HomeMy WebLinkAboutMiscellaneous - 149 MARIAN DRIVE 11/4/2000 (2) CHECKLIST FOR NORTH ANDOVER
SEPTIC SYSTEM PLANS
The following is a checklist that incorporates all Title 5 and local regulations for septic plans.
Name of Applicant: D/ 1/ / M 00 b 4;6 A)Name of Designer: Dy1,ee-'-s-,/L',
Plan Date: LIZ fir`�C� Revision Date: Date of Review:
Property Address: ^�y Awl vv 0 C Map: f Lot:
BOH Reviewer: Type of Plan(new or upgrade): .
Number of Bedrooms in Assessor's Records: gpd)Garbage Disposal Allowed: �-J
General Information: N.A. =North Andover Septic Regulations Other numbers refer to Title 5
OK Problem N/A
` Street number and map/lot-220(4)(u)
i Maximum scale of 1 "=40'for plot plan-220(4)
/ Maximum scale of 1 "=20' for profile and component details-220(4)
t� Legal boundaries of the facility being served-220(4)(a)
Names of abutters from recent tax map- NA 8.02j
Number of bedrooms,design calcs.,-NA 8.021
Name&address of record owner&applicant- NA 8.02k
r/ Name&address of designer-NA 8.021
Holder and location of all easements-220(4)(b)
Date plan drawn&any revision date- NA 8.02m
All dwellings and buildings, existing and proposed-220(4)(c)
Location of all existing or proposed impervious areas-220(4)(d)
All distances on site plan—NA 8.03a-c
Elevation of proposed driveway-NA 8.02t
1--- Location and elevation of foundation drain-NA 8A2y
c Location and dimensions of the system incl.reserve(new const.)-220(4)(e)
Limits of excavation of leach area on site plan-NA 8.02z
✓ Locus plan-220(4)(t)
u/ North arrow-220(4)(g)
Existing and proposed contours-220(4)(g)
Locations and logs of deep holes-220(4)(h)
Locations and logs of percolation tests-220(4)(i)
Date(s)of soil testing-220(4)(h)&(i)
Existing grade elevation of each deep hole-220(4)(h)
Elevation of percolation tests—N.A. 8.02n
Name of approving authority representative-220(4)(h)&(i)
Name of soil evaluator-220(4)0)
Soil logs and perc test logs match BOH records
�- Locations of waterlines, drains,and subsurface utilities-220(4)(m)
Observed and adjusted g.w. elevation in the vicinity of the system-220(4)(n)
v Complete profile of the system to scale-220(4)(0),NA 8.02c
�77 Cross section of leaching facility-NA 8.02w
Location of benchmark(s)within 50-75 feet of facility-220(4)(q)
i� Note listing all variance requests with proper citations-220(4)(p)
t Local upgrade approval request form submitted-403(1)
Original R.S./P.E. stamp, signature&date-220(1)&(2)
2
,- if P.E.,discipline specified within stamp. MGL C. 1.12 s. 81 M
�.., sfe. supplies(w/in 400'),pub.wells(w/in 250'),pvt.wells(w/in 150')-220(4)(
Location of watercourses,wetlands,wells,etc.Win 150'of system—NA 8.02r
i/ Wetland disclaimer—NA 8.02s
Land surveyor plan reference required(property line setbacks)-220(3)
Plan contains designer's certification statement
' Use approvals/standards checked for I/A system -DEP does.,
Pere rate>30 MPI-not allowed for new,L -
UA far upgrade 245(1)&(3)
1 Pere rate> 60 MPZ-must use modified tight tank or VA technology-245(4)
Proposed system qualities as"shared" system -002 (definitions)
Flow is over 2,000 gpd-No R.S. allowed-220(1)
Design flow was set in accordance with code-203
Existing system location and note on proper abandonment-354
Leaching facility at least 1' above Base Flood elevation—NA 9.05
All piping Sch 40 minimum—NA 10.01
k. Basement floor minimum I' above groundwater elevation—NA 5.04
Foundation drain present with elevation—NA 8.02y
On-site Soil and Groundwater review
01, Problem N/A
/ Proper deep observation hole logs on plan -220(4)(h)
All deep holes and peres shown,including aborted tests—NA 8.02n
Soil evaluation forms submitted within 60 days of field work-018(2)
t Proper percolation test log-220(4)(i)
Ample deep observation holes in primary disposal area(minimum 2)- 102(2)
Ample deep observation holes in secondary disposal area(minimum 2)- 1.02(2)
7- Ample perc testing(one in each disposal area,3 in prim. >2,000 gpd)- 104(4)
N",74- Deep hole testing conducted within two years—NA 7.05
Hole Identification Numbers:
��
ground elevation el.
