Loading...
HomeMy WebLinkAboutDecision - 1003 OSGOOD STREET 3/1/2011 (2) Bk 12545 Ps330 ABOPW FOR REGISTTYOF.DERDS U S—E t] r CO'Vgft $HEET THIS IS THE FIRST PAdE 00 THIS DOCUMENT" LSD 111D7$ . 4)00a�TR- ORANTn ADIfRESS OF PROPE Y Cri Y/TO WN TYPE F 00CU NT M.LC --ASSIGNMENT. DEED TXP ; / XORTGAGE NOTICE _ . 1P TYPE SGFiABOE �..$UBORDINA.TION "FIDAVIT TYPE PEC OF HOMESTEAD IJCC TYPE -DEC OF TRUST l� `SCJJM ESSEX NORTH RIEGISTRY OF NEEDS Robert F. Kelley; RregfstLor 3S4 Merrimack St. Suite, 104 Lawrence, MA 01843 (978) 653-2745 wv w-lawrencedeads.com Bk 12545 Pg'331 #15934 ON o�r,+•e Town of North Andover 2U1 I MAR -2 Pil 4: 10 > t.• Office of the Planning Department �* Community Development and Services Dlvisionhop, ti i,IEoi, °r 1600 Osgood Street �a North Andover,Massachusetts 01845 NOTICE OF DECISION Any appeal shall be filed within(20)days after the date of fling this notice in the office of the Town Clerk. Date: March 1,20011 Data of}fearing;July 200 2010,Oct.5, 2010,Nov.16,2010,February.15,2011, March 1,2011 Date of Decision: March 1,2011 Petition of: Osgood Properties LLC,John Grasso,Manager 865 Turnpike Street,North Andover,MA 01845 Premises Affected: 1003 Osgood Street,North Andover,MA 01545,within the Business Two(B-2)Zoning District,Assessors A1ap 35,Lot$0. R•okn ing to the above petition for a Site plan Special Permit from ft requirements of the North ,Andover Zoning Bylaw,Sections 2.30.1,8.1,8.3,8,4, 10.3,and 14.31 and MGL CAOA,Sec.9 So as to allow: to allow to construction of 19,300 sq. ft. retaiUofficelrestaurant complex, including the renovation of an existing barn, with 70 total parking spaces, drainage systont network,a ctensive grading and landscape work within.the Business Two(B-2)Zoning Disrriot. After a public hearing giver) on the above date,the Planning Board voted to APPROVE a Site Plan Special Permit, a Common Driveway Special Permit and an O"treet Parking Special Permit based upon the,following conditions: r thwis e I t by urrlff�r�dt Ytwr e n�gdr�eoh b11���,i~ id th mP l Wing Board r•, Richard Rowena '(qtr do• Timothy Seibert Courtney LaVolpicelo Michael Colanton! A T + `Lawn Chark Rk 12545 Pg332 #15934 1003 Osgood St1r'£et,Map 35 Lot 50 Site Plan Review,Common Driveway and Parking Special Permits The Planning Board herein approves the Site Plan Special Permit, Parking Special Permit and Common Driveway Special Permit for the construction of 19,300 sq. ft. retail/office/restaurant complex, including the mnovation of an existing barn, with 70 total parking spaces, drainage system network, extensive grading.and landscape work. The site is accessed by a Common Driveway shared with the Great Pond Crossing complex at 3025 Osgood St.,which runs along the eastern property line.The building is located on 1003 Osgood Street,Map 35, Lot 50 in the Business Two (B-2)Zoning District. This Special Permit was requested by Osgood Properties LLC, Jobti Grosso, Manager, located at 865 Turnpike Street,North Andover, MA 01845. The application was filed.with the Planning Board on .tune 18, 2010. The applicant submitted a complete application, which was noticed and reviewed in accordance with Section 2,30.1, 8.1, 8.3,8.4, 10.3,and 10.31 of the Town of North Andover Zoning Bylaw and MGL C.40A,Sec. 9 The Planning Board makes the following ;Endings as required by the North Andover Zoning Bylaws Section 2.30.1,8.1,8.3,8.4,and 10.31: FINDINGS OF FACT: 1) As a result of discussions with the Planning Board, Planning Staff and outside consultants. the applicant has significantly altered the design of the complex from that which was originally presented. The resulting proposal limits site disturbance, provides maximum distance from Lako Cochichewiak and provides for the least mount of impact on art environmentally sensitive area. 2) The proposal also includes the preservation of an historic barn,leaving the barn in its current position. The final design of the complex provides for as integration of the barn with the now addition and also provides design integration with the surrounding commercial properties,in particular the Great Pond Crossing complex located at 1025 Osgood St. 3) The application was mviewed by the Town's civil engineering consultants, VBB, who reviewed the project for confornmeej with the Town's Zoning Bylaw and also reviewed the Trip Oweration Study submitted by the applicant and written by Dennott Kelly, dated June 16,2010. The:5W project reflects changes to the traffic pattern within the site,a relocation of parking spaces away from the environmentally sensitive areas and the use of a common driveway that will be shared with the development at 1025 Osgood St. See VHB letters dated July 26,2010,November 5,2010 and February 11,2011. 