MEMORANDUM
TO: Planning Board
FROM: J.Justin Woods,Planning Director
CC: Tim Willett&Bill Hmurciak,DPW
Mark Rees,Town Manager
Raymond Santilli,Assistant Town Manager/Acting Director of Community Development
Heidi Griffin,Community Development&Services Director
RE: 10 Commerce Way-proposed car wash
DATE: March 10,2003
I have reviewed the application and supporting documentation for the proposed car wash on 1.0 Commerce Way.
The Applicant has made considerable and significant revisions to the proposed facility. However,based on my
review of the materials and VHB's comments,I offer the comments on the Site Plan,Drainage and Traffic
Analysis:
Site Plan Review
1) The applicant needs to clarify the proposed tree-line on the site plan(Stella Gray Street Site Mylar is a
good example)
2) The applicant needs get written approval from the DPW that verifies the existing sewer has the capacity
to handle the additional flow generated by the carwash.
Drainage Review
1) Per VHB,the applicant does not provide the required 2-foot clearance to seasonal high groundwater
and the drainage system will not function as designed. Jim Comeau does not believe they are required
to have a 2-foot clearance to seasonal high groundwater and that the drainage system will function as
designed.
Traffic/Parking
1) Applicant needs to provide accident data to evaluate the safety of drivers entering/exiting the site.
2) Applicant needs to develop a traffic management plan.
3) Applicant needs to analyze and present traffic operations analysis for the evening peak hour.
4) The Applicant must provide additional information confirming the turning radius from the north side of
the building for larger SUV vehicles to maneuver into the wash tunnel.
The Board can choose to act tonight,or keep the public hearing open until 3/25. A decision is due on 3/31/03. 1
recommend continuing the open hearing to 3/25/03 or extending the hearing,as the applicants may need
additional time to provide these materials.
Respectfully submitted,jw.
BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 I-IEALTI1 688-9540 PLANNING 688-9535
03/11/03 TUE 14:26 FAX 978 688 9573 NORTH ANDOVER DPW 0001
TOWN OF NORTH ANDOVER
DIVISION OF PUBLIC WORKS
384 OSGOOD STREET
NORTH ANDOVER,MASSACHUSETTS 01845-2909
J.WILLIAM HMURCTAK,DIRECTOR, P.E.
Timothy J. Willett d wa o*w Telephone (978) 685-0950
Staff Engineer �r �.'•°o� Fax(978) 688-9573
e �
s�
March 11,2003 "asA—I
Mr.Justin Woods
Town Planner
27 Charles Street
North Andover,MA 01845
RE: Site Platt—
Proposed Car Wash
10 Commerce Way
Dear Mr. Woods:
The Division of Public Works has reviewed the letter dated February 10, 2003 by Hancock Engineering
Associated. We offer the following,comments,
1. &2. The daily sewer flow has been provided,however, the peak sewer flow rate should also
be provided. A flow analysis should be conducted by the applicant on the Butcher Boy Pump
Station. A sewer meter would be installed at the station to measure flows for seven days.
After flow information has been collected,the Division can determine if the Butcher Boy Pump
Station can accommodate the additional flow from the car wash.
3. Some of the information provided by the vendor is for water pressure at 40 PSI, however, water
pressure at the site is around 80 PSI. The applicant should strive to recycle 50%of water
consumption.
4. OK
5. OK
6. OK
7. OK
8. OK
Very ttruly yours,
Timothy J. i11ett
Water& Sewer Superintendent
CC:Bill Hmurciak, Dennis Bedrosian
l
:
W
l
a
fz
C(I
�o
h
/Q p"t-slo,
c LQ o r� LJ bo r/itu
�klA I Glk rid ()� t a
Water T'reatment Plant
420 t1reat Pond Rd, 01845
Dennis t..,, Bedrosian t°ek 78-61 8-9 X74
Superintendent ax: 978-688-9575
rm.
