing: Lot Testing for Addition:E]
In the Lake Cochichewick Watershed? Yes I== No
THE FOLLOWING MUST BE INCLUDED WITH THIS FORM
Proof of land ownership(Tax bill,or letter from owner permitting test)
8.5"x 11"Plot Plan& Location of Testing(Please indicate test pit sites air the
Fee of$425.00 per lot for new construction. This covers the minimum two deep holes and
two percolation tests required for each disposal area. Fee of$360.00 per lot for repairs or upgrades.
GENERAL INFORMATION
Only Certified Soil Evaluators may perform deep hole inspections.
Only Mass, Registered Sanitarians and Professional Engineers can design septic plans.
At least two deep holes and two percolation tests are required for each septic system disposal area.
Repairs require at least two deep holes and at least one percolation test,at the discretion of the BOH
representative.
Full payment will be required for all additional tests within two weeks of testing.
Within 45 days of testing,a scaled plan(no smaller than 1"-100')shall be submitted to the Board of Health
showing the location of all tests(including aborted tests).
Within 60 days of testing soil evaluation forms shall be submitted.
Please Do Not Write Below This Line
...........
N.A. Conservation Commission Approval Date-
Signature of onsert,ation Agent:
Date back to Health Depariment: (stamp iq).- Cq� C
e
a
a
,
1
,
LT
4Y 4
Al
F�
7 W&& a
,DelleChiaie, Pamela
From: Isaac Rowe [irowe @millriverconsulting.com]
Sent: Thursday, December 15, 2011 8:35 AM
To: 'Susan Sawyer(ssawyer @townofnorthandover.com)'
Cc: DelleChiaie, Pamela; 'Dan Ottenheimer'; 'Marianne Peters'; rburley @millriverconsulting.cam;
Subject: Soil Test Results -3321 Raleigh Tavern Rd & 730 Winter , ...,..
J g St
Attachments: 332 Raleigh Tavern Road -Soil Test Results 12-13-11. df; 730 Winter Street`�,Soil Test
Results 12-14-11.pdf �" '
Susan,
Attached are the soil logs for the above referenced properties. Atlantic Eng was very professional and a pleasure to work
with. Please let me know if you have any questions.
I also dropped off that soil sample for Cricket Lane.
Thanks,
Isaac M. Rowe, R.S.
Project Manager
Miff River `oiiis kilt in
6 Sargent Street
1
„,,,.,,,,, �, ;, ;;, ';' ;,,;. r //rr r„ .,.✓ /; / //ii//a/r � ;i/ rr r ri r/%///iii//�/i
,,,,,<: ,cr .:/,� ,,:,:, ,, ,” it /%1"rr .✓„,,, � „� ////:. r �//,:r�,�,,/,� // // ii /rr e�r// „� r
r r. / r ✓ r � r r r / / /r /
r/, / r , r //r / / r r r / ✓
l
l
tia
}
r.,
IQ
VN
f
e
v
�
r ”
_
C a,k1&SD
r
Z l0
T-J)
AA-
_ __
I-eb 14 12 02:15p Colleen Piepiola 1-978-352-9940 p.1
FORM 11-SOIL EVALUA11ON FORM
Page 1.of 3
No:A-1131-02 Date:12/14/2011
Commonwealth of Massachusetts
N. Andover,MA.
Soil Suitabilitil Assessment Lor On-Site Sewage Disposal
Performed By: John Paulson Date 12/1:1/2011
Witnessed By: Isaac Rowe-Mill River Consultin
Location Address:730 Winter Street Owner's Name, Diamond Realty Trust
or Lot#: MAP 104-A LOT 89 Address,and C/O William Bonnell
Telephone# 14 London St.-apt 2
New Construction 0 Repair 0 Lowell,kla 01852
978-888-7134
Office Review:
Published Soil Survey Available: No D Yes
Year Published 1981 Publication Scale 1:15840 Soil Map Unit:31
Draiatage Class B Soil Limitations CbD-CANTON
Surficial Geological Report Available: No 0 Yes ❑
Year Published Publication Scale
Geologic Material(Map unit)
Land Form
Flood Insurance Rate Map:
Above 500 year flood boundary No ❑ Yes
Within 500 year flood boundary No Yes 11
Within 100 year flood boundary No Yes ❑
Wetland Area:
National Wetland Inventory Map(neap unit)
Wetlands Conservancy Program Map (map urdt)
Current Water Resource Conditions (USGS):Month:January
Range: Above Normal 0 Normal ❑ Below Normal ❑
Other References Reviewed:
11•:11 APPH.-M-T 1�0�'%l -, 13 0r'O."
