Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Correspondence - 140 ACADEMY ROAD 8/2/2011 (3)
Scott D. Kelloway, .P.Ef. Professional Civil and Environmental Designs and Inspections. 148 North St. Andover, Ma. 01810 Phone: (978) 682-5054 Ma. Lisc #40122 7/31/2012 North Andover Planning Department Attn: Judith M. Tymon 1600 Osgood St. North Andover, Ma. 01845 Dear, Ms. Tymon Please refer to the attached field inspection reports of site monitoring for the project at 140 Academy Lane at Stevens Street. in North Andover. Ma. DEP No. 242-1504,NPDES Tracking no. MARI OE3 83. Construction activities on this site, for this month are as follows: • Construct and stabilize entrance for lots 5 & 6. • Continued removal of excess fill and rough grading of lots 5&6.. • Stabilization of slopes lot's 5, and 6. • Installation of sediment traps for lots 2b and 3b. Site work continues to progress as noted above. All BMP's are being properly maintained and containing sediment within the work site. There has been no encroachment within restricted areas. Currently all work on this site has been completed in compliance with the project SWPPP, and Order of Conditions. If you have any questions or concerns,please feel free to contact me at address and phone number listed above. 4incerely, co tt Ike I way, P.k CC. Tom Patenaud Stormwater Construction Site Inspection Report General Information Project Name North Andover: 140 Academy Road at Stevens St. NPDES Tracking No. MARI OE383 Location Stevens St.between Great Pond Rd, and Academy Rd. Date of Inspection r7l�t/� Start/End Time (Oe 01 Inspector's Name(s) Scott D.Kelloway,P.E. Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,Ma.01810 (978)479-5648 Inspector's Qualifications Professional Engineer for 15 years specializing in Environmental Permitting, Site Management, and Environmental Monitoring. (Resume provided) Describe present phase of • Mobilize job construction • Install erosion controls • Construct/stabilized entrances for L&a2 �& L- l , • Cut trees and chip brush, grind stumps • Install offsite sewer main Iaul excess fill for first 3 lots: 2b, 3b, and 4. 1 ad • Construct uphill retaining walls • Excavation for foundations, and construction of driveway walls for first 3 lots: 2b, 3b, and 4 • Construction of the first 3 houses. • Final Grading of lots first 3 lots: 2b, 3b, and 4. • Final stabilization with suitable vegetation of first 3 lots: 2b, 3b, and 4. T_ypS.of Inspection: ❑fie ular ❑Pre-storm event ❑During storm event ost-storm event Weather Information Has there been a storm event since the last inspection? ❑Yes ❑No If yes,provide: Storms%art Date&Time: Storm Durati m)(hrs): Approxim� Amoun of Precipitation(in): 1 Z/ G lK1 Y r Weather at time of this inspection? ❑Clear UCloudy ❑Rain ❑ Sleet ❑Fog ❑ Snowing ❑High Winds ❑ Other: Temperature: V Have any discharges occurred since the last inspection? ❑Yes o If yes,describe: Are there any discharges at the time of inspection? ❑Yes If yes,describe: Site-specific BMPs BMP BMP ' BMP Corrective Action Needed and Notes Installed? Maintenance Re aired? 1 Stabilized Construction UYEes ❑No ❑Yes entrance/exit. EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 2 BMP BMP BMP Corrective Action Needed and Notes Installed? Maintenance Required? 2 Silt Fence. es L No ®Yes UNo 3 Staging/Materials es 1]No ❑Yes o storage area 4 Dumpsters,and Sanitary es ❑No ❑Yes o Facilities 5 Sediment trap es ®No ❑Yes No 6 Soil Stockpile Offles ❑No ❑Yes ou 7 Drop Inlets O.Y s ONo ❑Yes o 8 Concrete washout area es ONo UYesoNo 9 Dirt bag filter es ONo ❑Yes o 10 Hay Bale Check Dams ONo ❑Yes 0&0 11 Terra Tube es ®No ❑Yes o 12 Erosion Control UIN es ®No ❑Yes o ( " Blankets 13 Stability of slopes under es ONo ❑Yes ®No construction 14 Vehicle and equipment No ❑Yes 9AIo fueling,cleaning, storage. 15 Other. ❑Yes ONo ❑Yes ONo EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 3 BMP BMP BMP Corrective Action Needed and Notes Installed? Maintenance Required? Other. 16 Other. ❑Yes ❑No ❑Yes ONo Non-Compliance Describe any incidents of non-compliance not described above: CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete.I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." Print name a d title: Signature: Date: EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 4 StormwTater Construction Site Inspection Rgort General Information Project Name North Andover: 140 Academy Road at Stevens St. NPDES Tracking No. MAR10E383 Location Stevens St.between at Pond Rd, and Academy Rd. Date of Inspection 7 z, Start/End Time ���®S; Inspector's Name(s) Scott D.Itelloway,P.E. Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,Ma.01810 (978)479-5648 Inspector's Qualifications Professional Engineer for 15 years specializing in Environmental Permitting, Site Management,and Environmental Monitoring. (Resume provided) Describe present phase of • Mobilize job construction • Install erosion controls • Construct/stabilized entrances for Lots 2B&W11 (o • Cut trees and chip brush, grind stumps • Install mam Rough grade and sha • Construct uphill retaining walls • Excavation for foundations, and construction of driveway walls for first 3 lots: 2b, 3b, and 4 • Construction of the first 3 houses. ® Final Grading of lots first 3 lots: 2b, 3b, and 4. • Final stabilization with suitable vegetation of first 3 lots: 2b, 3b, and 4. Typ�Inspection: UMe ular ❑Pre-storm event ❑During storm event ❑Post-storm event Weather Information Has there been a storm event since the last inspection? ❑Yes ❑No If yes,provide: Storyn Stajt Date k Ti�,ie: Storm Duration(hrs): Approximate Amount of Precipitation(in): 7/ �Yau <lL r?aet�—mac` We r at time of this inspection? tr Clear ❑Cloudy ❑Rain ❑ Sleet ❑Fog ❑ Snowing ❑High Winds ❑ Other: Temperature: S.L&D Have any discharges occurred since the last inspection? ❑Yes If yes,describe: Are there any discharges at the time of inspection?❑Yes If yes,describe: Site-specific BMPs BMP BMP BMP Corrective,Action Needed and Notes Installed? Maintenance _ Required? 1 Stabilized Construction 01es ❑No ❑Yes allo entrance/exit. EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 2 BNIl' BMP BMP Corrective Action Needed and Notes Installed? Maintenance Re uired? 2 Silt Fence. es ONo OYes o 3 Staging/Materials es ONo Oyes o storage area 4 Dumpsters,and Sanitary OYes EKo OYes o Facilities 5 Sediment trap es ONo OYes o 6 Soil Stockpile es ONo OYes o �l sv tt-- 7 Drop Inlets 3fes ONo OYes OWo 8 Concrete washout area ❑Yes / o OYes ELNe 9 Dirt bag filter Wes ONo OYes LlR6 10 Hay Bale Check Dams es ONo OYes No 11 Terra Tube s ONo OYes o 12 Erosion Control &res ONo OYes o Blankets r 13 Stability of slopes under es ONo OYes o 5 ►- construction 14 Vehicle and equipment 8fes ONo OYes oo i►S ,DIP� 1 fueling,cleaning, p J storage. 15 Other. OYes ONo ❑Yes ONo EPA SWPPP Inspection Report, Version 1.1, September 97, 2007 3 Corrective Action Needed and Notes B1VIP BMP aautenance Installed`' R,wired`' ®Yes ®No ®Yes ®No N on-COT liance an incidents of non-compliance not described above: Describe Y CERTIFICATION STATEMENT direction or "I certify under penalty of law that this document and all attachments were prepared under my directs and evaluated supervision in accordance with a system designed to ass hat qualsonswho manageothe system,or those persons P the information submitted.Based on my inquiry , the person directly responsible for gathering the information,the informasi°nifi submitted antlttenalties for submitting false information, belief,belief,true,accurate,and complete.I am aware that there are g P including the po sibility of fine and imprisonment for knowing violatio S. �o L J,.,4 Print name a d title: D� G�V`b Date: -7 ce" Signature: EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 4 Stormwater Construction Site Inspection Report General Information Project Name North Andover: 140 Academy Road at Stevens St. NPDES Tracking No. MAR10E383 Location Stevens St.between Great Pond Rd, and Academy Rd. Date of Inspection Start/End Time �," it ✓} Inspector's Name(s) Sc tt .Kelloway,P.E. Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,Ma.01810 (978)479-5648 Inspector's Qualifications Professional Engineer for 15 years specializing in Environmental Permitting, Site Management,and Environmental Monitoring.(Resume provided) Describe present phase of • Mobilize job construction • Install erosion ® Construct/stabilized entrances for Lots 2B &' 4- • Cut trees an c ip rus , grin s ps Install offs' aul excess fill_f lots: an . • Rou a d sha a lots • Construct uphill retaining w s • Excavation for foundations, and construction of driveway walls for first 3 lots: 2b, 3b, and 4 • Construction of the first 3 houses. • Final Grading of lots first 3 lots: 2b, 3b, and 4. • Final stabilization with suitable vegetation of first 3 lots: 2b,3b, and 4. Typ Inspection: e ular ❑Pre-storm event ❑During storm event ❑Post-storm event Weather Information Has there been a storm event since the last inspection? ❑Yes o If yes,provide: Storm Start Date&Time: Storm Duration(hrs): Approximate Amount of Precipitation(in): WeaffiOr at time of this inspection? Lear ❑Cloudy ❑Rain ❑ Sleet ❑Fog ❑ Snowing ❑High Winds ❑ Other: Temperature.,( o4-5 Have any discharges occurred since the last inspection? ❑Yes If yes,describe: Are there any discharges at the time of inspection?❑Yes UIN6" If yes,describe: Site-specific BMPs BMP BMP BMP Corrective Action Needed and Notes lost alle ? Maintenance Required? I Stabilized Construction Lrf es ❑No ❑Yes entrance/exit. -� EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 2 BMP BMP BMP Corrective Action Needed and Notes Installed? Maintenance Required? 