'uwn nm�
To: Mr. Justin Woods, Town Planner
From: Dennis Bedrosian, Drinking WTP Superintendent
Subject: Proposed car wash at 10 Commerce Way
Date: 3-20-03
My main job function is in drinking water but proper operation and maintenance of Town owned sewer pump
stations are part of my job as well. I am concerned about Town owned Sewer Pump Stations (SPS) that may
not be capable of handling additional flow from new development, so I requested Tim Willett to require flow or
wet well test studies to be performed by private developers, prior to approval, in order to calculate if hydraulic
overload to our SPS"s during peak times will be a problem.
It has been brought to my attention that the proposed car wash for 10 Commerce Way is to connect its waste line
to the Butcher Boy SPS. I have spoken to Vincent Grasso in regards to his proposed car wash and I find that
he may be excused of the Q test work if he accounts to the Town, in writing, his plans pertaining to the
wastewater pumping routine and max capacity in gallons per minute (gpm) expected to release to Butcher Boy
SPS.
He agreed to put in writing that the car wash wastewater pump to be utilized would only discharge 4 to 6 gpm
wastewater and only pump during the hours between 11 pm—7 am(off peak hours).
I have consulted with Bill Hmurciak and Tim Willett of this arrangement and they agree.
If you would like to speak to me my telephone#is 978 688 9574.
Cc: Bill Hmurciak, DPW Director
Tim Willett, Water& Sewer Superintendent
03/26/2003 14:19 89786889575 NO ANDOVER WTP PAGE 01
pad&- Fax Note 7672 ur•.:ws�ri rvdrr .
Na P A
__....... ......._...._,. From
omrfy
io
r �
r
_ KY-4-_....AO.W7
�... ....._ �.._........ ..... ;� VI .Foept Ghamo .....
iiac�ton
;FAR nT
d5p05�aan: ®�trY I3 n 00 for�cla¢
RECEIVED
Vincent Grasso MAR 2 7 2003
10 Commerce Way A1`OOVER
Norlh Andover,MA 01845 ! �� t n(F-,PARTMENT
(978)502-6239
March.24,2003
Dennis Bedrosian
Superintendent of Water Treatment
North Andover Public Works
384 Osgood Street
North Andover,MA 01845
RE: Flow Monitoring/Proposed Car Wash
10 Commerce Way
Dear Mr.Bedrosian:
Pursuant to our conversation on Thursday the 201h of March 24,2003,this letter shall
serve as an understandiog of our verbal agreement.
The agreement Is as follows:In lieu of performing a flow.monitoring study at the
pumping station in question,I agree to install a 5000 gallon storage tank and discharge
the water at non-peak hours between i 1:00pm and'7:00am at the rate of 4 to 6 gallons per
minute. This storage tank is more than double the anticipated water usage on peak days.
Please notify the Planning Board of our agreement at your earliest convenience. Feel free
to contact me at(978)502-6239 if you have any questions or comments.
Best Regards,
Vincent Grasso
Page 1 of 1
Wilson, Deb
..........
From: Woods, J. Justin
Sent: Monday, July 28, 2003 11:41 AM
To: Wilson, Deb
Subject: Aug 5, Agenda
Vincent Grasso, 10 Commerce Way Plan Endorsement
Mr. Grasso needs to comply with the following condition:
Prior to the endorsement of the plans by the Planning Board,the applicant must comply with the
following conditions:
A bond in the amount of rive thousand ($5,000)dollars in the form of a check must be posted for the
purpose of insuring that a final as-built plan showing the location of all on-site utilities, structures, curb
cuts, parking spaces, topography, and drainage facilities is submitted. The bond is also in place to insure
that the site is constructed in accordance with the approved plan.
The applicant must submit building elevations and profiles for the rear and sides of the building
I expect someone from Hancock will deliver mylars and a request to be on the August 5, 2003 Agenda
this afternoon. If they do, accept them and call Mr. Grasso to ask that he come in and post the bond.
I Justin Woods
Planning Director
Town of North Andover
Community Development Division
27 Charles Street
North Andover,MA 01845
P (978) 688-9535
F (978) 688-9542
ni'lifto, wood s,(e�),tow io f north ando ver,coo 3 11 Ij _
b6,tp:H'NA!vv v,l:o,%vi.iofwioi,tl�a idove°.coiri-/
7/28/03
HANCOCK
..........................
