Loading...
HomeMy WebLinkAboutConsultant Review - 10 COMMERCE WAY 2/10/2003 (2) r i 1 i Traffic Impact & Access Study Proposed Car Wash Development Project ' forth Andover, Massachusetts Proponent F VINCENT RDOEIV, r f-,fm�itAi�i�d�a ur ryr�t�7MCsC�f`P' DJKD'affi C r�c:1inG c i n n 1/I r,Irosf r>l 1 aPi«il Planning ,980 Mak) 204 CvIotlh ffc;ading, Y\1A 01864- 1300 I TRAFFIC IMPACT TU Proposed r Wash Development Project North Andover, Massachusetts Proponent Vincent Grasso February 6, 2003 prepared by Dermot J. Kelly.Associates, Inc. Traffic Engineering[Transportation Planning 280 Main Street,Suite 204 Forth Reading, MA 01864-1300 978-664-2205 FAX: 978-664-2444 610-TIS2 Copyright 0 2003 by DJK. All rights reserved. TABLE OF CONTENTS Page EXECUTIVESUMMARY .................................................................. ............................. l PROJECTDESCRIPTION............................................................................................1 ALTERNATIVES T{]THE PROJECT............................................................................1 STUDY/\REA..................... ............................................... .........................................2 EXISTING TRAFFIC CONDITIONS.................. ...........................................................2 FUTURE TRAFFIC VOLUME CONDITIONS ..................................................... ..........2 Site-Generated Traffic......................................................................... —................ 2 TRAFFIC OPERATION ANALYSIS ................................................................... ..........2 Commerce Way 8t Osgood Street ...................................................................... —...2 RECOMMENDATIONS ................................................................................................5 PROJECTDESCRIPTION..................................................................................... ......4 PROPOSAL...................................................... .......................................... ...... .........4 � ALTERNATIVES TO THE PROJECT ...................................... ......................................5 ALTERNATIVES TO THE PROJECT.................................................. .........................5 THE EXISTING BUILT ENVIRONMENT..... ............................................— ...... ............8 FIELDSURVEY................................... ......................................... ..............................O GE(]METFl|CS ..................................... .......................................................................O CommerceWay.........................................................................................................S TRAFFICVOLUMES....................................................................................................O FUTURE TRAFFIC VOLUME CONDITIONS..................................................................M INTRODUCTION..........................................................................................................U BACKGROUND TRAFFIC GROWTH...........................................................................8 SITE-GENERATED TRAFFIC VOLUMES ....................................................................9 TRIP DISTRIBUTION/ASSIGNMENT........... ............................................................. 1O TRAFFIC OPERATION ANALYSIS .............................................................................. 11 METHODOLOGY....................................................................................................... 11 Levelof Service........................................................................................................11 TRAFFIC ANALYSIS RESULTS................................................................................. 12 Commerce Way 8t Osgood Street ........................................................................... 12 APPENDD[--------------------------------------. 14 i 610-nS2.d= Copyright@ 2003 by DJK All rights reserved. EXECUTIVE SUMMARY Oe[OODt J. Kelly Associates, Inc. /OJK\ has conducted @ Traffic |[np8Ct & /\cCe8S Shxiv for @ pFnpO3Gd C3[ wash d8vS|0pDlerk project to be located west of and adjacent to CVn0rn8[Ce VVaY in North ADdOVe[, PW@sS8ChUVHttS. The project site iOC8tiOD is graphically presented OD the following Figure 1. This report 8V8|UBteS the pD\eDUa( traffic-related iDlp3CtS aSSOCi@t8d with the pnDpOS8d d8Vo|op[O8Dt project and identifies potential traffic rDiUg3tiOD measures necessary to minimize the potential traffic-related � � impacts of the proposed project. PROJECT DESCRIPTION The project proponent presently is planning for the CnOve[SioD Of an existing OffiC8 building into 3 car wash in North /\DdOVe[. W1@SS8ChUSHttS. Current project planning n8US for the site t0 be accessed along COnl[De[Ce VV8y' which in [UrD iDhe[SeCte with Osgood Street to the south Of the development project. The Proposed Site Drive would intersect with COn8[08R}e Way forming @ "T" type iDt8[SeCUOD with CoDlDle[CB Way. � For the purposes of this report, the fO||OvvinQ aUe[D3tiV83 were evaluated: * No-Build - The No-Build alternative was 8X8OliO8d to establish the 2003 baseline i[BffiC-VO|Vnle conditions. The iDcneDl8Dt8| iDlp8CtS Of the proposed project may be determined by making n0[np3[iSOOS to the No-Build aK8[n8UVe. The No-Build alternative @SSU0eS that the project i8 not built. * Build - The Build 3Ke[DGUVe includes the dev8|OpDl8Dt of the p[OpDSBd project. The Build olte[DaUVg is evaluated in this report and is COnnp@[8d to the No-Build analysis 1 "`*r/n,.mm Copyright(D 2003 by DJK. All rights reserved. Figure 1: Site Location Map V NIX ,' 1 � ^ ^ \,.'gyp ,' » « �r • » »» '��„ ,�." `tir'h�^ ���� �'. �°/" �(f� � " � *n.'° �,, W �r.�w�4wi � �"�..„ .,r�'�. w�r"�'r� �"~ r t a i k YIDS E %f� � .., v ✓'" t � "f � � r"a'"te��� ������, \ �.,./ dtaf f r"' f � i �,, (`` r ✓I `, �.., 1 " �// ��.. ,,� �t r� hey ,�I f, ,�;�r�� i'~� �:��..