2 Silt Fence. es ❑No U*es ❑No fL-1 If -NCz—W p�� 3 Staging/Materials Wles ❑No ®Yes o storage area 4 Dumpsters,and Sanitary es ❑No ❑Yes o Facilities 5 Sediment trap es ❑No ❑Yes o 6 Soil Stockpile es ❑No ❑Yes o pz� 5 c 7 Drop Inlets Ules ❑No ❑Yes 8 Concrete washout area LlYes ❑No ❑Yes ❑No 9 Dirt bag filter es ❑No ❑Yes QWc - 10 Hay Bale Check Dams es ❑No ❑Yes ❑Nt ' 11 Terra Tube ❑No ❑Yes o 12 Erosion Control es ❑No ❑Yes o Blankets 13 Stability of slopes under es ❑No ❑Yes o construction 14 Vehicle and equipment es ❑No ❑Ye o fueling,cleaning, storage. 15 Other. ❑Yes ❑No ❑Yes ❑No EPA SWPPP Inspection Report, Version 1.1, September 97, 2007 3 Corrective Action Needed and Notes BMP BM1' Maintenance ., Installed`' Re -aired' ®Yes ®No ®Yes ®No Non-Corn liance incidents ofnon-compliance not described above: Describ e any CERTIFICATION STATEMENT direction or "I certify under penalty of law that thaewneea o assure that ualified personnel properly gathered and evaluated supervision in accordance with a system knowledge e and the information submitted.Based on my inquiry of the perslonna�ion submitted is to the best oftmy, n wledgeand directly responsible for gathering the information,the lnfor belief,true,accurate,and complete.I am aware that there are significant penalties for submitting false information, including the po ibility of fine and impnsonm n Print name 71 title: Signatur Date: t I I EPA SWPPP Inspection Report, Version 1.1, September 17,2007 4 Stormwater Construction Site Inspection Deport General Information Project Name North Andover: 140 Academy Road at Stevens St. NPDES Tracking No. MARIOE383 Location Stevens St.between Great Pond Rd, and Academy Rd. Date of Inspection f` iy �� Start/End Time f45--CA, A Inspector's Name(s) Scott D.Kelloway,P.E. Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,Ma.01810 (978)479-5648 Inspector's Qualifications Professional Engineer for 15 years specializing in Environmental Permitting, Site Management,and Environmental Monitoring. (Resume provided) Describe present phase of e Mobilize job construction a Install erosion controls e Construct/stabilized entrances for Lots 2B&3B e Cut trees and chip brush, grind stumps e Install offsite sewer main e Haul excess fill for first 3 lots: 2b, 3b, and 4. e Rough grade and shape lots e Construct uphill retaining walls e Excavation for foundations, and construction of driveway walls for first 3 lots: 2b, 3b, and 4 e Construction of the first 3 houses. e Final Grading of lots first 3 lots: 2b, 3b, and 4. Final stabilization with suitable vegetation of first 3 lots: 2b, 3b, and 4. Tye of Inspection: Xe ular ❑Pre-storm event ❑During storm event ❑Post-storm event Weather Information Has there been a storm event since the last inspection? ❑Yes ❑No If yes,provide: Stor Start Date&Time: Storm Duration(hrs): Approximate Amount of Precipitation(in): t, -* i NFL �2- Weather at time of this inspection? La--ear ❑Cloudy ❑Rain ❑ Sleet ❑Fog ❑ Snowing ❑High Winds ❑Other: Temperature: ca Have any discharges occurr d since the last inspection? ❑Yes L No If yes,describe: AA [..svTt� 3.134---q, TW1 c 5 �rr.ft � s��,J -p,--( Ll \P°"� Lt r u!l Are there any discharges at the time of inspection? ❑Yes UM If yes,describe: 14 1x10,4 Site-specific BMPs BMP BMP BMP Corrective Action Needed and Notes - Installed? Maintenance Required? 1 Stabilized Construction QaVe s ❑No ❑Yes ❑N- entrance/exit. EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 2 BMP BMP BMP Corrective Action Needed and Notes Installed? Maintenance Required? 2 Silt Fence. Ufes ONo ❑Yes o 3 Staging/Materials UKes ®No ❑Yes Cflo storage area 4 Dumpsters,and Sanitary ®Yes O-N OYes Facilities 5 Sediment trap es ONo ®Yes U o 6 Soil Stockpile es ❑No ❑Yes o 7 Drop Inlets es ONO OYes o 8 Concrete washout area dyes o ❑Yes OWO 9 Dirt bag filter ❑Yes UKo OYes 10 Hay Bale Check Dams es ONO ❑Yes o 11 Terra Tube �s ❑No ❑Yes o 12 Erosion Control WYes ONO ❑Yes o Blankets -TT Stability of slopes under @Fes"ONO OYes o construction 14 Vehicle and equipment Uffes ONO Oyes o fueling,cleaning, storage. 15 Other. Oyes ONO OYes ®No EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 3 Corrective Action Needed and Notes B1VIP BMP at�tenance installed? R aired? ®Yes ®No ®Yes ®No Non-Com Hance an incidents of non-compliance not described above: Descrtb e y CERTIFICATION STATEMENT direction or "I certify under penalty of law that this document and all attachments were prepared under'properly athered and evaluated supervision in accordance with a on m in suiirrye of the person or persons who manage the y gathered oWled persons and the information submitted.Based y q directly responsible for gathering the information, that a infOare signifi cantlpenalties for submitting false information, belief,true,accurate,and complete.I am aware including the ossibility of fine and imprisonment for knowing violations." �-- Print name d title: Date: Signature EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 4 Storrnwater Construction Site Inspection Report General Information Project Name North Andover: 140 Academy Road at Stevens St. NPDES Tracking No. MARI OE383 Location Stevens St.between Great Pond Rd, and Academy Rd. Date of Inspection Start/End Time Inspector's Name(s) o D.Kelloway,P.E. Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,Ma.01810 (978)479-5648 Inspector's Qualifications Professional Engineer for 15 years specializing in Environmental Permitting, Site Management,and Environmental Monitoring. (Resume provided) Describe present phase of • Mobilize job construction • Install erosion controls • Construct/stabilized entrances for Lots 2B-&4B- • Cut trees aud chi rush, grind stumps 1 offsite sewer main -[-- IE Z • Haul excess fill for first 3 lots: 2b, 3 and 4. h grade and shape to s • Construct uphill retaining walls • Excavation for foundations, and construction of driveway walls for first 3 lots: 2b, 3b, and 4 • Construction of the first 3 houses. • Final Grading of lots first 3 lots: 2b,3b, and 4. • Final stabilization with suitable vegetation of first 3 lots: 2b, 3b, and 4. Ty p Inspection: e ular ❑Pre-storm event ❑During storm event ❑Post-storm event Weather Information Has there been a storm event since the last inspection? OYes OlTo If yes,provide: Storm Start Date&Time: Storm Duration(hrs): Approximate Amount of Precipitation(in): Weq r� at time of this inspection? I'Clear ❑Cloudy ®Rain ® Sleet ®Fog ❑ Snowing ❑High Winds ®Other: Tem �ature: Have any discharges occurred since the last inspection? ❑Yes If yes, describe: Are there any discharges at the time of inspection?®Yes o If yes, describe: Site-specific BMPs BMP BMI, BMP , Corrective Action Needed and Notes Installe ? Maintenance Re uired? 1 Stabilized Construction 02rYes ®No ❑Yes ONo &W --/ entrance/exit. fill ll rA poqu� EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 2 lamp BMP -BMP ` Corrective Action Needed and Notes Installed? Maintenance Required? 2 Silt Fence. es ❑No ❑Yes o 3 Staging/Materials es ❑No Wes o storage area 4 Dumpsters,and Sanitary ❑Yes ONo ❑Yes ❑No Facilities 4 5 Sediment trap g>Cs ❑No Wes 6 Soil Stockpile s ❑No ❑Yes o 7 Drop Inlets es ❑No ❑Yes 9110 8 Concrete washout area ❑Yes No ❑Yes ❑No 9 Dirt bag filter es ❑No Dyes UN0 10 Hay Bale Check Dams es ❑No ❑Yes o 11 Terra Tube es ❑No ❑Yes EP< 12 Erosion Control WY'es ❑No ❑Yes Blankets 13 Stability of slopes under Wes ❑No ❑Yes W<o f-a PEF, � construction ` 14 Vehicle and equipment Ufes ❑No ❑Yes UW6 fueling,cleaning, storage. 15 Other. ❑Yes ❑No ❑Yes UNo EPA SWPPP inspection Report, Version 1.1, September 17, 2007 3 ction Needed and Notes Corrective A. BIB M tenanCe Installed? Re uired? ®Yes ®No Oyes ®No Non-Com Hance dents of non-compliance not described above: Descri e an� 44 CERTIFICATION STATEMENT direction or "I certify under penalty of law that this document and all attachments were prepared under my athered and evaluated supervision in accordance with a system designed to assure person or persons manageothersyem,or those e and Persons the information submitted.Based on my inquhY p directly responsible for gathering the information,the�°are sign fi submitted ant penalties for s bmitting false information, belief,true,accurate,and complete.I am aware including the possibility of fine and imprisonment for knowing violatio p Print name a title: �- t Date: Signatur c EPA SWPPP Inspection Report, Version 979, September 97,2007 4 /,, r , /r�� 1 i � ;fir% ;a ���rj%;/��/f�/.� '�iJ' % .J (����/ r " rr //i/i% Ir, � ,ri� ( r,„�� l �� /iii„/�//� �/„/� � ,.:�/ / //, �, //, i,... ,.o„�/,.,, / �„ �... r i //I/ /., �,r/i/,. / a// r %. /,,, ., � / i,�r �, /ii,/////,,.. ,.dli�r ,.i� i�./, ,��, �,�,/..l�r � / �„, � r. / :✓/i r�, iii. rr,,,,/� a.. //r, / /�/„/� 1% / / /9�J,,,,///r r �/�r%//p///„!//� //,//��i, e,r ii „r,,,/,l%,,,%�� rl 1 jj����////I�n�����il�%�i i/f%/��/�/i, r r /��/i �////err/ /r� i „�//�-�� J /Y /pr/� � � ,�,,, rr, r r. rii '"��// / df/i ' r/�If/�� � ', �� ����/�/1%C//F�/ r j q,F / � / / r/r//rl��kyjr�rlllf lr / �//r'%irG/,1'/lr/(f/ ! r a � /� r�r� ��I,I l������/fir �/J��(�s✓it ��� �i f/ 1 r J�//�d//�. ! a'� �0 �'//'�i�l/// �����r��i��/ �� ��� /��j1 r�/Il, J !l1 //✓/ a�r ��� , f i/n/„��r,a� rr///r,..�1"d r rrl� ✓1 /„!Jp �/Prri��/ �,D'/ P I a i 1 � rJ�l, r/; IJ s, p�/�"l;rci l�'r�d/li ” >Urr//Ila” i// � ''^ 1, 'Idi"r,' ,r r ��//�„r,l'� ���!/lf�., �� .�� V !/. f , 6!'�i;l r✓..�1.,; 4� ,r/Y%� ,1 i"�, 'li'>P �,�, ,/ �/,)r rrruf /f//�H/// />r� „��ri,; O/�y /fl,,, 1;,,� r r, �I�. 1, �/, f//rcr�l� ��� o��i,,� �' rlr,%'�// �d � u,� oii /.�Y/�/� „ f„! ,s�, �,1,,, & ;..g.f,,. p,,/,�(/ �)i lcil fnr/JPJ�'i//% ,r�� / r�sD vi f.?�r/,'F � r'J/�rr ���H���� J'I//,�l/i/irfi I ��/ ;rrr, �;U r�r%,,.y�i�,�r,r"'" (rr!� � ,�/Jy/yiy r/., � it ,l� y///�n ��i/' Gi.i'f,'1 ,” ,�G�/r/ /„/s, ��/ f� � r �/�/a�� 11�, f1�G�� V l�l����/'�/ J"y��f�� �'�,�/ �.'t'.