Loading...
HomeMy WebLinkAboutCorrespondence - 239 GRANVILLE LANE 1/18/2011 | l � | | PRINTEO BY: Pamela DdIeChiaie- PLEASE LEAVE IN PRINT-OUT TRAY.......THANK YOU, DelleChiale, Pamela From: DelleChiaie, Pamela y Sent: � // C" /p �v/ / / / �/ �m U , /| / To: Grant, Michele / " U Subject: m � Hi Michele, I received a call this morning from Linda Gagnon,homeowner of 239 Granville Lane. She called to complain about septic system problems they are having as a result of system they had installed at the end of 2009. Here is a synopsis an was provided toouo from Mrs. Gagnon: 1. There is on emergency sensor on tbeflotudon device which couoox on alarm to go off every%-3 6oux when there ix heavy usage«ywater,such ox taking multiple showers;laundry, etc, When the system is no/wx/rk/q9pn/parly, theu/unn8ouyoff. � / I The electric pump installer, Tony Grieco, suggested that they get their tank pumped 1 3. The homeowners calledJoe Caruso-septic installerlexcavator last week, and told him that the there ir apparently o faulty sensor. They spoke Co him once last week,but he was out plowing, and has not gotten back tnbhcxnyat fk The homeowners have been hand pumping tn help the system. This past weekend, the alarm went off again,but the light oovorw/mnt«fftnshovvthodro/ooBe. 5. Mrs. Gagnon called the Lynnfield BOH and spoke with a Kristin to reportJoe Caruso, as Lynnfield is his home address, lvnmfio/df70D told her to call here, but she wanted his hometown f/O}{to know about the system problems nswell, l pulled the file for review. I will leave itin your office. Please call Mrs. Gagnon atg78.97S.O774 to discuss the issues further,and provide any information that would be beneficial to her. Thank you. � 8/vtn As Built Plan submitted and Final Grade com�leted in December of2009, but not COC issued as the installation -form with signatures otengineer and installer was never submitted Vae ~ Pamela De0eCBimie Departmental Assistant|Comm"nity Development|Health Department Town of North Andover 16no Osgood Street I Bldg uo |Suite 2'36 North Andover,nm\o/84S --- ` 2 Oƒfiue'978-h88-954» � Fax Email - i5 Website "We can never see WWepw&6of our&?p�I'we tire too bms.Y.f6cusin0gwn fhepeb6lev under murfi!et,~���mm��mmm�m ^ � U ,( f � (���� Dellel]hiaiB,Pamela DelleChiaie, Pamela From: Sawyer, Susan Sent: Monday, November 16, 2009 9:31 AM To: Grant, Michele Cc: DelleChiaie, Pamela Subject: FW: 239 Granville Lane Just opened this. You rnight have already spoken to someone about it. S From: Isaac Rowe [mailto:irowe@millriverconsulting.com] Sent: Friday, November 13, 2009 3:07 PM To: Sawyer, Susan Subject: RE: 239 Granville Lane Hi Susan, Luke Roy just called me and said the cleanout has been installed. I didn't know if you wanted to go by there to verify? Do you need me to do anything? Isaac Isaac M.Rowe,R.S. Project Manager I MW River Consulting 6 Sargent Street C loucester,M� 01930-2719 Phone: (978)282-0014 Fax: (978)282-1318 jogwe c millriv_erconsultin wConl www,rn ill„riverconsultino.com From: Sawyer, Susan [mailto:ssawyer @townofnorthandover.com] Sent: Friday, November 13, 2009 2:05 PM To: 'Isaac Rowe'; 'Daniel Ottenheimer'; Grant, Michele; 'Marianne Peters'; DelleChiaie, Pamela; 'Randy Burley' Subject: RE: 239 Granville Lane FYI all I asked Michele to call the installer and to have him put the Clean out in. This property was given leeway due to special circumstances.They were allowed to have 2 building sewers due to complicated interior issues. Cutting another corner is not optional. I hand wrote it on their plans to emphasize it. We could have made them tie it in together in the building.That would have been worse. Thx