acceptable soil el. `'°�1"" V
Leach facility invert el. /
ground water e1.
refusal el.
bottom of leach facility el.
thickness of acceptable soils
before&after soil R&R
separation to groundwater ,
separation to refusal
p r e
soil class
perc rate Via;
2
3
loading rate
septic tank below g.w.table (yes or no)
pump tank below g.w.table (yes or no)
l.f in fill -255(l)
Setback Distances(Given in feet) 15.21 1
OK Problem N/A
Is the lot in the Lake Cochiewick Watershed? NA 6.00&5.02
Septic Tank Leach Facility
Property line 10' 10
t Cellar wall 10 20
Inground pool 10 20
Slab foundation 10 10
% Deck,on footings,etc. 5 10
Waterline 10 10
Private drinking well 75 100
�-' Irrigation well 75 100
Wetlands 75 100
cy��
Public well 400 400
Wetlands bordering surface 150 150
water Supply or trib.
(in Watershed)
�~ Trib. To Surface Water supply 325 325
�J Reservoirs 400 400
i f Tributaries to reservoirs 200 200
i/ Drains(wat. supply/trib.) 50 100
Drains(intercept g.w.) 25 50
Foundation drains 10 20
Drains(Other) 5 10
Drywells 20 25
Downhill slope 15'to 3:1 slope
s
w/o barrier pp Ai /
3
upoN g2no qj o1sum podsutui of IlLuaad Xuvduroo ;Dqj jo Kdoo u bmo Isnuz sxanal
ITV 'M 01 spLIoz aaeopuV gVOM nano ajstem podsural 01 aapJo ui ulIt'aHJo paL'og auj Xq
palliuuad aq Tsnui s3mudwo3 Butxan�Z ��. j RIIi�I oqj ilovaa of spuoi aanopu�a oN
5uisn sjajntq 31sum HL' 01 glluOHJo prvog auk Xq ino lugs onm suoijumIddu pug saallaZ
---uo9oas
`2I,I lV_K3o uoiIUIoin ui si XuLduzoo inoX osnuooq nof, of uaniB Ouiaq s1 joXU stgZ
4
Building
OK Problem N/A
I I....w Grease trap required for certain uses(check 230 for details)
Pipe diameter listed(4"minimum.)-222(1)
Pipe schedule listed-222(3)
'.. Pipe cast iron or Sch 40 PVC—NA 11.02
Watertight joints specified-222(3)&(4)
Pipe laid on compact,fin base-222(5)
Pipe laid on continuous grade in straight line-222(7)@)
t Cleanouts precede all changes in alignment and grade=
•spno.t.tanopUV ujTON.tano lann.zI
01 aapao ur gpg atll Xq paaaisr as aq Isnuz Xji
Pouj'tIJEW-uapOo otp.5utsn siolnutl o1suAk
•aanopu�
upoN tl,2nojgj alsnm podguml of iiuuad XuudiLuoo aill jo Xdoo u fain isnux s3lonal
ffV 'FM 01 spuoa aanopuV uIJoN aano aIsLIm ltodsuurl of Top.io ut qll-eoH jo pauog atll Xq
pajjztuaad aq Tsnuz somudwoo i?ugotu jL -Xjiltou� of �lonoi o}spnoa aanopuV MJON
2utsn walnut alsnm flu of qllt,aH jo panog atlj Xq ono jugs anm suognorlddn pun saallaZ
---u01133s
`gZ IF�Njo not}uloin ut si fuudtuoo anoX osnnooq noX of uomi? 1?utoq st ioXU sTgl
5
Tight Tank(Check here if not present:
OK Problem N/A
500%of deisgn flow or 2000 gallons provided—260(2)(a)
3-20"manholes—228(2)
Soil compaction below tank specified(if soil non-native)—22](2)
6"of<=3/4"stone beneath tank specified—221(2)&228(1)
Buoyancy talcs. Required if tank at or below water table—221(8)
_ Tank is watertight—221(1)
9"of cover over tank specified(minimum)—228(1)
H-10 loading(min.)—H-20 if traffic—226(3)
Top of tank<=36"below grade—221(7)
All pumping to tank(if applies)in accordance with—229
A/V alarm set at 3/5 tank capacity—260(2)(c)
Min. 1-24"frame w/cover at finished grade—228(2)(f)
Year round access for pumping—228(2)(g)
Distribution Box(Check here if not present:_ )
OK Problem N/A
Inlet elevation:
Outlet elevation: .