���! v. I I r d ;t r,frr/��,ril t �,,r',I`� rr /�!1>�P� fI/ Tl�r /';�u /I r �:;, , rr r/ fi �r r � /„✓ a r/ , � ti J 7 Ito r r/ l � , sir:r,, y /<r 1 ,r ll/ xr^t��/l,� i r,r; d q9 � �� �rN 11Y�/ 1!frj���%/f�J��b�H���Kr a'� N f�� ?j7�����1�� �, �J���✓y� r�:(fa'�i� �,,yr���ia,,Yd n� >1a IJaJI/G 1�1�t�l</ y�P t/ i r y�irr�l i r � � r�/tr r r `'���.d lei Gd a ri df,�P'�'�r���Irk� y�� j�+� /�/(����� d a��� u , i"�r���' �1�i'ji�i 1P/ °' `� , r /, Gf� J yM,r r drr� u'+,r ��'”„ „ �,V�r l yr�l ,r rl � �� 'I '� � J ��ll /� IJ./�,�J/9F�r/� 1J� �7G '7��r'P ���1'. i, '`��� J ���r s r �. r i r ,,�, i� �,�f y��f j �/fl�� ,�J sl� r rl{ r' s 1 l tir 1 t r m� r y � 1� ,� d4 Rio �,�/� r; fix:Fa�l�� � 1 ra i;, � , � r /� d � f ,e ✓ ,rm� ! � �{y� � ' / i a d dr r Yl `� P L�v "d � �r r r 7, / r ro r , I ',y� r n n I�ii�,� P l �f��Iir�� °rr �>t �e ", � �/ �� /,� /�rclr/ir �/ �% �l�/ �'�������° � �1u l l� i ,�' � �/r/r jld l,/1 ����au r%�d`f�a% ,%�'/ /r��l�J� � ) , ������n � j 1 �y� 0 �P ��� >fi � �J ///�w?,r''M, i f'� �l � Y t P � ,� .�i,l °ilYli i��,vdV �� Wa d '� �'S � ij s r. 14, W � j . � ,^ rj ^°�w".W IMF p. ! �b. wu d4f,°' i/�b �, �,. I i i /�/1����! I�� I J i � d 11r ��� ��� ( lT/ '�� ' fr// � ' "r ,(�1 /„ �J��1�J��i r G, �y � 1 r ' fir, ��'�' 1 � i�, rr � � �� 1, r ' �N �%r�f i �� � � .. >d���,,,�r i . i� � !k� ,.1 ,. !Dl .�,fi i� i. , ul> hdw�a>! �rr .n r�x w ”,a i�. /'( ��➢l�i�l1^'J�e��,�7,� C��� � { � ��'� P"J,V"� °"@VmufO+Pyro ^IIW .r y ��/ ✓1f�Lvl�/� 1/l� V �l� ✓ �� 'purr r� �a� rl i d U� Iq ifl Y�� � E ✓ uli � 91 .t�'Nk I ��r i�r au✓m���,r�uu6'� Jl�� �' �� t r y �6 w✓l l'�V'r" k✓u�ue/a ml i��©t/ a��� / ��u�,a ti"✓�rf�✓P nr°��,r����vps9 ��1�/1 � � U/��6 �J'�` � tr ���,ol"�.A/ ,ii f��¢ �1�lrr'��.J�✓� U � � I I, u�� r:�l ' � r� r M �, Pd Scott D. Kefloway, P.E. Professional Civil and Environmental Designs and Inspections. 148 North St. Andover, Ma. 01810 Phone: (978) 682-5054 Ma. Lisc #40122 8/31/2012 North Andover Planning Department Attn: Judith M. Tymon 1600 Osgood St. North Andover, Ma. 01845 Dear, Ms. Tymon Please refer to the attached field inspection reports of site monitoring for the project at 140 Academy Lane at Stevens Street. in North Andover. Ma. DEP No. 242-1504,NPDES Tracking no. MARI0E383. Construction activities on this site, for this month are as follows: * Continued removal of excess fill and rough grading of lots 586.. * Stabilization of slopes lot's 5, and 6. * Excavate pour, and backfill foundation at lot 2B. Site work continues to progress as noted above. All BMP's are being properly maintained and containing sediment within the work site. There has been no encroachment within restricted areas. Currently all work on this site has been completed in compliance with the project SWPPP, and Order of Conditions. If you have any questions or concerns, please feel free to contact me at address and phone number listed above. Sincerelv, WA: �AAE W, r ACY Sco C Sco ke way, CC. Tom Patenaud Stormwater Construction Site Inspection Report General Information Project Name North Andover 140 Academy Road at Stevens St NPDES Tracking No. MARIOE383 Location Stevens St between Great Pond Rd And Academy Rd.N.Andover Date of Inspection Start/End Time _to A Inspector's Name(s) Scott D. Kelloway, P.E. Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover, Ma. 01810, Phone(978)479-5648 Inspector's Qualifications Professional Engineer for over 15 years specializing in Environmental Permitting, Construction Inspection, Site Management,and Environmental Monitoring.(resume provided) Describe present phase of • Mobilize job construction ! Install erosion controls ® Construct I stabilize entrances for lot§#20;#3b,#4,#5 • Install Offsite Sewer Main e Haul excess fill for lots lots#213, #3b,#4,1%'#Q i Rough shape lots #213,#3b, 6�� e Construct uphill retaining walls lots B,#3b,#4,#5,#6. ® Excavation for foundations and construction of driveway walls lots g .3b,#4, #5,#6. O Construction of houses on lots#213,#3b, #4, #5,#6. '.... • Final grading of lots#213,#3b,#4,#5,#6. ® Final stabilization with suitable vegetation of lots#213,#3b,#4,#5, #6. Type of Inspection: LJ Regular LI Pre-storm event wring storm event ❑ Post-storm event Weather Information Has there been a storm event since the last inspection? ❑Yes ❑No If yes, provide: Storm St -t Date&Time: Storm Duration(hrs): Approxi ate Amount of Precipitation(in): Weather at time of this insp ction? LI Clear ®Cloudy Ufkain ® Sleet ® Fog ® Snowing LI High Winds ® Other: Temperature: 6 e, Have any discharges occurred since the last inspection? ®Yes 0 o If yes,describe: Are there any discharges at the time of inspection? ®Yes qDI-6' If yes,describe: Site-specific BMPs • Number the structural and non-structural BMPs identified in your SPVPPP on your site map and list them below(add as many BLIMPS as necessary). Carty a copy of the numbered site map with you during your inspections. This list will ensure that you are inspecting all required BNIPs at your site. • Describe corrective actions initiated, date completed, and note the person that completed the work in the Corrective Action Log. EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 1 BMP' BMP BM1(' Corrective Action Needed and Notes Installed Ma>ntenance Re "aired? I Stabilized Construction es ❑No ❑Yes ❑Ncd' Entrance 2 Hay bale/Silt Fence UY6 ❑No ❑Yes'®'No 3 Staging/Materials DYes ❑No ❑Yes o storage area. 4 Dumpsters,and sanitary UYes ❑No ❑Yes UNe' facilities 5 Sediment trap 0-Yes ❑No Dyes UNO 6 Soil stockpiles QYes ❑No ❑Yes' UKo -j 4 7Nrr°.+„ 7 Drop inlets ❑Y-e-s' ❑No ❑Yes OW- 8 Concrete washout area es ❑No ❑Yes ❑N-6' 9 Dirt bag filler ❑vYet—®No ❑Yes gN°"" 10 Hay bale check dams ❑ es ❑No ❑Yes o 11 Tema tube C3 es ❑No ❑Yes P116 12 Erosion control blankets LIW-s ❑No ❑Yes qNd" 13 ❑Yes ❑No ❑Yes ❑No 14 ❑Yes ❑No ❑Yes ❑No EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 2 BMP BMP BMP Coa reet►ve Actio►r Needeii andNotes Ins (It , Maintenance Re aired? 15 ❑Yes ❑No ❑Yes ❑No Overall Site Issues Below are some general site issues that should be assessed during inspections. Customize this list as needed for conditions at your site. BMP/activity Implemented?; ; Maintenance Corrective Action Needed and Notes, ; .Re uired? 1 Are all slopes and UY— ❑No ❑Yes QTo disturbed areas not actively being worked properly stabilized? 2 Are natural resource U-Yes-UNo ❑Ye No areas(e.g.,streams, wetlands, mature trees, etc.)protected with barriers or similar BMPs? 3 Are perimeter controls O-Yeg"❑No ❑Yeses WNo and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and LIY-ds-❑No ❑Yes ,UNo receiving waters free of any sediment deposits? 5 Are storm drain inlets U* s ❑No ❑Yes,, o properly protected? 6 Is the construction exit ❑Yes-IoNo' ❑Yes LIN'o preventing sediment from being tracked into the street? 7 Is trash/litter fi•om work ❑'des ❑No ®Yes No areas collected and placed in covered dumpsters? 8 Are washout facilities 1f'es ❑No ❑Yew-OTo (e.g.,paint, stucco, concrete)available, clearly marked, and maintained? EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 3 BMP/activity Implemented? ' Maintepance; Corrective Action Needed and Notes 9 Are vehicle and Q es ❑No ®Yes equipment fueling, cleaning,and maintenance areas free of spills, leaks,or any other deleterious material? " 10 Are materials that are es ®No ❑Yes o potential stormwater contaminants stored inside or under cover? 11 Are non-stormwater LA-e� ®No ®Yes SIB— discharges(e.g.,wash water,dewatering) properly controlled? 12 (Other) ❑Yes ®No ®Yes ®No Non-Compliance Describe any incidents of non-compliance not described above: CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information, the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." — _ Print name and f le: �— 'i°l°tr Uc L"ik3 /4�' �t Oro c— r t=:T e_ Signature: - Date: EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 4 Stormwater Construction Site Inspection Report `General Information Project Name North Andover 140 Academy Road at Stevens St NPDES Tracking No. MARIOE383 Location Stevens St between Great Pond Rd And Academy Rd.N.Andover Date of Inspection s (L Start[End Time Z �vlz 0Z Q� Inspector's Name(s) Scoh D.Kelloway,P.E. Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover, Ma.01810, Phone(978)479-5648 Inspector's Qualifications Professional Engineer for over 15 years specializing in Environmental Permitting, Construction Inspection, Site Management, and Environmental Monitoring.(resume provided) Describe present phase of • Mobilize job construction • Install erosion controls • Construct I stabilize entrances for lots 2B`i#3b,#4, • Install Offsite Sewer Main • Haul excess fill for lots lots#2B,#3b, • Rough shape lots#213, #3b, ; . a Construct uphill retaining walls lots#2B,#3b,#�+,#5,#6. 'Lx" Y • Excav v n for foundations and construction of driveway walls lots 2B 3b,#4,#51#6. -2- +nsFa� • Construction of houses on lots#2B,#3b, #4,#5,#6. • Final grading of lots#213,#3b,#4,#5,#6. • Final stabilization with suitable vegetation of lots#213,#3b,#4,#5, #6.. Type of.Inspection: ❑"lie ular ❑ Pre-storm event ❑ During storm event ❑ Post-storm event Weather Information Has there been a storm event since the last inspection? ❑Yes LaNtS-` - If yes,provide: Storm Start Date&Time: Storm Duration(hrs): Approximate Amount of Precipitation(in): Weather at time of this inspection? ❑CTeat ❑Cloudy ❑ Rain ❑ Sleet ❑ Fog ❑ Snowing ❑ High Winds ❑ Other: Temperature: Have any discharges occurgd since the last inspection? ❑Yes CINo If yes,describe: Are there any discharges at the time of inspection? ❑Yes Dlgo' If yes,describe: Site-specific BMPs • Number the structural and non-structural BMPs identified in your SYIYPPP on your site map and list them below(add as many BjVfPs as necessary). Carry a copy of the numbered site map with you during your inspections. This list will ensure that you are inspecting all required BMPs at your site. • Describe corrective actions initiated, date completed, and note the person that completed the work in the Corrective Action Log. EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 1 BMP BMP BMP Corr'ective'Actioi Needed"and Notes Installed?. , �Maintenance Re aired? I Stabilized Construction O es ®No ®Yes UN-6- Entrance 2 Hay bale/Silt Fence O,Yes"®No ❑Yes-UNo 3 Staging/Materials Ores ❑No ❑Yes o storage area. 4 Dumpsters,and sanitary CI1`es ®No ®Yes 8 0 facilities S Sediment trap W-Yes ❑No ❑Yes Eloo 6 Soil stockpiles UjIf es LJNo 7 Drop inlets Cage ®No ®Yes--UNo 8 Concrete washout area C3-Ye-s ®No ❑Yes U(o 9 Dirt bag tiller C7- es ❑No ❑Yes l3Nro 10 Hay bale check dams C3Yes ®No ❑Yes LIKO 11 Terra tube O-Yds ❑No ❑Yes QNo 12 Erosion control blankets UY6e ®No dyes —L—IN—to, 13 ❑Yes ❑No ®Yes ❑No 14 ❑Yes ®No ❑Yes ❑No EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 2 BMP BMP BMP Corrective Action Needed and Notes ;;Installed 1Vlaintenance 'Re aired? 