4) 'The site drainage system and storm water management design are designed in accordance whb the Town Bylaw requirements and Best Management Engineering and Practices, and the most recent version of the MA MP Stoanwatet' Haridbook, and has been reviewed by the outside consulting engineer, Lisa Eggleston. The applicant altered the original drainage design to provide for maximum stormwatex infiltration and has prof lded adequate Safeguards to mitigate pollutants from entering the Lake and the surrounding area. See letters from L. E,gglestonifiated August 5, 2010, October 5, 2010, January 6, 2011, Febroary'1, 2011 and February 9,2011. 2 B:k 12545 Pg333 #15934 . 1003 Osgood Street,Map 35 Lot 50 Site Plan Review,Common Driveway and Parking Special Permits 5) An Emergency Response Plan that describes steps to be taken by the management of the project in cooperation, with the town of North Andover in the case of an environmental emergenoy has been incorporated as part of this decision. b) The project is located within an extremely environmental sensitive area and in close proximity to Take Cochichowick.The final design reflects extensive discussions between the Town and applicant to ensure the continued protection of hake Cochichewick and the safety and welfare of the residents of 14orth Andover, and as provided under section 4.136 (4)(e), the Planning Board has detenWned that there will not be any signmeant degradation of the quality and quantity ofwater in or entering fake Cochichewick. 7) The shared access way results in a better overall and cohesive plan that improves internal/external circulation of vehicles and pedestrians, etnergency access, eliminates out curb cut on Osgood Street, and provides for a more aesthetically pleasing and cohesive shmtscape for both projects at 1025 Osgood Street and 1003 Osgood Street. 8) The reduction in parlay will provide for an efficient use of parking spares, decreases the hoed for impervious surfaces and provides for a more euvizonmentally sensitive project design. 9) The use as proposed will not adversely affect the neighborhood, as the proposal is designed to complement the adjacent development at 1025 Osgood St.,Great Pond Crossing. 10)There will be no nuisance or serious hazard to vehicles or pedestrians. Tile applicant has demonstrated that(1)the proposed access and egress point from Great fond Road will not significantly increase traffic flow or volumes and (2) the parking design provides for adequate traffic flow,safety,and sufficient pedestrian connections throughout the project. 11)The project meets the requirements of Section 2.30.1, 8.1,8.3 and 8.4, of the North Andover Zoning Bylaw,with the-exception of the following waivers: A) Section:83.5.e.xxik Fiscal Impact Statement. In lieu of the fiscal Impact Statement,the applicant has provided information that addresses the fiscal impact of the proposed comet ereW development and the Planning Board has found that the development provides potential benefits to the community, :13) Section 8.3.5.e,xxiii: Community Impact Statement. In lieu of the Community.Impact Statement, the, applicant has provided lnforrmation that addresses the impact of the proposed commercial development on the community and the Planning Board has found that the development is in harmony with the surrounding commercial area. C) Section 8.3.5.e.xix:Traffic Impact Analysis. In lieu of the Traffic Impact Statement,the applicant has provided a traffic report prepared by Deirnott Kelly, elated June 24,2010. The report contains information on site-generated traffic volume, wb,ich addresses the 3 Bie 12545 Pg334 #15934 1003 Osgood �Map 35 Lot 50 Site Plan RevioW, moron Driveway and Parking Special permits requininont for site specific traffic impacts. D) Section 8.4.2 Screening and Landscaping Requirements for Off-Street Commercial and Industrial Districts. The applicant is proposizag a landscaped area in the front of the property that does not run the entire length of the front setback area,because of the need to preserve sight-lines along Route 125. The Board grants a waiver under Section 8.1.8, due to the sensitive environmental area and the need to reduce