Engineering Aquiciates
235 Newbury Street
Danvers,MA 01923
#9425 (978)777-3050
Fax (978)774-7816
July 28, 2003 Bolton, MA
(978)779-6767
Mr. S. Justin Woods, Town Planner 0
Div. of Community Development & Services Boston, MA
27 Charles Street (617)350-7906
North Andover, MA 01845
RE: Vincent Grasso
10 Commerce Way
Dear Mr. Woods:
Enclosed for your action are the final mylars for the above referenced project. Sheets 1
— 6 represent the final approved submission. Please place us on the August 5 agenda
of the North Andover Planning Board, such that the mylars can be signed by the Board.
Mr. Vincent Grasso will supply the $5,000.00 bond and architectural elevations views.
Thank you for your prompt response. Please return signed and mylars to Hancock
Associates.
Sincerely,
AIL's,
HANCOCK ENGINEERING ASSOCIATES
-11JI, 2
Richard F Doherty, P.E.
Engineering Division Manager
RFD/dec
F:\personal\dcrowder\lefters\rfd9425-Itr.doc
Division of Hancock Survey Associates,Inc.
"DIf" "Juo 61
err.. ..........
MEMORANDUM
DATE: September 3, 2002
TO Clay Mitchell, Heidi Griffin
cc. Tim Willett, Bill Hmurciak
FROM. Bob Beshara
RE.- Review of Car Wash Facility Permit Site Plan &Storm Water Management Plant
10 Commerce Way
Plans Dated: 07130102
The Division of Public Works has reviewed the above referenced plan and offers the following
comments:
1. The division of Public Works is concerned with the daily rate of sewerage flow to be discharged.
As it will flow into the nearby Butcher Boy Sewer Pump Station, which has limited capacity.
Please request the Applicant to provide estimated sewage flows at this time for our review.
2. The Applicant may be required, at its own expense, to upgrade the capacity of the Butcher Boy
Sewer Pump Station in order to accommodate the additional flow proposed.
3. Water from the facility should be recycled to the maximum practical limit. Please request that
the Applicant provide for our review, his proposed water usage and recycling plan.
4. Sewer mitigation fees will apply to this facility.
5. All proposed drainage facilities should remain privately owned and maintained.
6. Sleeves, where required for the sewer force main, should be 4" ductile iron pipe, not PVC as
shown on the plan.
7. All utility structures located within paved areas or subject to vehicle loadings must be designed
for H-20 loading.
8. A Street Opening Permit will be required for work proposed in the street right-of-way and for
the driveway entrance. The Street Opening Permit for the driveway entrance is required before
work can begin A the site.
09-03-02 Site Plan Review
Page 2
09/04/02
It is my understanding that the Applicant may already have begun work on this site. Requests for sewer
and water permits by the Applicant have been denied pending receipt of plans signed by the Planning
Board.
SEP. 5.2002 2:42PM VHB H0.978 P.2
TOWN OF NORTH ANDOVER PLANNING BOARD
SITE PLAN REVIEW FOR CONFORMANCE
WITH THE"TOWN OF NORTH ANDOVER
ZONING BYLAW&STANDARD ENGINEERING PRACTICE
Location: 10 Commerce-Way VHS No.: 06714.60
Owner: Vincent Grassso
Applicant: Vincent Grassso
Applieaotis Engineer: Hancock Engineering Associates,235 Newbury Street,Danvers,MA 01923
Plan Date: 07-30-02 Review Date: 09-04-02
The Applicant submitted a plan dated July 30,2002 along with the following information:covet letter,site
plan application form,fiscal impact statement,community impact statement,certified list of abutters and a
drainage report. The Site Plan Review was reviewed for conformance to the appropriate sections of the
1972 Town of North Andover Zoning Bylaw as amended May 2001 and standard engineering practice. The
following comments note non-confortnance with specific sections and questions/eomtnents.on the proposed
design, VIB offers the following comments:
Section 8,3 Site Plan Review
Section 8.3.5.Information Required.
ix The Applicant has not submitted an elevation view of the proposed building as required by this
section. VHB recommends that the Applicant provide this plan.
xi This section requires that the Applicant file a Notice of Intent with the North Andover
Conservation Commission to be reviewed concurrently. VHB requests that the Applicant verify
that a Notice of Intent has been filed or will be filed in the near future.
a The Applicant has shown a proposed landscape retaining wall. No information about the height
of the wall or the materials used is provided. VHB recommends that the Applicant provide a
construction detail of the wall showing the dimensions of the wall and all materials used.
The Applicant is also proposing a sign at the corner of Osgood Street(Route 125)and Commerce
Way. The plans do not provide any information regarding the materials to be used or the type of
sign proposed. The location shown on the plan is approximately 25 feet from the Osgood Street
property line and 30 feet from the Commerce Way property line. The Zoning Bylaw requires that
all signs be a minimum of 40 feet from all property lines. VHB recommends that the Applicant
revise the location of the sign on the plans or request a special permit. VHB also recommends
that the Applicant provide a construction detail showing the materials to be used.
xv The proposed landscape retaining wall shown on the site plans is not shown on the Landscape
Plan. Please clarify. The Applicant has not shown any existing trees on the site. This section
requires that all existing trees over 12-inch diameter at breast height are to be shown on the site
plan. VHB requests that the Applicant confirm that there are no existing trees greater than 12-inch
on site or revise the plans to include this information.
1
T:\0671639\dv-\=p0rt%\taewa6h Review 94-02-doe
SEP. 5.2002 2:42PM VHB N0.970 P.3
xix The Applicant has not provided a"Traffic Impact Study. The Applicant states that the current
use generates 211 trips and that the proposed use as a carwash would add 131 daily trips,malting a
negligible impact to traffic operations. V1M requests that the Applicant submit backup calcs
showing the Land use code from the Institute for Traffic Engineers ®Trip Generation that was
used to calculate the total trips.VHB also recommends that the Applicant provide a Traffic Impact
Study detailing the impacts o(,ihe•proposed earwash..At a minimum the Applicant should discuss .
the impact of queuing on Commerce Way during peak hours both weekday and weekend.
xxii The Applicant has stated that there would be no increase in demand for public services. The
plans state that the carwasll will utilize a water reuse system and discharge to public sewer will be
provided as an overflow from this system. VHB recommends that the Applicant provide an
estimate of the proposed water usage and sewer discharge from the development, to verify the
impacts to Town resources.
xxiii The Applicant states that the existing structure will be "upgraded in appearance". VHB
requests that the Applicant provide further detail regarding the proposed architecture of the site.
Section S.3.63v)'Txaffic/Parking
a)The driveway entrance to the site is 130 feet wide and the proposed circulation within the site is
not shown. VHB recommends that the Applicant clarify the proposed circulation with respect to
entrance and exit from the site. The Applicant should evaluate the need for an exclusive entrance
and exit curb cut. At a minimum VHB recommends that the Applicant provide a much narrower
driveway opening to limit possible conflicting vehicle movements.
e)The internal circulation is not shown on the plans. VHB is unable to evaluate the circulation in
any way because the plans do not indicate the location of the entrance or exit from the carwash
facility. VHB recommends that the Applicant provide detailed plans of the building layout and
proposed circulation within the site.
IDrainage Review
1. The Stormwater Management Standards allow for a 70% credit for the use of Water Quality Inlets
when calculating the Total Suspended Solids (TSS) Removal. The Applicant has takan an 90%
credit. VHB recommends that he Applicant revise the calculations.
2. The HydroCAD stormwater model submitted by the Applicant is not accurate. The supplementary
calculations show that the designer has added the peak flows from the two existing sub-catchments
to get a total peak flow from the site, This is not a proper method for determining peak discharge.
The hydrographs from the two sub-catchments must be routed together to create a single
hydrograph,which can then be used to determine the peak flow rate. The designer has performed
the same type of analysis under proposed conditions as well. VIM recommends that the Applicant
revise the stormwater model to include a single hydrograph describing the peak flow under existing
and proposed conditions respectively. The existing pond to the west of the site could be added to
the model,and the various design elements routed to the single pond so that the analysis points are
the same under existing and proposed.
3. The HydroCAD analysis of the infiltrative drainage is not accurate. The routing procedure has not
accounted for any infiltration. The designer has modeled the system to overflow under the 2-year
storm frequency. VHB recommends that the model be revised to include the affect of infiltration
based upon percolation tests conducted in the existing sub-grade on site.
4. The designer has used a flow path of 90 feet of sheet flow from the grass buffer strip. The Time of
Concentration should be recalculated with a distance equal to the width of the grass buffer strip
used as the sheet flow length.
2
Tt\06 71659\doa\nponv\Carwmh Ravl—91-42.dee
SEP. 5.2002 2:42PM VHB N0.978 P.4
S. The Applicant has not provided any calculations to support the design of the Vortechnies units.
VHB recommends that the Applicant submit the backup calculations from Vortechnics to verify
the suitability of the proposed structure.
6. Tho Applicant has stated in the Stormwater Management Form that recharge calculations have
been waived because type "D" soil is present on site and is considered unsuitable for recharp.
However, the Applicant has ghovm a proposed flow diffuser unit to be installed for recharge of
stormwater and is proposing to infiltrate all rooftop runoff. VHB recommends that he Applicant
provide test pits and percolation rates for the proposed locations of infiltrative drainage to insure
that these systems will function as designed.
It is recommended that the Applicant provide WRITTEN RESPONSES to the issues and comments
contained herein.
Reviewed by- L0 y,��• Date: °l 0Z
Andrew W.Ogilvie,P.E.
Senior Project Engineer-Highway and Municipal Engineering
Checked lay:
Timothy B.McIntosh,P. .
Project Mauager®Highway and Municipal Engineering
3
T'\0671659\doca\tvpate\Canvaa6 FzAaw 9"Idac
Hancock Engineering Associates JOB 6,00-
235 Newbury Street, Route One North SHEET NO. OF
Danvers, MA 01923 CALCULATED BY DATE
(978) 777-3050 (781) 662-9659
(978) 352-7590 (978) 283-2200 CHECKED BY DATE
SCALE
...................
............ ............. .............
...........
........ .........
.................. ............ .............
............
.............. ..............— .................. ...........
......................
........ ..........
.. ......... ..... ...... .....
............ . .... .. .... . . ...... .
............
e-
x ............
----- .......
................ ..............
............. ............. ................ ........ ..............
...................... ..........
..................... ............ ..........
...........
............... ..............k ............. ..............................
........... 1- ..e -- - --- L-- ! .. ............
..........
...........
............ ..........
.......... ............ ------------- ... .............
............ ............. ....... ........
I............. ..........
........... .................. ............. .............
*......... ..........
........... ............. ... ... ........ ........................
.......... ..........
........................... ............. ............... ............. ..........
.............. .......... ........ ..........
................. ............ .............:........... .............. .......................................... ........... ..........
............ I---------- .............
.......... ------- .........................- ............... ... ............. ..........
................................ .............
---------- .... -----------------
......................... ............ ---------------------- -=--.. ............ .............. ............. ..........
.............
........... G ............ l ............
................... .......... ........... I.............................------- ................................. ..............
.................. ............
..........
.............. ........... ------- ........ ---
.................... ................
........... ....... .4........... -----------------
....................... ..............
-----------......... ........................... ............ ........... .............-------------..............
.................. ......................... ............ .............
........... ------------ -J� _J.............. ..... .....................................
.......... ............ ............. ...........
............
...........
------------- ........... .......... ...........
...........
---------------------- ...........
.............. .............----------- ----------............ ----------- .................. ........... .......................... .......... ........................
...........
.............. ...........------------- .............. ....... ............
..............-...................
......................
............. ...................................... ..........
.................... ........... ........................ ........... ............-
............. ............................ .......................... ............. ...........
.......... ..........
.............. ...... ...........
........................ .................... ........................ .......... .................