0.17'drop from inlet to outlet(minimum)-232(3)(b)
. 6" sump(minimum)-232(3)(e)
All outlets at same elevation-232(3)(b)
Outlet pipes laid level for first 2 ft. -232(3)(c)
Pipe Sch 40-NA 10.
Number of outlets: 6 Number of laterals:
Size of outlets: e
.. ,. ' Inlet baffle/tee min. V over outlet invert for all d-boxes-232(3)(a),
L� Soil,compaction below distribution box specified(if soil is non-native)-221(2)
e 6"of stone beneath distribution box specified-221(2)
Boy,is watertight-221 (1)
,. Top of box<=36"below grade-221(7)
Buoyancy calculations required if box is at or below water table-221(8)
P'utn (Check here if not present: )
OIL Problem N/A
Volume specified: � 1 '> '-� 220(4)(r)
Pump on elevation- . 4: `" 220(4)(x)
Pump off elevation: pry"` r�' 220(4)(r)
Alarm on elevation: (Z 220(4)(r)
,.,.,.. Number of cycles per day-220(4)(r)(also 254(1)(d)if gravity from d-box) /
Minimum 2"delivery line to d-box if gravity-254(l)(c)
Pressure dosed Lf, if flow>=2,000 gpd-254(l)(a)&254(2)(a)
Cycles per day is consistent with chamber volume-23 1
Volume calculations include flowback volume-2') 1(2)
24 hour storage capacity above pump on elevation -231(2)
,. Number of pumps: _ 2 if system serves>2 dwelling units-231(6)
5
'Town of North Andover
�
Office of the o . i n Board of .A.ppea)s
Community Development and Services Division
William J. Scott-, Division Director air a
27 Charles Street � acFEUa
D, Robert 4licetta
North Andover,Massachusetts 01.845 Telephone (978) 688-9541
Building Coll mis57nl'ler Fax(978)688-9542
In-House distribution (decisions):
Assessors Officefrown Hall
Building Commissioner/Building Inspector/Mr. Nicetta/Mr. McGuire
Conservation Dept./Charles St.
DPW/Mr. Rand
Fire Dept./Chief Dolan
Health Dept./Ms Starr
Planning Dept./Ms Griffin
Police Dept./Chief Stanley
Town Manager/Town Hall (via E-MAIL)
Town Attorney/Thomas Urbelis (via hard copy)
Surrounding Town distribution (legal notices and/or decisions):
Planning Dept. c/o Ms Griffin
Andover/Planning Dept.
Boxford/Planning Dept.
Haverhill/Planning Dept.
Lawrence/Planning Dept.
Methuen/Planning Dept.
Middleton/Planning Dept.
North Reading/Planning Dept.
This distribution is provided by the office of the North Andover, Zoning Board of
Appeals.
ml/distribution
BOARD OF APPEALS 698-9541 BLTI'L,DI IG 688-9545 CONSELtVA ION 689-x9530 1IEALT11 698-9540 PLANNING 689-953 5
6
Capacity asst 1/4 sal is minimum 23f 7'DH-220(4)(x)
1 Y pump(s)-
Pump p (minimum)- 1(7)
Pump controls specified-220(4)(r)
Alarm equipment specified-231(2)
Alarm is in building and powered on separate circuit from pump-2') 1(9)
Pump sequence correct(off-lead on-lag on-alan-n on)-231(8)
Pump performance curves included-220(4)(r)
Manual operating switch-NA 12.01
Check valve,bleeder hole-NA 1.2.01
' 1 childproof,24"riser/manhole to final grade-2'31(5),
Soil compaction beneath pump chamber specified(if soil is non-native)-221(2)
6"of<=3/4"stone beneath chmbr. specified-221(2)&228(1),
Buoyancy calculations if chamber is at or below water table-221(8)@
9"of cover over chamber(minimum)-228(l)
H- 10 loading(min.)-H-20 if traffic-226(')),
Chamber is watertight-221 (1)
Top of chamber<=36"below grade-221(7)
Leachigg Facility(general-complete for all designs)
OK Problem N/A
..... 50%larger if garbage disposal-240(4)
Trenches to be used whenever possible-240(6)
No vehicle access or imperv. area above 1.£ unless unavoidable-240(7)
Vented if under impervious cover-241 (1)
�,• Vented through same pipes as distribution system -241 (1)(a)
Vent protected from precipitation/animal entry-241 (1)(b)
Vent is placed'beyond traffic or impervious area-24 1 (1)(c)
All lines connected to vent if bed or trenches-241(l)(d)
77 9"cover over peastone-240(9)
Reserve area provided(new construction)-248(1)
f Reserve 4' from primary leach area—NA 9.04 �.