15 ❑Yes ❑No ❑Yes ❑No Overall Site Issues Below are some general site issues that should be assessed during inspections. Customize this list as needed for conditions at your site. BMP/activity Implemented? > Mamtenapce Corregt�xe Action Needed anti Notes ; Re"wired? > 1 Are all slopes and U`es ONo ❑Yes LINo disturbed areas not actively being worked properly stabilized? 2 Are natural resource LlYes ONo G]Yes Ellgo areas(e.g.,streams, wetlands, mature trees, etc.)protected with barriers or similar B MPs? 3 Are perimeter controls ®Yes ONo ❑Yes ONo and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and UY6s ❑No ❑Yes No receiving waters free of any sediment deposits? 5 Are storm drain inlets UYes ❑No ❑Yes LJ o properly protected? 6 Is the construction exit QYes ❑No ❑Yes LIKo preventing sediment fi•om being tracked into the street? 7 Is trash/litter from work ClYes LJNo ❑Yes LaMo areas collected and placed in covered dumpsters? 8 Are washout facilities Cyes ❑No ❑Yes -Uo (e.g.,paint,stucco, concrete)available, clearly marked,and maintained? EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 3 BMP/activity : "Implemented? Maintenance .`` Corrective Action Needed and Notes' Re nired? r 9 Are vehicle and aYes ❑No ❑Yes o equipment fueling, cleaning,and maintenance areas free of spills, leaks,or any other deleterious material? 10 Are materials that are L1Yes ❑No ❑Yes o' potential stormwater contaminants stored inside or under cover? I I Are non-stormwater LW- ❑No Dyes UK6 discharges(e.g.,wash water,dewatering) properly controlled? 12 (Other) ®Yes ®No ❑Yes ❑No Non-Compliance Describe any incidents of non-compliance not described above: CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." Print name and,atle: c � ' -"Dec— IQ Signature: Date: / EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 4 Stormwater Construction Site Inspection Report General Information Project Name ame North Andover 140 Academy Road at Stevens St NPDES Tracking No. MARl0E383 Location Stevens St between Great Pond Rd And Academy Rd.N. Andover Date of Inspection t 6 Start/End Time 2 — 2 °S®C-"rs, Inspector's Name(s) Scott D.Kelloway,P.E. Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St. Andover,Ma.01810, Phone(978)479-5648 Inspector's Qualifications Professional Engineer for over 15 years specializing in Environmental Permitting, Constriction Inspection,Site Management,and Environmental Monitoring.(resume provided) Describe present phase of • Mobilize job construction . Install erosion controls • Constructs/stabilize entrances for lot #2 #3b,#4,#5;� • Install Offsite Sewer Main • Haul excess fill for lots lots #3b, • Rough shape lots#213,#3b, G Construct.uphill retaining walls lots#213,#3b,#4,#5,#6. Exc dk on for foundations and construction of driveway walls lot # #3b,#4,#5,#6. • Construction of houses on lots#213, #3b,#4,#5, #6. • Final grading of lots#213,#3b,#4,#5,#6. Final stabilization with suitable vegetation of lots#213,#3b,#4,#5, #6. Type of Inspection: �/� ❑ Regular ❑ Pre-storm event ❑ During lJ"storm event Post-storm event 77W Information Has there been a storm event since the last inspection? ❑Yes ❑No If yes, provide: Storm Start Date&Time: Storm Duration(hrs): Approximate Amount of Precipitation(in): f 7 1 Ids Weather at time�o is mspe tion? ❑ Clear We oudy fain ❑ Sleet ❑ Fog ❑ Snowing ❑ High Winds ❑ Other: Temperature: T;— Have any discharges occurred since the last inspection? ❑Yes Bf,4o If yes,describer Are there any discharges at the time of inspection? ❑Yes Q1qo If yes,describe: Site-specific BMPs • Number the structural and non-structural BMPs identified in your SFVPPP on your site map and list them below(add as many BAIPs as necessary). Carry a copy of the numbered site map with you during your inspections. This list will ensure that you are inspecting all required BMPs at your site. • Describe corrective actions initiated, date completed, and note the person that completed the work in the Corrective Action Log. EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 1 B1VIP BNPI rrective Action Needed and Notes ." Installeth ManYenarice Re ulred? 1 Stabilized Construction es ®No ®Yes UP< Entrance 2 Hay bale/Silt Fence es ®No ®Yes No 3 Staging/Materials 51es ❑No ®Yes o storage area. 4 Dumpsters,and sanitary ®Yes ❑No ❑Yes ❑No facilities / 5 Sediment trap es ®No ®Yes UNO, 6 Soil stockpiles es LjNo ®Yes o 7 Drop inlets Mes ®No ❑Yes No 8 Concrete washout area ❑Yes ❑No ❑Yes ❑No 9 Dirt bag filler CfYes ®No ❑Yes 5KO 10 Hay bale check dams UlKles ®No ®Yes o 11 Terra tube es ©No ®Yes o 12 Erosion control blankets UYes ®No ®Yes FwKo � v 13 ®Yes ❑No ❑Yes ❑No 14 ®Yes ❑No ❑Yes ®No EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 2 BMP BMP'. BMP Corrective Action Needed and Notes Instahed� Maintenance Re uired? 15 ❑Yes ❑No ❑Yes ❑No Overall Site Issues Below are some general site issues that should be assessed during inspections. Customize this list as needed for conditions at your site. BMP/activity Implemented MaintenanQ Corrective Actioxi Needed and Notes Reuired? I Are all slopes and es ❑No ❑Yes WK6 disturbed areas not actively being worked properly stabilized? 2 Are natural resource es ❑No ❑Yes o areas(e.g., streams, wetlands,mature trees, etc.)protected with barriers or similar BMPs? 3 Are perimeter controls es ❑No Dyes LKO and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and ❑ es ❑No ❑Yes EMO receiving waters free of any sediment deposits? 5 Are storm drain inlets s ❑No ❑Yes No properly protected? 6 Is the construction exit es ❑No ❑Yes preventing sediment fi•om being tracked into the street? 7 Is trash/litter from work ❑*e5- No ❑Yes,1WN areas collected and placed in covered dumpsters? 8 Are washout facilities es ❑No ❑Yes- o (e.g.,paint,stucco, concrete)available, clearly marked, and maintained? EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 3 w BNIP/activity w Implemented? Maintenance. ' Corrective Action Needed and Notes , Re'"ulred? 9 Are vehicle and No ❑Yes UNo equipment fueling, cleaning,and maintenance areas free of spills, leaks,or any other deleterious material? 10 Are materials that are ❑, s ❑No ❑Yes o potential stormwater contaminants stored inside or under cover? I 1 Are non-stormwater No ❑Yes o discharges(e.g., wash water,dewatering) properly controlled? 12 (Other) ❑Yes ❑No ❑Yes ❑No Non-Compliance Describe any incidents of non-compliance not described above: jr1 it,l pal-o✓Zs ���t r"f�":�—� ®c� t�1�.�� t �°".� CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true, ac rate,and complete. I am aware that there are significant penalties for submitting false information, including the sibility of fine and imprisonment tffor�knowing violations." /�, Print name title: �` '" "`® ` f a'-e � ` t �-°°° CAf Signature: Date: EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 4 Storrrlwater Construction Site Inspection Report General Information Project Name North Andover 140 Academy Road at Stevens St NPDES Tracking No. MARI OE383 Location Stevens St between Great Pond Rd And Academy Rd.N. Andover Date of Inspection ((. (Z-- Start/End Time Inspector's Name(s) Scott D. Kelloway, P.E. Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover, Ma.01810, Phone(978)479-5648 Inspector's Qualifications Professional Engineer for over 15 years specializing in Environmental Permitting, Construction Inspection, Site Management,and Environmental Monitoring.(resume provided) Describe present phase of • Mobilize job construction ® Install erosion controls • Construct I stabilize entrances for lots(W., 3b #4,#50�6.,.�:� • Install Offsite Sewer Main • Haul excess fill for lots lots#2B bj#4, #5,c - • Rough shape lots B r#3b,#4, # ® Construct uphill retaining walls lots#213,#3b, 94, #5,#6. • Excav�.t....ion for foundations and construction of driveway walls lots#B #3b,#4,#5,#6. • Con—ruction of houses on lots#213,#3b,#4,#5,#6. '... • Final grading of lots#213,#3b,#4,#5,#6. • Final stabilization with suitable vegetation of lots#213,#3b,#4,#5, #6. Type of Inspection: ❑ Regular ❑ Pre-storm event ❑ During storm event ❑"Post-storm event Weather Information -, Has there been a storm event since the last inspection? ❑Yes ❑No If yes,provide: Storm S art Date Time: Storm Duration(hrs): Approximate Amount of Precipitation(in): Wea her at time of this inspection? 3'Clear ❑Cloudy ❑ Rain ❑ Sleet ❑ Fog ❑ Snowing ❑ High Winds ❑ Other: Temperature: ° q . Have any discharges occurred since the last inspection? ❑Yes @ o If yes,describe: Are there any discharges at the time of inspection? ❑Yes o If yes,describe: Site-specific BMPs • Number the structural and non-structural BMPs identified in your SWPPP on your site map and list them below(add as many BMPs as necessary). Carty a copy of the numbered site map with you during your inspections. This list will ensure that you are inspecting all required BMPs at your site. • Describe corrective actions initiated, date completed, and note the person that completed the work in the Corrective Action Log. EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 1 BMP BMP` BMP Corrective Action Needed and Notes " Installed ", Maintenance Re'"uired? 