........... .......... ............. . ......... .............
.............
............ ...........
........... .......... .......... ...............
............... ............ .................. ........... ............. ............--.......... .............
.............. ......... .......... ............ ... ....... ................
ROOM 204-1(ftgle Shmts)205-1(pa",
Oct 15 02 12: 43p Hancock Assoc. 9787744205 p. 1
H A N(-",0 "'ur- K
Engineering Associates, Inc.
FACSIMILE 235 Newbury St., Danvers, MA 01923
DATE: /0�/S/Z' PROJECT NCB_
ATTENTION: A61M,' 9✓/1g,� _ /��A..1z✓ .rG- 6044C>—
COMPANY:
FAX NUMBER: 975 &6 - 9'S,l Z
FROM: 'T/9-1 s
SUBJECT:
TOTAL PAGES INCLUDING THIS COVER:
DISPOSITION I REQUESTED ACTION:
® Original to follow by mail D As requested ® For your use
CJ Please review/ comment LJ Please call me
MESSAGE:
Uja 57/6— H14 vc-N1if MC51&10
�.
OUR (16L) —(? ��c�slo�
A /X7-c`fit/ /-) 714 54 704JiCI ir3 M C-j-M Zn. ,
ATTACHMENTS:
COPY TO:
Please call us if this fax is riot clear and complete:
Voice (978) 777 3050, Fax (978) 774 7815 or 774 4205
The information contained in this communication is confidential and is intended only for the use of the addressee.
Unauthorized use,disclosure or copying is strictly prohibited. 11/97
Town of North Andover uF yORTH q
,�tLEO 6
Office of the Conservatism Department �y'` " ''°°
Community Development and Services Division 9
27 Charles Street
��SSACHUS����
Alison McKav North Andover,Massachusetts 01845 Telephone(978)688-9530
Conservation Associate Fax(978)688-9542
December 18, 2002
Mr. Jim Comeau, P.E.
Senior Project Manager
Hancock Engineering Associates
235 Newbury Street
Danvers, MA 01923
RE: Vincent Grasso, 10 Commerce Way—242-1162
Proposed Car Wash
Dear Mr. Comeau:
This department received a fax from you on Monday December 16, 2002, late in the workday,
with the fax itself dated December 17, 2002 requesting a continuance on behalf of your client,
Vincent Grasso, for the Conservation hearing scheduled for Wednesday, December 18, 2002.
This letter was written in response-to my prone call made to you on the morning ofthe le. This
office and the Conservation Commission feel these "reminder"phone calls are unnecessary since
your firm should be well aware of the procedures pertaining to the North Andover Conservation
Commission. The department should not be responsible for contacting you the week of the
meeting date fox lack of information submitted and/or for initiating communication regarding the
proposed project.
The record indicates that the Notice of Intent was filed on July 31, 2002 with the first public
hearing date scheduled for August 14, 2002. Yourself or a representative from your office has
appeared beforo the Commission on three occasions in moving forward withIhe project. The
project had been continued to this point for reasons understandable to the Commission. Lisa
Eggleston had completed her stormwater drainage review on November 20`h, with a copy of this
review sent to you the following week. In light of this, the Commission feels that your client
should have made progress on this review and should be addressing such progression to the
Commission at the December 18, 2002 scheduled hearing date.
The Conservation Commission has determined that this is unacceptable and does not excuse your
appearance in front of the Commission. The Commission has requested the presence of the
applicant, or a representative on his behalf, to be present at the December 18, 2002 Conservation
Meeting to explain-the reasons for the delay in the project and-to request a continuance-to the
next meeting date if necessary.
Your anticipated cooperation is appreciated.
BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 FiBALTR 688-9540 PLANNING 688-9535
If you have any further questions in this regard, please feel free to contact me.
Sincerely,
Alison McKay, Consery n Associate
Cc: Rich Albano, Hancock Environmental Associates
Dick Doherty, Hancock-Environmental Associates
NACC
Julie Parrino, Conservation Administrator
Kathy McKenna, Planning Director
Heidi Griffin, Community Development-Coordinator
File