the overall footprint of the site. E) Reduction in parking section and modification of design standards 8.1.8: The applicant is proposing 70 parking spaces, a reduction of 35% from the number of required spaces, along with modifications to the aisle width. The Board finds that this reduction is appropriate for this development,based on the following: a) There is an opportunity to share parking spaces with the adjacent development at 1025 Osgood St. b) The applicant has m do an effort to minimize site disturbance in an area close to Lake Cochicewvick, and has reduced the footprint of the entire site, including reducing tbe number of parrking spaces. c) The uses that are being proposed (office and restaurant) provide for a sharing of parking spaces based on hours of operation. d) The parking and aisle layout provides for adequate circulation for emergency and other vehicles within and around the site. 12)The Conservation Commission closed the Public Hearing for the project on February 9,2011 and has issued an Order of Conditions. 13)Adequate and appropriate facilities will be provided for the proper operation of the proposed use. The project will provide'Town water,sewer, and utilities on the property to adequately address the needs of the project and has been reviewed by the Division of Public Works and the outside consulting engineers,Vanasse Hangen Bnxtlkn,Inc and Lisa Eggleston. 14)The Common Driveway provides safe and convenient access to the site and is subject to a recorded maintetmac agreement as required under section 2.30.1 of dw Bylaws. Finally the Plying Board finds that this project generally complies with the Town of Worth. Andover Zoning Bylaw requizemonts as listed in Sections 2,30.1, 8.1, 8.3 and 8.4,but requires conditions in order to be fully in compliance. The Planning Board hereby grants an approval to the appli=t provided the following conditions are met: SPECIAL C'OMMON& FgTmh Definitions, i) The"Locus"refers to the 138,729 sq.f1.parcel of land with land fronting on Osgood Street as shown on Assessors Map 35,lot 50,and also known as 1003 Osgood Street, North Andovera Massachusetts. 4 Bk 12545 Pg335 #15934 1003 Osgood Street,Map 35 TAt 50 Site Plan Review,Common Driveway and Parking Special Permits ii) The"Plazas"refer to the plans prepared by MHF Design Consultants dated June 17, 2010,revised September 22,2010,December 8,2010,January 17,2011,February 3, 2011,and February 18,2011 entitled"Proposed Site Development Plans for Map 35 Lot 50, 1003 Osgood Street,North Andover,Massachusetts 01845"and consisting of sheets 1 through 13. iii)The"Project"or"1003 Osgood Street"refers to the development of 19,300 square feet of retail/office/r%itaurant space,70 parking spaces and associated grading and extensive landscaping work. The project includes the creation of a common driveway for 1003 Osgood street,Map 35,Lot 50 and 1025 Osgood Street Map 35,Lot 20 and depicted an Sheet 3 of the Plans. The driveway will provide a shared access road to both properties. iv)The'Applicant"refers;to Osgood Properties LLC,the applicant for the Special Permits. v) The"Project Ownce'refers to the person or entity holding the fee interest to the title to the Loous from time to time,which can include but is not limited to the applicant, developer,and owner. 1) Prior to the endorsement of the plans by the Planning Board, the applicant most comply with the following conditions: A) The developer shall designate an independent Environmental Monitor who shall be chosen in consultation with the Planning and Community Development Staff. This monitor spell be the same environmental professional required by the Conservation Commission,per their Order of Condition,March 1,2011. The Environmental Monitor must be available upon four(4)hours notice to inspect the site with the Planning Board designated official. The Environtuental Monitor shall male weekly inspections of the project and file weekly reports, as specified in the Order of Conditions and the Plm�aning Board's Special Permit decision, to the Planning Board throughout the duration of the project.The monthly reports shall detail area of non-compliance,if any and actions taken to resolve these issues.The designated monitor may not be applicant and/or developer. B) All stormwater best management practices shall be maintained as specified irj the Operation and Mai»,teuarice Plan and Long Term Pollution Prevention Plan and Erosion and Sediment