1 Stabilized Construction es ❑No ❑Yes o Entrance 2 Hay bale/Silt Fence DVes ❑No ❑Yes UTTo 3 Staging/Materials Comes ❑No ❑Yes o storage area. 4 Dumpsters,and sanitary ❑Yes ❑No ❑Yes ❑No facilities ` 5 Sediment trap Q[Ye's ❑No ❑Yes UNo 6 Soil stockpiles UVes ❑No ❑Yes ❑lib / 7 Drop inlets U es ❑No ❑Yes llmo- 8 Concrete washout area ❑Yes ❑No ❑Yes ❑No 9 Dirt bag filler Effes ❑No ❑Yes E00- 10 Hay bale check dams ( Yes ❑No ❑Yes ❑ o i" 11 Terra tube ❑No ❑Yes ® o 12 Erosion control blankets es ❑No ❑Yes o 13 ❑Yes ❑No ❑Yes ❑No 14 ❑Yes ❑No ❑Yes ❑No EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 2 BMP BMP BMP - ' Correetive Action Needed and Installed? Maintenance Re uireil 15 ❑Yes ❑No ❑Yes ❑No Overall Site Issues Below are some general site issues that should be assessed during inspections. Customize this list as needed for conditions at your site. BMP/activity Implemented? 1 'Maintenance Corrective Action Needed 'and Notes Require 1 Are all slopes and U'Gs ❑No ❑Yes QA1'o disturbed areas not actively being worked properly stabilized? 2 Are natural resource r`Yes ❑No ❑Yes GI o areas(e.g.,streams, wetlands,mature trees, etc.)protected with barriers or similar BMPs? 3 Are perimeter controls es ❑No ❑Yes U o and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and es ❑No ❑Yes UmN' receiving waters free of any sediment deposits? 5 Are storm drain inlets Ules ❑No ❑Yes 01,10 properly protected? 6 is the construction exit es ❑No ❑Yes @Tqo preventing sediment from being tracked into the street? 7 is trash/litter from work es ❑No ❑Yes Callo areas collected and placed in covered dumpsters? 8 Are washout facilities es ❑No ❑Yes ❑ o (e.g.,paint,stucco, concrete)available, clearly marked,and maintained? EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 3 BMP/activity implemented? Maintenance, Corrective Action Needed and`Notes Re aired? 9 Are vehicle and U es ®No ®Yes [a o equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? 10 Are materials that are 0 es ®No ❑Yes -CJNo potential stormwater contaminants stored inside or under cover? I I Are non-stormwater U"es ®No ❑Yes WNn--- discharges(e.g., wash water,dewatering) properly controlled? 12 (Other) ®Yes ❑No ❑Yes ®No Non-Compliance Describe any incidents of non-compliance not described above: CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I am aware that there are significant penalties for submitting false information, including the possibility offine and imprisonment for knowing violations." Print natnin d title: _.��F.� ( � � G t �aa r t �• �� � ._ r � Signaturg J 1�"t Zd M- r`s(A Date: EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 4 Stormwater Construction Site Inspection Report General Information Project Name North Andover 140 Academy Road at Stevens St NPDES Tracking No. MARIOE383 Location Stevens St between Great Pond Rd And Academy Rd.N.Andover Date of Inspection 0 j� — Start/End Time ' t Inspector's Name(s) Scott D.Kelloway,P.E. Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,Ma. 01810, Phone(978)479-5648 Inspector's Qualifications Professional Engineer for over 15 years specializing in Environmental Permitting, Construction Inspection,Site Management,and Environmental Monitoring.(resume provided) Describe present phase of • Mobilize job construction . Install erosion controls • Construct/stabilize entrances for lots#213, b . ,#5,#6. ` • install Offsite Sewer Main (_'�YKevat` '... • for lots lots#213 #3b, ,#5, #6. ®Aj��u �sh�ape ts#26, #3b, #5, #6. ® Construct uphill retaining walls lots#213,#3b,#4, #5,#6. klwr" • Excavation for foundations and construction of driveway walls lots#26,#3b, #4,#5,#6. • Construction of houses on lots#213,#3b,#4, #5,#6. • Final grading of lots#213,#3b,#4,#5,#6. • Final stabilization with suitable vegetation of lots#213,#3b,#4,#5, #6. Type of Inspection: ❑ Regular ❑Pre-storm event ❑ During storm event a- ost-storm event Wea'fherinformation Has there been a storm event since the last inspection? ❑Yes ❑No If yes,provide: Storm Start Pate&Time: Storm Duration(hrs): Approximate Amount of Precipitation(in): Weather at time of this inspection? ❑ Clear 114?roudy ❑ Rain ❑ Sleet ❑ Fog ❑ Snowing ❑ High Winds ❑ Other: Temperature: L "( r' Have any discharges occurred since the last inspection? ❑Yes If yes,describe: Are there any discharges at the time of inspection? ❑Yes If yes,describe: Site-specific BMPs • Number the structural and non-structural BIVIPS identified in your SYVPPP on your site map and list them below(add as many BMPs as necessaty). Carry a copy of the numbered site map with you during your inspections. This list will ensure that you are inspecting all required BMPs at your site. • Describe corrective actions initiated, date completed, and note the person that completed the work in the Corrective Action Log. EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 1 BMP BMP !. _ BMp Corrective Action Needed and Motes Installed? Maintenance_ Re n red?; I Stabilized Construction es ONo es ®No �j�dYlOq i" ACL-04Z�L�'� Entrance TO- � . 2 Hay bale/Silt Fence es ®No ®Yes o 3 Staging/Materials es ®No ❑Yes o storage area. 4 Dumpsters,and sanitary es ®No ❑Yes EYfqo facilities 5 Sediment trap Ules ❑No ❑Yes o 6 Soil stockpiles es ONo ®Yes UTqo 7 Drop inlets es ®No ❑Yes 8 Concrete washout area ®Yes ❑No ❑Yes ❑No t1jl 9 Dirt bag filler UrYes ❑No ❑Yes o 10 Hay bale check dams es ®No es ®No t� 64*7 4?—L��T-6 u� I 1 Terra tube es ®No ®Yes UKO 12 Erosion control blankets es ❑No ®Yes LKo ,; 'e 13 ❑Yes ❑No ❑Yes ❑No 14 ❑Yes ❑No DYes ❑No EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 2 BMP BMP. BMP C,orreetive Action Needed and Notes Installed Mairitennce Re aired? 15 ®Yes ®No ®Yes ®No Overall Site Issues Below are some general site issues that should be assessed during inspections. Customize this list as needed for conditions at your site. BMP/activity Implemented Maintenance Corrective Action Needed end No _ . R e- ,' e uirp A'? 1 Are all slopes and es LlNo ®Yes o disturbed areas not actively being worked property stabilized? 2 Are natural resource Wles ®No ®Yes d< areas(e.g.,streams, wetlands,mature trees, etc.)protected with barriers or similar BMPs? 3 Are perimeter controls Ules ❑No ®Yes o and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and es LJNo ®Yes o 5.ZoP( F-7 �z a receiving waters free of any sediment deposits? 5 Are storm drain inlets Uqes LJNo ®Yes 1W0 properly protected? 6 Is the construction exit es LJNo ®Yes o G2&AQo C�i 4 preventing sediment —yv�;,JU , from being tracked into the street? 7 Is trash/litter from work LlYes LJNo ®Yes LJNo areas collected and placed in covered dumpsters? 8 Are washout facilities ❑Yes LJNo ®Yes ❑No (e.g.,paint,stucco, concrete)available, clearly marked,and maintained? EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 3 BMP/activity Implemented? Mainte'dance Corrective Action Needed and Notes , Re wired? 9 Are vehicle and UKs ®No ®Yes LWK equipment fueling, cleaning,and maintenance areas free of spills, leaks,or any other deleterious material? 10 Are materials that are ®Yes ❑No ❑Yes ®No potential stormwater contaminants stored inside or under cover? 1 I Are non-stormwater MWs ®No ®Yes Lj&_� discharges(e.g.,wash water,dewatering) properly controlled? 12 (Other) ®Yes ®No ®Yes ®No Non-Com liance Describe any incidents of non-compliance not described above: /� scc?�tS9sl�1c�J + t ► y:� '� � � Q an t.y Drs I-q Wl t �y'Ot t�yL t '42, t"C'Y " tti f 2�4rr„t /l/ �S t�Z��'1-�All— CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true, accurate,and complete. I am aware that there are significant penalties for submitting false information, including the pos lity of fine and imprisonment for knowing violations.,, Print name a d i e: CQ 1 Signature: Date: < EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 �� 4 Stormwater Construction Site Inspection Report Genes at Information Project Name North Andover 140 Academy Road at Stevens St NPDES Tracking No. MARIOE383 Location Stevens St between Great Pond Rd And Academy Rd.N.Andover Date of Inspection l Start/End Time (� (�� `3f Inspector's Name(s) Scott D. Kelloway, P.E. Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,Ma.01810, Phone(978)479-5648 Inspector's Qualifications Professional Engineer for over 15 years specializing in Environmental Permitting, Construction Inspection, Site Management,and Environmental Monitoring.(resume provided) Describe present phase of • Mobilize job construction • Install erosion controls • Construct I stabilize entrances for lots#213,#3b,#4,#5, #6. • Install Offsite Sewer Main • Haul excess fill for lots lots#213, #3b, #4,#5,#6. • Rough shape lots#213,#3b,#4,#5,#6. • Construct uphill retaining walls lots#2E, #3b, #4,#5,#6. • Excavation for foundations and construction of driveway walls lots#213,#3b,#4,#5,#6. • Construction of houses on lots#213, #3b,#4, #5,#6. • Final grading of lots#213,#3b,#4,#5,#6. • Final stabilization with suitable vegetation of lots#213,#3b,#4,#5, #6. Typ-of Inspection: ��ii LYRegular ❑Pre-storm event ❑ During storm event l=1 Post-storm event Weather Information Has there been a storm event since the last inspection? ❑Yes ❑No If yes, provide: Stomp Start Rate&Timer Storm Duration(hrs): Approximate Amount of Precipitation(in): We tI(r at time of this inspection? ❑Clear ❑Cloudy ❑ Rain ❑ Sleet ❑ Fog ❑ Snowing ❑ High Winds ❑ Other: Te pperature: G Have any discharges occurred since the last inspection? ❑Yes UT40 If yes,describe: Are there any discharges at the time of inspection?