Susan From: Isaac Rowe [mailto:irowe @millriverconsulting.com] Sent: Wednesday, November 11, 2009 3:10 PM To: 'Daniel Ottenheimer'; Grant, Michele; irowe @millriverconsulting.com; 'Marianne Peters'; DelleChiaie, Pamela; 'Randy Burley'; Sawyer, Susan Subject: 239 Granville Lane Susan, Please find attached the final inspection report for the above referenced property, You will notice on the inspection report that there are 2 bends in the building sewer pipe with no cleanouts. The design plan proposed 1 bend with 1 cleanout. The engineer and installer felt there was enough pitch in the pipe to justify no cleanouts plus there is a cleanout in the basement. I told the installer not to backfill around bends until he gets the OK from you. I told the installer the plan required one and I would pass along my report to you. You may want to speak with Luke Roy the engineer to discuss? Other than the building sewer pipe the install was very well done. They did add a 2"x4" coupling with a 6' length of 4" SCH 40 pipe prior to the d-box to reduce the velocity of the effluent. This allows the effluent to enter d-box smoothly and allows even distribution to the laterals. I would recommend that we begin requiring this for all pump to d-box systems. As designers this is what we do for our projects and it works well. When there is just a 2"tee the effluent still tends to be very turbulent in the d-box and usually seeps out the cover of the d-box. Please let me know if you have any questions. Thank you, Isaac Isaac M. Rowe,R.S. Project Manager Mifi :f iver, Consulting 6 Sargent Street 2 Grant, Michele From: Sawyer, Susan Sent: Friday, November 13, 2009 2:05 PM To: 'Isaac Rowe'; 'Daniel Ottenheimer'; Grant, Michele; 'Marianne Peters'; DelleChiaie, Pamela; 'Randy Burley' Subject: RE: 239 Granville Lane FYI all, I asked Michele to call the installer and to have him put the clean out in. This property was given leeway due to special circumstances. They were allowed to have 2 building sewers due to complicated interior issues. Cutting another corner is not optional. I hand wrote it on their plans to emphasize it. We could have made them tie it in together in the building.That would have been worse. Thx Susan From: Isaac Rowe [mailto:irowe @millriverconsulting.com] Sent: Wednesday, November 11, 2009 3:10 PM To: 'Daniel Ottenheimer'; Grant, Michele; irowe @millriverconsulting.com; 'Marianne Peters'; DelleChiaie, Pamela; 'Randy Burley'; Sawyer, Susan Subject: 239 Granville Lane Susan, Please find attached the final inspection report for the above referenced property. You will notice on the inspection report that there are 2 bends in the building sewer pipe with no cleanouts. The design plan proposed 1 bend with 1 cleanout. The engineer and installer felt there was enough pitch in the pipe to justify no cleanouts plus there is a cleanout in the basement. I told the installer not to backfill around bends until he gets the OK from you. I told the installer the plan required one and I would pass along my report to you. You may want to speak with Luke Roy the engineer to discuss? Other than the building sewer pipe the install was very well done. They did add a 2"x4" coupling with a 6' length of 4" SCH 40 pipe prior to the d-box to reduce the velocity of the effluent. This allows the effluent to enter d-box smoothly and allows even distribution to the laterals. I would recommend that we begin requiring this for all pump to d-box systems. As designers this is what we do for our projects and it works well. When there is just a 2"tee the effluent still tends to be very turbulent in the d-box and usually seeps out the cover