Control flan. for Stormwater Management Systems submitted to the- Conservation Commission and to the Planning Board and incorporated in the 6nservation Commission's Order of Conditions and the Planning Hoard's Special Permit. The'approved Operation and Maintenance Plan and Long Term. Pollution PmVention:Plan for Stonnwater Managoinent Systems is folly binding upon the applicant and/or owners,successors,agents, associations, heirs and assips and must be adhered to in perpetuity Q The applicant shad designate an independent construction monitor who shall-be chosen in Bk 12545 Pg336 #15934 1003 Osgood Street,Map 35 Lot 50 Site Plan Acview,Common Driveway and Parking Special Permits consultation with the Planning Department. The construction monitor must be available upon four(4)hours notice to inspect the site with the Planning Board designated official. The construction monitor shall make weekly inspections of the project and file monthly reports to the Planning Board throughout the duration of the project. The monthly reports shall detail area of not-compliance,if any,and actions taken to resolve these issues. D) The conditions of the Common Driveway Easement, dated October 10, 2006 and recorded at the Northern Essex ltegistry,of Deeds, Book 10431, Pago 325, shall be incorporated into and be made a part of this decision. E) The Arebitectural Design Elevations from Apnino Inc., dated January 14, 2011, as presented by the applicant at the Planning Board me cling on February 15,2011,shall be incorporated as part of this decision. Substantial changes to the design.shall be reviewed by the Planning Board. F) The final. plazas must he reviewed and approved by the DPW and the Planning Department and be endorsed by the.Planning Board, The final plans must be submitted for review within ninety(90)days. Failing submission of required final plans within 90 days will render this Special. Permit null and void. The applicant may west an extension of this condition, G) If applicable,the applicant must supply a copy of the approved Massachusetts Highway Department permits necessary for constuction of the site to the Planning Department. Confirmatory soil testing will be conducted at the proposed infiltration system #2, as noted on the Flans, The results of this soil testing will be provided to both the Planning and Conservation Staff. 2) F rior to the s"of construction: A) A construction schedule shall be. submitted to the Planning Staff for the purpose of tracking the construction and infot7q ibV the public of anticipated activities on the site. B) All applicable erosion oontml measures as shown on the plan must be in place and reviewed and approved by the Planning Department. C) It shall be the responsibility of the developer to assure that no erosion on the site shall occur which will cause deposition of soil or sediment upon adjacent properties or public ways, except as normally ancillary to off site sewer or other off-site construction, Off- site erosion will be a basis for the Planning Board making a finding that the project is not ­in compliance with the plan; provided, however,that the Planning Board shall give the developer written notice of any such finding and ten days to cure said condition, B Bk 12545 Pg337 #15934 1003 0sgoo4 Street,Map 35 Let 5U Site Platt Review,C6mmon Driveway and Parking Special Permits D) Yellow"Caution" tape must be placed along the limit of clearing and grpding as shown on the plan. The ftanintg Department must be contacted prior to any OuWng and or clearing on site. E) A pre-construction meeting must be held with the developer, their construction • employees,Planning Department,and Conservation Department to discuss scheduling of inspections and inspections to be conducted on the project. F) The applicant small provide the Planning Board with copies of permits, plans and decisions received from the Conservation Commission. Should the Town Planmer find that plans approved by the Conservation Commission substantially differ from the approved plans of the Planning Board; the Planning Board reserves the right to require the developer to present the changes(tough a public hearing to the Planning Board for a Modification to Site Plan approval- G) The applicant shall.provide copies of required approvals from both,the Federal Aviation Administration(FAA)and the.Aeronautics Division of MmDCT. Id) A site opening/erosiDn control bond shall be in the total amount of