❑Yes ❑ o If yes,describe: Site-specific BMPs • Number the structural and non-structural BMPs identified in your SWPPP on your site map and list them below(add as many BMPs as necessary). Carly a copy of the numbered site map with you during your inspections. This list will ensure that you are inspecting all required BNfPS at your site. • Describe corrective actions initiated, date completed, and note the person that completed the work in the Corrective Action Log. EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 1 _BMP BMP BMP Corrective Action Needed and NotQs Instal ed� Maintenance I Stabilized Construction es ❑No ®Yes o Entrance =��✓L��S i-- Comet �- �'t `f. 2 Hay bale/Silt Fence CPYes ❑No ®Yes o 3 Staging/Materials OYes ®No ®Yes ONo storage area. 4 Dumpsters,and sanitary ®Yes ®No ❑Yes ®No facilities 5 Sediment trap Gees ONo ®Yes QNNI ' 6 Soil stockpiles @-Yes ®No ®Yes Q o 7 Drop inlets ❑- s ONo ®Yes. o 8 Concrete washout area ❑Yes ❑No ❑Yes ONo 9 Dirt bag filler Cat es ❑No ❑Yes o 10 Hay bale check dams B'y'es ❑No ®Yes UKO I I Terra tube ®" es ®No ®Yes o 12 Erosion control blankets a es ❑No ❑Yes:O o L- 13 ❑Yes ❑No ❑Yes ❑No 14 ❑Yes ❑No ❑Yes ❑No EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 2 BMP BMP ;BMP Corrective Action Needed and Notes Ins#ailed? Maintenance I3e uired? 15 ❑Yes LINO ❑Yes LINO Overall Site Issues Below are some general site issues that should be assessed during inspections. Customize this list as needed for conditions at your site. 11 IV Iniple . nted? Maintenance Corrective Action Needed and Notes i' Re aired? I Are all slopes and 12 es LINO ❑Yes ❑ o disturbed areas not actively being worked property stabilized? 2 Are natural resource ❑ es LINO ❑Yes "No areas(e.g.,streams, wetlands, mature trees, etc.)protected with barriers or similar BMPs? 3 Are perimeter controls ❑Yes LINO ❑Yes-Jf4o and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and ❑ es LINO ❑Yes LINO receiving waters fi•ee of any sediment deposits? 5 Are storm drain inlets ❑- es ❑No ❑Yes Uf4o properly protected? 6 Is the construction exit Yes ❑No ❑Yes ENO preventing sediment fi•om being tracked into the street? 7 Is trash/litter fi•om work ❑Yes LINO ❑Yes LINO ���,1 _ �c�,d C^yi i�F" z iii areas collected and placed in covered dumpsters? I 8 Are washout facilities es ❑No ❑Yes tflo (e.g., paint,stucco, concrete)available, clearly marked, and maintained? EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 3 BMP/aetiv ty Implemented? Maintenanee" Corrective AetiomNeeded and Notes ! Re aired? 9 Are vehicle and U es ❑No ❑Yes UNo equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? �- 10 Are materials that are es ❑No ❑Yes 0-&o potential stormwater contaminants stored inside or under cover? 11 Are non-stormwater LL es ❑No ❑Yes ZNo discharges(e.g.,wash water,dewatering) properly controlled? 12 (Other) ❑Yes ❑No ❑Yes ❑No Non-Compliance Describe any incidents of non-compliance not described above: CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." � n Print name a4title: / a Signature: �� -� ( = _ Date: b4z- EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 4 ..., �� .,. ..,,....,., �7 ' � ,.�. .. ..�. ��/�(��� `� yip f o ,.. � s�f i / � r,� ��I��f����r) �� n �� %� Vii!' � � J� m � ��,�� �; �r �� �a� °���`'� ` �r ���1r� �'6„� ` �Pf�l i �. �� a� v!i �' l, � � � � f 1 I Irl�� r sir ix 4 r r rah„ I � r N�&I rdy F /� �ry 71tl c Iry"M �/flP� am��/il)l{�('��'�� >t" ✓,,..,f ql d?ill P� � l �,��� �� �r/ �/� ::iii r i - /✓..... / ii�� i// r�: /I � /�j�f�/r�f�//��r�,��� / %/�l/ �/i /��i///%//,✓iii 'i 'ii i i�/j���/� j�/,�%i� % ����i�//%/ ✓i i l/,%%i/ i �///iii/i i� '/�/r'����,�/�� /r/�/' r i � 4�,'✓/��//�/.��r P " �r I Il���%ir�r �fi'r%%r///�i �/ r�, Lrv2���%r�P i / /%� i �1i� l'`%�Ir�t��✓'��"�� �. ,'�,:l A� //i/;, -i�r if Z rl/ i rirlr7lGr./... I/�f, Scott D. Kelloway, 1'.E. Professional Civil and Environmental Designs and Inspections. 148 North St. Andover, Ma. 01810 Phone: (978) 682-5054 Ma. Lisc #40122 9/30/2012 North Andover Planning Department Attn: Judith M. Tymon 1600 Osgood St. North Andover, Ma. 01845 Dear, Ms. Tymon Please refer to the attached field inspection reports of site monitoring for the project at 140 Academy Lane at Stevens Street. in North Andover. Ma. DEP No. 242-1504,NPDES Tracking no. MARI OE3 83. Construction activities on this site, for this month are as follows: • Continued construction of single family home on lot#2b. • Construction of proposed retaining wall on lot#4. • Excavation for and pour foundations at lot 3b, and 4. • Misc. grading, site work, and maintenance of BMP's Site work continues to progress as noted above. All BMP's are being properly maintained and containing sediment within the work site. There has been no encroachnient within restricted areas. Currently all work,on this site has been completed in compliance with the project SWPPP, and Order of Conditions. If you have any questions or concerns, please feel free to contact me at address and phone number listed above. ncerely, Scott D. elloway, P.E. CC. Tom Patenaud Storlmwater Construction Site Inspection Report General Information Project Name North Andover 140 Academy Road at Stevens St NPDES Tracking No. MAR10E383 Location Stevens St between Great Pond Rd And Academy Rd.N.Andover Date of Inspection AL44 Start/End Time Inspector's Name(s) Scott D.Kelloway,P.E. Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,Ma.01810, Phone(978)479-5648 Inspector's Qualifications Professional Engineer for over 15 years specializing in Environmental Permitting, Construction Inspection,Site Management,and Environmental Monitoring.(resume provided) Describe present phase of ® Mobilize job construction ® Install erosion controls ® Construct/stabilize entrances for lots#*#3b,#4,#5,. ® Install Offsite Sewer Main 0..,h ® haul excess fill for lots lots#213, 3b,#4145,#6. .. �� �,. ® Rough shape lots#213, 3b,#4C6,#6 -�- 0 Construct uphill retaining walls lots#2B,#3b,� 5,#6. ® Excav " n for foundations and construction of driveway walls lots 2B b,#4,#5,#6. `2 6 YCd�11 � 9 �O-ZO AN 0 ® Construction of houses on lots#213, 3b,#4,#5,#6. '.... ® Final grading of lots#26,#3b,#4,#5,#6. ® Final stabilization with suitable vegetation of lots#213,#3b,#4,#5, #6. Type nspection: e ular ❑Pre-storm event ®During storm event ost-storm event Weather Information Has there been a storm event since the last inspection? ®Yes ®No If yes,provide: Storm S rt Date 4 Time: Storm Duration(hrs): Approximate Amount of Precipitation(in): 41,1 q 1/ 4-- Weather at time his inspection? • Clear UICloudy ®Rain ® Sleet ®Fog ❑ Snowing ®High Winds • Other: Temperature r Have any discharges occurred since the last inspection? ®Yes UKo If yes,describe: Are there any discharges at the time of inspection?®Yes F& o If yes,describe: Site-specific BMPs • Number the structural and non-structural BMPs identified in your SWPPP on your site map and list them below(add as many BMPs as necessary). Carry a copy of the numbered site map with you during your inspections. This list will ensure that you are inspecting all required BMPs at your site. • Describe corrective actions initiated, date completed, and note the person that completed the work in the Corrective Action Log. EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 1 BMP BMP BMP Corrective Action Needed and Notes Installed? Maintenance Required? 1 Stabilized Construction Wes ❑No ❑Yes LK6 Entrance 2 Hay bale/Silt Fence es ❑No ❑Yes o 3 Staging/Materials es ❑No ❑Yes No storage area. 4 Dumpsters,and sanitary LKes ❑No ❑Yes o facilities 5 Sediment trap 3fes ❑No ❑Yes o 6 Soil stockpiles es ❑No ❑Yes UNo 7 Drop inlets Elfes ❑No ❑Yes 8 Concrete washout area ❑Yes ❑No ❑Yes Uf,4o 9 Dirt bag filler es ❑No ❑Yes LK6 10 Hay bale check dams ❑=i'es ❑No ❑Yes o 11 Terra tube es ❑No ❑Yes QWO 12 Erosion control blankets es ❑No ❑Yes 414o 13 ❑Yes ❑No ❑Yes ❑No 14 ❑Yes ❑No ❑Yes ❑No EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 2 BMP BMP BMP Corrective Action Needed and Notes Installed? Maintenance Required? 15 ®Yes ®No ®Yes ®No Overall Site Issues Below are some general site issues that should be assessed during inspections. Customize this list as needed for conditions at your site. BMP/activity Implemented? Maintenance Corrective Action Needed and Notes Required. 1 Are all slopes and UIGs ®No ®Yes LKo disturbed areas not actively being worked proveriv stabilized? 2 Are natural resource ® s ®No ®Yes,RNo areas(e.g.,streams, wetlands,mature trees, etc.)protected with barriers or similar BMWs? 3 Are perimeter controls ® es ®No ®Yes LI o and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and CKes ONo ®Yes Ulqo receiving waters free of any sediment deposits? 5 Are storm drain inlets es ®No ®Yes Qf4o properly protected? 6 Is the construction exit es ®No ®Yes LJWO preventing sediment fiom being tracked into the street? 7 Is trash/litter from work U es LlNo ®Yes 01114o areas collected and placed in covered dumpsters? 8 Are washout facilities LWes ®No ®Yes 5- o (e.g.,paint,stucco, concrete)available, clearly marked,and maintained? EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 3 BMP/activity Implemented? 'Maintenance Corrective Action Needed and Motes Require 9 Are vehicle and es ®No ®Yes LDKO equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? 10 Are materials that are es ®No ®Yes FJWo potential stormwater contaminants stored inside or under cover? I I Are non-stormwater UYes ®No ®Yes Lkqo discharges(e.g.,wash water,dewatering) properly controlled? 