of the d-box. Please let me know if you have any questions. Thank you, Isaac Isaac M. Rowe, R.S. Project Manager z Mill Riven" Consulting 6 Sargent Street 1 DelleChiaie, Pamela From: Marianne Peters [mpeterst;,"7a millriverconsulting.com] Sent: Tuesday, November 10, 2009 1:49 PM To: DelleChiaie, Pamela; 'Daniel Ottenheimer'; 'Isaac Rowe'; 'Randy Burley' Cc: Sawyer, Susan; Grant, Michele Subject: RE: 239 GRANVILLE LANE -FINAL CONSTRUCTION REQUEST Isaac will be doing this Wednesday/Nov 11th (tomorrow) at 10:30. From: DelleChiaie, Pamela [mailto:pdellech @townofnorthandover.com] Sent:Tuesday, November 10, 2009 1:16 PM To: 'Daniel Ottenheimer'; 'Isaac Rowe'; Marianne Peters; 'Randy Burley' Cc: Sawyer, Susan; Grant, Michele Subject: 239 GRANVILLE LANE - FINAL CONSTRUCTION REQUEST Hello, I received a voice mail message from Luke Roy, engineer for 239 Granville Lane, ready for a Final Construction inspection. The installer is Joe Caruso (new this year). Luke Roy's number is: 978.664.8141. Joe Caruso's number is: 781.983.6598. 1 called and verified with Joe also that the site is all set. 1-1calth I7eow tinent Assistant TOWN OF NORTH ANDOVER I-lealtlr Department 1000 Osgood Street Building 20;SSuit:e,2-36 Nort:lr Andover,MA 01845 978.688.9540-Phone. 978.688.8476-Fax l cl o � �< i �c -E-1rail iitt12,;,//vvv ✓to-,v�ata6,iic�t r tiatiLtove.tP.c oltbi/t tl;c s/imp _Iex-Website. Notes. If copied to BOH Members-Reference Copy Only-no response requested at this time 1 DelleChiaie, Pamela From: Sawyer, Susan Sent: Thursday, October 22, 2009 9:59 AM To: DelleChiaie, Pamela; Grant, Michele Subject: 239 Granville Tank to be set noon today,(Thursday) but pump tank hole will be done a different day. Couldn't do one big hole for both due to ledge. May have to swing pump chamber 90 degrees; engineer and I gave ok and to just show on the as-built. So,tank insp. choices are 1) See bottom of hole for septic tank before noon today 2) Wait and see bottom of pump chamber hole another day and he will try to leave one side of septic tank hole open if possible. I don't think it is necessary for us to go out two times,so which ever works. FYI,The engineer will likely be called for the field inspection on Monday. He should then call us like usual. The installer is Joe Caruso 781983-6598. 1 told him to keep going and we'll be there one time or another. S Michele, if you can't fit this in the schedule, let me know I will be happy to help out. Questions??? DelleChiaie, Pamela From: DelleChiaie, Pamela Sent: Monday, July 20, 2009 5:16 PM To: 'Iroy.oneill@verizon.net' Subject: FW: Septic-239 Granville Lane- Plan Approval Attachments: SKMBT60009072017040.pdf The original letter has been mailed to the homeowner. Paote& Z)effe&da& A-1171ela I)cIIeC'hjaic 'roWN OF NORTH ANDOVER Health Department 1600 Osgood Street Building 20;Suite 2-36 North Andover,MA 01845 978.688.9540- Phone 978.688.8476- Fax 12(—Icjl—cicl,li—,Ii ,�tr>wr)ofiioi-thaiiclover.cotii- E-mail li��).//w-WW—.townof'not-tli,,ttidover.c_oDI -Website Not",:- Ifeopie(I to,801-IMenihers,---Rehv-cnce C"I"Opy(,)])I)/-no response requested at this tifne From: noreply@townofnorthandover.com [mailto:noreply@townofnorthandover.com] Sent: Monday, July 20, 2009 6:04 PM To: DelleChiaie, Pamela Subject: Septic- 239 Granville Lane - Plan Approval DelleChiaie, Pamela From: Sawyer, Susan Sent: Friday, July 17, 2009 3:20 PM To: DelleChiaie, Pamela Subject: 239 Granville app Attachments: 239 Granville Ln Plan Approval 7.17.09.doc Pls check over and print. Note that with this one, we need proof of electrical and plumbing permits before issuing the DWC. Thx S 1 DelleChiaie, Pamela From: Sawyer, Susan Sent: Wednesday, May 20, 2009 1:03 PM To: Isaac Rowe Cc: DelleChiaie, Pamela Subject: RE: 239 Granville Lane ok From: Isaac Rowe [ma!Ito:irowe@ m il Iriverconsu Iti ng.com] Sent: Wednesday, May 20, 2009 11:20 AM To: Sawyer, Susan Subject: RE: 239 Granville Lane Thanks, I received the info I requested for 1980 Turnpike Rd. I am just waiting to hear back from Bob Amor, he is confirming schedules for the inspection with the T5 Inspector, plumber and himself, Isaac M.Rowe,R.S. Project Manager Mill River Consulting 2 Blackburn Center Gloucester,Nl 01930-2268 Phone: (978)282-0014 Fax: (978)282-0012 iro�wem�illriverqpqn www.millriverconsuLtLnAcom From: Sawyer, Susan [mailto:ssawyer@townofnorthandover.com] Sent: Wednesday, May 20, 2009 11:11 AM To: Isaac Rowe Subject: RE: 239 Granville Lane Great thanks. FYI, Bateson is doing 66 Cedar Lane, so I am sure You'll be around again soon to do that one. Susan From: Isaac Rowe [ma i Ito:i rowe@rnil I riverconsu Iti ng.com] Sent: Wednesday, May 20, 2009 11:06 AM To: Sawyer, Susan Subject: RE: 239 Granville Lane Yes I will be back for more training. Seems like a good way to document the inspections. Isaac M.Rowe,R.S. Project Manager Mill River Consulting 2 Blackburn Center 2 Gloucester,MIA 01930-226$ Phone: (978)2820014 Fax: (978)282-0012 irowe millriverconsultin .com w.millriverconsulting,corrr From: Sawyer, Susan [mailto:ssawyer @townofnorthandover.com] Sent: Wednesday, May 20, 2009 10:53 AM To: Isaac Rowe Subject: RE: 239 Granville Lane Hope he did enough testing...t ) Thx S How did your intro training go? Are you coming by again to work with Pamela? From: Isaac Rowe [mailto:irowe @millriverconsulting.com] Sent: Wednesday, May 20, 2009 8:29 AM To: 'Daniel Ottenheimer'; Grant, Michele; irowe @millriverconsulting.com; 'Marianne Peters'; DelleChiaie, Pamela; 'Randy Burley'; Sawyer, Susan Subject: 239 Granville Lane Susan, Please find attached, the soil testing results for the above referenced property. As you already know from Jennifer, there are wetlands behind the house. The test pits were all approximately 100' from the wetland boundary. The bottom of Perc 2 had damp soil so we attempted the perc test but it was influenced by the groundwater. Most likely Luke will not be using this area for the upgrade. Please let me know if you have any questions. Thank you, Isaac Isaac M. Rowe,R.S. Project Manager 1' !fftt River Consulting 2 Blackburn center 3 Gloucester,MIA 01930-2268 Phone: (978)2820014 Fax: (978)282-0012 ira e millriverconsuWD cam vu.millriverconsultin .ccm 4 DelleChiaie, Pamela From: Isaac Rowe [irowe@millriverconsulting.com] Sent: Monday, June 29, 2009 11:52 AM Ilriverconsulting.com; 'Marianne Peters'; To: 'Daniel Ottenheimer'; Grant, Michele; irowe@mi DelleChiaie, Pamela; 'Randy Burley'; Sawyer, Susan Subject: 239 Granville Lane Lane 6-29-09.doc Attachments: Disapproval Letter-239 Granville Susan, Please find attached the disapproval letter for the above referenced property. A handful of comments but mostly minor changes. Overall plan/design looked good. Maybe we will have more from this company in the future. A couple of things, I was not positive on: 1,- Does NA BOH require 900 SF leach bed minimum for upgrades? If not, then the designer should revise his SAS size. 2. Mercury float switches in the pump chamber are proposed. it is my understanding that mercury floats are no longer allowed for use in MA but I did not know what agency or department to cite this requirement from. Do you know? 0101 Please let me know if you have any questions. Thank you, Isaac Isaac M.Rowe,R.S. Project Manager Mill River Consulting 2 Blackburn Center 0