�.
4'�5',if pert rate =21d✓IPT)separation og.w. -212(a)&(b) P., ofil t
4' down to 2'with variance or /A-upgrades onl of natural soil under l.f. 1)'
C W separation is adjusted to highest existing grade if facility cuts into a hillside
ink Pipe slope minimum of 0.005-251(9)
Require 5'removal and replacement if in fill-255(5)
Top of leach facility<=36"below grade-221(7)
Final grade over U minimum 0.02 ft/ft-240(10)
Minimum design flow 440 �d without 'rl l.f -240(1 1)& A 13.
Surface&subsurface drainage away fror
.g gp
deed restriction—NA 13.01
3.1 slope where grading required-255(2) \)cx v`€ck oc
Toe of fill slope stops 5'from property line or swale installed-255(2)
Impermeable barrier if<3:1 slope or< 15 feet to—3:1 slope-255(2)
XW Impermeable barrier/retaining wall poured concrete—NA 9.02
Retaining wall stamped by P.E. -255(2)(b)
Top of retaining wall>=top of peastone elevation-255(2)(0
10'offset from edge of leach facility to edge of ret.wall-255(2)(g)
Pere test(s)done in most restrictive layer- 104(2)
Perc test 4' below leaching elevation—NA 7.06
Design flow listed and required/provided leach area given-220(4)(f)
Leach pipes SCH40 PVC—NA 10.01
Leach pipes minimum 4"diameter except for dosed system—NA 14.04
Leach lines capped,vented,or connected together-251(9)
Pressure dosing guidance followed if pressure distribution-254(2)(c),
6
Town of North Andover Of �oRrN q
REL'EIVED
JOYCE BRf?DSHa'! Office of the Zoning Board of Appeals v
TOWN CEERCommunity Development and Services Division ; a
NORTH A N D O V E R William f. Scott,Division Director '
2001 APR { g A = I 27 Charles Street RsSACHl1S���
North Andover,Massachusetts 01845 one Tele h 978 688-9541
D. Robert Nicetta p ( )
Building Commissioner
Fax (978) 688-9542
Any appeal shall be filed Notice of Decision
within(20)days after the Year 2001
date of filing of this notice
in the office of the Town Clerk. Property at: 402 Sutton Street
NAME: Vincent Funaro DATE: 4/11/2001
ADDRESS: 402 Sutton Street PETITION: 008-2001
North Andover,MA 01845 HEARING: 4/10/2001
The North Andover Board of Appeals held a public hearing at its regular meeting on Tuesday,April 10,
2001 at 7:30 PM upon the application of Vincent Funaro,402 Sutton Street,North Andover,NIA
requesting a dimensional Variance from Section 71 Paragraph 7.3 of Table 2,for relief of a side(East&
West)setbacks and rear setback and for a Special Permit from Section 9,Paragraph 9.2 to allow for the
extension of a pre-existing non-conforming structure on a pre-existing non-conforming lot,to construct an
addition of a downstairs bath,a proposed attached garage with a family room over the garage within the R-
4 zoning district
The following members were present: Walter F. Soule,Robert Ford, Scott Karpinski,Ellen McIntyre,
George Earley.
Upon a motion made by George Earley and rd by Robert Ford the Board voted to GRANT a dimensional
Variance for relief of a side setback of 11',and a rear setback of 10'and to GRANT a Special Permit to
allow for a proposed addition of a downstairs bath,and a proposed attached garage with a family room over
the garage on a pre-existing,non-conforming structure on a non-conforming lot,and that the present
existing garage be demolished. In accordance with the Plan of Land by: Scott L. Giles,PLS,#13972, 50
Deer Meadow Road,North Andover,MA 01845,dated:2/4/2001. In accordance with the architectural
drawing by;P.R.Boucher Builders,LTD,dated 2/23/01. Voting in favor: WFS/RF/SK/EM/GE.
