Loading...
HomeMy WebLinkAboutCertificate of Compliance - 444 SALEM STREET 6/26/2014 PUBLIC HEALTH DEPARTMENT Town of Forth Andover Community Development Division CERTIFICATE COMPLIANCE As of: 6/26/2014 This is to certify that the individual subsurface disposal system received a SATISFACTORY INSPECTION of the: Complete Repair of D-Box John DiVincenzo At 444 Salem Street Map 037.B Lot 0053 (Jhs Dance f this cei't t hall not e !ustrued as a guarantee that the system will function satisfactorily. w le Grant _.` °� Public Health Agent 1600 Osgood Street,North Andover,Massachusetts 01845 Phone 978.688.9540 Fax 978.688.8476 Web www.townofnorthandover.com North Andover Health Department Community Development Division QNSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 444 Salem St. MAP: 037.13 LOT: 0053 INSTALLER: John DiVincenzo DESIGNER: PLAN DATE: BOH APPROVAL DATE ON PLAN: INSPECTIONS INSPECTION: 6/26/14 D-Box DATE OF BED BOTTOM INSPECTION: DATE OF FINAL CONSTRUCTION INSPECTION: DATE OF FINAL GRADE INSPECTION: SITE CONDITIONS ❑ Contractor reports any changes to design plan ❑ Existing septic tank properly abandoned ❑ Internal plumbing all to one building sewer ❑ Topography not appreciably altered Comments: SEPTIC TANK ❑ Building sewer in continuous grade, on compacted firm base ❑ Cleanouts per plan ❑ Bottom of tank hole has 6" stone base ❑ Weep hole plugged ❑ 1500 gallon tank has been installed H-10 loading ❑ Monolithic tank construction ❑ Water tightness of tank has been achieved by visual testing ❑ Inlet tee installed, centered under access port ❑ Outlet tee installed, centered under access port (gas baffle/effluent filter) ❑ inch cover to within 6" of finish grade installed over one access port ❑ Hydraulic cement around inlet & outlet Comments: PUMP CHAMBER ❑ Bottom of tank hole has 6" stone base ❑ Weep hole plugged ❑ 1500 gallon Pump Chamber installed ❑ H-10 loading ❑ Monolithic tank construction ❑ Inlet tee installed, centered under access pork ❑ Pump(s) installed on stable base ❑ Alarm float working ❑ Pump On/Off floats working ❑ Separate on/off floats ❑ Drain hole in pressure line ❑ cover at final grade installed over pump access port ❑ Water tightness of tank has been achieved by testing ❑ Hydraulic cement around inlet & outlet Comments: CONTROL PANEL ❑ Alarm & Pump are on separate circuits ❑ Alarm sounds when float is tripped ❑ Location of control panel: basement ❑ Alarm signal located inside: basement Comments: DISTRIBUTION-BOX / [' Installed on stable stone base X H-20 D-Box Inlet tee (if pumped or >0.08'/foot) ❑' Hydraulic cement around inlet & outlets X Observed even distribution E3 Speed levelers provided (not required) ❑ Schedule 40 PVC Pipe Comments: 3 leaks in pipes, 1 at the joint of the outlet pipe as well as seepage going into D-box. 2nd outlet pipe has s epage at pipe entering the d-box. Re- inspect. A�J