To. Susan Sawyer/Jennifer Hughes
Frown: Philip Christiansen
CC:
oat : May 23, 2013
R : 858 Johnson St
changed the plan slightly so that the work would be farther from the wetlands.
I changed to the low profile chambers which are only 8 inches high. This change allowed
installation of the chambers without having to change the surface topography for breakout and
enables the chambers to be installed in the parent soil without excavation of the top and
subsoil 5 feet around the system.
Jennifer said that wetland flag 1 was missing so I had Leah Basbane go back out. She
established a new flag 1 and also a flag 0.The plan shows those flags.
Additionally Leah did two soil probes in the brush pile and found the soil to be upland soil
RECEIVED
HEM (a ,u°� I E T
r
•
North Andover Health Department
Community Development Division
May 24, 2013
Phillip Christiansen, P.E.
Christiansen and Sergi, Inc.
160 Summer Street
Haverhill, MA 01830
Re: Subsurface Sewage Disposal System Plan for 858 Johnson Street(Map 107A,Lot45)
Dear Mr. Christiansen,
The proposed wastewater system design plan for the above site dated April 25, 2013 and
received on May 23, 2013 has been reviewed. Unfortunately, the plan cannot be approved until
the following items are corrected. The specific section in Title 5: 310 CMR 15.000, or North
Andover regulation that is not met by this design follows each item.
1. Please reference the Lake Cochichewick watershed in the notes on sheet 1 (NA 3.2).
2. Please demonstrate that a conventional system in compliance with 310 CMR 15.000 can
be built on the site in order to use the Infiltrator Chamber system according to Section
1(3) of the DEP General Use approval letter. An outline and brief description of a
conventional system on the site plan is sufficient.
3. The design plan references two different Infiltrator Chamber models (High Capacity and
Standard Low Profile). It appears the design is based on the Standard Low Profile model.
Please modify the design accordingly to correct the discrepancy.
4. Please indicate if the existing garage adjacent to the leaching facility has a slab
foundation. If so, it must be 10 feet away from the proposed leaching facility.
5. It appears the existing dwelling is proposed to be removed and a new dwelling
constructed. However, the design plan indicates the existing dwelling to be razed. Please
clarify this note.
Page 1 of 2
North Andover Health Department, 1600 Osgood Street, Suite 2035,
North Andover, MA 01845 Phone: 978.688.9540 Fax: 978.688.8476
6. The leaching detail on sheet 1, indicates a trench length of but the design calculations
indicate a trench length of 48'. The detail also indicates 11 bers per row but the
design calculations indicate 12 chambers per row.
7. On the profile view on sheet 1, the pipe from the D-box should be connected to the inlet
of the chamber.
Please feel free to contact the office with any questions you may have. We look forward to
working with you to obtain a wastewater treatment and dispersal system which will be in
compliance with all regulations and assure protection of public health and the environment of
North Andover.
Sincerely,
Susan Y. Sawyer, REHS/RS
Public Health Director
cc: Stephen Franciosa
File
Page 2 of 2
North Andover Health Department, 1600 Osgood Street, Suite 2035,
North Andover, MA 01845 Phone: 978.688.9540 Fax: 978.688.8476
r
Blackburn, Lisa
Emmaus
From: Sawyer, Susan
Sent: Tuesday, May 28, 2013 3:27 PM
To: Lois Christiansen
Cc: Blackburn, Lisa
Subject: 848 johnson
Hi Lois,
I would like to offer to not have another tree cut down, by asking if we can do two things via email
Rather than printing out a new copy, could you put in writing answers to the following;
Or request and give approval to change the plan I have. I will leave it to your discretion.
Thank you
Susan
1. Please reference the Lake Cochichewick watershed in the notes on sheet 1 (NA 3.2).
2. Please demonstrate that a conventional system in compliance with 310 CMR 15.000 can be built on the site in
order to use the Infiltrator Chamber system according to Section 1(3) of the DEP General Use approval letter. An
outline and brief description of a conventional system on the site plan is sufficient.
3. The design plan references two different Infiltrator Chamber models(High Capacity and Standard Low Profile). It
appears the design is based on the Standard Low Profile model. Please modify the design accordingly to correct
the discrepancy.
4. Please indicate if the existing garage adjacent to the leaching facility has a slab foundation. If so, it must be 10
feet away from the proposed leaching facility.
Susan Sawyer
Public Health Director
Town of North Andover
1600 Osgood Street
Suite 2035
North Andover,MA 01845
Phone 978.688.9540
Fax 978.688.8476
Email mailto:ssawver@townofnorthandover.com
Web www.TownofNorthAndover.com
Please note the Massachusetts Secretary of State's office has determined that most emails to and from nwnicipal offices and officials are Public records.For more
information Please refer to:httl)://www.sec.state.ma.us/pre/preidx.htm,
Please consider the environment before Printing this email.
1
•
•
LEDI
•
North Andover Health Department
Community Development Division
May 30, 2013
Stephen Franciosa
8 Newell Farm Drive
West Newbury, MA 01985
Subsurface Sewage Disposal System Plan for 858 Johnson Street,North Andover, Massachusetts
Map 107A Lot 45.
I
Dear Mr. Franciosa,
The North Andover Board of Health has completed the review of the septic system design plans
for the above referenced property, submitted on your behalf by Christiansen& Sergi, Inc. dated
April 25, 2013, last revised on May 24, 2013 and received May 28, 2013. The design has been
approved for use in the construction of a new onsite septic system for a 4-bedroom (max 9-room)
home. This plan is good for 3 years from the date of approval.
During this time, a licensed septic system installer must obtain a permit and complete this work,
and a Certificate of Compliance be endorsed by the installer, designer and the Town of North
Andover.
This approval is also subject to the following conditions:
I. Prior to the issuance of a Disposal Works Construction permit the following must be
submitted.
a. A Foundation plot plan in a V= 20' scale; the same as the approved plan
,vA Floor plans of the proposed home
2. If site conditions are found in the field to be different from those indicated on the
design plan and/or soil evaluation,the originally issued Disposal System Construction
Permit is void, installation shall stop, and the applicant shall reapply for a new
Disposal Systems Construction Permit(3 10 CMR 15.020(1)).
3. It is the responsibility of the applicant and/or the applicant's septic system designer,
septic system installer or other representative to ensure that all other state and
municipal requirements are met. These may include review by the Conservation
Commission, Zoning Board, Planning Board, Building Inspector, Plumbing Inspector
Page 1 of 2
North Andover Health Department, 1600 Osgood Street. Building 20, Suite 2035,
North Andover, MA 01845 Phone: 978,688.9540 Fax: 978.688.8476
858 Johnson Street May 30, 2013
and/or Electrical Inspector. The issuance of a Disposal System Construction Permit
shall not construe and/or imply compliance with any of the aforementioned
requirements.
Your effort to provide a properly functioning septic system for your dwelling is greatly
appreciated. The Health Department may be reached at 978-688-9540 with any questions you
might have.
Sincer ,
Susan Y awy HS/RS
Public Healt irector
cc: Christiansen& Sergi, Inc.
file
Encl. copy of the approved Installers List for N.A.
Page 2 of 2