fifteen► thousand dollars ($15,000) for the purpose of covering any contutgeneies that might affect the public waif= such as site openiDg, clearing, erosion control and performance of any other condition coznMined herein. The Ouarantee shall be in the form of a bond acceptable to the Town and made payable to the Town ofNorth Andover escrow account Upon fulfilling the requirements under said bond, the said bond amount will be Trolled over to Condition 7(1). I) A bond in the amount of fifteen thousand dollars ($15,000) must be posted for the purpose of insuring that a final as built plan showing the location of all on-site utilities, structures, durb cuts, parting spaces, topography, and drainage facilities are submitted. The bond is also in place to insure that the site is constructed in accordance with the approved pieta, This bond should be in the form acceptable to the Towri and made payable to the Town of North Andover escrow account. J) .A. bond in the amount of ten thousand dollars ($10,000.00) shall be posted for the purpose of covering any contingencies or emergency situatidw that may degrade or impact the quality of the Towm's drinking water supply, Lake Cochichowick. The Guarantee shall be in the foram of a bond acceptable to the Town made payable.to.the Town of North Andover escrow account and will be held in pmpetuity. Should the properly be sold or transferred, the Planning Department will require that a bond be posted by.the now owner and to be held in perpetuity. Said bond will only be utilized for the purposes stated.above, 3) Prior to the issuance of-a Building Permit: A) Three (3) copies of the signed, recorded plaits must be delivered to the Planning Department. 7 Bic 12545 Pg338 #15954 1003 Osgood Street Map 55 Lot 50 Site Plan Review,Common Driveway and Parking Special permits B) One certified copy of the recorded decision must be submitted to the Planning Department. C) The applicant skull adhere to the following requirements of tbo North Andover Fire Department and the North Andover Building Department: 1. All structures must contain a commercial fire sprinkler system. The plans and hydraulic calculations for each commercial system shall be submitted for review and approval by the North Andover Fire Department. Plans and hydraulic calculations for each commercial system must also be supplied to the Building Department. D) To ensure the continued protection of the health and welfae of the residents of North Andover and lessen the probability and possibility of contat ination and incident to the Town's primary source of drinking,the applicant shall be xequired to submit to the Planning Department a comprehensive Emerg=y Response PIan and Maintenance Proc Waves. The Planning Board shall review and approve said plan. The final plans must be submitted for review within nioty (90) days of filing the decision with the Town Clerk. Failing submission of required Emergency Response Plan within 90 days will reader this Sped Permit null and void. Said Emergency Response Plan and Mairdmance Procedures will be distributed to the Town's Fire Department,Police Department,Planning Department,and the project site when the documents)will be kept on file and easily accessible in case of an emergency. 4) During construction: A) Dust mitigation,and roadway clewft roust be performed weekly, or more frequently as directed by the Town Plawer,throughout the construction process. B) The Board will strictly enforce the policy relative to the stockpiling of materials (dirt, wood, construction material, eta) and must be shoiva on a plan and reviewed and apps aved-by�the Town Plann=er. The developer will snake every effort to locate stockpiles • on the site away from the Lake Cochichewick, Any approved piles must remain covered at all times to mi;nh=` potential dust and be required to install appropriate erosion control measures to mitigate potential irx�paets to Lake Cochichewick. Any stockpiles to remain for longer than.one week must be fenced off and be seeded. C) In an effort to reduce noise levels, the developer sball keep in optimum working order, through regular maintenance, any and all equipment that shall emanate soun=ds from,the structures or site, D) The Town Planner will perform bi=weekly inspections of the site during construction to ensure that the developer is adhering to the condi=tions set forth in the decision. 5) Prior to the issuance of a Certificate of Occupancy: 8 Bk 12545 Pg339 #15934 1003 Osgood Street,Map 35 Jet 50 Site Plan Review,Common Driveway and Parking Special Permits A) The applicant must submit a letter from the architect and engineer of the project stating that the building,signs,landscaping,lighting and site layout substantially comply with the plans referenced at the end of this decision as endorsed by the Planning Board, .Alternatively,the applicant and/or property owner may provide a bond, detemimed by the Planning Board,to cover the full amount of the landscaping materials arnd installation if weather conditions do not permit the completion of the landscaping prior to anticipated occupancy. B) The Planning Staff shall approve all artificial lighting used to illuminate the site. All lighting shall have underground wiring and shall be so arranged that all direct rays from such lighting falls entirely within the site and shall be shielded or recessed so as not to shine upon abutti ag properties or streets, The Planning Staff shall review the site. Any changes to the approved lighting plan as may be reasonably required by the Planning Staff shall be made at the ownees expense. All site lighting shall provide security for the site and structures however it must mot create any glare or project any light onto adjamat residential properties. Q The commercial fire sprixilder systems must be installed in accordance with referenced standard NFPA 13D and in accordance with 780 C1vIR, Chapter 9 of the Massachusetts State Building Code. Certification tint the systems have been installed properly in accordance.with the above referenced regulations must be provided from both the North Andover Fire Department and the North ,Andover Building Department to the applkvit. The applicant must then provide this certification to the North Andover Planning Department. D) Emergency Response flan to be filer/and posted in obvious place such as Fire Department, Police Department and Planning Department. E) The applicant must submit proof pf contract to the Conservation and the Planning Department in the farm of a written and signed document from the assignee(s) responsible for conducting the perpetual site maintenance in accordance with the Operation and Maintenance flan and Long Term Pollution Prevention Plan for Stormwater Managemmt Systems and perpetual eornditions mandated in Conservation Commission's Order of Conditions, In addition to this contract, the applicant shall . submit an Affidavit from the assignee (s) acknowledging the Stormwater Operation &t Maintenance responsibilities of the storrnwater management systems in accordance with the approved Operation and Maintenance Plan and Long Term Pollution Prevention Plan for Stormwater Management Systems and other perpetual conditions mandated in this Decision and in the Order of Conditions. 6) Prior to the final release of all security and escrowed funds. A) The Planning Staff shall review the site. Any screening as may be reasonably required by the Planning Staff will be added at the Project Owner's expense. 9 Ble 12545 Pg340 #15934 1003 Osgood Street,Map 35 Y,ot 50 Site Plan Review,Common Driveway and Parking Special Permits R) A final as-built plan showing final topography, the location of all on-site utilities, structures, curb cuts, parking spaces, and drainage structures and facilities must be submitted to the Planning Department. The applicant must submit a letter from the architect and engineer of the project stating said items substantially comply with the plans referenced at the end of this decision as endorsed by the Planning Board. 7)General conditions: A) Any plants,trees or shrubs that have been incorporated into the Landscape Plan approved in this decision that die must be replaced by the project owner in perpetuity. B) 'free cutting shall be kept to a minimum throughout the project to minimize erosion and preserve the natural features of the site. Q The emergency shear gate valves Iocated at the infiltration system should be tested twice yearly to insure that they are in working condition. The test reports are to be submitted to the Planning Once For review. D) Snow removal may be stored our the designated storages areas shown on said plans referenced below to the extent possible, but must be trucked off site whenever sww exceeds on-site storage capacity. E) No road salt,sodium cblorxde,or other de-icing chemicals sUl be used on paved surfaces in the buffer zone, and any arrangement for