HomeMy WebLinkAboutCorrespondence - 239 GRANVILLE LANE 1/18/2011 |
l
� |
|
PRINTEO BY: Pamela DdIeChiaie- PLEASE LEAVE IN PRINT-OUT TRAY.......THANK YOU,
DelleChiale, Pamela
From: DelleChiaie, Pamela y
Sent: � // C"
/p �v/ / / / �/ �m U , /| /
To: Grant, Michele
/ " U
Subject: m
�
Hi Michele,
I received a call this morning from Linda Gagnon,homeowner of 239 Granville Lane. She called to complain about
septic system problems they are having as a result of system they had installed at the end of 2009. Here is a
synopsis an was provided toouo from Mrs. Gagnon:
1. There is on emergency sensor on tbeflotudon device which couoox on alarm to go off every%-3 6oux
when there ix heavy usage«ywater,such ox taking multiple showers;laundry, etc, When the system is
no/wx/rk/q9pn/parly, theu/unn8ouyoff. �
/
I The electric pump installer, Tony Grieco, suggested that they get their tank pumped 1
3. The homeowners calledJoe Caruso-septic installerlexcavator last week, and told him that the there
ir apparently o faulty sensor. They spoke Co him once last week,but he was out plowing, and has not
gotten back tnbhcxnyat
fk The homeowners have been hand pumping tn help the system. This past weekend, the alarm went off
again,but the light oovorw/mnt«fftnshovvthodro/ooBe.
5. Mrs. Gagnon called the Lynnfield BOH and spoke with a Kristin to reportJoe Caruso, as Lynnfield is his
home address, lvnmfio/df70D told her to call here, but she wanted his hometown f/O}{to know about
the system problems nswell,
l pulled the file for review. I will leave itin your office. Please call Mrs. Gagnon atg78.97S.O774 to discuss the
issues further,and provide any information that would be beneficial to her. Thank you. �
8/vtn As Built Plan submitted and Final Grade com�leted in December of2009, but not COC issued as the installation
-form with signatures otengineer and installer was never submitted
Vae ~
Pamela De0eCBimie
Departmental Assistant|Comm"nity Development|Health Department
Town of North Andover
16no Osgood Street I Bldg uo |Suite 2'36
North Andover,nm\o/84S --- `
2 Oƒfiue'978-h88-954»
�
Fax
Email
-
i5 Website
"We can never see WWepw&6of our&?p�I'we tire too bms.Y.f6cusin0gwn fhepeb6lev under murfi!et,~���mm��mmm�m ^
�
U ,( f � (����
Dellel]hiaiB,Pamela
DelleChiaie, Pamela
From: Sawyer, Susan
Sent: Monday, November 16, 2009 9:31 AM
To: Grant, Michele
Cc: DelleChiaie, Pamela
Subject: FW: 239 Granville Lane
Just opened this. You rnight have already spoken to someone about it.
S
From: Isaac Rowe [mailto:irowe@millriverconsulting.com]
Sent: Friday, November 13, 2009 3:07 PM
To: Sawyer, Susan
Subject: RE: 239 Granville Lane
Hi Susan,
Luke Roy just called me and said the cleanout has been installed. I didn't know if you wanted to go by there to verify? Do
you need me to do anything?
Isaac
Isaac M.Rowe,R.S.
Project Manager
I
MW River Consulting
6 Sargent Street
C loucester,M� 01930-2719
Phone: (978)282-0014
Fax: (978)282-1318
jogwe c millriv_erconsultin wConl
www,rn ill„riverconsultino.com
From: Sawyer, Susan [mailto:ssawyer @townofnorthandover.com]
Sent: Friday, November 13, 2009 2:05 PM
To: 'Isaac Rowe'; 'Daniel Ottenheimer'; Grant, Michele; 'Marianne Peters'; DelleChiaie, Pamela; 'Randy Burley'
Subject: RE: 239 Granville Lane
FYI all
I asked Michele to call the installer and to have him put the Clean out in.
This property was given leeway due to special circumstances.They were allowed to have 2 building sewers due to
complicated interior issues. Cutting another corner is not optional.
I hand wrote it on their plans to emphasize it.
We could have made them tie it in together in the building.That would have been worse.
