Loading...
HomeMy WebLinkAboutCorrespondence - 75 WINDSOR LANE 10/16/2012 sw • North Andover Health Department Community Development Division October 16, 2012 Gregory and Nancy Smith 75 Windsor Lane North Andover, MA 01845 Re: Subsurface Sewaize Disposal System Plan for 75 Windsor Lane,Map 106D,Lot 67 Dear Mr. and Mrs. Smith: The proposed wastewater system design plan for the above site dated September 6, 2012 and received on September 25, 2012 has been reviewed and the final revision dated October 15, 2012 has been approved. The design has been approved for use in the construction of a replacement onsite septic system. This plan is generally good for 3-years from the date of approval however, as this is for a repair system,this is reduced to 2-years. During this time, a licensed septic system installer must obtain a permit and complete this work, and a Certificate of Compliance be endorsed by the installer, designer and the Town of North Andover. In the event an imminent health problem such as sewage backup into the dwelling is occurring, the North Andover Board of Health may reduce the time period for which this plan is valid. This approval is also subject to the following conditions: 1. If site conditions are found in the field to be different from those indicated on the design plan and/or soil evaluation, the originally issued Disposal System Construction Permit is void, installation shall stop, and the applicant shall reapply for a new Disposal Systems Construction Permit(3 10 CMR 15.020(1)). 2. It is the responsibility of the applicant and/or the applicant's septic system designer, septic system installer or other representative to ensure that all other state and municipal requirements are met. These may include review by the Conservation Commission,Zoning Board,Planning Board, Building Inspector, Plumbing Inspector and/or Electrical Inspector. The issuance of a Disposal System Construction Permit Page 1 of 2 North Andover Health Department, 1600 Osgood Street, Building 20, Suite 2-36, North Andover, MA 01845 Phone: 978.688.9540 Fax: 978.688.8476 75 Windsor Lane October 16, 2012 shall not construe and/or imply compliance with any of the aforementioned requirements. Please feel free to contact the office with any questions you may have. We look forward to working with you to obtain a wastewater treatment and dispersal system which will be in compliance with all regulations and assure protection of public health and the environment of North Andover. Sincer , Su an Y. Sa , REH Public Hea Direct cc: Merrimack Engineering File Page 2 of 2 North Andover Health Department, 1600 Osgood Street, Building 20, Suite 2-36, North Andover, MA 01845 Phone: 978.688.9540 Fax: 978.688.8476