snow removal shall so stipulate due to the importance of the site and wetlands. in addition,permanent signs designating "No-Salt Zone"and "Snow Stockpiling Zones"shall be displayed in prominent locations along the Norte Disturbance Zone as approved by the Conservation Department and shown on the herein referenced plans, F) Fertilizers utilized for landscaping and lawn care shall,be slow release,low-nitrogen types (<5°l0),and shall not be used within 25 feet of a resource arez pesticides and herbicides shall not be used within 100 feet of a wetland resource area, This condition with the title of the property and shall remain in perpetuity, G) Should the Project Owner transfer ownership of the project and/or property prior to the couipletion of the project and the submission of asbuilts, khe buyer shall meet with the Planning Board to provide an update on the status of the project. H) The contractor shall. contact Dig Safe at least 72 hours prior to commencing any excavation. 1) Gas,Telephone,Cable and Electric utilities shall be installed underground as specified by the respective utility companies, .l) The hours for coustruotion shall be limited to between 7:40 a•m. and 5.00 p.m. Money through Friday and between 8:00 a.m.and 5:00 pm.on Saturday. 10 Bic 12545 Pg341 #15934 1003 Osgood Street,Map 35 Lot 50 Site Plan Review,Common Driveway and parking Special Pemits K) No open burning shall be done except as is pumlittcd during burning season under the Fire Department regulations. L) No underground fuel storage shall be installed. M) The pmvWons of this conditional approval shall apply to and be binding upon the applicant,its employees and all successors and assigns in interest or control. N) Depending ou the allowed uses,the Planning Board reserves the right to modify the form and frequency of water quality and maintenance testing and inspection. O) Any action by a Town Board, Commission, or Department,which requires changes in the plan or design of the building, as presented to the Planning Board, may be subject to modification by the Planning Board. P) Any revisions shall be submitted to the Town Planner for review. If these revisions are deemed substantial, the developer must submit revised plans to the Planning Hoard for approval. Q) This Special Permit approval shall be deemed to have lapsed two years after the date of the grant of this special pern3it(March 1,2013),exclusive of the time required to pursue or await determination of any appeals, unless substantial use or construction has commenced within said two year period or for good cause. For purposes of this development, the developer shall be deemed to have undertaken substantial use or construction if the developer has installed 100%of the designed drainage system. R) This Site Plant. Review Special Permit approval is based upon the following information which is incogwated into this decision by re*rence. 1) Plan titled: Proposed Site Development Plans for Map 35 Lot 50 1003 Osgood Street,North Andover,Massachusetts 01 545. Prepared for Osgood properties LLC 865 Turnpike Street North Andover,MA 01845 Prepared by. MllF Design Consultants,Inc. 44 Stiles Road,Suite One Salem,NH 03079 Scale: 1"=20' Tate: Juno 17.2010,Revised Sept 22,2010,Dee 8,2010,Jan.17,2011,Feb.3, 2011,Feb.18,2011 - Sheets: I—13 and Exhibit A,dated Febmary.8,2011 2) RAport; storm'VVetea Managoment Report Prepared for. Osgood properties LLC Prepared by: MHF Design Consultants,Inc. 44 Stiles Road,Suite One Salem,NH 03079 t1 Bk 12545 Pg342 # 15934 i r 1003 Osgood Street,Map 35 Let 50 Site Plan Review,Common Driveway and Parking Special Pern its Date: June 17. 2010, Revised Sept. 22, 2010, Oct. 08, 2010, Jan. 17, 2011 3) Report: Operations&Manntenance,Plan and Long Tenn Pollution Prevention Plan Date: June 17,2010.Revised September A 2010,December 8,2010,January 17,2011 and Febmary 18,2011 Prepared by-, MHF Design Consultants,Inc. 44 Stiles RoA Suite One Salem,NH 03079 4) Report. storm Water Management keport Prepared for; Osgood Properties LL,C Prepared by: MU Pesigu Consultants,Inc. 44 Stiles Road,Suite One Salem,NH 03079 Date: June 17.2010,Revised Sept.22,2010,Oct.08,2010,Jan.17,2011 5) Elevations: Osgood Properties LLC 1003 Osgood Street—ConceptElevations Pmpted by. Aninno,Inr,. Date: January 14,2011 cc: Director of PubHc Works .Building Inspector Conservation Administrator Drainage Consultant Planning Board Police Chief Fire Chief Applicant Eugineex File 12