HomeMy WebLinkAboutCorrespondence - 492 SALEM STREET 3/30/2000 Town of Noah Andover NORTH
OFFICE OF �? °t o�
COMMUNITY DEVELOPMENT SERVICES p
27 Charles Street * 1
North Andover, Massachusetts 01845
WILLIAM J. SCOTT SSACHUSE
Director
(978)688-9531 Fax (978) 688-9542
March 30, 2000
Mr. Ben Osgood, Jr.
New England Engineering
60 Beechwood Drive
North Andover, MA 01845
Re: 492B Salem Street,No. Andover
Dear Ben:
This is to inform you that the revised septic system plan dated 3/14/00 for the site
referenced above has been approved for maximum nine (9) rooms.
If you have any questions, please do not hesitate to call the Board of Health Office at
978-688-9540.
Sincerely,
/r A2
Sandra Starr,R.S., C.H.O.
Health Director
S S/smc
cc: Cyrus Construction
File
BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535
0A Paul raw Tt.ay~bide, F°E..,f°F°' I_S 71.3 465-°0313 P .('
March 22, 2000
Sandra Starr
North Andover ward ofllealth Administrator
Office of Community Development and `services
30 School St.
North Andover, MA 01 845
RE: Title V fourth review for 429 Salern Street, Lot B (revision date of March 13,
2000
.bear Sandra,
I find that the concerns outlined in airy report dated February 22, 2000 have been
I adequately addressed by the revised Marrs.
If you have any questions or comments please feel free to contact Me.
7
Sincerely
C'aritoii A. row ,PE/PLS
alern429M.doc
42913 Salem Street
PORT
INGINIMING
Gnww�Civil higimers&
T,,eud Surveyors
011P i€arris SnTet
Neivbtiryport,MA
01950
;;r, l
NEW ENGLAND ENGINEERING SERVICES
..._.... .�.... .. .�.. . .w.�.�. . .. .�..�
INC . � ..
March 13, 2000
Sandra Starr, Administrator
North Andover Health Department
Town Hall Annex
27 Charles Street
North Andover, MA 01845
Re: Lot B Salem Street,North Andover, Septic system design
Dear Sandra:
Enclosed you will find five copies of a revised septic system design for the above
referenced property. These plans are being submitted for approval. The following
changes have been made to address your comments.
1. The leach trenches have been moved closer to the street in order to provide the proper
breakout offset between the edge of the trenches and the driveway at the garage.
If you have any questions or need additional information please do not hesitate to contact
this office.
Sincerely,
Benjamin C. Osgood, Jr.,
President
. ....... ._..... ... e... ... ... .. ..............
�
DRIVE 60 BEECHWOOD NOFZTH ANr.ataVw:-R, MA 01845-(978)686-1768-E888>359.-7645, FAX(s.rs)685-7e99
'I'®®Vn of North Andover 3�0 ry`t"e(o7 egtioL
OFFICE OF
C® I'TY DEVELOPMENT SERVICES °
27 Charles Street °4
North Andover, Massachusetts 01845 �9ssgcHUS�s�y
WILLIAM I SCOTT
Director
(978)688-9531 Fax (978)688-9542
February 28, 2000
New England Engineering Services, Inc.
60 Beechwood Drive
North Andover, MA Ol 845
RE: 492 Salem Street, Lot B
Dear Mr. Osgood:
This letter is to inform you that the proposed septic plan for Lot B Salem Street,
North Andover has a technical deficiency that needs to be addressed before an approval
can be issued. The deficiency is as follows:
• The proposed dwelling will have a garage-under with a floor elevation of 203.5'.
Since the required grade at the corner of the foundation is 206', the stone retaining
wall beside the driveway must be an impervious barrier.
Please do not hesitate to call the office at 978-688-9540 if you have any questions.
Sincerely,
Sandra Starr,R.S., C.H.O.
Health Director
Cc: Cyrus Construction
W. Scott
File
BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535
Feb-22-00 02 : 38P Paul ®. Turbide, PE/PLS 978-465-0313 P .03
February 22, 2000
Sandra Starr
North Andover Board of Health Administrator
Office of Community Development and Services
30 School St.
North Andover, MA 01845
RE: Title V third review for 429 Salem Street, Lot B (Revision date of Feb. 16, 2000)
Tear Sandra
I find that the plans adequately address the regulations except for the following:
The proposed dwelling will have a garage-under with a garage floor elevation of 203.5'.
Therefore the stone retaining wall shown on the plan running along the side of the
paved driveway until it hits the foundation must be an impervious barrier(at the corner
of the foundation the required grade is 206', yet the garage floor will be 203.5').
If you have any questions or comments please feel free to contact me.
Sincerely
Carlton A. rown, PE/PLS
Salem429b3.doc
429A Salem Street
URT
ENGINEERING
Civil Engineers&
Land Surveyors
One Harris Street
Newburyport,MA
Q1950
(978)465-8594
,..
NEW ENGLAND ENGINEERING SERVICES
February 17, 2000
Sandra Starr, Administrator
North Andover Health Department
Town Hall Annex
27 Charles Street
North Andover, MA 01845
Re: Lots A &B Salem Street,North Andover, Septic system design
Dear Sandra:
Enclosed are five copies of new septic system designs for the above referenced
properties. These plans are being submitted for approval. The following additional items
are also being submitted.
1. Application forms.
2. Checks to cover the fee.
These plans are intended to replace the previous designs that were submitted and
approved by Eastern Land Survey. If you have any questions or need additional
information please do not hesitate to contact this office.
Sincerely,
Benjariin C. Osgood, Jr.,EIT
President
6
............u.............--................................ .....mow..................... �,... a
0 B 'C,HWOO DRIVE- NORTH ANDOVER, A 01845-(9-78)�r86-1 768-(888)359-7645.. FAX(978) 85s 1099
Town of North Andover o4 AORoT e,�
OFFICE OF ,�? y°' ° °
COMMUNITY DEVELOPMENT AND SERVICES o
imp
27 Charles Street 1
North Andover, Nlassachusetts 01845
SAC US
WILLIAM J. SCOTT
Director
(978) 688-9531 Fax (979) 688-9542
May 12, 1999
Eastern Land Survey Associates, Inc.
104 Lowell Street
Peabody, NIA 01960
RE: 492 Salem Street, Lots A, B, and C
I
Dear Mr. Morin:
This letter is to inform you that the proposed septic plans, dated 4/16/99 for Lots
A, B and C at 492 Salem Street, North Andover have been approved. Please call the
Health Department at the number below if you have any questions.
Sincerely,
Sandra Starr, R.S.
Health Administrator
Cc: Cyrus Construction
File
BOARD OF APPEALS 688-9541 BUILDEVG 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535
May- 11 -99 01 : 39P F>a i.i 1 D u y,b°i ci , PE,/°Pr._.S 508-465-0313 P-03
May 11, 1999
Sandra Starr
North Andover Board of Health Administrator
Office ofConamunity Development and Services
30 School St.
North Andover, MA 01845
1 ,: Title V second review for WSalem Street, Lot B
Dear Sandra,
I find that the concerns outlined in my report dated March 22, 1999 have been
adequately addressed by the revised plans.
If"you have any questions or comments please feel free to contact rne.
,Sincerely
Carlton A. Brown, PE/PPS
Salem429b2.doc
U
429E Salem Street
Poirr
ENGINEERING
W.-MMEM
Civil Engineertt fir
Land surveyors
0110 Harris Street
Newburyport,111:'1
01950
(978)465-8594
May-03-99 02 * 29P PaUl D. Turbide , PE/PLS 508-465-0313 P . 02
May 3, 1999
Sandra Starr
North Ar,love,Board oI health Administrator
Office of Community Development and Services
30 School St.
North Andover, MA 01 2 45
-11
RE: Correction to'Title V review for 40 Salem Street, Lot D
Dear Sandra,
On my review letter dated March 22, 1999 for the above-mentioned premises, I stated
that there was confusion about the numbering of the test pits. This led me to believe
that the determination ofESHW was in error, and that the proposed leaching bed should
be raised to be 4 feet above ISHW.
After talking with Alex.parker, soil evaluator, I realize that there is no confusion and
that the plans correctly show the test pit numbering and ESHW elevations.
Therefore Itenes 913, 34 and 15 in the March 22, 1999 report are not problems and
should be deleted from the report.
If you have any questions or comments please feel free to contact rne.
Sincerely
Carlton A. Brown, PE/pLS
Salem429d2.doc
PORT
ENGINIIHING,
Civil Engineers&
Land Surveyors
One Harris Street
Newburyport,MA
01950
(978)465.8594
Professional Land Surveyors&Civil Engineers
ESSEX SURVEY SERVICE 1958- 1986
OSBORN PALMER 1911 - 1970
BRADFORD&WEED 1885- 1972
April 21, 1999 �,�,i;,
Ms. Sandra Starr, R.S., Health 22 (gg
Administrator
Office of Community Development and Services ,
27 Charles Street
North Andover, Massachusetts 01845
RE: F 11074
Lot B
492 Salem Street
North Andover, MA
Dear Ms. Starr:
Please accept the following responses to your letter of March 29,
1999, relative to the referenced lot.
The reserve area is now located four (4) feet from the primary
area (i.e., between the proposed trenches).
A breakout wall of reinforced concrete construction is now pro-
posed instead of the slope.
The breakout wall is proposed to be five (5) feet from the line
of Salem Street.
Trenches are now proposed.
The invert elevations have been revised to correct the one foot
drafting error.
A notation that the distribution lines be connected with solid
pipe has been added to the Plan.
The slope of distribution lines has been added to the profile.
The vent has been noted as a vent/monitoring well in the plan and
profile views.
Note 7 has been amended to include the Board of Health.
104 LOWELL STREET
PEABODY, MASS. 01960
TELEPHONE: 978-531-8121 TELECOPIER: 978-531-5920 E-MAIL: elsai @prodigy.net
Ms. Sandra Starr
Town of North Andover
April 21, 1999
Page 2
Four (4) inch pipe is now specified on the distribution box
detail.
The Owner/Applicant's name and address are now noted in the title
block.
The driveway elevations have been clarified by the addition of
spot elevations.
The location and elevation of the proposed foundation drain has
been added to the Plan.
The elevation of the perc tests have been added to the Plan®
A benchmark with 75 feet of the proposed septic system has been
added to the Plan.
Accompanying this letter are three (3) copies of the Proposed
Construction Plan, revised April 16, 1999. Any questions regard-
ing to the responses may be directed to Clayton A. Morin, P.E. or
the undersigned.
Very truly yours,
James H. MacDowell
JBM/tlm
Enclosures
cc: Cyrus Construction
ltlm� �TTJ�Dy
Town of North Andover I TH
0 4,
OFFICE OF 6 110
COMMUNITY DEVELOPMENT AND SERVICES 0
27 Charles Street
North Andover, Massachusetts 0 1845
WILLIAM I SCOTT ACHUS
Director
(978) 688-9531 Fax (978) 688-9542
March 29, 1999
Eastern Land Survey Associates, Inc.
104 Lowell Street
Peabody, MA 01960
RE: 492 Salem Street, Lot B
Dear Mr. Morin:
This letter is to inform you that the proposed septic plan for Lot B Salem Street,
North Andover has been disapproved for the foRowina reasons:
0
• The reserve area is less than 4' from the primary leaching area (NA 9.04)
• There is less than 15' to the property line from the toe of slope, -so 3:1 Slope and
15' cannot be achieved. Please rectify.
• Fill is shown runi-iing right to the street line of Salem Street. The regulations
require that the toe of fill stop at least 5' from a property line or a Swale must be
in
,stalled. (310 CMR 15.255(2))
• Profile of system appears to have drafting errors. Please check.
Ja if�f use of field. (110 CMR
• Trenches shall be used whenever possible. Ple-aseJust use I -
15,240(6))
•
Distribution lines of field shall be corunected with -Solid pipe - profile. (T\TA 15.01)
• Distribution lines missing slope specification . (310 CMR 115.251(9))
• Vent detail is for a monitoring well"not just _- vent.
• Note 7-"Any change of conditions...." Please add"and the Board of Health".
• In d-box detail pipe is not specified as 4".
• Addresses of owner and applicant are missing, (NA 8.02k)
I Driveway elevation missing. (NA 8.021)
• Location and elevation of foundation drain missing. (NA 8.02y)
• Elevation of per-, test missing. (NA 8.02n)
• Benchmarks within 75' of the proposed septic system are missing. (310 CMR
15.220(4)(q))
BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535
Please do not hesitate to call the office at the number below if you have any
question--.
Sincerely,
Sandra Starr,R.S.
Health Administrator
Cc: Cyrus Construction
W.Scott
File
u ty
11/16/98
To: Joseph Pelich -Cyrus Construction Corporation
I"rom: Michael & Debra De>niz•djian
Regarding: 492 Salem Street soils tests
Dear Mr. Pelich,
Please let this letter serve as our permission to perform any and all testing/review so as to obtain any and all
tests and evaluation needed by the Town Of North Andover for permits, approval,or anything required by
the Town Of North Andover. This includes permission for any and all boards or persons within the Town
Of North.Andover to take steps tln•ough you for the development of the property at 492 Salem Street,North
Andover. We grant this approval as owners of record of the property.
Sincerely,
Michael &Debra Demirdjian