Thx
Susan
From: Isaac Rowe [mailto:irowe @millriverconsulting.com]
Sent: Wednesday, November 11, 2009 3:10 PM
To: 'Daniel Ottenheimer'; Grant, Michele; irowe @millriverconsulting.com; 'Marianne Peters'; DelleChiaie, Pamela; 'Randy
Burley'; Sawyer, Susan
Subject: 239 Granville Lane
Susan,
Please find attached the final inspection report for the above referenced property, You will notice on the inspection report
that there are 2 bends in the building sewer pipe with no cleanouts. The design plan proposed 1 bend with 1 cleanout.
The engineer and installer felt there was enough pitch in the pipe to justify no cleanouts plus there is a cleanout in the
basement. I told the installer not to backfill around bends until he gets the OK from you. I told the installer the plan
required one and I would pass along my report to you. You may want to speak with Luke Roy the engineer to discuss?
Other than the building sewer pipe the install was very well done. They did add a 2"x4" coupling with a 6' length of 4" SCH
40 pipe prior to the d-box to reduce the velocity of the effluent. This allows the effluent to enter d-box smoothly and allows
even distribution to the laterals.
I would recommend that we begin requiring this for all pump to d-box systems. As designers this is what we do for our
projects and it works well. When there is just a 2"tee the effluent still tends to be very turbulent in the d-box and usually
seeps out the cover of the d-box.
Please let me know if you have any questions.
Thank you,
Isaac
Isaac M. Rowe,R.S.
Project Manager
Mifi :f iver, Consulting
6 Sargent Street
2
Grant, Michele
From: Sawyer, Susan
Sent: Friday, November 13, 2009 2:05 PM
To: 'Isaac Rowe'; 'Daniel Ottenheimer'; Grant, Michele; 'Marianne Peters'; DelleChiaie, Pamela;
'Randy Burley'
Subject: RE: 239 Granville Lane
FYI all,
I asked Michele to call the installer and to have him put the clean out in.
This property was given leeway due to special circumstances. They were allowed to have 2 building sewers due to
complicated interior issues. Cutting another corner is not optional.
I hand wrote it on their plans to emphasize it.
We could have made them tie it in together in the building.That would have been worse.
Thx
Susan
From: Isaac Rowe [mailto:irowe @millriverconsulting.com]
Sent: Wednesday, November 11, 2009 3:10 PM
To: 'Daniel Ottenheimer'; Grant, Michele; irowe @millriverconsulting.com; 'Marianne Peters'; DelleChiaie, Pamela; 'Randy
Burley'; Sawyer, Susan
Subject: 239 Granville Lane
Susan,
Please find attached the final inspection report for the above referenced property. You will notice on the inspection report
that there are 2 bends in the building sewer pipe with no cleanouts. The design plan proposed 1 bend with 1 cleanout.
The engineer and installer felt there was enough pitch in the pipe to justify no cleanouts plus there is a cleanout in the
basement. I told the installer not to backfill around bends until he gets the OK from you. I told the installer the plan
required one and I would pass along my report to you. You may want to speak with Luke Roy the engineer to discuss?
Other than the building sewer pipe the install was very well done. They did add a 2"x4" coupling with a 6' length of 4" SCH
40 pipe prior to the d-box to reduce the velocity of the effluent. This allows the effluent to enter d-box smoothly and allows
even distribution to the laterals.
I would recommend that we begin requiring this for all pump to d-box systems. As designers this is what we do for our
projects and it works well. When there is just a 2"tee the effluent still tends to be very turbulent in the d-box and usually
seeps out the cover of the d-box.
Please let me know if you have any questions.
Thank you,
Isaac
Isaac M. Rowe, R.S.
Project Manager
z
Mill Riven" Consulting
6 Sargent Street
1
DelleChiaie, Pamela
From: Marianne Peters [mpeterst;,"7a millriverconsulting.com]
Sent: Tuesday, November 10, 2009 1:49 PM
To: DelleChiaie, Pamela; 'Daniel Ottenheimer'; 'Isaac Rowe'; 'Randy Burley'
Cc: Sawyer, Susan; Grant, Michele
Subject: RE: 239 GRANVILLE LANE -FINAL CONSTRUCTION REQUEST
Isaac will be doing this Wednesday/Nov 11th (tomorrow) at 10:30.
From: DelleChiaie, Pamela [mailto:pdellech @townofnorthandover.com]
Sent:Tuesday, November 10, 2009 1:16 PM
To: 'Daniel Ottenheimer'; 'Isaac Rowe'; Marianne Peters; 'Randy Burley'
Cc: Sawyer, Susan; Grant, Michele
Subject: 239 GRANVILLE LANE - FINAL CONSTRUCTION REQUEST
Hello,
I received a voice mail message from Luke Roy, engineer for 239 Granville Lane, ready for a Final Construction
inspection. The installer is Joe Caruso (new this year). Luke Roy's number is: 978.664.8141. Joe Caruso's
number is: 781.983.6598. 1 called and verified with Joe also that the site is all set.
1-1calth I7eow tinent Assistant
TOWN OF NORTH ANDOVER
I-lealtlr Department
1000 Osgood Street
Building 20;SSuit:e,2-36
Nort:lr Andover,MA 01845
978.688.9540-Phone.
978.688.8476-Fax
l cl o � �< i �c -E-1rail
iitt12,;,//vvv ✓to-,v�ata6,iic�t r tiatiLtove.tP.c oltbi/t tl;c s/imp _Iex-Website.
Notes.
If copied to BOH Members-Reference Copy Only-no response requested at this time
1
DelleChiaie, Pamela
From: Sawyer, Susan
Sent: Thursday, October 22, 2009 9:59 AM
To: DelleChiaie, Pamela; Grant, Michele
Subject: 239 Granville
Tank to be set noon today,(Thursday) but pump tank hole will be done a different day. Couldn't do one big hole for both
due to ledge. May have to swing pump chamber 90 degrees; engineer and I gave ok and to just show on the as-built.
So,tank insp. choices are
1) See bottom of hole for septic tank before noon today
2) Wait and see bottom of pump chamber hole another day and he will try to leave one side of septic tank hole
open if possible.
I don't think it is necessary for us to go out two times,so which ever works.
FYI,The engineer will likely be called for the field inspection on Monday. He should then call us like usual.
The installer is Joe Caruso 781983-6598. 1 told him to keep going and we'll be there one time or another.
S
Michele, if you can't fit this in the schedule, let me know I will be happy to help out.
Questions???
DelleChiaie, Pamela
From: DelleChiaie, Pamela
Sent: Monday, July 20, 2009 5:16 PM
To: 'Iroy.oneill@verizon.net'
Subject: FW: Septic-239 Granville Lane- Plan Approval
Attachments: SKMBT60009072017040.pdf
The original letter has been mailed to the homeowner.
Paote& Z)effe&da&
A-1171ela I)cIIeC'hjaic
'roWN OF NORTH ANDOVER
Health Department
1600 Osgood Street
Building 20;Suite 2-36
North Andover,MA 01845
978.688.9540- Phone
978.688.8476- Fax
12(—Icjl—cicl,li—,Ii ,�tr>wr)ofiioi-thaiiclover.cotii- E-mail
li��).//w-WW—.townof'not-tli,,ttidover.c_oDI -Website
Not",:-
Ifeopie(I to,801-IMenihers,---Rehv-cnce C"I"Opy(,)])I)/-no response requested at this tifne
From: noreply@townofnorthandover.com [mailto:noreply@townofnorthandover.com]
Sent: Monday, July 20, 2009 6:04 PM
To: DelleChiaie, Pamela
Subject: Septic- 239 Granville Lane - Plan Approval
DelleChiaie, Pamela
From: Sawyer, Susan
Sent: Friday, July 17, 2009 3:20 PM
To: DelleChiaie, Pamela
Subject: 239 Granville app
Attachments: 239 Granville Ln Plan Approval 7.17.09.doc
Pls check over and print.
Note that with this one, we need proof of electrical and plumbing permits before issuing the DWC.
Thx
S
1
DelleChiaie, Pamela
From: Sawyer, Susan
Sent: Wednesday, May 20, 2009 1:03 PM
To: Isaac Rowe
Cc: DelleChiaie, Pamela
Subject: RE: 239 Granville Lane
ok
From: Isaac Rowe [ma!Ito:irowe@ m il Iriverconsu Iti ng.com]
Sent: Wednesday, May 20, 2009 11:20 AM
To: Sawyer, Susan
Subject: RE: 239 Granville Lane
Thanks,
I received the info I requested for 1980 Turnpike Rd. I am just waiting to hear back from Bob Amor, he is confirming
schedules for the inspection with the T5 Inspector, plumber and himself,
Isaac M.Rowe,R.S.
Project Manager
Mill River Consulting
2 Blackburn Center
Gloucester,Nl 01930-2268
Phone: (978)282-0014
Fax: (978)282-0012
iro�wem�illriverqpqn
www.millriverconsuLtLnAcom
From: Sawyer, Susan [mailto:ssawyer@townofnorthandover.com]
Sent: Wednesday, May 20, 2009 11:11 AM
To: Isaac Rowe
Subject: RE: 239 Granville Lane
Great thanks.
FYI, Bateson is doing 66 Cedar Lane, so I am sure You'll be around again soon to do that one.
Susan
From: Isaac Rowe [ma i Ito:i rowe@rnil I riverconsu Iti ng.com]
Sent: Wednesday, May 20, 2009 11:06 AM
To: Sawyer, Susan
Subject: RE: 239 Granville Lane
Yes I will be back for more training. Seems like a good way to document the inspections.
Isaac M.Rowe,R.S.
Project Manager
Mill River Consulting
2 Blackburn Center
2
Gloucester,MIA 01930-226$
Phone: (978)2820014
Fax: (978)282-0012
irowe millriverconsultin .com
w.millriverconsulting,corrr
From: Sawyer, Susan [mailto:ssawyer @townofnorthandover.com]
Sent: Wednesday, May 20, 2009 10:53 AM
To: Isaac Rowe
Subject: RE: 239 Granville Lane
Hope he did enough testing...t )
Thx
S
How did your intro training go?
Are you coming by again to work with Pamela?
From: Isaac Rowe [mailto:irowe @millriverconsulting.com]
Sent: Wednesday, May 20, 2009 8:29 AM
To: 'Daniel Ottenheimer'; Grant, Michele; irowe @millriverconsulting.com; 'Marianne Peters'; DelleChiaie, Pamela; 'Randy
Burley'; Sawyer, Susan
Subject: 239 Granville Lane
Susan,
Please find attached, the soil testing results for the above referenced property.
As you already know from Jennifer, there are wetlands behind the house. The test pits were all approximately 100' from
the wetland boundary. The bottom of Perc 2 had damp soil so we attempted the perc test but it was influenced by the
groundwater. Most likely Luke will not be using this area for the upgrade.
Please let me know if you have any questions.
Thank you,
Isaac
Isaac M. Rowe,R.S.
Project Manager
1' !fftt River Consulting
2 Blackburn center
3
Gloucester,MIA 01930-2268
Phone: (978)2820014
Fax: (978)282-0012
ira e millriverconsuWD cam
vu.millriverconsultin .ccm
4
DelleChiaie, Pamela
From: Isaac Rowe [irowe@millriverconsulting.com]
Sent: Monday, June 29, 2009 11:52 AM Ilriverconsulting.com; 'Marianne Peters';
To: 'Daniel Ottenheimer'; Grant, Michele; irowe@mi
DelleChiaie, Pamela; 'Randy Burley'; Sawyer, Susan
Subject: 239 Granville Lane Lane 6-29-09.doc
Attachments: Disapproval Letter-239 Granville
Susan,
Please find attached the disapproval letter for the above referenced property. A handful of comments but mostly minor
changes. Overall plan/design looked good. Maybe we will have more from this company in the future.
A couple of things, I was not positive on:
1,- Does NA BOH require 900 SF leach bed minimum for upgrades? If not, then the designer should revise his
SAS size.
2. Mercury float switches in the pump chamber are proposed. it is my understanding that mercury floats are no
longer allowed for use in MA but I did not know what agency or department to cite this requirement from. Do
you know?
0101
Please let me know if you have any questions.
Thank you,
Isaac
Isaac M.Rowe,R.S.
Project Manager
Mill River Consulting
2 Blackburn Center
0