�6 NII,�.^ " �-• w�" .4 �; ",y'°'' f �r~"" �-.,". f � a_ ' .....� Fib w � F �° � ���n� ,.,; .�'✓�j � f;• ''�»»�i 133 w �y I�aru i b kllo V / � /�� 1 �� /�,�/� ��-i � 1� /� /� � k �r i' P`r r�,',"�. "`.w r v ��,v'"'✓ �q� �"r� S,: IN4 j { 0 1000 .Scale in Feet DJKDermot J. Kelly Associates, Inc. Traffic Engineering/Transportation Planning Coovrlaht Cal 2002 By DX All rlahts reserved, I:\810\610FIG1 � condition. The Build condition represents the increase in traffic from the previous condition k] the proposed condition /ie, the delta irDpa[t\. STUDY AREA The study area includes Commerce Way adjacent to the project parcel as well as the intersection Of Commerce Way at Osgood Street. EXISTING TRAFFIC CONDITIONS [)U[iOg the t[@MiC VO|UOle inventory period 8 total of 20,043 vehicles per day (Vpd) were observed 8|DOg [)SgODd Street north of COnn[Deroe VVaV on 8 Friday. During the weekday evening peak hour \Ot3\ Of 1'873 Vehicles per h0U[ (Vph) were observed along Osgood Street. During the Saturday midday peak hour, 8 total of1`243Vphwere ObSg[Ved along Osgood Street with 12,8O2Vpd observed OnSaturday. FUTURE TRAFFIC VOLUME CONDITIONS Site-Generated Traffic � Based OD the [[E JOU[O8| trip generation rates and other assumptions, it is anticipated that the proposed C@[ facility VVDu|d generate @pp[OX[Oat8|y 708 vehicle-trips per day OD a mealk day. This daily volume VV0U(d he Split evenly with 354 vehicle-trips 9Dt8hDg and 354 vehicle-trips exiting the site over the course of the entire 24-hour day. � More importantly, during the peak hour Of the site, the project VVOU|dg8O8[ate8totG! Of Up to bO vehicle-trips per hour with 40 vehicle-trips entering and 40 vehicle-trips exiting the project site. The remaining vehicle-trips VVOU|d occur over the COV[Se of the day. It ShOU|d be noted that the peak use Of the Car wash tUOD8| is 8OUCip8t8d to OCCUr OCCGSiOD8||y during the Vvinh8[ and early spring [nOOthS, typically DD @ fair weather � � Saturday after an earlier snovVSb}rUl. The peak use of the detailing service bay is � anticipated to occur during late spring and/or summer [nOOthS. For this study the peak use of the car wash tunnel and self-service bay were assumed to be coTRAFFIC OPERATION ANALYSIS incidental. � � UDSigD@UZed in1e[s8CdOD capacity aD@|y88S were performed for the study area inb3[G8CUDO. The capacity analysis is summarized he|OVY. � Commerce Way at Osgood Street � The Commerce Way approach currently operates atLOS B during the Saturday midday hour and it will det8hO[8t8 slightly to LOS C UPd8[ p88h use day conditions. The (S# turns from the Butcher Boy Shopping Center currently operate at LDS F with the right- turns operating at LOS B. The LOS F CDDdibOD 8SSuOloS [[@ffiC is not affected by the adjacent traffic signal. C0DS8qU8DUy. the 8{tU8| Level Of Service i3 better than the Ca|ou|8tHd delay. � 2 6/*ns�dc,c Copyright 0 2003 by DJK. All rights reserved. RECOMMENDATIONS The final phase of the analysis process is to identify [RCODlDl8Od8UUUS regarding only the fOl|OVVDg issues: 1. OOsite CjrCU|@UOn and queuing; 2. Traffic cUDhDi Ul9GSU[BS at the Site [}hVe; and 3. Sight distance maintenance @[88s. * It is suggested that OnSi\B circulation 8[OUOd the existing building be COUD[erC|OCkYVise to DlgXirDiz8 ODSi[e queuing for the car wash tunnel. Along the north Side Of the building, entrance to the car wash tunnel should be one-way westbound. TO Dl@XiDliZe ODsite queuing capacity for the ca[ vv8Sh tunnel, the proponent ShOU\d develop 8 L[80C rD@n8g8nneO\ p|8D to provide two |@nSS for queuing from Commerce Way tO the tunnel entrance iUthe event the OO8ite queuing demand exceeds the single lane capacity of @ppPOxi[0Gt8|y 15 vehicles. |Dlp|e[n8Ob31i0n Of this p|8D may not be required but it ShOU|d be developed to ensure queuing does not occur on Con0Dle[Ce Way. The outer queuing lane would normally be used 8s8 bypass lane. The bypass lane should extend [O the southern Side of the building. The bypass |@ng 8|0Dg the SOUthe[D end of the building should be OD8-YV8y eastbound. The car wash tUDOe| is suggested to be located @|ODg the southern end of the building. * It is suggested that the P[OpOS8d Site Drive 8ppFO@oh to Commerce Way b8 placed under STOP sign CVOtrO| with 3 painted stop |iD8 and 8 dDUb|8 Ve/|OVV centerline twenty-five feet into the site. * In order to enhance the available safety Sight lines at the proposed driveway intersection with CDDlnlerCg VV@Y, topographic g[OUOd elevations, landscaping, gigD3g8 (if any), et:. are Suggested to be Dl@iDL@iDed such that adequate sight distances are available throughout the life Of the project. The sight distance DO@iOt8D3OCe 1riGDg4|8[ area 8|DDg the property frontage 3hDU|d extend 14.4 feet (4.4 DO8te[S) to 17.8 feet (5.4 O08te[S) back into the site drive from the existing edge of Commerce Way (representing aD exiting vehicle) and extend 1O8 maximum possible |OCGtiOD (250 feet rOiOinOV[D) representing an approaching vehicle in each direction along Commerce Way. � mmISmoc Copyright Q 2003 by DJK, All rights reserved. PROJECT DESCRIPTION PROPOSAL The project proponent presently is planning for the conversion of an existing office building into a car wash in North Andover, Massachusetts. Current project planning calls for the site to be accessed along Commerce Way, which in turn intersects with Osgood Street to the south of the development project. The Proposed Site Drive would intersect with Commerce Way forming a "T"type intersection with Commerce Way. 4 610-TIS2.doc Copyright O 2003 by DJK. All rights reserved. ALTERNATIVES TO THE PROJECT ALTERNATIVES TO THE PROJECT For the purposes of this report, the following alternatives were evaluated: • No-Build - The No-Build alternative was examined to establish the 2003 baseline traffic-volume conditions. The incremental impacts of the proposed project may be determined by making comparisons to the No-Build alternative. The No-Build alternative assumes that the project is not built. • Build - The Build alternative includes the development of the proposed project. The Build alternative is evaluated in this report and is compared to the No-Build analysis condition, The Build condition represents the increase in traffic from the previous condition to the proposed condition (i.e., the delta impact). 