Loading...
HomeMy WebLinkAboutCorrespondence - 492 SALEM STREET 3/30/2000 Town of Noah Andover NORTH OFFICE OF �? °t o� COMMUNITY DEVELOPMENT SERVICES p 27 Charles Street * 1 North Andover, Massachusetts 01845 WILLIAM J. SCOTT SSACHUSE Director (978)688-9531 Fax (978) 688-9542 March 30, 2000 Mr. Ben Osgood, Jr. New England Engineering 60 Beechwood Drive North Andover, MA 01845 Re: 492B Salem Street,No. Andover Dear Ben: This is to inform you that the revised septic system plan dated 3/14/00 for the site referenced above has been approved for maximum nine (9) rooms. If you have any questions, please do not hesitate to call the Board of Health Office at 978-688-9540. Sincerely, /r A2 Sandra Starr,R.S., C.H.O. Health Director S S/smc cc: Cyrus Construction File BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535 0A Paul raw Tt.ay~bide, F°E..,f°F°' I_S 71.3 465-°0313 P .(' March 22, 2000 Sandra Starr North Andover ward ofllealth Administrator Office of Community Development and `services 30 School St. North Andover, MA 01 845 RE: Title V fourth review for 429 Salern Street, Lot B (revision date of March 13, 2000 .bear Sandra, I find that the concerns outlined in airy report dated February 22, 2000 have been I adequately addressed by the revised Marrs. If you have any questions or comments please feel free to contact Me. 7 Sincerely C'aritoii A. row ,PE/PLS alern429M.doc 42913 Salem Street PORT INGINIMING Gnww�Civil higimers& T,,eud Surveyors 011P i€arris SnTet Neivbtiryport,MA 01950 ;;r, l NEW ENGLAND ENGINEERING SERVICES ..._.... .�.... .. .�.. . .w.�.�. . .. .�..� INC . � .. March 13, 2000 Sandra Starr, Administrator North Andover Health Department Town Hall Annex 27 Charles Street North Andover, MA 01845 Re: Lot B Salem Street,North Andover, Septic system design Dear Sandra: Enclosed you will find five copies of a revised septic system design for the above referenced property. These plans are being submitted for approval. The following changes have been made to address your comments. 1. The leach trenches have been moved closer to the street in order to provide the proper breakout offset between the edge of the trenches and the driveway at the garage. If you have any questions or need additional information please do not hesitate to contact this office. Sincerely, Benjamin C. Osgood, Jr., President . ....... ._..... ... e... ... ... .. .............. � DRIVE 60 BEECHWOOD NOFZTH ANr.ataVw:-R, MA 01845-(978)686-1768-E888>359.-7645, FAX(s.rs)685-7e99 'I'®®Vn of North Andover 3�0 ry`t"e(o7 egtioL OFFICE OF C® I'TY DEVELOPMENT SERVICES ° 27 Charles Street °4 North Andover, Massachusetts 01845 �9ssgcHUS�s�y WILLIAM I SCOTT Director (978)688-9531 Fax (978)688-9542 February 28, 2000 New England Engineering Services, Inc. 60 Beechwood Drive North Andover, MA Ol 845 RE: 492 Salem Street, Lot B Dear Mr. Osgood: This letter is to inform you that the proposed septic plan for Lot B Salem Street, North Andover has a technical deficiency that needs to be addressed before an approval can be issued. The deficiency is as follows: • The proposed dwelling will have a garage-under with a floor elevation of 203.5'. Since the required grade at the corner of the foundation is 206', the stone retaining wall beside the driveway must be an impervious barrier. Please do not hesitate to call the office at 978-688-9540 if you have any questions. Sincerely, Sandra Starr,R.S., C.H.O. Health Director Cc: Cyrus Construction W. Scott File BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535 Feb-22-00 02 : 38P Paul ®. Turbide, PE/PLS 978-465-0313 P .03 February 22, 2000 Sandra Starr North Andover Board of Health Administrator Office of Community Development and Services 30 School St. North Andover, MA 01845 RE: Title V third review for 429 Salem Street, Lot B (Revision date of Feb. 16, 2000) Tear Sandra I find that the plans adequately address the regulations except for the following: The proposed dwelling will have a garage-under with a garage floor elevation of 203.5'. Therefore the stone retaining wall shown on the plan running along the side of the paved driveway until it hits the foundation must be an impervious barrier(at the corner of the foundation the required grade is 206', yet