The Board finds that the petitioner has satisfied the provisions of Section 10,paragraph 10.4 of the Zoning
Bylaw and that the granting of these variances will not adversely affect the neighborhood or derogate from
the intent and purpose of the zoning Bylaw.
The Board finds that the applicant has satisfied the provisions of Section 9 Paragraph 9,2 of the zoning
bylaw and that such change,extension or alteration shall not be substantially more detrimental than the
existing structure to the neighborhood.
Furthermore,if the rights authorized by the Variance are not exercised within one(1)year of the date of the
grant,it shall lapse,and may be re-established only after notice, and a new hearing. Furthermore,if a
Special Permit granted under the provisions contained herein shall be deemed to have lapsed after a two(2)
year period from the date on which the Special Permit was granted unless substantial use or construction
has commenced, it shall lapse and may be re-established only after notice,and a new hearing.
Town of North Andover
Board of Appeals,
bra
Walter F, Soule, acting Chairman
Ml/Decisions2001/9
BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535
7
Pressure dosing required over 2,000 gpd or with I/A remedial use-231(1)
Leaching Trenches(Check here if not present: °` )
OK Problem N/A
Number of trenches:
Minimum of 2 trenches-NA 9.01(2)
Depth of trenches(max eff.2'): -247(1)
Width of trenches(2'min.,4'max.): -251 (1)(b)
Length of trenches(100'max.): -25 1 (1)(a)
Trenches are vented(when>50')-251 (11)
Trenches follow contour lines-251(2)
Trench spacing 3 times effective width or depth-251 (1)(d)
In fill or reserve between trenches, 10'min. -NA 14.01& 14.03
Available]each area given(Min. 500 s.f.)-NA 9.01(2)
Bottom=L x W x# = s.f
Sidewall=L x D x# x 2= s. f.
Effective leach area given
Loading factor:
Effective area=total area s.f.x LTAR = g/day
Effective area is>=design flow of facility being served
2"of 1/8"- 1/2"2x washed peastone.-247(2)
Trench depth of 3/4"to 1 1/2" double washed stone-247(1)
Leaching Pits(Check here if not present:
OK Problem N/A
#of pits/pit systems: (dosing chamber if>1,231 (1))
Dimensions of each pit or system: L W D
Depth of pits(max eff. 2'): -253(1)(a)
Available leach area given
Bottom=L x W x#of systems= s.f.
Sidewall=L+W x D x 2 x#of systems= s.f.
Total area=bottom +sidewall = s.f,
Effective leach area given
Loading factor:
Effective area=total area s.f. x LTAR = g/day
Effective area is>=design flow of facility being served
Minimum of 2 pits at least 13'X 16'—NA 9.01(3)
Distribution for galleries/chmbis. in trench config.-pipe every 20'-253(6)
Distribution for galleries/chmbrs. in bed config.-ea.pipe serves<=40 s.f-253(6)
Spacing-2 times the effective width or depth(the greater)-253(1)(c)
2"of 1/8"- 1 /2"2x washed peastone.-247(2)
3/4"to 1 1/2"double washed stone-247(1)
Each pit has at least one 20"access cover.24"Cl to grade over 2,000 gpd
-253(3)
Surrounding aggregate thickness between 1'(min.)and 4'(max.)-253(1)(b)
_ Vents, if necessary,extend under covers of pit(s)-241 (e)
Leach Fields(Check here if not present: )
OK Problem N/A
Number of fields: (need dosing chamber if> 1,231 (1))
Length(100'max.): "" -252(2)(b)
Width: ..`
7
8
Minimum 900 s ua ��9.01(1)
�
x W ,.�- s f
re feet m NA 9. ..�.. vn i "1 C..� t �.a'`, .r , r /✓.
Distribution lines connected with solid pipe—NA 15.01
Effective leach area given.
Loading factor ✓ i
Effective area—total area )/ s.f x LTAR . ) ` = g/dav
Effective area is>=design flow of facility being served
Minimum of two distribution lines-252(2)(a)
6' line separation(max.)-252(2)(d)
4'maximum separation from edge of field to line-252(2)(e)
10'minimum separation between adjacent leach fields-252(2)(f)
Between 6"and 12"of 3/4- 1 1/2" stone beneath field-252(2)(g)&247(2)
20 18 12 ,2 ..
washed peastone.-247(2)
8/28/98
8