Loading...
HomeMy WebLinkAboutCorrespondence - 10 COMMERCE WAY 9/3/2002 �—j T k' 17 1 V f MEMOMANDUM, DATE: September 3, 2002 TO: Clay Mitchell, Heidi Griffin C0 Tim Willett, Bill Hmurciak FROM.• Bob Beshara RE.- Review of Car Wash Facility Permit Site Plan &Storm Water Management Plant 10 Commerce Way Plans Dated: 07130102 The Division of Public Works has reviewed the above referenced plan and offers the following comments: 1. The division of Public Works is concerned with the daily rate of sewerage flow to be discharged. As it will flow into the nearby Butcher Boy Sewer Pump Station, which has limited capacity. Please request the Applicant to provide estimated sewage flows at this time for our review. 2. The Applicant may be required, at its own expense, to upgrade the capacity of the Butcher Boy Sewer Pump Station in order to accommodate the additional flow proposed. I Water from the facility should be recycled to the maximum practical limit. Please request that the Applicant provide for our review, his proposed water usage and recycling plan. 4. Sewer mitigation fees will apply to this facility. 5. All proposed drainage facilities should remain privately owned and maintained. 6. Sleeves, where required for the sewer force main, should be 4" ductile iron pipe, not PVC as shown on the plan. 7. All utility structures located within paved areas or subject to vehicle loadings must be designed for H-20 loading. 8. A Street Opening Permit will be required for work proposed in the street right-of-way and for the driveway entrance. The Street Opening Permit for the driveway entrance is required before work can begin A the site. 09-03-02 Site Plan Review Page 2 09/04/02 It is my understanding that the Applicant may already have begun work on this site. Requests for sewer and water permits by the Applicant have been denied pending receipt of plans signed by the Planning Board.