the garage floor will be 203.5'). If you have any questions or comments please feel free to contact me. Sincerely Carlton A. rown, PE/PLS Salem429b3.doc 429A Salem Street URT ENGINEERING Civil Engineers& Land Surveyors One Harris Street Newburyport,MA Q1950 (978)465-8594 ,.. NEW ENGLAND ENGINEERING SERVICES February 17, 2000 Sandra Starr, Administrator North Andover Health Department Town Hall Annex 27 Charles Street North Andover, MA 01845 Re: Lots A &B Salem Street,North Andover, Septic system design Dear Sandra: Enclosed are five copies of new septic system designs for the above referenced properties. These plans are being submitted for approval. The following additional items are also being submitted. 1. Application forms. 2. Checks to cover the fee. These plans are intended to replace the previous designs that were submitted and approved by Eastern Land Survey. If you have any questions or need additional information please do not hesitate to contact this office. Sincerely, Benjariin C. Osgood, Jr.,EIT President 6 ............u.............--................................ .....mow..................... �,... a 0 B 'C,HWOO DRIVE- NORTH ANDOVER, A 01845-(9-78)�r86-1 768-(888)359-7645.. FAX(978) 85s 1099 Town of North Andover o4 AORoT e,� OFFICE OF ,�? y°' ° ° COMMUNITY DEVELOPMENT AND SERVICES o imp 27 Charles Street 1 North Andover, Nlassachusetts 01845 SAC US WILLIAM J. SCOTT Director (978) 688-9531 Fax (979) 688-9542 May 12, 1999 Eastern Land Survey Associates, Inc. 104 Lowell Street Peabody, NIA 01960 RE: 492 Salem Street, Lots A, B, and C I Dear Mr. Morin: This letter is to inform you that the proposed septic plans, dated 4/16/99 for Lots A, B and C at 492 Salem Street, North Andover have been approved. Please call the Health Department at the number below if you have any questions. Sincerely, Sandra Starr, R.S. Health Administrator Cc: Cyrus Construction File BOARD OF APPEALS 688-9541 BUILDEVG 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535 May- 11 -99 01 : 39P F>a i.i 1 D u y,b°i ci , PE,/°Pr._.S 508-465-0313 P-03 May 11, 1999 Sandra Starr North Andover Board of Health Administrator Office ofConamunity Development and Services 30 School St. North Andover, MA 01845 1 ,: Title V second review for WSalem Street, Lot B Dear Sandra, I find that the concerns outlined in my report dated March 22, 1999 have been adequately addressed by the revised plans. If"you have any questions or comments please feel free to contact rne. ,Sincerely Carlton A. Brown, PE/PPS Salem429b2.doc U 429E Salem Street Poirr ENGINEERING W.-MMEM Civil Engineertt fir Land surveyors 0110 Harris Street Newburyport,111:'1 01950 (978)465-8594 May-03-99 02 * 29P PaUl D. Turbide , PE/PLS 508-465-0313 P . 02 May 3, 1999 Sandra Starr North Ar,love,Board oI health Administrator Office of Community Development and Services 30 School St. North Andover, MA 01 2 45 -11 RE: Correction to'Title V review for 40 Salem Street, Lot D Dear Sandra, On my review letter dated March 22, 1999 for the above-mentioned premises, I stated that there was confusion about the numbering of the test pits. This led me to believe that the determination ofESHW was in error, and that the proposed leaching bed should be raised to be 4 feet above ISHW. After talking with Alex.parker, soil evaluator, I realize that there is no confusion and that the plans correctly show the test pit numbering and ESHW elevations. Therefore Itenes 913, 34 and 15 in the March 22, 1999 report are not problems and should be deleted from the report. If you have any questions or comments please feel free to contact rne. Sincerely Carlton A. Brown, PE/pLS Salem429d2.doc PORT ENGINIIHING, Civil Engineers& Land Surveyors One Harris Street Newburyport,MA 01950 (978)465.8594 Professional Land Surveyors&Civil Engineers ESSEX SURVEY SERVICE 1958- 1986 OSBORN PALMER 1911 - 1970 BRADFORD&WEED 1885- 1972 April 21, 1999 �,�,i;, Ms. Sandra Starr, R.S., Health 22 (gg Administrator Office of Community Development and Services , 27 Charles Street North Andover, Massachusetts 01845 RE: F 11074 Lot B 492 Salem Street North Andover, MA Dear Ms. Starr: Please accept the following responses to your letter of March 29, 1999, relative to the referenced lot. The