Feb 14 12 02:15p Colleen Piepiora 1-978-352-9940 p.2
FORM 11 -SOIL EVALUATION FORM
Page 2 of 3
Location Address or Lot No, 730 Winter St.
On-site Review
Deep Hole Number TP-1 Date 12/14/2011 Time am Weather-ac.
Location(identify on site plan)
Land Use Residential Slope(%)0u3 Surface Stones
VegetafionLawn
Landform Outwash Plain
Position on landscape(sketch on back)
Distances from:
Open Water Body 60'+ feet Drainage Way na feet
Possible Wet Area 60'+ feet Property Line 20 feet
Drinking Water Well NA feet Other
DEEP OBSERVATION HOLE LOG'S
Depth from Soil Horizon Soil Texture Soil Color Soil Other
Surface (USDA) (Munsell) Mottling (Structure,Stones,Boulder,
Consistency,%Gravel)
0-19 FILL
19-23 A SL 10YR-3/2
23-36 B SL 5YR-4/6
36-90 C-1 SL 10YR-6/6 REFUSAL
56 MOTTLES WEEPING 70
INII VINIUNI OF T;V0 HOLES AT EVERY PROPOSED DISPOSAL AREA
Parent Material(geologic):Glacial Ouhyash Depth to Bedrock:90
Depth to Groundwater:Standing Water in the Hole:NA Weeping from Pit Face: 70
Estimated Seasonal High Ground Water:56
DEP APPROVED FORM-12/07/95
FORM 11-SOIL EVALUATION FORM
Feb 14 12 02:15p Colleen Piepiora 1-978-352-9940 p.3
Page 2 of 3
Location Address or Lot No. 730 WINTER ST
On-site.Review
Deep Hole Number TP-2 Date 12/14/2011 Time am Weather P.C.
Location(identify on site plan)
Land Use Residential Slope(%)0!3 Surface Stones YES
Vegetation LAWN
Landform Outwash Plain
Position on landscape(sketch on back)
Distances from:
Open Water Body 601+ feet Drainage Way na feet
Possible Wet Area 60'+ feet Property Line 60 feet
Drinking Water Well NA feet Other
DEEP OBSERVATION HOLE LOG*
Depth from Soil Horizon Soil Texture Soil Color Soil Other
Surface (USDA) 0-11) Mottling (Structure,Stones,Boulder,
Consistency,%Gravel)
0-21 FILL
2144 B SL 5YR-4/6
44-120 C-1 SL 10YR-6/6
66 MOTTLES
'NUNIMUM OF TWO HOLES AT EVERY PROPOSED DISPOSAL AREA
Parent Material(geologic):Glacial Outwash Depth to Bedrock:N/A
Depth to Groundwater:Standing Water in the Hole:NA Weeping from Pit Face: 78
Estimated Seasonal High Ground Water:66
iwDull ArrROVED FORNI-12/07/95 '..
Feb 15 12 04:04p Colleen Piepiom 1-978-352-9940 p.1
FORM 11-SOIL EVALUATION FORM
Page 3 of 3
Determination for Seasonal High Water Table
730 Winter Street
Method Used:
❑ Depth observed standing in observation hole none inches
❑ Depth weeping from side of observation holes
■ Depth to soil mottles
❑ Ground water adjustment none feet
Index I'Vell Number Reading Date Index well level
Adjustment factor Adjusted ground water level
Depth of Naturally Occurring Pervious Material
Does at least four feet of naturally occurring pervious material exist in all areas observed throughout the
area proposed for the soil adsorption system? Yes
If not,what is the depth of naturally occurring pervious material?
Certification
I certify that on July 1995 (date)I have passed the soil evaluator examination approved by the
Department of Environmental Protection and that the above analysis was performed by me consistent with
the required,expertise and experience described in 310 CMR 15.017.
Signatui4� Date
1371
DEP APPROVED rORhf-12107/95
Feb 14 12 02:16p Colleen Piepiora 1-978-352-9940 p.4
FORM 12-PERCOLATION TEST
COMMONWEALTH OF MASSACHUSETTS
N. ANDOVER, Massachusetts
Percolation Test- 730 WINTER ST
Date 12/14/2012
Observation Hole # P-1
Depth of Perc 42 +17
Start Pre-soak 10:00
End Pre-soak 10:15
Time at 12" 10:15
Time at 9" 10:23
Time at 6" 10:35
Time (9"-6") 12
Rate Min./Inch 4
Site Passed ■ Site Failed ❑
Performed By: John Paulson &Bob Lynch
Witnessed By: Isaac Rowe-Mill River Consulting
Comments: