HomeMy WebLinkAboutCorrespondence - 15 FOREST STREET 3/7/2016 tl J T & C CONSTRUCTION CO., INC. 14 Appleton Street North Andover, MA 01845 Phone (978) 686-4082 Fax (978) 688-0489 PROPOSED CONSTRUCTION SCHEDULE Septic System Installation/Mr. James Cassell Owner 15 Forest Street North Andover, MA DATE DESCRIPTION OF WORK 10/3 To 10/9/99 Excavate for Concrete Retaining Wall Pour Concrete Footings and Wall 10/10 To 10/17 Install Septic System 10/17 To 10/24 Install Landscape Retaining Wall Loam and Seed to Stabilize Town of North Andover NORTH OFFICE OF �01 �`t. L COMMUNITY DEVELOPMENT AND SERVICES 0 -' 27 Charles Street North Andover,Massachusetts 01845 �gssacHUS�t�y WILLIAM J. SCOTT Director (978)688-9531 Fax(978)688-9542 August 27, 1999 Ben Osgood, Jr. New England Engineering 33 Walker Road, Suite 23 North Andover, MA 01 845 Re: 15 Forest Street Dear Ben: This is to confirm that on August 26, 1999, at their regularly scheduled meeting the North Andover Board of Health considered variances requested for the repair of a septic system at 15 Forest Street. The following variances were granted by a vote of the Board. Local Upgrade Approvals: 1. Reduction in the offset distance from the edge of the leach field to the property line from the 10 feet required by the Title 5 Section 15.211(1)to 7 feet. 2. Allow the reduction in the offset distance between the bottom of the leach bed and the water table from the 5 feet required by the Title 5 section 15.212 to 4 feet. Local Variances: 1. Reduction in the offset distance between the edge of the leach field and the wetlands from 100 feet required to 70 feet. 2. Reduction in the leach field size,from the minimum 900 square feet required to 600 square feet. 3. Allow the use of a poly barrier in lieu of a buried concrete wall for slope reduction. With the granting of these variances, the septic plan dated August 13, 1999 is approved. BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535 Please feel free to call the Health Department at 978-688-9540 if you have any questions concerning this action. Sincerely, Sandra Starr,R.S. Health Administrator cc: James Cassell File ig-17-99 03: 08P Paul D_ Tuv-bide, PE/PLS 508-465-0313 P_02 August 17, 1999 Sandra Starr North Andover Board of Health Administrator Office of Community Development and Services 30 School St. North Andover, MA 01845 RE: Title V fourth review for 15 Forest Street(Map 106a Lot 68) Dear Sandra, I find that the plans with revision date of 8/13/99 adequately address the concerns outlined in my report dated August 11, 1999. If you have any questions or comments please feel free to contact me. Sincerely Carlton A. Brown, PE/PLS Forest 15d.doc MR so Fill ME URM [NUINIHING Civil Engineers& Land Surveyors One Harris Street Newburyport.MA 01950 (9;8)465-8S94 NEW ENGLAND ENGINE',-,'"ERING SERVICES INC August 13, 1999 Sandra Starr, Administrator North Andover Health.Department Town Hall. Annex 27 Charles Street North Andover, MA 01845 Re: IS Forest Street,North Andover, Septic system design Dear'Sandra: Please accept this letter as a request to have the above referenced plan considered for approval at the Board of Health meeting on August 26, 1999. Specifically, the board needs to approve the following. LOCAL UPGRADE APPROVALS: 1. Reduction in the offset distance from the edge of the leach field to the property line from the 10 feet required by Title 5 Section 15.211(1) to 7 feet. 2. Allow the reduction in the offset distance between the bottom of the leach bed and the water table from the 5 feet required by Title 5 section 15.212 to 4 feet. LOCAL VARIANCES: 1. Reduction in the offset distance between the edge of the leach field and the wetlands from 100 feet required to 70 feet. 2. Reduction in the leach field size from 900 square feet required to 600 square feet. 3. Allow the use of a poly barrier in lieu of a buried concrete wall for slope reduction. As you Imow this plan is a redesign and all of the above have been approved previously except for the offset to water table. w n i � � d d a 1; . _ .. . 4 WALKER c -MU iµ : _NORTH AN DOVE 01845, ( r a _ t a. F((978 .,,,,.,,... ..,w w..,,.,..,�..ww.w...,.v.�u..„« �,.,.w,.,�.....w..v....,..n..»,...�.www.ww,wo..www......,..,... .»... .�.......,.n........,dj.. If you have any questions or need additional information please do not hesitate to contact this office. Sincerely, 6 Benjamin C. Osgood, Jr.,EIT President NEW ENGI.-AND ENGINEERING SERVICES ...... I INC August 13, 1999 Sandra Staff, Administrator North Andover Health Department Town Hall Annex 27 Charles Street North Andover, MA 01 845 Re: 15 Forest Street,North Andover, Septic system design Dear Sandra: Enclosed you will find five copies of a revised septic system design for the above referenced property. These plans are being submitted to address the two comments in your letter dated August 11, 1999. Each of the comments has been addressed as follows. 1. A detail of how the poly barrier will be connected to the retaining wall has been added to the plans. The detail specifies that the poly barrier shall be applied to the fresh bituminous waterproofing with a 24" overlap. 2. The system is the same distance from the property line as the previous plan. A hearing was held for this variance at a previous meeting. If you have any questions or need additional information please do not hesitate to contact this office. Sincerely, Benjamin C. Osgood, Jr., EIT President P.S. Please note that our new address is 60 Beechwood Drive, North Andover. ............ ............. ....................—.— ................---................... . ..... 33 WALKER ROAD-suirE 23-NOR i ANDOVER, MA 01845-(978)686�1 768-(888)359-7645-FAX(978)685-1099 .................--................--...-................ .................. ......... ..................... Aug-11-99 01 :o1P Paul D. Tuirbide, PE/PLS 508-465-0313 P .02 August 11, 1999 Sandra Starr North Andover Board of Health Administrator Office of Community Development and Services 30 School St_ j North Andover, MA 01845 RE: Title V third review for 15 Forest Street(Map 106a Lot 68) Dear Sandra, Enclosed find the"Checklist for North Andover Septic System Plans" for the above- mentioned site. The following is a list of all the`Problem' areas and deficiencies Port Engineering has found. (Note that this design plan with revision date of 8/6/99 is different than the design plan with revision date of 5/20/99. The fast system and pressure distribution system has been eliminated. The new design is for a conventional leaching trench system with conventional septic tank, pump chamber system and dbox.) u The leaching bed will be closer to the property line than the setback requirement allows_ Thus the abutter must be notified by certified letter as per 310 CMR 15.405(2). (I missed this the first time.) L) Note 14 on sheet one states that a Professional Land Surveyor shall stake the southern lot line. This should be made a condition of approval. u There will be an impervious barrier completely encircling the leaching bed. The southern part will be a concrete retaining wall. The rest will be a poly barrier. There should be a detail showing how the poly barrier will be tied into the concrete retaining wall to make sure it is a waterproof seat. If you have any questions or comments please feel free to contact me. Sincerely Carlton A. Brown, PE/PLS Forest 5c.doc PORT ENGINEERING Civil Engineers& Land Surveyors Otte Barris Street Newburyport,SSA 01950 (978)465-5594 I Town of North Andover NORTH OFFICE OF 3�o aHO c COMMUNITY E L P EN'S AND SERVICES p 27 Charles Street " North Andover, Massachusetts 018459°°A,TEO WILLIAM J. SCOTT 9SSACa+US Director (978)688-9531 Fax (978)688-9542 August 11, 1999 RE: 15 Forest Street Ben Osgood,Jr. New England Engineering 33 Walker Road North Andover, MA 01845 Dear .?vtr. Osgood: This letter is to inform you that the proposed septic plans for the repair of the system at 15 Forest Street have been disapproved for the following reasons: 1. Please submit detailed plans showing how the poly barrier is being proposed to be tied into the concrete retaining wall. It is important that this be a waterproof seal. 2. Leaching area less than 10' from property line. Abutters must be notified and a hearing held if setback less than on previous design. (3 10 CNIR 15.405(2)), If you have any questions, feel free to call the Health Department at 688-9540. Sincerely, Sandra Starr, R.S. Health Administrator Cc: James Cassell File BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535 Town of North Andover RTH OFFICE OF ��o COMMUNITY DEVELOPMENT AND SERVICES 0 . 27 Charles Street North Andover, Massachusetts 01845 �9SSACFHUS�t�y WILLIAM J. SCOTT Director (978)688-9531 Fax(978) 688-9542 July 1, 1999 Ben Osgood, Jr. New England Engineering 33 Walker Road, Suite 23 No. Andover, MA 01845 Re: 15 Forest Street No. Andover, MA 01845 Dear Ben: This is to inform you that the proposed septic system repair plans for the site referenced above have been approved. If you have any questions, please do not hesitate to call the Board of Health Office at 978- 688-9540. Sincerely, - 1�1) AML) Sandra Starr, R.S. Health Administrator SS/smc cc: James Cassell File BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535 Town of North Andover Of tAORT°�a•o OFFICE OF Comm I'TY DEVELOPMENT AND SERVICES 0 A 27 Charles Street - North Andover, Massachusetts 01845 �9SSACHUSE�� WILLIAM J. SCOTT Director Fax(978) 688-9542 (978)688-9531 June 25, 1999 Ben Osgood, Jr. New England Engineering 33 Walker Road, Suite 23 North Andover, MA 01845 Re: 15 Forest Street Dear Ben: This is to confirm you that on June 24, 1999, at their regularly scheduled meeting the North Andover Board of Health held a hearing to consider variances requested for the repair of a septic system at 15 Forest Street,No. Andover, MA. The following variances were granted by a vote of the Board. 1. Reduction in distance of leach field to property line from 10 ft. to 7 ft. 2. Reduction in distance from leach field to wetlands from 100 ft. to 70 ft. 3. Reduction in leach field size 900sq. ft to 600 sq. ft. 4. Use of poly barrier in lieu of concrete wall. The following variances were requested but not granted: 1. Reduction from edge of leach field to well from 100 ft. to 53 ft, Please feel free to call the Health Department at 978-688-9540 if you have any questions concerning this action. Sincerely, -"'6) V'j lall Sandra Starr, R.S. Health Administrator cc: James Cassell File )OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535 23 Forest Street North Andover, MA 01845 (978) 794-4319 June 24, 1999 Benjamin C. Osgood, Jr., EIT President New England Engineering Services Inc. 33 Walker Road, Suite 23 North Andover, MA 01845 Dear Mr. Osgood: L), nk you for the notice regarding a public hearing before the Board of Health today at 7:00 PM. The request of Mr, James Cassel for a"local upgrade approval" to allow the installation of a septic system 7' from our property line (as opposed to the Title 5 requirement of 10') should be quickly approved. We understand the proposed construction to include a retaining wall and have no objection to the plan. On the contrary, Mr. Cassel and his family have a real health issue with their current septic problems and their request should be expedited in any way possible. We may not be able to stay at the hearing tonight, therefore this letter of support for the plan. We will try to get a copy to the Board of Health, but would appreciate it if you would make sure they have received it at the hearing. Sincerely, e C�. Edward C. Martin Siegli We Martin /CC: North Andover Board of Health Jun-17-39 10: 11A Paul D. Tuvrbide, PE/PLS SOS-465-0313 P .06 June 17, 1999 Sandra Starr North Andover Board of Health Administrator Office of Community Development and Services 30 School St, North Andover, MA 01845 RE: Title V second review for 15 Forest Street (Map 106a Lot 68) Dear Sandra, I find that the areas of concern outlined in my report dated June 2, 1999 have been adequately addressed by the revised design plans. (A revision date should be added to the new plans to differentiate them from the old plans.) If you have any questions or comments please feel free to contact me. Sincerely Carlton A. Brown, PE/PLS c. Forest 15b.doc PORT ENGINEERING Civil Engineers& Land Surveyors One Barris Street Newburyport,MA 01950 (978)465.8594 .............. ------- NEW ENGLAND ENGINEERING SERVICES I N C June 10, 1999 Gayton Osgood, Chairman North Andover Health Department Town Hall Annex 27 Charles Street North Andover, MA 01845 Re: 15 Forest Street revised septic system design Dear Mr. Chairman: Please accept this letter as a request for the Board of Health to hold a public hearing at their June 24, 1999 meeting. The purpose of the hearing will be for the Board to consider the following Local Upgrade Approval requests and Local Bylaw requests for the above referenced property. Local Upgrade Requests: 1. Allow the reduction in the offset distance between the edge of the leach field and the property line from the 10 feet required by Title 5 section 15.211(1)to 7 feet. Local Bylaw Variances Required: 1. Reduce the offset from the edge of the leach field to the wetlands from 100 feet required to 70 feet. 2. Reduce the leach field size from 900 sq. ft, required to 600 sq. ft. 3. Allow the use of a poly. barrier in lieu of a buried concrete wall for slope reduction. 4. Allow a reduction in the offset distance between the edge of the leach field and the irrigation well from the 100 feet required to 53 feet. The local upgrade request requires that the abutter on the side of the reduced offset be notified. A copy of the certified notice that has been sent today is enclosed. ............... 33 WALKER ROAD.-SUITE 23-Nor�n-f ANDOVER, MA01845-(978)686-1-768-(888)359-7645-FAX(978)685-1099 ............................... If you have any questions regarding any of the new information please do not hesitate to contact this office. Sincerely, Benjamin C. Osgood, Jr., EIT President NEW ENGLAND ENGINEERING SERVICES .............. I N C ...... ............... June 10, 1999 Sandra Staff, Administrator North Andover Health Department Town Hall Annex 27 Charles Street North Andover, MA 01845 Re: 15 Forest Street revised septic system design Dear Sandra: Enclosed are the following documents regarding the application for approval of the septic system repair for the above referenced property. 1. 5 copies of revised design plans. 2. Check to cover the fee. These revised plans address all of the comments in your letter dated June 2, 1999. 1 have notified the abutter on the side of the lot where we are requesting a lot line offset variance that the Board of Health will hold a public hearing on Thursday June 24"'. A copy of that notice is enclosed as well as a formal request for a hearing. If you have any questions regarding any of the new information please do not hesitate to contact this office. Sincerely, Ben jamif(c. Osgood �?'""'ie'4�T President 33WAI-KER ROAD-SUITE 23-NORTH ANDOVER, MA01845-(978)686,'1768.-(8138)35()-'7645,-FAX(9'78)685-1099 ........... NEW ENGLAND ENGINEERING SERVICES INC June 10, 1999 Edward and Sieglinde Martin 23 Forest Street North Andover, MA 01845 Re: 15 Forest Street Board of Health public hearing Dear Mr. And Mrs. Sieglinde: Please accept this letter as a notice of a public hearing scheduled with the North Andover Board of Health for Thursday June 24, 1999 at 7:00 PM in the Town Hall Library on the lower level of town hall. This public hearing will be for the purpose of discussing the request of Mr. James Cassel for a local upgrade approval to allow the installation of a septic system 7' from the property line that abuts your property. Title 5 requires an offset of 10 feet. If you have questions concerning this request you may contact the North Andover Board of Health between 8:00 AM and 4:00 PM at 978-688-9540 or this office at 978-686-1768 Sincerely, /5-117— C Benjamin C. Osgood, Jr., EIT President 33 WALKER ROAD-SUITE 23-NORTH ANDOVER, MA 01845-(978)686-1768-(888)359-7645-FAX(978)685-1099 Town of North Andover 01 tAORoTH -1 OFFICE OF 3a ytt a O L COMMUNITY DEVELOPMENT AND SERVICES 0 . p 27 Charles Street North Andover, Massachusetts 01845 SACw�s���y WILLIAM J. SCOTT Director (978)688-9531 Fax (978)688-9542 June 2, 1999 RE: 15 Forest Street Ben Osgood,Jr. New England Engineering 33 Walker Road North Andover, MA 01845 Dear lvlr. Osgood: This letter is to inform you that the proposed septic plans for the repair of the system at 15 Forest Street have been disapproved for the following reasons: 1. FAST septic tank missing 6" stone base. (3 10 CMR 15.221(2)). 2. Plan view and Section A-A disagree with Leach pipe layout plan view and lateral spacing. 3. System profile has error on bottom of bed elevation. Please submit a letter requesting variances and an appearance before the Board of Health for the meeting of June 24, 1999. In accordance with regulations, also submit a copy of the letter sent to notify abutters for this meeting. If you have any questions, feel free to call the Health Department at 688-9540. Sincerely, Sandra Starr, R.S. Health Administrator Cc: James Cassell File BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535 Jun-02-99 09: 50A Paul De Turbide, PE/PLS 508-465-0313 P .02 June 2, 1999 Sandra Starr North Andover Board of.Health Administrator Office of Community Development and Services 30 School St_ North Andover, MA 01845 RE: Title V review for 15 Forest Street(Map 106a Lot 68) Dear Sandra, Enclosed find the"Checklist for North Andover Septic System Plans" for the above- mentioned site. The following is a list of all the `Problem' areas and deficiencies Port Engineering has found. • A 6-inch stone base must be under the FAST Septic tank. 310 CMR 15.221(2). • The Plan and Section A-A on Sheet I show the two laterals for the leaching field. By scaling off the plan and section, it appears that the intent is to have 5 feet between laterals, with 2.5 feet between the laterals and the edge of the leaching field. If this is true, then the"Leach Pipe Layout Plan View" on Sheet 2 is incorrect in showing the laterals as being 8 feet apart and only one foot from the edge of the field. • The pump chamber buoyancy calculations show only a 300-pound difference between the buoyancy force and the weight of the chamber and overburden. However the calculations are for only one foot of soil over the tank where the grading shown on the plan would place about three feet of soil over the tank. Therefore, if the grading and pump chamber are placed according to plan, there should be an adequate factor of safety in the buoyancy calculations. • The"System Profile" has a drafting error for bottom of bed elevation of 99.28'. All the other bottom of bed elevations have the correct elevation of 99.5'. o If the well is in fact only for irrigation, then only a waiver from the North Andover regulation is required (as outlined in the"Local Variances Required" note on Sheet 1). • One of the impervious barriers is proposed to be a 20-mil poly barrier. Written policy of the DEP entitled "Guidance on Maximum Feasible Compliance" addresses this issue: "Appropriate synthetic materials may be allowed, provided that the applicant demonstrates to the local approving authority that the material is 0 R T impervious, is designed to be buried without the integrity of the material being affected, adequate provisions have been made to ensure its support and to prevent ENG�NEEGING puncture during installation". If these provisions are met,then the impervious barrier should be adequate. ® Other local upgrade approvals and local variance requests are also noted. In my Civil Engineers& professional opinion the requests seem reasonable for the conditions of the lot. Land Surveyors One Harris Street If you have any questions or comments please feel free to contact me. Newburyport,MA 01951) (978)465-8594 Sincerely Carlton A. Brown, PE/PLS Forest 15.doc .ry ...................... .........._ „—w,----..-.......... ...,�...,,„„.„„o. ,� NEW ENGLAND ENGINEERING SERVICES , ...W.,..«.»�„»�................ ......... .........,.w.v�, ,�,.....��,.W.,,....,w..��._. .......,.,�....,., ....,... �,,.�.�......,. ...,, . May 26, 1999 Sandra Starr,Administrator North Andover Health Department Town Hall Annex 27 Charles Street North Andover, MA 01845 Re: 15 Forest Street,North Andover Dear Sandra: Enclosed are the following documents regarding the application for approval of the septic system repair for the above referenced property. 1. 5 copies of design plans. 2. 2 copies of soil data sheets. 3. 2 copies of request for local upgrade. 4. 2 copies of pressure dosing calculations with a letter from pine street consulting regarding the pressure dose design. 5. Check to cover the fee. If you have any questions or need additional information please do not hesitate to contact this office. Sincerely, "., I r-� Benjamin C. Osgood, Jr., EIT I President i4 33 WALKER ROAD-SUITE 23-NORTH ANDOVER, MA 01845-(976)686-1768--(888)359-7645 FAX(978)685--1099 Environmental vine Street Consultin Assessment i ec��nol��gy 105 Pine Street Florence, Massachusetts 01062 413-584-7637 1.dua111011 May 12, 1999 Ben Osgood Jr. New England Engineering 33 Walker Rd. Suite 22 North Andover, MA 01845 RE: 15 Forest Street North Andover, MA Dear Ben, Attached are my recommendations for the pressure distribution system for the Forest Street project. I have developed a lateral layout and orifice spacing for the bed size you have indicated on the plans (sheet 1 of 2, file 4264). The manifold and force main diameters are 2" and should drain back to the pump chamber and the laterals should be level. A single 0.25"orifice should be placed in the manifold. Note the orifice indicated in the end caps at the end of each lateral. These could be replaced with an elbow and a capped riser for flushing out the laterals. If you consider them necessary, place an orifice somewhere in the lower portion of the elbow. Also note orifice along the laterals are placed slightly offset from vertical. While I do not consider this design practice essential it seems to be a suitable method for eliminating orifice blockage. The pump size is indicated, and should meet the minimum discharge of 46.5 GPM against 11.3 feet of head. If you find a pump that is significantly different, please provide me with the specifications and I can rerun the friction losses. An oversized pump will produce more pressure head at the distal end. An undersized pump is not desirable. A small throttle valve can resolve any issues about an oversized pump. Calculations based on your system criteria indicate less than 5% difference in orifice discharge over the entire system. I have reviewed the bed layout shown in sheet 1. I think that a reduction in the bed area to 6' by 60' will get you to the same treatment results, provided the basal loading area remains the same. The benefit of this change is a reduction in the height of the retaining wall and associated costs for materials. The pressure distribution design would not change significantly by reducing the lateral spacing to 4 feet on center,(ie. use a 4 foot manifold versus an 8 foot manifold). I can make any modification to the lateral layout enclosed if you want me to. If you have any questions or would like digital copy of the lateral layout(in Autocad 14) give me a call. 'Sincerely, Eric Winkler, Ph.D CPSS, RS Encl 15 Forest Street Pressure Design N.Andover,MA ma `r Fill in the shaded areas,revise as needed DESIGN FLOW(in gallons/day)? 440 Elevation of the PUMP OFF SWITCH,in feet? 92.95 Elevation of the upper LATERAL,in feel? ; 100 DELIVERY PIPE distance,from pump to manifold,in feel? 27 DELIVERY PIPE diameter,in inches(if not 2"-use 2"min)? 2 Design DISTAL PRESSURE,in feet(if not 2.5)?(hd) 2.5 IS MANIFOLD CENTER-FED&SYMETRICAL(yes or no)? yes YES How many orifices in the MANIFOLD? 2 MANIFOLD ORIFICE diameter,in inches(if not 5116") 0.25 0.25 MANIFOLD DIAMETER(if not 2"-use 2"min)? 2 2 TOTAL LENGTH OF MANIFOLD 8 Does MANIFOLD drain to FIELD after dose(yes or no)? yes How many LATERALS? 4 Pumping chamber weep hole size(usually.25") 0.25 USE 0 IF FORCE MAIN DOES NOT DRAIN PROGRAM WILL CALCULATE UP TO 26 LATERALS AND UP TO 50 ORIFICES PER LATERAL Your HIGHEST elevation lateral MUST be LATERAL 1: (first orifice from lateral 1/2 of orifice spacing) Lateral 1: Lateral 2: Lateral 3: Lateral 4: Length of each LATERAL,in feet? 29 29 29 29 Diameter of each LATERAL,in inches(1.5"min)? 1.5 1.5 1.5 1.5 Elevation of each LATERAL,in feet? 100 100 100 100 Number of ORIFICES per lateral 9 9 9 9 Distance from Manifold to closest Orifice,in feet 3 3 3 3 ORIFICE SPACING,in feel 3.25 3.25 3.25 3.25 Diameter of ORIFICES,in inches?(D) 0.25 0.25 0.25 0.25 Square feet of leachfield per laterals(can ignore) 1 150 150 150 150 Maximum number of orifices in any one lateral 9 Minimum lateral diameter 1.5 FRICTION CALCULATIONS(using Hazen Williams friction ft=Ld((3.55Qm/Ch(D&2.63)))^1.85) PRESSURE CALCULATIONS(using orifice dischage equation Q=11.79 DA2 hdA.5 Lateral l: Lateral 2: Lateral 3: Lateral 4: LATERAL DISCHAGE(first approximation) 10.49 10.49 10.49 10.49 MANIFOLD ORIFICE DISCHARGE 2.33 TOTAL SYSTEM DISCHAGE(first approximation) 44.27 TOTAL DISCHARGE PER LATERAL 10.51 10.51 10.51 10.51 DISCHARGE PER SQUARE FOOT OF LEACHFIELD 0.07004867 0.07004867 0.0700487 0.0700487 ORIFICE MAXIMUM DISCHARGE BY LATERAL 1.17 1.17 1.17 1.17 ORIFICE MINIMUM DISCHARGE BY LATERAL 1.17 1.17 1.17 1.17 ORIFICE%DIFFERENCE DISCHARGE within LATERAL 0.5% 0.5% 0.5% 0.5% 0.0% 0.0% 0.0% 0.0% 0.0% MAXIMUM DISCHARGE LATERAL 10.51 MINIMUM DISCHARGE LATERAL 10.51 MAXIMUM DISCHARGE PER SQUARE FOOT 0.07 MINIMUM DISCHARGE PER SQUARE FOOT 0.07 •DIFFERENCE DISCHARGE for SYSTEM by orifice 0.5%as percent of maximum orifice in system •DIFFERENCE DISCHARGE for SYSTEM by laterals 0.0%as percent of maximum lateral in system •DIFFERENCE DISCHARGE for SYSTEM by square feet 0.0%as percent of maximum square foot in system WEEP HOLE DISCHARGE(usually a 114"weep hole) 2.10 weep hole 0.25 inch VOID VOLUME IN DELIVERY PIPE 4.41 VOID VOLUME IN MANIFOLD 1.31 VOID VOLUME IN EACH LATERAL 2.66 2.66 2.66 2.66 0.00 0.00 0.00 0.00 0.00 TOTAL LATERAL VOID VOLUME 10.65 MINIMUM DOSE MUST INCLUDE MANIFOLD BECAUSE MANIFOLD DRAINS TO FIELD MINIMUM DOSE VOLUME(based on void volume) 59.77 to 119.54 MIN ACTUAL MINIMUM IS BASED ON DAILY DESIGN FLOW (weep hole,usually 1/4",not counted for dose,effluent is repumped during process and not counted for friction,except as fitting headloss) TOTAL HEAD LOSS IN EACH LATERAL 0.13 0.13 0.13 0.13 MAXIMUM TOTAL LATERAL HEADLOSS IN SYSTEM 0.13 MANIFOLD HEADLOSS(center-fed unless manifold design) 0.08 DELIVERY PIPE HEADLOSS 1.01 w/delivery 2 inch diameter FITTING LOSS(headloss e.15) 0.38 add extra head if fittings are more than absolute minimum DISTAL PRESSURE HEAD 2.50 STATIC HEAD(OFF-SWITCH TO HIGH LATERAL/MANIFOLD) 7.05 HEADLOSS PUMP TO WEEPHOLE(assume T run) 0.12 PUMP MUST BE ABLE TO PASS SOLIDS AT 46.46 G.P.M 11.27 FEET OF HEAD GPM=all laterals plus manifold orifices pals weep hole or head is sum of static head and headloss shown After OTIS(network losses=1 3'distal head) 46.46 GPM 13.96 FEET OF HEAD head is stalk head,delivery losses and network losses Pine Street Consulting 105 Pine Street Florence,MA 01062 5112/99 Page I 15 Forest Street Pressure Design N.Andover,MA FRICTION CALCULATIONS(.,hg Hazen Wdkams friction 8=Ld((3.55GWCh(Dd"2.63)))^1.85) PRESSURE CALCULATIONS(using onf a dischage equation 0=11.79 D 42 h&.5 NOTE:Orifices and pipe segments are measured from'the end(distal)of lateral ('using ofd a discharge formula,with additional Lateral l: Lateral 2: Lateral 3: Lateral 4'. DISTAL ORIFICE DISCHARGE,(G 1.17 1.17 1.17 1.17 0.00 0.00 1st segment FRICTION,in feet" 0.00 0.00 0,00 0.00 2nd ORIFICEIDISCHARGE 1.17 1.17 1.17 1.17 total LATERAL FLOW at(his orifice 2.33 2.33 2.33 2.33 2nd segment FRICTION 0.00 0.00 0.00 0.00 31d ORIFICE DISCHARGE 1,17 1.17 1.17 1.17 total LATERAL FLOW at this orifice 3,50 150 3.50 3.50 3rd segment FRICTION 0.00 0.00 0.00 0.00 4TH ORIFICE DISCHARGE 1,17 1.17 1.17 1.17 total LATERAL FLOW at this orifice 4.66 4.66 4.66 4.66 4th segment FRICTION 0.01 0.01 0.01 0.01 5TH ORIFICE DISCHARGE 1.17 1.17 1.17 1.17 total LATERAL FLOW at this orifice 5.83 5.83 5.83 5.83 5th segment FRICTION 0.01 0.01 0.01 0.01 6TH ORIFICE DISCHARGE 1.17 1.17 1.17 1.17 total LATERAL FLOW at this orifice Z00 7.00 7.00 7.00 6th segment FRICTION 0.02 0.02 0.02 0.02 7TH ORIFICE DISCHARGE 1.17 1.17 1.17 1.17 total LATERAL FLOW at this orifice 8.17 8.17 8.17 8.17 711,segment FRICTION 0.02 0.02 0.02 0.02 8TH ORIFICE DISCHARGE 1.17 1.17 1.17 1.17 total LATERAL FLOW at this orifice 9.34 9.34 9.34 9.34 8th segment FRICTION 0.03 0.03 0.03 0.03 9TH ORIFICE DISCHARGE 1.17 117 1.17 1.17 total LATERAL FLOW at this orifice 10.51 10.51 10.51 10.51 9th segment FRICTION 0.03 0.03 0.03 0.03 Pine Street Consulting 105 Pine Street Florence,51A 01062 5/12/99 Page Town of North Andover 04 T 41 OFFICE OF 0• 0 COMMUNITY DEVE Y, ENT AND SERVICES 27 Charles Street 0 North Andover, Massachusetts 01845 WILLIAM J. SCOTT CH Director (978)688-9531 Fax (978) 688-9542 February 22, 1999 Ben Osgood, Jr New England Engineering 33 Walker Road, Suite 23 North Andover, MA 01845 Dear Mr Osgood: Please find the current form being used for the application for soil tests in the North Andover Board of Health. Please use this form in all future applications for soil testing. Note