reserve area is now located four (4) feet from the primary area (i.e., between the proposed trenches). A breakout wall of reinforced concrete construction is now pro- posed instead of the slope. The breakout wall is proposed to be five (5) feet from the line of Salem Street. Trenches are now proposed. The invert elevations have been revised to correct the one foot drafting error. A notation that the distribution lines be connected with solid pipe has been added to the Plan. The slope of distribution lines has been added to the profile. The vent has been noted as a vent/monitoring well in the plan and profile views. Note 7 has been amended to include the Board of Health. 104 LOWELL STREET PEABODY, MASS. 01960 TELEPHONE: 978-531-8121 TELECOPIER: 978-531-5920 E-MAIL: elsai @prodigy.net Ms. Sandra Starr Town of North Andover April 21, 1999 Page 2 Four (4) inch pipe is now specified on the distribution box detail. The Owner/Applicant's name and address are now noted in the title block. The driveway elevations have been clarified by the addition of spot elevations. The location and elevation of the proposed foundation drain has been added to the Plan. The elevation of the perc tests have been added to the Plan® A benchmark with 75 feet of the proposed septic system has been added to the Plan. Accompanying this letter are three (3) copies of the Proposed Construction Plan, revised April 16, 1999. Any questions regard- ing to the responses may be directed to Clayton A. Morin, P.E. or the undersigned. Very truly yours, James H. MacDowell JBM/tlm Enclosures cc: Cyrus Construction ltlm� �TTJ�Dy Town of North Andover I TH 0 4, OFFICE OF 6 110 COMMUNITY DEVELOPMENT AND SERVICES 0 27 Charles Street North Andover, Massachusetts 0 1845 WILLIAM I SCOTT ACHUS Director (978) 688-9531 Fax (978) 688-9542 March 29, 1999 Eastern Land Survey Associates, Inc. 104 Lowell Street Peabody, MA 01960 RE: 492 Salem Street, Lot B Dear Mr. Morin: This letter is to inform you that the proposed septic plan for Lot B Salem Street, North Andover has been disapproved for the foRowina reasons: 0 • The reserve area is less than 4' from the primary leaching area (NA 9.04) • There is less than 15' to the property line from the toe of slope, -so 3:1 Slope and 15' cannot be achieved. Please rectify. • Fill is shown runi-iing right to the street line of Salem Street. The regulations require that the toe of fill stop at least 5' from a property line or a Swale must be in ,stalled. (310 CMR 15.255(2)) • Profile of system appears to have drafting errors. Please check. Ja if�f use of field. (110 CMR • Trenches shall be used whenever possible. Ple-aseJust use I - 15,240(6)) • Distribution lines of field shall be corunected with -Solid pipe - profile. (T\TA 15.01) • Distribution lines missing slope specification . (310 CMR 115.251(9)) • Vent detail is for a monitoring well"not just _- vent. • Note 7-"Any change of conditions...." Please add"and the Board of Health". • In d-box detail pipe is not specified as 4". • Addresses of owner and applicant are missing, (NA 8.02k) I Driveway elevation missing. (NA 8.021) • Location and elevation of foundation drain missing. (NA 8.02y) • Elevation of per-, test missing. (NA 8.02n) • Benchmarks within 75' of the proposed septic system are missing. (310 CMR 15.220(4)(q)) BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535 Please do not hesitate to call the office at the number below if you have any question--. Sincerely, Sandra Starr,R.S. Health Administrator Cc: Cyrus Construction W.Scott File u ty 11/16/98 To: Joseph Pelich -Cyrus Construction Corporation I"rom: Michael & Debra De>niz•djian Regarding: 492 Salem Street soils tests Dear Mr. Pelich, Please let this letter serve as our permission to perform any and all testing/review so as to obtain any and all tests and evaluation needed by the Town Of North Andover for permits, approval,or anything required by the Town Of North Andover. This includes permission for any and all boards or persons within the Town Of North.Andover to take steps tln•ough you for the development of the property at 492 Salem Street,North Andover. We grant this approval as owners of record of the property. Sincerely, Michael &Debra Demirdjian