HomeMy WebLinkAboutCertificate of Compliance - 517 JOHNSON STREET 11/23/2002 Town of North Andover, Massachusetts Form No.3
BOARD OF HEALTH
NORTH
Ott« � ee�Yp
T
�,'•�,,,,o •�"� DISPOSAL WORKS CONSTRUCTION PERMIT
�SSACHUS��
Applicant
9AME V ADDRESS TELEPHONE
Site Location
Permission is hereby granted to Construct ( ) or Repair (1-<an Individual S it Absorption
Sewage Disposal System as shown on the Design Approval S.S. No. �
CHAIRMAN, BOARD OF HEALTH
17
Fee s° D.W.C. No.� . '�✓
BOARD OF HEALTH
NORTH ANDOVER, MA 01845
978-688-9540
APPLICATION FOR DISPOSAL WORKS CONSTRUCTION PERMIT
DATE: <�7_ lJ ` CURRENT INSTALLER'S LICENSE#
LOCATION:
LICENSED INST
SIGNATURE: c TELEP ONE#
CHECK ONE:
REPAIR: NEW CONSTRUCTION:
IF NEW CONSTUCTION, PLEASE ATTACH FOUNDATION AS-BUILT.
Administrative Use Only
l�
160.00 Fee Attached. Yes No
Project Manager Ob. Yes No
Foundation As-Built? Yes No
Floor Plans? Yes No
Approval Date: /Z
INSTALLER PROJECT MANAGEMENT OBLIGATIONS
As the North Andover licensed installer for the construction of the septic system for the
property at 7 C) relative to the application
of') /Vdated q for plans by , F and
dated Lit— with revisions dated 'J:- �0_
I understand the following obligations for management of this project:
1. As the installer I am obligated to obtain all permits and Board of Health approved plans prior
to performing any work on a site. I must have the approved plans and the permit on site
when any work is being done.
2. As the installer I must call for any and all inspections. If homeowner, contractor, project
manger, or any other person not associated with my company schedules an inspection and the
system is not ready then item three shall be applicable.
3. As the installer I am required to have the necessary work completed prior to the applicable
inspections as indicated below. I understand that requesting an inspection, without
completion of the items in accordance with Tile 5 and the Board of Health Regulations may
result in a$50.00 fine being levied against my company.
a) Bottom of Bed - generally first inspection unless there is a retaining wall which should be done
first. Installer must-request the inspection but does not have to be present.
b) Final inspection –Engineer must first do their inspection for elevations, ties, etc. As-built or
verbal OK from engineer must be submitted to Board of Health, after which installer calls for
inspection time. Installer must be present for this inspection. With pump system all electrical
work must be ready and able to cause pump to work and alarm to function.
C) Final Grade-Installer must request inspection when all grading is complete. Does not have to be
on site.
4. As the installer I understand that only I may perform the work(other than simple excavation)
required to complete the installation of the system identified in the attached application for
installation. I further understand that work by others unlicensed to install septic systems in
North Andover can constitute reasons for denial of the system, and/or revocation or
suspension of my license to operate in the Town of North Andover; significant fines to all
persons involved are also possible.
5. As the Installer I understand that I must be on site during the performance of the following
construction steps:
a) Determination that the proper elevation of the excavation has been reached.
b) Inspection of the sand and stone to be used.
c) Final inspection by Board of Health staff or consultant.
d) Installation of tank, D-box, pipes, stone, vent, pump chamber, retaining wall and other
components.
6. As the installer I understand that I am solely responsible for the installation of the system as
per the approved plans. No instructions by the homeowner, general contractor, or any other
persons shall absolve me of this obligation.
Undersign icensed Septic taller
® Date:
Dispos Works Construct' n Permit �dl
Office t�w't Health
. tt t"' . 1 Department
W
."t1ni trait y I)e'velopment artd Services S 011
77 Charles Street tl'1 5 NCH��r�w,
North Andover, Massachusetts 01845
Sandra ' tar!r 1 a:&1ephone( 7' )688-9540
Publia t teidth Director Fax (975)tell 9542
TOWN OF NORTH ANDOVER
BOARD OF HEALTH
CERTIFICATE OF COMPLIANCE
DATE OF COMPLIANCE
11/23102
This is to certify that
the individual subsurface disposal system
constructed () or repaired (X)
by
John Soucy
at
51.7 Johnson Street
has been installed in accordance with the provisions of Title V of the State Sanitary Code and with the
North Andover Board of Health regulations.
The Issuance of this certificate shall not be construed as a guarantee that the system will function
satisfactorily.
Ole
rian . LaGrass..
J e
Board of Health Inspector
Fed k�4f�'.9:' C.)k l4N"C L9 f 1� •! w N B NNd.D1N"G 6'W(-9.545 CONSFRV TJG"N 688-9530 ��kr�, ➢,TH PrN'0�0540 PLA N%NG 6 -953 r
-. ,c � � � o _ � -';•,, ::� ::.. .rid` ,z� ':": - :I
'-- y�C' K `-c .��'`._`�' .��~` ::ice ;.. ,} ?;.�..•c,<:'
j .
r ,
si !
TOWN OIL NORrfH AiNBOVER SE�V.kGEz DISPOSAI. S). ,-TE1,t
I\STAZ. LA-rZON CERTII=ICATION
The undersis^ed here_-v certify that the Szewa!2e Disposal System cor.su<<ct:;d-,
( repaired: y
by
located at 1-7 -_Jv bLL e ------
was installed in conformance with the North Andover Board of Hcrith approved plan;
Svstem Deslem Permdt dated: with an aruroved design
flow of gallons per day The matenals;usea; were in conformarc•. those
specmea on the appirovea plan; the systern was installed in' accordtmu ,bith the provisions
of 310 C'NM 15.000, Title 5 and local rei-zalatiors, and the final Qradiri agrees
substantially %,6th the approved plan. .ail :Cork- is accurateiv represented or the As-built
Nhich has been submitted to the Board c-Health.