that before any scheduling is done for the actual testing, there must be a signed approval on the form from the Conservation Conum*ssion. Once this has been received, a date for soil tests will be scheduled with the Health Department. In addition, the plan you submitted to the Health Department shows a proposed addition to the existing dwelling. Is this being proposed now? If the soil tests are for the purpose of adding an addition,it is considered new construction and conditions are altered. Please contact me for a discussion about this issue. Sincerely, Sandra Starr, R.S. Health Administrator cc: J. Cassell File BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535 „ .................... um„ ........ I NC _....... .. . .. ...a.... . . ... . . . ... .. February 1.9, 1999. , F Sandra Starr, Administrator North Andover Board of Health 27 Charles Street North Andover, MA 01845 Re; Soil testing 15 Forest Street Dear Sandra; Enclosed is an application for soil testing at 1.5 Forest Street in North Andover. Additional documentation enclosed includes a copy of the plot plan with proposed test pit locations, a copy of the contract for design as proof that the owner has given permission to have testing done, and a check to cover the fee. I understand that soil testing season does not open until March 1,however I would appreciate you having the schedule process started so testing could be done as soon after March 1 as weather permits. The owner is having problems with the system and is going to have a backup if something is not done soon, Thank you for your anticipated cooperation in this matter. If you have any questions,please do not hesitate to contact this office. Sincerely, Benjamin C. Osgo , Jr., EIT President 33 WALKER ROAD-SUITE 23-NORTH ANDOVER, MA 01845 ) 68..( 8E1)35 -7645•u FAX 978 685-1 099 NEW ENGLAND ENGINEERING SERVICES INC 4-Ir i CONTRACT COPY PROPOSAL FOR SEPTIC SYSTEM DESIGN James Cassell February 17, 1999 15 Forest Street North Andover, MA 01845 Dear Mr. Cassell: The following is a proposal to complete a septic system design, and permitting for the design, at your property located at 15 Forest Street, North Andover, MA. A breakdown of the price is as follows: 1. Deep hole soil testing $ 2. Percolation testing 3. Design Plans and Specifications 4. Site Survey 5. Backhoe for soil testing 6. Board of Health fee 7. Delineate Wetlands 8. Conservation Commission submittal Total Price Any fees due to the North Andover Board of Health other than those listed above are not included. These fees may be fees for a variance request to the Town, advertising fees, certified mail fees, or fees for a submittal to the state DEP Included in this contract is a submittal to the conservation commission for any work that will take place between 50 feet and 100 feet from a wetlands. Attendance at one meeting, the advertising fee, and filling out the paperwork for a determination of applicability are all included. The fees above include testing for the new system in both the front and side yards. Plans will be produced for the most appropriate location. 33 WALKER ROAD-SUITE 23-NORTH ANDOVER, MA 01845-(978)686-1768-(888)359-7645-FAX(978)685-1099 b PAGE 2 i PAYMENT TERMS: 1• on signing contract. 2. Wai on approval of the design plans by the Board of Health 3. Fly nal c harges are due upon invoicing. NOTE: Unpaid balances subject to a 1.5 % service charge per month plus all costs of collection including reasonable attorneys fees. PROJECT SCHEDULE: n Commencement of work will be upon receipt of the initial deposit. Final plans will be completed and submitted to the Town within two weeks of completion of on site soil testing. Soil testing will be done in the first week of March, weather permitting. All plans produced will be given to you for review and comment prior to release to contractors or the town. t Kindly advise if further information or clarification is required. Thank you for the opportunity to present this proposal to you. If acceptable, please indicate by signing below and returning the deposit and a copy of this letter- in the envelope provided. Sincerely, Benjamin C. Osgood Jr? President This proposal is acceptable as written: James Cassell: Date: