Loading...
HomeMy WebLinkAboutCorrespondence - 940 JOHNSON STREET 10/24/2011 DelleChiaie, Pamela From: Sawyer, Susan Sent: Monday, October 24, 2011 11:51 AM To: DelleChiaie, Pamela Cc: 'Marianne Peters' Subject: RE: Soil Testing for 940 Johnson scheduled for Mon/Nov 7th @ 9:30 1 Suspect this means we will have a plan in here by Nov 2"'1 and then we'll be the bad guys. I had also had a good conversation with the son of the deceased 2 weeks ago and told him they should focus on selling with an approved plan, as the end of the season is near. So as not to push everyone. We will not Push for a review just to get an installation permit pulled by the Nov. 1.5"' deadline. if they have to come to the Nov, 17t" meeting for out of season installation, so be it. Or even December. `T'hx S From: DelleChiaie, Pamela Sent: Monday, October 24, 2011 11:29 AM To: 'Marianne Peters' Cc: Sawyer, Susan Subject: RE: Soil Testing for 940 Johnson scheduled for Mon/Nov 7th @ 9:30 Thank you!!! ( &a Rwwa, Pamela DelleCbiaiie From: Marianne Peters IMa ILQLol -pe ,L t o qCaLr3iLillrive �--rCQ1L!MU1-JnQ2mMJ Sent: Monday, October 24, 2011 11:27 AM To: DelleChiaie, Pamela; Sawyer, Susan; Grant, Michele Cc: WMLdu L Qs _Lie0d comcast.net 'Randy Burley' Subject: RE: Soil Testing for 940 Johnson scheduled for Mon/Nov 7th @ 9:30 Rescheduled for October 31,1, same time; all moved up! -----Original Appointment----- From: DelleChiaie, Pamela LM:ciLI(C),Ijdel.t C_b c toWLiofoio�thandover.com Sent: Monday, October 24, 2011 10:13 AM To: 'Daniel Ottenheimer'; 'Isaac Rowe'; 'Peters, Marianne'; 'Randy Burley'; Sawyer, Susan Subject: Soil Testing for 940 Johnson scheduled for Mon/Nov 7th @ 9:30 When: Monday, November 07, 20119:30 AM-12:30 PM (GMT-05:00) Eastern Time (US &Canada). Where: 940 Johnson Street, North Andover, MA 01845 Monday—October 24,2011-10:12 a.m. Hello Mill River, I received a call from- 603-315-3864—David Taylor—Trustee for 940 Johnson Street—who called to request that this soil testing be scheduled ASAP, and not wait until Nov.T1. Is there anyway in your schedule that this could happen? Bill Dufresne told Mr.Taylor that it had to do with Mill River's availability. Please let me know if any sooner scheduling is possible. Thank you. Pamela NAHD ------------ From: Marianne Peters fmpeters@millriverconsulting.com] Sent: Friday,October 21,20111:41 PM To: DelleChiaie, Pamela;Sawyer,Susan;Grant, Michele Cc: 'Randy Burley';'Isaac Rowe' Subject: Soil Testing for 940 Johnson scheduled for Mon/Nov 7th @ 9:30 Soil testing for 940 Johnson w/Bill Dufresne scheduled for Monday, November 71, @ 9:30 with Randy. Marianne Peters Office Manager 6 Sargent Street Gloucester, MA 01930-2719 Phone: 978-282-0014 Fax: 978-282-1318 www..-rn il I rive rcons,g1tbg...go al ,LoRettL �@.rttiliCiy!g�r(on�iult,i _ .com qq__ Please note the MaSS,1GhL1SettS Secretary of State's office has determined that rnost ernails to and from municipal offices and officials are Public records, For more information please refer to: htjr.L.,t wvu,sec s at� q �j rn. t P�qj /Lreid��h Please consider the environment before printing this email, << Message:Soil Testing for 940 Johnson scheduled for Mon/Nov 7th @ 9:30(23.0 KB)>> 2 t` • North Andover Health Department (ommunity Developinent Division December 12, 2011 Vladimir Nemchenok c/o: Bill Dufresne Merrimack Engineering Services 66 Park Street Andover, MA 01810 Re: Subsurface Sewage Disposal System Plan for 940 Johnson Street, Mai) 107A, Lot 91 Dear Mr. Nemchenok: The proposed wastewater system design plan for the above site dated November 13, 2011 has been reviewed. Unfortunately, the plan cannot be approved until the following items are corrected. The specific section in Title 5: 310 CMR 15.000, or North Andover regulation that is not met by this design follows each item where applicable. 1, A Local Upgrade Approval for only having one test pit in the soil absorption system area must be requested. Please submit the Form 9A Local Upgrade Approval request or revise the design plan(3 10 CMR 15,405(1)(k)). 2. A local variance will be required to be requested to have the tank(s) less than 75' to the wetland resource area NA Table 1. Please submit request to be on the next BOH meeting. List all variance and LUA's requested. 3. Please note all LUA and local variance requests on plan NA 3.2 4. The notation in the "Deep Test Results" calls for the C material in T-1 to be GR. SL. The soil logs call for a GR. LS. Please clarify 5. Please illustrate the distance from the pool to the tank (10'min. or LUA) 6. Please provide a pump curve 15.220(4)(r) Page 1 of 2 North Andover health Department, 1600 ()sgood Street, Building 20, Suite 2-36, North Andover, MA 01845 phone: 978.688,9540 'ax: 978.688.8476 7. The soil log and "Deep Test Results" call for the ground elevation of T-1 to be 98.8, but there appears to be a spot grade of 99x9 right next to the test pit on the site plan. Also, scaling between the contours it appears the 99.9 is more accurate of a grade than 98.8. Please re-evaluate design parameters. 8. In the "Design Calculations"the perc rate is referenced to be, "3 M.P.I. *SEE SIEVE ANALYSIS BY TERRA FILTER". The sieve analysis reference appears to be have been inadvertently copied from another plan, Please clarify. Please note the reviewer has observed a repeated problem in the field, and has the following recommendation, though not required by the code. Depict a gas baffle 15,227(4); while Title 5 says for an effluent filter or gas baffle, the preference is for both, for the reason that if the effluent filter is removed and not reinstalled, the gas baffle feature is also lost. This is not a deficiency only an observation. Please feel free to contact the office with any questions you may have. We look forward to working with you to obtain a wastewater treatment and dispersal system which will be in compliance with all regulations and assure protection of public health and the environment of North Andover. Sincerely, S/u/tY. Sawyer, HS/RV,/,", is Health Director cc: File Homeowners—CARROLL H & MARY A TAYLOR TRUSTEE, TAYLOR FAMILY TRUST Attach: Page 6 of the local septic regulations Page 2 of 2 North Andover Health Department, 1600 Osgood Street, Building 20, Suite 2-36, Noilli Andover, MA 01845 Phone: 978.688.9540 Fax: 978.688.8476 3A Design plans for a tight tank shall require approval of the Board of Health at a public hearing, 3,5 All drilled or dug wells shall meet all setbacks and be considered potable water supply wells. 3,6 Wetlands resource area setbacks as described in these regulations and in Title 5 are to be measured from the resource as may be jurisdictional under federal, state or North Andover requirements, 3.7 No well shall be constructed or placed within the distance specified In Table 1 from the component of an existing onsite wastewater system. 3.8 If a variance to the North Andover Board of Health regulations,Title 5 Local Upgrade Approval and/or Title 5 variance can be met with the incorporation of a Massachusetts Department of Enviromnental Protection(DEP)-approved device which reduces wastewater to levels below 30 mg/L 130D and 30 rng/L TSS, then the design plan can be approved by the Health Department and does not require a bearing before the Board of Health unless otherwise required. 3.9 Per the current fee schedule,the fee for the onsite wastewater system plan review shall be paid upon initial submission and will cover the first revision if applicable, Each subsequent revision will require a separate fee. TABLE 1 -SETBACK DISTANCE TABLE. Resource Build Septic Tanks, Prnnp Tanks, Soil ing Treatttiont Units,Tight Absorption Sewer Tanks,Grease Traps(feet) System (feet) Deck on footin s _ 5 10 Tributaries to Surface Water Supply 325 325 Watercourses or Wetland Resource Areas 75 100 Wetlands Bordering . Surface 150 150 Water Supply or Tributary in watershed district) Private Well 50 (setbacks tame supplemental to MAD EP 3.10CMR 15) Pagcg j MERRIMACK ENGINEERING SERVICES, INC. ` PROFESSIONAL ENGINEERS LAND SURVEYORS PLANNERS eceM e 8TAETNANDOVER, MA 01810• (978)475-3555,373-5721 • FAX(978)475-1448 • E-MAIL lnfo @merrimackengineering.com Susan Sawyer ro „ Public Health Director 1600 Osgood Street Building 20, Suite 2-36 ,�a North Andover, MA 01845 3O\NN'i£ RE: 940 Johnson Street 'ti � °" � ° wAPPW-- Dear Ms. Sawyer, We received your review letter dated 12-12-11 for the above referenced site. We revised the plan with regards to item 41 through 6 and #8. With regard to item#7, the reviewer is incorrect. T-1 was performed on the side of the lot which had steep slopes and undulating topography with several small knolls and hills. The test pit was performed in a saddle at the base of a knoll. Please note that equally as close to T-1 is a spot elevation of 98.4. Why would the reviewer not assume that the test pit was closer in elevation to that spot grade? The fact is that the slope is not consistent between the two contour lines and so it is incorrect to interpolate grades between the two contours. The grade in reality drops quickly then flattens before T-1 so the elevation of T-1 is closer in value to spot elevation 98.4 than it is to elevation 99.9 as suggested by the reviewer. Additionally we checked our survey notes and confirmed the elevation. Please note that we revised the plan such that a local variance is no longer required for the setback distance to a wetland for the pump tank or the septic tank. We did however request an additional LUA for the distance from the septic tank to the foundation from 10 ft. to 7 ft. All LUA requests are noted on the revised plan. We feel we have adequately addressed your concerns and respectfully request that the plans be approved as re-submitted. Yours truly, .v William Dufresne Merrimack Engineering services.