Beet inspection date: u n;AS.�:,� /0 .(J / 1/
RI ARD Engineer R mi s,=.ative.
C. m
Final inspect-on /7107- — � G o
ngireer Represeniat' e
oe5'�rl i. e�/y/J Slp L
L:c.T: Date:
Date —�.
INSPECTION CHECKLIST FOR SEPTIC SYSTEMS
Yes NO Initials
A. Bottom.of Bed
I. Excavation to proper depth
2. With trenches,sides of excavation are beneath B horizon
i
3. Edge of excavation specified distance from foundation,etc.
Comments:
B. Retaining Wall
1. Wall height and width as specified
2. Waterproofed
3. Wall minimum 10'to leaching facility
4. Wall meets specifications of plan
Comments:
C. Building Sewer
1. Pipe diameter minimum 4"
2. Schedule 40 pipe
3. Watertight joints
4. Inlet to tank cemented
5. Slope minimum 0.01 or 1/8"per foot minimum
6. Pipe properly set on compact firm base
7. Pipe laid on continuous grade in straight line
8. Cleanouts precede all change in alignment and grade
9. Manholes at any 90°change
10, 10'minimum offset to water line
Comments:
D. Septic Tank
ef
1. Level
'.
2. 1,500 gal minimum 3. Gas Gas baffle present on outlet
4. Manhole to grade
5. Manholes over center and each tee
6. 3-20"manholes
7. Inlet tee minimum 12"under invert
8. Outlet tee minimum 14"under invert
9. Outlet line cemented
10. Air space 3"above tees
11. 2"—3"drop fi•om inlet to outlet
12. Pipe set
13. Compact base with 6"of 3/4"crushed stone under tank
14. Tank is watertight
Comments:
E. Pump Chamber Yes NO
1. If separate from tank,compact base with 6"of'14"stone underneath
2. Minimum 2"pipe to d-box if gravity system
3. 20"access manhole
4. Tank level
5. Watertight
6. Tank size agrees with plan specification
7. Manhole to grade
8. Check valve and bleeder hole present
9. Alarm in building on separate circuit
10. Alarm functions
11. Manual operating switch
12. Pump delivers liquid to d-box
Comments:
F. Distribution Box
1. D-box level
2. Minimum 0.17"(2")drop from inlet to outlet
3. Minimum 6"sump
4. Outlet pipes show equal distribution
5. Compact base with 6"of stone beneath box
6. Box is watertight
7. All lines cemented with hydraulic cement
8. Schedule 40 pipe
Comments:
G. Soil Absorption system
1. All stone double-washed-'/4"- 1 %z"
-pea stone ,j
Bucket test done?
2. Minimum 2"of pea stone above distribution lines
3. Minimum 6"stone beneath pipe
4. Distribution lines capped or connected together
5. Grading meets 3:1 slope
6. Minimum of 9"of fill graded over system
7. Toe of slope stops minimum 5' from edge of property; if not,then swale. -
Cam nts:
H. Leach Trenches
1. Minimum 2 trenches
2. Length of trenches agree with plan. (Max. length 100')
3. Width of trenches agree with plan-Minimum 2';maximum-4'.
4. Vent present if<50 feet or specified
5. Distance between trenches minimum 4'and maximum of 6'
6. Minimum distance between trenches 10'
7. Pipe slope minimum 0.005 or 6"per 100'
8. Depth of trenches below outlet invert minimum of 6".
Yes NO
9. Pipes set on stable base.
Comments;
I. Leach Field
1. Maximum length of field 100'
2. Pipe slope minimum 0.005 or 6"per 100'
3. Separation between pipe 6'maximum.
4. Pipes connected at end
5. Separation between adjacent fields 10'minimum
6. Pipes set on stable base
7. Maximum 4'separation from edge of field to first line
j 8. Minimum two distribution lines
A 9. Maximum pere rate 20 mpi
Comments:
I Leaching Pits
1. Minimum inlet pipe 4"
2. Pits of concrete
3. Sidewall between 12"and 48"wide
4. Access manholes on each pit
5. Pipes cemented with hydraulic cement
i
Comments:
I
K. Final Grade
1. Slope over soil absorption system minimum 0.02
2. All system components covered by at least 9"soil _
3. Cover soil free of stones larger than 6"
4. Grading slopes away from dwelling
5. No areas over system that may pond
AS-BUILT CHIECKLIST
LOT NUMBER, STREET NAME
ASSESSORS MAP & PARCEL NUMBER
LOT LINES & LOCATION OF DWELLINGS
LOCATIONS & DIMENSIONS OF SYSTEM,
INCLUDING RESERVE
TIES
TO LOT LINES & DWELLING, WELLS
a. FROM SEPTIC TANK
b. FROM LEACH AREA
LOCATION
° S OF DEEP HOLES &PERC
TESTS
ELEVATIONS OF DISPOSAL SYSTEM
TOP OF FDN ELEVATION
:. .. ' LOCATIONS OF WELLS, DRAINS, WATERCOURSES
WITHIN 150' OF SYSTEM
LOCATION OF WATER, GAS, ELECTRIC LINES, CABLE
DISTANCES FROM CORNERS OF HOUSE TO CENTER OF
i
TANK. & D-BOX
w... ORIGINAL STAMP & SIGNATURE
IMPERVIOUS AREAS -DRIVEWAYS, ETC.
NORTH ARROW
LOCATION & ELEVATIONS OF BENCHMARK USED