12 (Other) ®Yes ®No ®Yes ®No Non-Compliance Describe any incidents of non-compliance not described above: CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete.I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." Print name n title: 11 � � �lfi3f�o, L j VA Signature: %- Date: l EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 4 Stornlwater Construction Site Inspection Report General Information Project Name North Andover 140 Academy Road at Stevens St NPDES Tracking No. MAR10E383 Location Stevens St between Great Pond Rd And Academy Rd.N.Andover Date of Inspection Start/End Time Inspector's Name(s) Scott D.Kelloway,P.E. Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,Ma.01810, Phone(978)479-5648 Inspector's Qualifications Professional Engineer for over 15 years specializing in Environmental Permitting, Construction Inspection,Site Management,and Environmental Monitoring.(resume provided) Describe present phase of ® Mobilize job construction ® Install erosion controls ® Construct I stabilize entrances for lots#2W,#3b,#4,#5, ® Install Offsite Sewer Main lr�P ® Haul excess fill for lots lots#013,#3b,#4, za '... ® hough shape lots#2B,#3b, Aa '..... ® Construct uphill retaining walls lots#213,#3b, #5,#6. ® Excav 'on for foundations and construction of driveway walls lots #3b,#4,#5,#6. ® Cons ruction of houses on lots B J#3b,#4,#5,#6. ® Final grading of lots#213,#3b,#4,#5,#6. ® Final stabilization with suitable vegetation of lots#2B, 3b,#4,#5, #6. Typ f Inspection: egular ®Pre-storm event ®During storm event ®Post-storm event Weather Information Has there been a storm event since the last inspection? UYes ®No If yes,provide: Storm S rt Dat &Time: Storm Duration(hrs): Approximate Amount of Precipitation(in): W7_c Weather at time of this inspection? 3-CIear ®Cloudy ®Rain ® Sleet ®Fog ® Snowing ®High Winds ®Other: Temperature: Have any discharges occurred since the last inspection? ®Yes If yes,describe: Are there any discharges at the time of inspection?®Yes o If yes,describe: Site-specific BMPs • Number the structural and non-structural BMPs identified in your SWPPP on your site map and list them below(add as many BMPs as necessary). Carry a copy of the numbered site map with you during your inspections. This list will ensure that you are inspecting all required BMPs at your site. • Describe corrective actions initiated, date completed, and note the person that completed the work in the Corrective Action Log. EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 1 BMP BMP BMP Corrective Action Needed and Motes Installed? Maintenance' Required? 1 Stabilized Construction es ONO ®Yes o Entrance 2 Hay bale/Silt Fence (Yes LINO ®Yes Imo 3 Staging/Materials es ONO ®Yes UNo- storage area. 4 Dumpsters,and sanitary es LINO ®Yes o facilities 5 Sediment trap UYee-s LINO ®Yes G]No 6 Soil stockpiles 31fes ®No ®Yes- 7 Drop inlets tc7Y-e�. LINO ®Yes U.No 8 Concrete washout area esJ®No ®Yes OWo 9 Dint bag filler es LINO ❑Yes U o 10 Hay bale check dams WY s- ®No ®Yes QNo 11 Terra tube es ®No ®Yes brio 12 Erosion control blankets Cites LINO ®Yes 13 ®Yes LINO ®Yes LINO 14 ®Yes LINO ®Yes LINO EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 2 BMP BMP BMP Corrective Action Needed and Dotes Installed? Maintenance Required? 15 ®Yes ®No ®Yes ®No Overall Site Issues Below are some general site issues that should be assessed during inspections. Customize this list as needed for conditions at your site. BMP/activity Implemented? Maintenance Corrective Action Needed and Motes Required? 1 Are all slopes and UWi ®No ®Yes 3 disturbed areas not actively being worked properly stabilized? 2 Are natural resource ®'Yes ®No ®Yes 290 areas(e.g., streams, wetlands,mature trees, etc.)protected with barriers or similar BMPs? 3 Are perimeter controls @Yes ®No ®Yes ElAo and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and @-Yes ®No ®Yes ❑No- receiving waters free of any sediment deposits? 5 Are storm drain inlets U T'e–s No ®Yes @No properly protected? 6 Is the construction exit s'®No ®Yes UNo preventing sediment from being tracked into the street? ? Is traslAitter from:work UY-e§ UNo L'Yes QW0 areas collected and placed in covered dumpsters? 8 Are washout facilities Comes ®No ®Yes ONtS " (e.g.,paint,stucco, concrete)available, clearly marked,and maintained? EPA SWPPP Inspection Report, Version 1.1, September 97, 2007 3 BMP/activity Implemented? Maintenance Corrective Action Needed and Notes Re wired? 9 Are vehicle and tYes ®No ®Yes eW6 equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? 10 Are materials that are ®Yes ®No ®Yes ®No potential stormwater contaminants stored N4 inside or under cover? — 11 Are non-stormwater es ®No ®Yes F_W discharges(e.g.,wash water,dewatering) properly controlled? 12 (Other) ®Yes ®No ®Yes ®No Non-Compliance Describe any incidents of non-compliance not described above: CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." ,r Printnameandtle: � Signature: Date: �� EPA SINPPP Inspection Report, Version 1.1, September 17, 2007 4 Stormwater Construction Site Inspection Report General Information Project Name North Andover 140 Academy Road at Stevens St NPDES Tracking No. MARI OE383 Location Stevens St between Great Pond Rd And Academy Rd.N.Andover Date of Inspection f Start/End Time Inspector's Name(s) 8cottD.Kelloway,P.E. Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,Ma.01810, Phone(978)479-5648 Inspector's Qualifications Professional Engineer for over 15 years specializing in Environmental Permitting, Construction Inspection,Site Management,and Environmental Monitoring.(resume provided) Describe present phase of o Mobilize job construction ® Install erosion controls ® Construct I stabilize entrances for lot #2 ,#3 ,#4,#5, ® Install Offsite Sewer Main ® Haul excess fill for lots lots#213,#30,#4,#5,#6. ® Rough shape lots#213, 3b,#4; ". �a,1c ^:�".k'. --, "' ® Construct-.uphilLretaininc�walls lots#2B, xca n r foundations and construction of�driveway walls lots 2� b #4,#5,#6. �-�- ��--��u «�� a - ��� � ® Construction of houses on lo*� C 3�',#I4,#5,#6. ® Final grading of lots#213,#3b,#4,#5,#6. ® Final stabilization with suitable vegetation of lots#213,#3b,#4,#5, #6. Type of Inspection: ®Regular ®Pre-storm event ❑ During storm event ost-storm event Weather Information Has there been a storm event since the last inspection? ®Yes ®No If yes,provide: Storm Spit Date&Time: Storm Duration(hrs): Approximate Amount of Precipitation(in): Weather at time of this inspection? 2-wear ®Cloudy ®Rain ® Sleet ®Fog ® Snowing ®High Winds U Other: Temperature: Have any discharges occurred since the last inspection? ®Yes If yes,describe: Are there any discharges at the time of inspection?®Yes Ullo If yes,describe: Site-specific BMPs • Number the structural and non-structural BMPs identified in your SWPPP on your site map and list them below(add as many BMPs as necessa►y). Carry a copy of the numbered site map with you during your inspections. This list will ensure that you are inspecting all required BMPs at your site. • Describe corrective actions initiated, date completed, and note the person that completed the work in the Corrective Action Log. EPA SWPPP Inspection Report, Version 1.1, September 97, 2007 1 BMP BMP BMP ` Corrective Action Needed and Notes Installed? Maintenance Required? 1 Stabilized Construction es ®No ®Yes M1c3`- Entrance 2 Hay bale/Silt Fence ®' es ®No ®Yes Ulqo 3 Staging/Materials Wes ®No ®Yes o storage area. 4 Dumpsters,and sanitary Gales ®No ®Yes o facilities 5 Sediment trap es ®No 6 Soil stockpiles es ®No ❑Yes UN6 7 Drop inlets es ®No ®Yes-Z No 8 Concrete washout area es ®No ®Yes MO 9 Dirt bag filler es ®No ®Yes o 10 Hay bale check dams LI-Ye-s ®No ®Yes 11 Terra tube es ®No ®Yes o 12 Erosion control blankets lYes QNo ®Yes o 13 ®Yes ®No ®Yes ®No 14 ®Yes ®No ®Yes ®No EPA SWPPP Inspection Report, Version 1.1, September 97, 2007 2 BMP BMP BMP Corrective Action Needed and dotes Installed? Maintenance Required? 15 Dyes ®No Dyes ®No Overall Site Issues Below are some general site issues that should be assessed during inspections. Customize this list as neededfor conditions at your site. BMP/activity Implemented? Maintenance Corrective Action Needed and Notes Re uired? 1 Are all slopes and es ®No Dyes disturbed areas not actively being worked properly stabilized? 2 Are natural resource es ®No Dyes lam' areas(e.g.,streams, wetlands,mature trees, etc.)protected with barriers or similar BMPs? 3 Are perimeter controls es ®No Dyes U90 and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and es ®No Dyes LWo receiving waters free of any sediment deposits? 5 Are storm drain inlets s ®No Dyes Wo properly protected? 6 Is the construction exit es ®No Dyes QWo preventing sediment from being tracked into the street? 7 Is trash/litter from work LWes ®No ®Yes o areas collected and placed in covered dumpsters? 8 Are washout facilities es ®No Dyes QWo (e.g.,paint,stucco, concrete)available, clearly marked,and maintained? EPA SWPPP Inspection Report, Version 1.1, September 97, 2007 3 BMP/activity Implemented? Maintenance Corrective Action Needed and dotes Required? 9 Are vehicle and Uffes ®No ®Yes Ulqo equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? 10 Are materials that are es ®No ®Yes o potential stormwater contaminants stored inside or under cover? I 1 Are non-stormwater ayes ®No ®Yes o discharges(e.g.,wash water,dewatering) properly controlled? 12 (Other) es ®No ®Yes Uf4o Non-Compliance Describe any incidents of non-compliance not described above: -z /A- CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete.I am aware that there are significant penalties for submitting false information, including the ossibility of fine and imprisonment for knowing violations." € Print name n title: E,4,,l�'�- 6� �m--- Signatuie: !/ Dater / �f 7 EPA SWPPP Inspection Report, Version 1.1, September 97, 2007 4 Stormwater Construction Site Inspection Report General Information Project Name North Andover 140 Academy Road at Stevens St NPDES Tracking No. MARI OE383 Location Stevens St between Great Pond Rd And Aca emy Rd.N.Andover Date of Inspection Start/End Time !fj Inspector's Name(s) Scott D.Kelloway,P.E. Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,Ma.01810, Phone(978)479-5648 Inspector's Qualifications Professional Engineer for over 15 years specializing in Environmental Permitting, Construction Inspection,Site Management,and Environmental Monitoring.(resume provided) Describe present phase of ® Mobilize job construction ® Install erosion controls ® Construct/stabilize entrances for lots §o' b , 5, Install Offsite Sewer Main 63w.),u Haul excess fill for lots lots#213 #3b #4,#5,#6. ToWvP Jrlo p� ® Rough shape to gW8 '#4,#5, >, ® Construct uphill retaining walls lots#213,#3b 5,#6. ® Exca 'on for oundations and construction of driveway walls lot � #5,#6. _ ® Construction of houses on lot 2 ,#3b,#4,#5,#6. ® Final grading of lots#213,#3b,#4,#5,#6. ® Final stabilization with suitable vegetation of lots#213,#3b,#4,#5, #6. Ty f Inspection: egular ®Pre-storm event ® During storm event ❑Post-storm event Weather Information.- Has there been a storm event since the last inspection? ®Yes CKo If yes,provide: Storm Start Date&Time: Storm Duration(hrs): Approximate Amount of Precipitation(in): Weather at tim this inspection? 13 Clear Uffloudy ®Rain ® Sleet ®Fog ® Snowing ®High Winds ®Other: Temperature: Have any discharges occurred since the last inspection? ®Yes Ulqo If yes,describe: Are there any discharges at the time of inspection?®Yes 'o If yes,describe: Site-specific BMPs • Number the structural and non-structural BMPs identified in your SWPPP on your site Wrap and list them below(add as many BMPs as necessary). Carry a copy of the numbered site map with you during your inspections. This list will ensure that you are inspecting all required BMPs at your site. • Describe corrective actions initiated, date completed, and note the person that completed the work in the Corrective Action Log. EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 1 BMP BMP BMP Corrective Action Needed and Notes Installed? Maintenance Required? 1 Stabilized Construction es ®No ®Yes LIKo Entrance 2 Hay bale/Silt Fence es ®No ®Yes C3°ldo 3 Staging/Materials U-Yes ®No ®Yes UNo storage area. 4 Dumpsters,and sanitary UY'e-s L No ®Yes o facilities 5 Sediment trap es—®No ®Yes Mlqo 6 Soil stockpiles UVes ®No ®Yes -o C,e-®s "- }b't CV 7 Drop inlets es ®No ®Yes 8 Concrete washout area Wes ®No ®Yes Mo 9 Dirt bag filler es ®No ®Yes o 10 Hay bale check dams QYe's ®No E3YesJJKo 11 Terra tube es ®No ®Yes 12 Erosion control blankets es ®No i]Yes o 13 ®Yes ®No ®Yes ®No 14 ®Yes ®No ®Yes ®No EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 2 BMP BW BMP Corrective Action Needed and Notes Installed? Maintenance Required? - 15 ❑Yes ❑No ❑Yes ❑No ®veraU Site Issues Below are some general site issues that should be assessed during inspections. Customize this list as neededfor conditions at your site. BMP/activity Implemented? Maidtenance Corrective Action Needed and Notes Required? 1 Are all slopes and ayes ®No ❑Yes o disturbed areas not actively being worked Properly stabilized? 2 Are natural resource No ❑Yes ❑X6� areas(e.g.,streams, wetlands,mature trees, etc.)protected with barriers or similar BMPs? 3 Are perimeter controls U-Y-e-s ❑No ❑Yes UN and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and es ❑No ❑Yes o receiving waters free of any sediment deposits? 5 Are storm drain inlets ❑No ❑Yes Lle-' properly protected? 6 Is the construction exit ❑ s ❑No ❑Yes o preventing sediment fiom being tracked into the street? 7 Is trash/litter from work es ❑No Wes areas collected and placed in covered dumpsters? 8 Are washout facilities s ❑No ❑Yes o (e.g.,paint,stucco, concrete)available, clearly marked,and maintained? EPA SWPPP Inspection Report, Version 1.1, September 97, 2007 3 BMP/activity Implemented? Maintenance Corrective Action Needed and Notes Required?, 9 Are vehicle and ®f'es ®No ®Yes •Q510 equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? 10 Are materials that are Wes ®No ®Yes UNI— potential stormwater contaminants stored inside or under cover? 11 Are non-stormwater s ®No ®Yes discharges(e.g.,wash water,dewatering) properly controlled? / 12 (Other) ®Yes ®No ®Yes ®No Non-Compliance Describe any incidents of non-compliance not described above: CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for ga ing the information,the' ormation submitted is,to the best of my knowledge and belief,true,accurate,an co plete.I am aware that the e 6 s'gtu cant penalties for submitting false information, including the possibili o me an rxso t l'or wi violations." Print name and title _ � °t'��1. C,-1 4 ,�, f Signature: Date: EPA SWPPP Inspection Report, Version 9.9, September 97, 2007 4 Stormwater Construction Site Inspection Report General Information Project Name North Andover 140 Academy Road at Stevens St NPDES Tracking No. MARI OE383 Location Stevens St between Great Pond Rd And Academy Rd.N.Andover Date of Inspection ;,7q 17, Start/End Time Inspector's Name(s) Scott D.kelloway,P.E. Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,Ma. 01810, Phone(978)479-5648 Inspector's Qualifications Professional Engineer for over 15 years specializing in Environmental Permitting, Construction Inspection, Site Management,and Environmental Monitoring.(resume provided) Describe present phase of • Mobilize job construction . Install erosion controls • Construct I stabilize entrances for lot ,#4,#5, • l erflmain Cobb vq e `y • Haul excess fill for lots lot 2B,#3b 5 �� • Rough shape lots B;#3� .-#5;# • Construct uphill retaining wa s ots#2B,#A04. #5,#6. • Excavation for fou dations and construction of driveway walls lots ~ #6. • Construction of houses on lots ,#3b,#4,#5,#6. • Final grading of lots#213,#3b,#4,—#5,#6. • Final stabilization with suitable vegetation of lots#26,#3b,#4,#5, #6. Type of Inspection: � ❑Regular ❑Pre-storm event ❑During storm event a- ost-storm event Weather Infor ation Has there been a storm event since the last inspection? Oles ❑No If yes,provide: Storm S art Date&Time: Storm Duration(his): Approxi�te Nnount of Precipitation(in):V-L 12 Weather attime this inspection? ❑ � Clear t�loudy ❑Rain ❑ Sleet ❑Fog ❑ Snowing ❑High Winds ❑ Other: Temperature: 7 Have any discharges occurred since the last inspection? ❑Yes o If yes,describe: Are there any discharges at the time of inspection?❑Yes QNo If yes,describe: Site-specific BMPs • Number the structural and non-structural BMPs identified in your SWPPP on your site map and list them below(add as many BMPs as necessary). Carry a copy of the numbered site map with you during your inspections. This list will ensure that you are inspecting all required BMPs at your site. • Describe corrective actions initiated, date completed, and note the person that completed the work in the Corrective Action Log. EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 2 BMP BMP BMP Corrective Action Needed and Notes Installed? Maintenance Re uireO 1 Stabilized Construction UVes ❑No ❑Yes o o Entrance 2 Hay bale/Silt Fence es ❑No ❑Yes o 3 Staging/Materials Wes ❑No ❑Yes o storage area. 4 Dumpsters,and sanitary es ❑No ❑Yes o facilities 5 Sediment trap es ❑No ❑Yes CKo 6 Soil stockpiles es ❑No ❑Yes o S7J t- Lit e-.` 7 Drop inlets LPres ❑No ❑Yes o 8 Concrete washout area LKes ❑No ❑Yes UN(� 9 Dirt bag filler Ules ❑No ❑Yes. o 10 Hay bale check dams es ❑No ❑Yes U<o 11 Terra tube es ❑No ❑Yes o 12 Erosion control blankets ❑ s ❑No ❑Yes 13 ❑Yes ❑No ❑Yes ❑No 14 ❑Yes ❑No ❑Yes ❑No EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 3 BMP BMP BMP Corrective Action Needed and Notes Installed? Maintenance Required? 15 ❑Yes ❑No ❑Yes ❑No Overall Site Issues Below are some general site issues that should be assessed during inspections. Customize this list as needed for conditions at your site. BMP/activity Implemented? Maintenance Corrective Action Needed and Notes Required? I Are all slopes and UVes ❑No ❑Yes disturbed areas not actively being worked properly stabilized? 2 Are natural resource es ❑No ❑Yes LWo areas(e.g., streams, wetlands,mature trees, etc.)protected with barriers or similar BMPs? 3 Are perimeter controls es ❑No ❑Yes QRqo and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and 6Wes ❑No ❑Yes LINO, receiving waters free of any sediment deposits? 5 Are storm drain inlets es ❑No ❑Yes o properly protected? 6 Is the construction exit es ❑No ❑Yes o preventing sediment from being tracked into the street? 7 Is trash/litter from work LIY6s ❑No ❑Yes o areas collected and placed in covered dumpsters? 8 Are washout facilities Ules ❑No ❑Yes (e.g.,paint,stucco, concrete)available, clearly marked, and maintained? EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 4 BMP/activity Implemented? Maintenance Corrective Action Needed and Notes Required? 9 Are vehicle and es ❑No ❑Yes 9,Tqo equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? 10 Are materials that are es ❑No ❑Yes LJNo potential stormwater contaminants stored inside or under cover? 11 Are non-stormwater es ❑No ❑Yes E]Od'o discharges(e.g.,wash water,dewatering) properly controlled? 12 (Other) ❑Yes ❑No ❑Yes ❑No Non-Compliance Describe any incidents of non-compliance not described above: CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gath ing the information,the information submitted is,to the best of my knowledge and belief,hue, accurate,and c plete. I am aware that there are significant penalties for submitting false information, including the possibility o e and imprisonme�nnt�for knowing violations." Print name and e: a� - �iL-, V Signature: Date: EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 5 r / ! ' 1/ r riJ r or m r lIl II � / / /��jr fire/��✓ /f���//����j�����% r o�m f r �' ���'�j'�//Jr�/j/V�����ea/l/✓I Y / '�rF ( %1f/��I/r/l� P{, i� a r" f;fff ffffff/ f 'fff�ff�%f ,tiff au ,,