5 610-TIS2.doc Copyright @ 2003 by DJK. All rights reserved. THE EXISTING BUILT ENVIRONMENT FIELD SURVEY A comprehensive field inventory of the adjacent roadway system was conducted during December 2002. The field inventory included collection of existing roadway geometrics for the adjacent roadways in the vicinity of the site. GEOMETRICS Commerce Way Commerce Way is a two-lane, two-way roadway connecting the Proposed Site Drive with Osgood Street to the south opposite the Butcher Boy Shopping Center. The Commerce Way approach to the Osgood Street intersection is under stop sign control. Commerce Way is approximately 30 feet wide in the immediate vicinity of the Proposed Site Drive. Commerce Way is relatively tangent and level as the roadway passes the project parcel. TRAFFIC VOLUMES For this study traffic volumes were counted both manually and mechanically during December 2002. Mechanical recorder counts were conducted on Friday and Saturday, December 20 and 21, 2002 over a 48-hour period during the traffic-volume inventory periods. Vehicle classification and manual turning movement counts were conducted in 15-minute intervals between 4:00 and 6:00 PM on Friday, December 6, 2002 and between 11:00 AM and 2:00 PM on Saturday, December 7, 2002, to coincide with the typical peak traffic volume periods. 6 610-TIS2.doc Copyright Q 2003 by DJK. All rights reserved. During the traffic volume iOV8n|nry pBh0j @ total Of20.O43vehicles per day k«pd\ VVeFe observed along Osgood Street north Of ConnDle[Ce VV@y OD e Friday. During the weekday evening peak hour a total of 1.873 vehicles per hour (Vph) were observed along Osgood Street. During the Saturday midday peak hour, 8 total Of1.243Vphwere observed along Osgood Street with 12'882Vpd observed ODSaturday. Table 1 summarizes the daily and peak-hour traffic YO|U[DBs observed throughout the study area. Figure 2 graphically presents the [eaV|tS Of the manual turning 0oVeDl8Ot counts. The raw traffic-count data CO||8C1ed for the project i5 contained in the Technical Appendix Of this [eporL TABLE EXISTING TRAFFIC VOLUME SUMMARY Daily Traffic Peak-Hour K Location/ (24 hour) Peak Traffic Volume Factorc Time Period (vpd)a Hour b Osgood Street north of Commerce Way: Friday 20.043 4:30-5:30 PM 1.873 9.3 December 20.2002 Saturday 12.882 11:30AM-12:30 PN1 1.243 9.0 December 21.2OO2 aVehicies per day. Vehicles per..... "Percent of daily traffioOGCUmng during the peak hour. � � r m0-rm2.d" Copyright Oc 2003 by DJK. All rights reserved. Figure 2: 2002 Existing Saturday Midday Peals Hour Traffic Volumes 0 SITE ro R.:6�hrL 1?p NNE BUTCHER BAY EXl Schematic MEEMMM DJKDermot J. Kelly Associates, Inc. Traffic Engineering/Transportation Planning Copyright ® 2003 By DJK. All rights reserved. 610NET1 FUTURE TRAFFIC VOLUME CONDITIONS INTRODUCTION This section of the report d8be0niOeS the traffic-related impacts of the proposed project on the study area roadway SyaUaDl. To dGte[nOiDB the impact Of site-generated traffic VO|UnO8S on the roadway network under � future COOditiODS' the existing \[8ffiC YO|UDleG in the study area were projected to the year 2008 to be CODSiSteDt with the COOO[0ODVvea!th Of K4@SSoChUSGttS Executive Office Of EOVinDDDn8Ot8l Affairs Guidelines for Traffic Impact Assessments. Traffic VU|U[neS OD � the n]3dVV@y network at that time will include all existing traffic, background traffic � growth, and the site-generated volumes. BACKGROUND TRAFFIC GROWTH Traffic growth OD area nJ8dVV@yS is 8 function Of the expected land d8Ve|OpOOeOt in the immediate area as well as the surrounding region. Several methods can be used to estimate this growth. A procedure frequently employed is LO identify the |OC3UOD and type Of new developments planned to ncCU[ during the designated p|8DDiOg horizon period, estimate the traffic to be generated and @SG|gD it to the area nD8dVV8Y network. This method USUa|\y produces 8 realistic estimate of growth for local traffic. The P|GUDiDg Office for the TOVVD of North Andover was CoDSU|t8d during the preparation Of this Study to identify existing and projected deYe|OpDO8Ut projects anticipated to occur by 2008. Based On this iOfO[0@UVD and Other background infn[rO8tiDO' existing traffic Vo|UO0es were increased by 2% per year Up through 2000 to GCCOUn[ for future developments not anticipated at this time. Figure 3 graphically presents the 2008 NO Build peak hour traffic VU|UOle conditions for the weekday evening and S3{U[d8y midday peak hOUnS. 8 mu-TIo .doc Copyright wz000uvoJx. All rights reserved, Figure 3: 2007 No Build Saturday Midday Peak Hour Traffic Volumes C0 0- 46) SITE rbo O CO 0" t1b, BUTCHER BAY EXI T tSchematic DJKDermot J. Kelly Associates, Inc. Traffic Engine ering/Transportation Planning Copyright @ 2003 By DJK. All rights reserved. 61ONETI SITE-GENERATED TRAFFIG VOLUMES Traffic volumes generated by car washes normally follow well-established D8tbeDlS with respect 10 magnitude and temporal diu[hbUUOD. KX88SVre[DeOtS Of two such developments published by the Institute of Transportation Engineers (|TE) JOU[08| have � established trip generation rates, which may be used for analysis purposes. The rates at which car VV8$h projects generate vehicle-trips depend OD DUnn8[OUs cODd\tiODS including adjacent [O@dvY8y traffic vO|U080. market conditions, VV88[he[' etc. Accordingly, the !TE Journal was researched with the appropriate vehicle-trip generation characteristics applied to the proposed project. Table 2 SUOlDl3FiZeS the peak hour and daily traffic generation characteristics for the p[OpO38d project. E33SSd OD the |TE JDU[O3| trip generation rates and other assumptions, it i5 anticipated that the proposed car facility would generate app[OXiDl8t8|y 708 vehicle-trips per day OD a peak day. This daily volume VVOU|d be split evenly with 354 vehicle-trips entering and 354 vehicle-trips exiting the site over the course Of the entire 24-hour day. More importantly, during the peak hour of the site, the project would g8nerate 3 total of � Up to OO vehicle-trips per hour with 40 vehicle-trips entering and 40 vehicle-trips exiting � the project Site. The [8Ol8iniDg vehicle-trips VVOU\d occur over the oOUrSe of the day. It ShDU|d be noted that the peak use Of the C8[ vV@Sh tunnel is anticipated to OCCUr OCC@SiOD8||y during the winter and early spring DlOnthS' typically OD a fair VVe8th8[ Saturday after an earlier SnDYVSto[D0. The peak use Of the detailing service bay is � anticipated 10 occur during late spring and/or summer [DDDthS. For this study the peak use Df the car wash tunnel and self-service bay were assumed iOb8coincidental. TABLE2 TOTAL GENERATED VEH|CLE'TR|PSUD8KU&RY Time Period/ Car Wash Ootai|inQ h Service Total Direction fTravel Tunnela Bay Vehicle-Trips PEAK USSE OF SITE Weekday Evening endlox � Saturday Midday � Entering (v h)c 27-35 1 86(40)d � Exiting (vlh) _22 -35 - 1 _36(40) | Tota| (vph) 54-70 2 73(80) | Peak Daily Traffic: Entering (vpd)e 270-358 4 354 � Exiting (vpd) _270-350 -4 354 Tota| (vpd) 548-700 0 708 � � al3ased on the Institute of Transportation Engineers(ITE)Journal article"Queuing Areas for Drive-Thru Facilities,"May � 1895 and based onK factor o|10%. � beaoodnn information provided hy the proponent through his engineering, ovph=vehicle-trips per hour. "Rounuedup for analysis purposes. evpd=vehicle-trips per day. mor/sz.doc Copyright m2003 byomAll rights reserved. � TRIP DISTRIBUTION/ASSIGNMENT [)ineCU0Oa| dis1hbU\kJD of generated trips to and from the proposed development is expected to fO|}OVV existing b@ffiC patterns which, in tUrn, is a function Of pOpU|aUVD densities, shopping opportunities, areas Of 8nlp}oyrn8Dt and r8c[88tioDg| activities. ACCOnjiDg|y, the directional split Of the new trips originating [nJr0' or destined to, the � development was based OD 8XiSUDg traffic patterns as observed for this study. Table 5 sUDl[0@[izeS the @CtV8| traffic distribution and assignment Ofsite-generated trips. � The site-generated 1r@0C volumes were SVp8hrOpDsed onto the 2008 No Build traffic VO|UDle networks creating the 2000 EfUi|d traffic VOlUDle networks. Figure 4 graphically presents the 2008 Build weekday DlOrOiDg and evening peak-hour traffic Vo|UrD8 networks. TABLE3 PROJECT-GENERATED VEHICLE-TRIP ASSIGNMENT Proposed To/From To/From Site West Via East via Driveway Osgood Osgood � Time Period/ Total Street Street Direction o.Travel � PEAK USE OFSITE Weekday Evening anmYhr Saturday � Entehny (vph)a 40 24 16 � Exiting (vph) 40 — 24 16 Tnha| (vph) 80 48 32 Peak D »yTra ffic: Entering (v d)o 354 212 142 Exi1inQ-(vpd) 351 212 142 | Tota| (vpd) 708 424 284 � avehicle-trips "vvmoe-tripnpm,uay. � | / � � | / 10 � ��,,S2,doc Copyright @ 2003 by DJK All rights reserved. Figure 4: 2007 Build Saturday Midday Peak Hour Traffic Volumes Legend: xx Total Vehicle Trips Vehicle Lj (x) Site Generated Trips Only 00 C" LG rn 0 N SITE In 40 Out 40 Total 80 21 \-�0 t1b BUTCHER BAY EXI T Schematic Note: Neg = Negligible DJKDermot J. Kelly Associates, Inc. Traffic Engineering/Transportation Planning Copyright (D 2003 By DJK. All rights reserved, 61ONETI TRAFFIC OPERATION ANALYSIS To assess quality of flow along the study area roadways and intersections, an Intersection Capacity Analysis was conducted under the following analysis conditions: • 2003 Existing Traffic Volume Conditions ® 2008 No Build Traffic Volume Conditions ® 2008 Build Traffic Volume Conditions The Capacity Analysis will provide an indication of how well the roadway facilities serve the traffic demands placed upon them. METHODOLOGY Level of Service The primary result of capacity analysis is the assignment of level of service to a traffic facilities under various traffic-flow conditions.' The concept of level of service is defined as a qualitative measure describing operational conditions within a traffic stream and their perception by motorists and/or passengers. A level-of-service definition provides an index to quality of traffic flow in terms of such factors as speed, travel time, freedom to maneuver, traffic interruptions, comfort, safety, and convenience. Six levels of service are defined for each type of facility. They are given letter designations from A to F, with level-of-service (LOS) A representing the best operating conditions and LOS F the worst. Highway Capacity Manual(HCM 2000):Transportation Research Board,Washington,DC,2000. 11 610-TIS2.doc Copyright O 2003 by DJK. All rights reserved. � Since the level [f service 0fa traffic facility iS3 function Df the traffic flows placed upon it, such @ facility may operate 8t8 wide range Of levels 8f service, depending OD the time Of day, day[f week, O[ period Ofyear. Unsignalized Intersections The |8V8(S of service for UOSigD@|iZ8d iDtHcSeC|iODs are determined by application Of 8 procedure described in the 2000 Highway Capacity Ma8U@l.2 The procedure @cCOUnt3 for |8Oe configuration on both the minor and major approaches, conflicting traffic s(n88OO VUlU0eg' and type of iDhe[3Go(iDn CDDt[D| (STOP Ve[SUS YIELD). First, theoretical mD8XiO\UnD Or capacity f|UvV of vehicles for each DliOOr approach lane is C8|cU|8ted based on a gap analysis procedure. The capacities are then COnlp@rSd to the d8[D8Dd at the r8sV8CbVe minor approaches. The delay is then C8|CU|8t8d based on the n8|8UOOShip between the service rate and the degree of g8tU[@U0D. Table 4 3UnO[O8rizeS the relationship between |eVe|-Of-s8n/{oe and expected delay to minor street traffic. � TABLE LEVEL-OF-SERVICE CRITERIA FOR TWO-WAY STOP-CONTROLLED |NTERSECT|ONSa Level Average of Control Delay Service A <10 8 >10to15 � C >15to25 D >25hu35 E >35to6O F >5O aSource: Highway Capacity Manual, HCM 2000:Transportation Research Board, Washington,DC,2000, TRAFFIC ANALYSIS RESULTS Capacity 3D8|ySms have been CODdUCL8d at the study area intersection. Results of these � analyses are summarized below byintersection and are tabulated in Table 5. � Commerce Way at Osgood Street � The Commerce Way approach currently operates @t LOS B during the Saturday midday � hour and it will deteriorate slightly to LOS C under peak use day conditions. The left � turns from the Butcher Boy Shopping Center currently operate at [[)S FVVith the right- turns operating at LOS B. The L{}G F condition 8SSU0eS 1[8ffiC i8 not affected by the adiGDeDi traffic SiQD@i Consequently, the @[tUa| [eV8| Of Service is better than the C3|CUlB1ed delay. 2 /ighwoyCopocityManmal(HCM2O0O):Transportation Research Board,Washington, DC,eoo8. 12 610-T/az.doc � Copyright(D 2003 by DJK. All rights reserved. � TAB0E5 COMMERCE WAY ATOSGOOD STREET INTERSECTION LEVEL-OF-SERVICE SUMMARY Lnoatium9vokHour/ 2003 Existing 2008 No-Build 2008 Build Turning Movement Los" ACo~ Demand uoo ACID Demand LOS xuu Demand PEAKUSE&Ay Saturday Midday Peak Hour Osgood Street Eastbound Left-turn Movements A 8.8 7 A 9.0 7 A 9.3 36 Shopping Center Exit Northbound Left Turns F — 202 F — 202 F — 282 Northbound Right Turns B 11.0 82 B 11.3 82 B 11.5 82 Commerce Way Southbound Left-& Right- Turn Movements B 13.0 15 B 13.9 15 C 22.1 85 al-evel of service. °,"'"y"Control Delay p,^"''"s,"'"^=,. 13 m0-Tszdoc Copyright @ 2003 by DJK, All rights reserved. APPENDIX A. TRAFFIC VOLUME DATA B. INTERSECTION CAPACITY ANALYSIS 14 610-TlS1.doc Copyright(D 2003 by DJK. All rights reserved. TDC- Transportation Data Corporation P.O.Box 734 Natick MA 01760 `T/S: Chickening Road (Route 125) Office:508-651-1610 Fax:508 651-1228 File Name 02292A E/W: Butcher Boy Exit/Commerce Street Site Code 00000610 City, State: North Andover., MA Start Date 12/06/2002 ::lient: DJK/D. Kelly Page No 1 F , Chickering Road(Route 12 Commerce Street —5) Butcher Boy Mall Exit Chickermg Road(Route 125) From North From East From South From We-st Peels A ptp R —L—L�t P�.-j TA.PP Tod Right Total Thru Right h. Left Peds -1 4 -L�Thn-]Left Peds, Total P. Thru TPPI To. Start Time Right Tit ru T rUjLertj:Ped I LIP, Peak Hour Frorri-U:00 PM to 05:45 PM-Peak 1 of 1 Intersectio 04:30 PM n Volume 9 576 0 0 585 101 2 194 0 297 0 105 27 0 1080 31 0 13 0 44 2006 3 Percent 1.5 98.5 0.0 0.0 34.0 0.7 653 0.0 0.0 97.5 2.5 0,0 70.5 0.0 29.5 0.0 05:15 1 143 0 0 144 29 1 58 0 88 0 296 6 0 302 6 0 1 0 7 541 Volume 0.927 Peak Factor High Int. 04:30 PM 05:15 PM 05:15 PM 105:00 PM Volume 5 168 0 0 173 29 1 58 0 88 0 296 6 0 302 14 0 6 0 20 Factor 0. Peak 0.845 0.844 8 0.550 Chick enng Road(Route 125) Out In Total 1167 [-:r5 7=2 S 76 ---OFD--O L 7_ Right Thru Left Peds O Foil N g art= �T- orth 2 2 I12/6!2002 4:30:00 PM 12/6/2002 5:15:00 PM -4 0 E C'> Cars 0 Trucks o- +1 T Fp Left Thru Right Peds F 2710531_ 0 -1 -[=-_�_q L I— [---q-0--11 Awl =Iw-:11 Out In Total Ch9,cke,inQ Road(Rout.1251 TDC Transportation Data Corporation /S: Chickerin`Road ` 50-651-1229 File Name : 02292A E/W: Butcher Boy Ixit/[mnozcrccStreet G�cC de : 00000610 8�z�L)utc 12/O6/�OO� ri , State: ��ort6z��6over 2�/� � , , ' t: DTD[/D. KcUv Page No : 1 Groups Printed-Cars-Trucks Ch --Route 1-25) commerce—Stree—t -I Road(Route 125) Butcher Boy Mall E)dt ickering Road(I From West From North From East From Sou Start Time -Right 04:15 PM 4 134 0 0 17 0 39 0 0 205 10 0 7 0 2 t 418 26 0 Grand Total io 1127 O O 189 2 378 0 O 1938 01 58 O 28 O 3106 O � O�3 0s�3 ��O O QG�8 3Appmh4 t7 e83 O�D O� 0.0 66.7 0 33.3 0.0 | Tnta|Y6 0.5 28.6 UD 0.0 | 52 01 9.9 0.0 | VO 50.9 1.6 0�0 1.5 0.0 07 0�0 | Chickering Road(Route 125) Butcher Boy Mall Exit C ickering Road(Route 25) Commerce Street From North From East [�:A From South Right Thru From West PIP INC To Th Peds App ig�hht Left s gh Left �As App Total Total _E-,- -MIL- Total Total ..~~PM .. Volume S 576 O O 585 101 2 194 0 287 O 105 27 O 1080 31 n 13 O 44 2006 Percent 1.5 88.5 0.0 0.0 34.0 UJ 65.3 0.0 0.0 87.5 25 0.0 7I5 0.0 28.5 OU 05:15 1 143 O O 144 29 1 58 0 e8 O 296 0 0 302 8 . O 1 O 7 541 Volume oaz7 Peak � Factor | High|nL 04:30 PM 05:15 PIA 05:15 PM 05:00 PM Volume 5 168 U O 178 zS 1 58 O 88 0 28$ s U 302 14 O 0 0 20 Peak O�04s | O.844 | n.8S4 \ 0.550 | Factor � A / H � � ���� �� /. ` � Transportation Data Corporation 4/3� � 8»�JO{ont* 125 wm�� ruu��= °"���°"""" File Name � O22q2/� ' ~ ` � 5i��Co�c ' U00OO61O tI�� �n�6crDmyRr�/Co��c�c �hc� . ' - ' Start Date ' 12/O6/200� (J1v �m1c� ��nrt6�u�6o�cc IV[A . , , -lient: DJK/D. Kelly Groups Printed-Cars'' Page No 1 -------------I C-hh'ic-kering Roaa_(_Roufe_12�� Butcher Boy Mall E)dt Chickering Road(Route 125) Commerce Street From North From East From South From West Left Peds 04:30 PM 5 163 FI 21 0 46 i T 259 8 0 9 0 3 0 429 18 0 1824 Grand Total 17 1114 D U 199 2 378 � UO 8 1S24 tU o�O s5 O 32O 0V | 3770 App�h & 1�5 98.5 KO 0.0 o44 0.3 053 � V0 SO�g 31 O 67.9 0.0 21 � Total% 0.5 29.5 0.0 0.0 | 5.3 0 10.0 0.0 | 0.0 51.0 1.6 0.0 i 1.5 0.0 0 0.0 | Chickering Road(Route 125�_ Butcher Boy Mall EAt ickering Road( oute Commerce Street From North From East From South From West Start Time P tal Right T Total Tote Intersectio� 04:30 PM Volume 9 507 U o 576 101 o 194 O 297 O 104 27 O 1072 30 O 12 V 42 1987 Percent 1.6 e8.4 08 0.0 34.0 OJ 65.3 0.0 0.0 87.5 2.5 0.0 71.4 0.0 28.6 0.0 05:15 1 142 O O 143 29 1 58 V 88 O 294 O 8 300 8 O 1 o 7 538 Volume- UV2a Peak � Factor MigxInt. 04:30 PM 05:15 PM 05:15 PM 05:00 PM Volume 5 163 O O 168 29 1 58 O 81 0 214 0 U 3n0 14 O 5 O 19 Peak O�57 � | 0.044\ O.DS� | 0.553| Factor r i | | / - TDC_ Transportation Data Corporation PO.Box 734 Natick MA 01760 4/S: Chickcring Road (Route 125) Office:508-651-16 10 Fax:508-651-1229 File Name : 02292A E/W: Butcher Boy Exit/Commerce Street Site Code : 00000610 City, State: North Andover,MA Start Date : 12/06/2002 'hent: DJK/D. Kelly Groups Printed-Trucks Page No 1 ----F-Chickening Road(Route 125) Butcher Boy Mall Effnit Chickering Road(Route 125) Commerce Street From North From East From South From West Thru -Peds- Right e s Start T-hine R s _-Right E-Thrl Left Left Peds Int.Total 04:00 PM 2 3 0 0 0 0 0 0 0 0 1 0 6 04:15 PM 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 0 2 0 0 7 04:30 PM 0 5 0 0 0 0 2 0 0 2 0 0 0 0 0 1 2 04'.45 PM 0 1 0- 0 0 0 0 OAFO 0 0 0 -0 0 ------ 0 Total 2 9 0 0 0-------- 4 0 0 1 0 17 05:00 PM 0 2 0 0 0 0 0 0 0 4 0 0 0 0 1 0 7 05:15 PM 0 1 0 0 0 0 0 0 0 2 0 0 0 0 0 0 3 05:30 PM 0 1 0 0 0 0 0 0 0 1 0 0 0 0 0 0 2 0.5:4_5 PM 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0_1 --- ---- Total 0 4 0 o 0 0 6- 8 0 0 1 0 13 07 Grand Total 2 13 0 0 0 0 0 0 0 12 0 0 1 0 2 O � 30 Apprch% 13.3 86.7 U (w 0.0 0�0 0.0 0.0 0.0 100.0 0.0 0.0 33.3 0.0 661 0.0 Total% 6.7 43.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 40.0 0.0 0.0 3.3 0.0 6.7 0.0 _-Chickering Road -Butcher Boy Mall Exit hickkering Road(Route 125) Commer&istn�t From North From East _ From South From West t Tj fn-t -ri Peds -I- App.ERigh _ -,App. Total Time L=eft Total Total -9t., Right Pds Right ru Left Ped Right Thru Left Peds Right Th Left P!.ds j ht Total_5eak-Hour From 04:00 PM to 05:45 PM-Peak 1 of 1 Intersectio 04:30 PM n Volume 0 9 0 0 9 0 0 0 0 0 0 8 0 0 8 1 0 1 0 2 19 Percent 0.0 100. M 0.0 0�0 0.0 U 0.0 0.0 100. 0.0 0.0 50.0 0.0 50.0 0.0 0 0 05:00 0 2 0 0 2 0 0 0 0 0 0 4 0 0 4 0 0 1 0 1 7 Volume 0.679 Peak Factor High Int. 04:30 PM 3:45:00 PM 05:00 PM 04:45 PM Volume 0 5 0 0 5 0 0 0 0 0 0 4 0 0 4 1 0 0 0 1 Peak 0.450 0,500 1 0.500 Factor TDC_ Transportation Data Corporation P.O.Box 734 Natick MA 01760 ',4/S: Chickering Road (Route 125) Office:508-651-1610 Fax:508-651-1229 File Name 02292AA E/W: Butcher Boy Exit/Commerce Street Site Code 00000610 City, State: North Andover,MA Start Date 12/07/2002 --lient: DJK/D. Kelly Page No 1 5 A-F � _- x P PIPP —y _- hdChickering Road(Route 1�5) Butch Bo 11 E Cickerg Road ad(Ro ute 125) —-_-F--_- _Co mme rc-e Street From Nor th From East From S(Uth From West _T _ -r — - - - A App App. Start Time Fightj Thru Left Peds 0 � Right Thru Peds Total Right Thnu L eft Ped� To t.1=R ight FThru Le,ft0:ds�Aopta1 F—T.Int.t, ,I - -------- Peak Hour From 1 1:45 PM-Peak I of I Intersectio 11:45 AM n 1 Volume 6 542 0 0 548 79 3 202 0 284 0 414 6 0 420 7 0 2 0 9 1261 Percent 1.1 98.9 0.0 0.0 27.8 1.1 71.1 0.0 0.0 98.6 1.4 0.0 77.8 0.0 22.2 0.0 12:15 3 140 0 0 143 27 1 46 0 74 0 117 2 0 119 3 0 1 0 4 340 Volume 0.927 Peak Factor High Int. 12:15 PM 12:30 PM 12:15 PM 12:15 PM Volume 3 140 0 0 143 21 1 57 0 79 0 117 2 0 119 3 0 1 0 4 Peak 0.958 0.899 0.882 0.563 Factor —Chickering R65d(Route 125) Out In Total L-56��2L:::JOL:001 Right Thru Left Peds 4J L* ;10 C\j (0 DO T (0 o North 2 217/2002 11:45:00 AM :E 12M2002 12:30:00 PM 9 E E 0 Cars m X 0 Trucks CD C.0) 4-] Left Thru Right Peds 6 51 E 42O 1T Out in Total Chickering Road(Route 125) TDC- Transportation Data Corporation P.O.Box 734 Natick MA01760 �/S: Chickering Road (Route 125) Office:508-651-1610 Fax:508-651-I229 File Name : 02292AA E/W: Butcher Boy Exit/Commerce Street Site Code : 00000610 (-it-y, State: North Andover, MA Start Date : 12/07/2002 :Iient: DJK/D. Kelly Groups Printed-Cars-Trucks Page No : 1 ---------- ---Chickering-Rcad(Route 1-25) Butcher Boy Mall Exit------- Chickering Road-(Route-C25) Commerce Street From North From East From South ----From West Red Right Ri ht Thru Left Peds nt Left s gjMtj Thru Left P s Ri ht T_OtA] Thrj -- - --- 255 0 0 _ Start 11.00AIM 1 109 0 12 0 27 0 0 104 1 0 1 11:15 AM 0 118 0 io 18 0 36 0 0 96 0 0 0 0 1 0 269 11:30 AM 1 139 0 0 26 2 41 0 0 94 1 0 1 0 0 0 305 11:45 AM 1 129 0 0 11 0 47 0 0 112 2 0 0 0 303 Total 3 495 0 ---b- -046 4 --0 3 0 1 0 1132 70 15 5 1 12:00 PM 1 131 0 0 20 1 52 0 0 98 2 0 1 0 1 0 307 12:15 PM 3 140 0 0 27 1 46 0 0 117 2 0 3 0 1 0 340 12:30 PM 1 142 0 0 21 1 57 0 0 87 0 0 2 0 0 0 311 12:45 PM 1 114 0 0 14 1 42 0 0 104 2 0 0 0 1 0 279 Total 6 7 0 82 4 197 0 0 4-06 6 0 6 0 3 0 1237 01:00 PM 0 131 0 0 22 0 33 0 0 ill 2 0 3 0 1 0 303 01:15 PM 0 130 0 0 25 0 39 0 0 108 4 0 3 0 1 0 310 01:30 PM 0 110 0 0 16 0 46 0 0 117 2 0 2 0 0 0 293 01:45 PM 2 126 0 0 30 0 48 0 0 117 4 0 1 0------2 0 330 - - 93-6----f66 0 -- 4 0 1236 Total 2 497 6 Grand Total 11 1519 0 0 242 6 514 0 0 1265 22 0 18 0 8 0 3605 Apprch% 0.7 993 0. 0. 0,0 0.0 31.8 0.8 67.5 0 0.0 98.3 1.7 0 69.2 0.0 30� 0 8 .0 Total% 0.3 42.1 0,0 0.0 6.7 0.2 143 0.0 0.0 35.1 0.6 0.0 0.5 0.0 0.2 0.0 Ma Commerce Street Chickering R-oad(Route,te 125) Butcher Boy Mall )at --T-­Chi.kering Road(Route 125) From From Noah From East From South From West Ap Total App Total 411 _--A-p t Left F Pe T T 9 PJR�, h P-e - ------ Left F ed�F Wester Tot Agpp.�-R I-, Left Ep. Pdr Right�Thru Start Time Right Thru Right Thru ds ht To Total _Total �5eaR- our m 11:00 AM to 01:45 PM-Peak I of 1 Intersectio 11:45 AM n Volume 6 542 0 0 548 79 3 202 0 284 0 414 6 0 420 7 0 2 0 9 1261 Percent 1,11 98.9 0.0 0.0 27.8 1.1 71.1 0.0 0.0 98.6 1.4 0.0 77.8 0.0 22.2 0.0 12:15 3 140 0 0 143 27 1 46 0 74 0 117 2 0 119 3 0 1 0 4 340 Volume 0.927 Peak Factor High Int. 12:15 PM 12'30 PM 12:15 PM 12:15 PM Volume 3 140 0 0 143 21 1 57 0 79 0 117 2 0 119� 3 0 1 0 4 0,56 Peak 0.958 0.899 0.882 3 Factor TDC- Transportation Data Corporation PO,Box734 Natick MA 01760 N/S: Chickering Road (Route 125) Office:508-651-1610 Fax:508-651-1229 File Natne 02292AA E/W: Butcher Boy Exit/Commerce Street Site Code 00000610 City, State: North Andover, MA Start Date 12/07/2002 Client:DJK/D. Kelly Groups Printed-Cars Page No 1 Chicken ng Road(Route 125) Butcher Boy Mall Exit Chirkering Road(Route Commerce Street From North From East From South From Wes Left P -----Yh--ru-F-Left T-Peds Right Thru Peds Int.Total 11:00 AM Start ta ar rt t Tji�e ru -------- _Left 251 0 1 0 0 0 Right T 1 0 12 0 27 0 0 102 1 0 266 11:15 AM 0 116 0 0 18 0 36 0 0 95 0 0 0 0 1 0 299 11:30 AM 1 134 0 0 26 2 41 0 0 93 1 0 1 0 0 0 297 11:45 AM 1 128 0 0 11 0 47 0 0 107 2 0 1 0 ----0 0 ---- Total 3 485 0 -6-1­67 2 151 0 0- 397 ------------0- 3 1 0 1113 12:00 PM 1 128 0 0 20 1 51 0 0 96 2 0 1 0 1 0 301 12:15 PM 3 136 0 0 27 1 46 0 0 116 2 0 I 3 0 1 0 335 12:30 PM 1 138 0 0 21 1 57 0 0 83 0 0 2 0 0 0 303 12:45 PM 1 112 0 0 14 1 42 0 0 100 2 0 0 0 1 0 273 Total -6- 61-4-- 6 0 82-­�4--­1 96 0 ------0--365 6 0 6 0 3 q 1-212 01:00 PM 0 129 0 0 22 0 33 0 0 108 2 0 3 0 1 0 298 01:15 PM 0 127 0 0 25 0 39 0 0 104 4 0 3 0 1 0 303 01:30 PM 0 108 0 0 16 0 46 0 0 116 2 0 2 0 0 0 290 01:45 PM 2 125 0 0 30 0 48 0 0 115 4 0 1 0---- 2 0 327 Total 2 489 0 6 93 6 166 --b-443------ 0 9 4 0 1218 - Grand Total 11 1488 0 0 242 6 513 0 0 1235 22 18 0 0�0 3543 0� 0 30�88 0 Apprch% 0.7 99.3 0.0 0.0 31.8 0.8 67.4 0 0.0 98.2 1.8 0.0 69.2 0.0 Total% 0.3 42.0 0.0 0.0 6.8 0.2 14.5 0,0 0.0 34.9 0,6 0.0 0.5 0.0 0.2 0.0 -Butcher B-0- Chir-kering Road(Route 125) Boy Mall E Chickering Road(Route 125) Commerce Street From North From East From South ds App From West Tota ppil App Int. 7A9ptp Right Thru Left Peds Tot. Total Start Time Right Thru-[ Left Peds T at h -h. Tod at t Left Peds =Right hru Le Ped � Total Tru E To a Peak-Hour From 7l-1:00 AM to Peak I of I Intersectio 11:45 AM n Volume 6 530 0 0 536 79 3 201 0 283 0 402 6 0 401 7 0 2 0 1 1236 Percent 1.1 98,9 0.0 U 27.9 1.1 71,0 0.0 0.0 98.5 1.5 0.0 77.8 0.0 22.2 0.0 12:15 3 136 0 0 139 27 1 46 0 74 0 116 2 0 118 3 0 1 0 4 335 Volume 0.922 Peak Factor High Int. 12:15 PM 12:30 PM 12:15 PM 12:15 PM Volume 3 136 0 0 139 21 1 57 0 79 0 116 2 0 118 3 0 1 0 4 Peak 0.964 0.896 0.864 0.56 Factor TDC- Transportation Data Corporation PO.Box 734 Natick MA 01760 3/S: Cl-iickering Road (Route 125) Offine:508-651-1610 Fax:508-651-1229 File Nate : 02292AA i-'/W: Butcher Boy Exit/Commerce Street Site Code 00000610 City, State: North Andover, MA Start Date 12/07/2002 ;Bent: DJK/D. Kelly G Trucks Page No 1 ---F-T�-Ickehng Road­(Ro­ute-U�) ------- Butcher Boy Mall Exit Chickering Road(Route 125) commerce�stre Street From W� F From North From East From South Let --:L=eft -Pdr ft Start Tim. -:fR4iht -ThruT Right _I: nj._�T. l Right Left eft_E Peds ght:=Th- R_ ---------- 11:00 AM 0 2 0 0 0 0 0 0 0 2 0 0 0 0 0 0 4 11:15 AM 0 2 0 0 0 0 0 0 0 1 0 0 0 0 0 0 3 11:30 AM 0 5 0 0 0 0 0 0 0 1 0 0 0 0 0 0 6 11:45 AM 0 1 0 0 0 0 0 0 0 5 0 0 0 0 0 0 6 --Total -0-10 0 0 1 0 0 0 0 0 9 --6-0 - --0----O-- -6- 10 19 12:00 PM 0 3 0 0 0 0 1 0 0 2 0 0 0 0 0 0 6 12:15 PM 0 4 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5 12:30 PM 0 4 0 0 0 0 0 0 0 4 0 0 0 0 0 0 8 12:45 PM 0 2 0 0 0 0 0 0 0 4 0 ---- 0 -0 -'0 0 0 6 Total 0 -13 0 0 0 1 6 0 1-1 0 0 0 0 0 0 25 01:00 PM 0 2 0 0 0 0 0 0 0 3 0 01 0 0 0 0 5 01:15 PM 0 3 0 0 0 0 0 0 0 4 0 0 0 0 0 7 01:30 PM 0 2 0 0 0 0 0 0 0 1 0 0 0 0 0 0 3 01:45 PM 0 1 0 0 0 0 0 0 0 2 0 0 0 0 0 0 3 b- b----- o 0 0- 0 0 0 18 Total 0 Grand Total 0 31 0 0 0 0 1 0 0 30 0 0 0 0 0 0 62 Apprch% 0.0 100,0 0.0 0.0 0.0 0,0 100.0 0.0 0.0 100.0 0.0 0.0 0.0 0.0 0.0 0�0 Total% 0.0 50.0 0.0 0.0 0.0 0.0 1.6 0.0 0.0 48.4 0.0 0.0 0.0 0.0 0.0 0.0 Chickering Road(Route 125) ---Efutcher­­Bc C ickering Road(Route 125) Commerce e Street _From North From East From South From West Ap-p. [ Peds App- Right Thru Left Peds Total ru Thru Left F APP App Start Time Wight eft eds Total Left Peds Total Right Total Total L-otail _ R71 1��P -I - --------- LT ---- i iedk-Howw From 11:00 AM to 01:45 PM-Peak 1 of 1 Intersectio 12:30 PM n Volume 0 11 0 0 11 0 0 0 0 0 0 15 0 0 15 0 0 0 0 0 26 Percent 0.0 100. 0.0 0�0 0.0 0.0 0.0 0.0 0,0 100. 0.0 0.0 0.0 0.0 U 0.0 0 0 12:30 0 4 0 0 4 0 0 0 0 0 0 4 0 0 4 0 0 0 0 0 8 Volume Peak 0.813 Factor High Int. 12:30 PM 10:45:00 AM 12:30 PM 10:45:00 AM Volume 0 4 0 0 4 0 0 0 0 0 0 4 0 0 4 Peak 0.688 0.938 Factor ATR Osgood Street north of TD Transportation Data Corporation site: 610 Date: 12/20/02 ►-cation Butcher Boy Site,N.Andover,MA 12 Walnut Street,#9 Natick,MA 01760 tent DJK/D.Kelly Dice:508-651-1610 Fax:508-651-1229 Combined Day: Friday _,jrval SB Begin AM PM AM PM AM PM 12:00 21 70 9 759 19 40 22 773 110 411 1,532 12:15 20 195 6 168 26 363 12:30 17 196 8 220 25 416 12:45 12 179 7 163 19 342 01:00 13 33 181 669 6 13 152 597 19 46 333 1,266 01:15 6 164 2 147 8 311 01:30 6 154 4 132 to 286 01:45 8 170 1 166 9 336 02:00 2 15 187 728 4 14 132 598 6 29 319 1,326 02:15 6 178 4 155 10 333 02:30 4 181 1 170 5 351 02:45 3 182 5 141 8 323 03:00 2 14 202 924 7 19 180 584 9 33 382 1,508 03:15 5 230 4 138 9 368 03:30 3 236 6 151 9 387 03:45 4 256 2 115 6 371 04:00 4 22 308 1,227 0 27 127 564 4 49 435 1,791 04:15 6 303 8 146 14 449 04:30 5 314 9 156 14 470 04:45 7 302 10 135 17 437 05:00 8 69 328 1,259 22 140 130 534 30 209 458 1,793 05:15 12 352 34 156 46 508 05:30 29 290 38 146 67 436 05:45 20 289 46 102 66 391 06:00 53 201 232 708 83 425 124 430 136 626 356 1,138 06:15 46 174 94 108 140 282 06:30 56 164 130 110 186 274 06:45 46 138 118 88 164 226 07:00 57 277 125 457 165 743 106 318 222 1,020 231 775 07:15 72 126 158 76 230 202 07:30 52 108 194 66 246 174 07:45 96 98 226 70 322 168 08:00 86 421 82 295 245 822 61 235 331 1,243 143 530 08:15 99 76 255 48 354 124 08:30 118 71 158 62 276 133 08:45 118 66 164 64 282 130 09:00 141 537 67 236 156 587 42 146 297 1,124 109 382 09:15 too 56 121 32 221 88 09:30 165 53 166 39 331 92 09:45 131 60 144 33 275 93 10:00 128 555 72 207 130 700 41 145 258 1,255 113 352 10:15 157 60 164 32 321 92 10:30 134 38 190 36 324 74 10:45 136 37 216 36 352 73 11:00 165 675 46 185 200 905 45 141 365 1,580 91 326 11:15 148 54 217 45 365 99 11:30 172 44 242 32 414 76 11:45 190 41 246 — 19 436 60 '0_tals­ 2,889 7,654 4,43-5 5,065 7,324 12,719 Splitp/0 39.4 60.2 60.6 39.8 )ay Totals 10,543 9,500 20,043 .)ay splits 52.6 47.4 '3eak flour 11:00 04:30 07:30 12:00 11:00 04:30 Volume 675 1,296 920 773 1,580 1,873 factor 0.89 0.92 0.90 0.87 0.91 0.92 Page: I i�_—Data File: �O2292 TDC- ATR Osgood Street north of Transportation Data Corporation Site: 610 L ation Butcher Boy Site,N.Andover,MA 12 Walnut Street,#9 Natick,MA 01760 Date: 12121/02 C nt DJK/D,Kelly Office:508-651-1610 Fax:508-651-1229 Interval N13 SB —==—_ —Combined Day: Saturday Begin AM PM AM PM AM PM 2--00-21 ---6-4— 154-5­s-2 ---J-3 ----F3-4 143--5457-------54- 198-297 1,1-2-7— 2:15 21 154 24 140 45 294 12:30 14 142 45 133 59 275 12:45 8 132 32 129 40 261 11:00 13 29 130 513 13 32 119 493 26 61 249 1,006 11A5 6 138 8 122 14 260 01:30 7 148 7 133 14 281 01:45 3 97 4 119 7 216 )2:00 7 24 108 447 6 18 115 431 13 42 223 878 )2:15 10 127 4 107 14 234 J2:30 4 108 1 91 5 199 02:45 3 104 7 its 10 222 93:00 3 11 118 434 5 17 110 467 8 28 228 901 )3:15 1 103 3 98 4 201 03:30 3 110 5 120 8 230 03:45 4 103 4 139 8 242 04:00 3 25 100 396 10 35 92 367 13 60 192 763 04:15 3 104 9 95 12 199 04:30 4 94 12 96 16 190 04:45 15 98 4 84 19 182 05:00 9 45 145 433 4 38 101 359 13 83 246 792 05:15 10 104 4 94 14 198 05:30 12 98 12 82 24 180 05:45 14 86 18 82 32 168 06:00 18 104 96 363 21 120 94 327 39 224 190 690 06:15 31 92 28 66 59 158 06:30 29 96 35 83 64 179 06:45 26 79 36 84 62 163 07:00 28 147 96 318 64 214 102 283 92 361 198 601 07:15 40 84 50 66 90 150 07:30 46 68 42 56 88 124 07:45 33 70 58 59 91 129 08:00 42 261 66 238 80 350 50 180 122 611 116 418 08:15 62 43 73 44 135 87 08:30 61 61 95 44 156 105 08:45 96 68 102 42 198 110 09:00 102 428 52 203 110 480 30 128 212 908 82 331 09:15 94 54 120 35 214 89 09:30 110 39 118 30 228 69 09:45 122 58 132 33 254 91 10:00 116 498 51 190 124 505 22 118 240 1,003 73 308 10:15 130 54 130 31 260 85 10:30 124 38 135 27 259 65 10:45 128 47 116 38 244 85 11:00 136 595 50 174 144 605 42 114 280 1,200 92 288 11:15 129 40 139 20 268 60 1130 161 46 168 26 329 72 11:45 169 38 154 26 323 64 Cotals 2,231 4,291 2,5-4 8 3,812 --4,779 Splito/. 46.7 53.0 533 47.0 Say"Totals 6,522 6,360 12,882 Day Splits 50.6 49.4 Peak Hour 11:00 12:00 11:00 12:00 11:00 12:00 Volume 595 582 605 545 1,200 1,127 Factor 0.88 0,94 0.90 0.95 0.91 0.95 Data File 02292B Page: 2 Two-Way Stop Control. Page I of I TWO-WAY STOP CONTROL SUMMARY General Information Site Information Analyst DJK Intersection Osgood Street at Agency/Co. DJK Associates, Inc. Commerce WaZ Date Performed 1127103 Jurisdiction North Andover, MA nalysis Time Period Saturday Midday Peak Analysis Year 2003 Existin2 Hour Project Description 610 Grasso, North Andover East/West Street: Osgood Street ::]North/South Street: Commerence WaZ Intersection Orientation: East-West IStud y Period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R Volume 6 414 0 0 542 6 Peak-Hour Factor, PHIF 0.83 0.83 1.00 1.00 0.85 0.85 Hourly Flow Rate, HFIR 7 497 0 0 639 7 Percent Heavy Vehicles 0 Median Type Undivided RT Channelized 0 0 Lanes 1 2 0 0 2 0 Configuration L T T TR Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R Volume 202 3 79 2 0 7 Peak-Hour Factor, PHIF 1.00 1.00 1.00 0.57 1.00 0.57 Hourly Flow Rate, HFR 202 3 1 79 3 0 1 12 Percent Heavy Vehicles 0 0 0 0 0 0 Percent Grade (%) 0 0 Flared Approach N y Storage 0 RT Channelized 0 0 Lanes 1 1 0 0 0 0 Configuration L TR LR Delay, Queue Len qt and Level of Service Approach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration L L TR LR v (vph) 7 202 82 15 C (m) (vph) 949 260 686 465 V/c 0.01 0.78 0.12 0.03 95% queue length 0.02 5.80 0,41 0.10 Control Delay 8.8 54.4 11.0 13.0 LOS A F B B Approach Delay 41.9 13.0 1 Lpproach LOS E B HCS2000TM Copyright 0 2000 University of Florida,All Rights Reserved Version 4.1 c file:HC:\D ocuments%20and%20S ettings\D errnot\Local%2 OS ettings\Temp\u2k I C.tmp 1/30/2003 Two-Way Stop Control Page I of I TWO-WAY STOP CONTROL SUMMARY General Information Site Information nalyst DJK Intersection Osgood Street at )c /Co. DJK Associates, Inc. Commerce Way Date Performed 1127103 Jurisdiction North Andover, MA Saturday Midday Peak Analysis Year 2008 No Build Analysis Time Period Hour Project Description 610 Grasso, North Andover East/West Street: Osgood Street :]North/South Street: Commerence WaZ Intersection Orientation: East-West IStud y Period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street Eastbound — Westbound Movement 1 2 3 4 5 6 L T R L T R olume 6 457 0 0 598 6 Peak-Hour Factor, PHIF 0.83 0.83 1.00 1.00 0.85 0.85 Hourly Flow Rate, HIFIR 7 549 0 0 706 7 j Percent Heavy Vehicles Median Type Undivided RT Channelized 0 0 Lanes 1 2 0 0 2 0 Configuration L T T TR Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L. T R L T R olume 202 3 79 2 0 7 Peak-Hour Factor, PHF 1.00 1.00 1.00 0.57 1.00 0.57 Hourly Flow Rate, HFIR 202 1 3 79 3 1 0 12 Percent Heavy Vehicles 0 0 0 0 0 0 Percent Grade (%) 0 0 Flared Approach N y Storage 0 RT Channelized 0 0 Lanes I 1 0 0 0 0 Configuration L TR LR Delay, Queue Len gt and Level of Service Approach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration L L TR LR v (vph) 7 202 82 15 C (m) (vph) 896 224 650 420 V/c 0.01 0,90 0.13 0.04 95% queue length 0.02 7.44 0.43 0.11 Control Delay 9.0 82.7 11.3 13.9 LOS A F B –B Approach Delay 62.1 13.9 IlApproach LOS F B HCS2000TM Copyright(D 2000 University of Florida,All Rights Reserved Version 4.1c file://C:\Documents%2 Oand%20S ettin gs\D ern-iot\Loc al%2 0 S ettings\Temp\u2k I 9.tmp 1/30/2003 Two-Way Stop Control Page I of I TWO-W ►Y STOP CONTROL SUMMARY General Information Site Information Analvst DJK Intersection Osgood Street at Agency/Co. DJK Associates, Inc. Commerce WaZ Date Performed 1127103 Jurisdiction North Andover, MA nalysis Time Period Saturday Midday Peak Analysis Year 2008 Build Four Project Description _610 Grasso, North Andover East/West Street: Osgood Street iNorth/South Street: Commerence WaZ Intersection Orientation: East-West IStud y Period (hrs): 0.25. Vehicle Volumes and Adiustments Major Street Eastbound — Westbound Movement 1 2 3 4 5 6 L T R L T R olume 30 457 0 0 598 22 Peak-Hour Factor, PHIF 0.83 0.83 1.00 1.00 0.85 0.85 Hourly Flow Rate, HFR 36 549 0 0 706 25 Percent Heavy Vehicles Median Type Undivided RT Channelized 0 Lanes 1 2 0 0 2 0 Configuration L T T TR Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R Volume 202 3 79 18 0 31 Peak-Hour Factor, PHF 1.00 1.00 1.00 0.57 1.00 0.57 Hourly Flow Rate, HFIR 202 1 3 79 31 1 0 54 Percent Heavy Vehicles 0 0 0 0 0 0 Percent Grade (%) 0 0 Flared Approach N y Storage 0 RT Channelized 0 0 Lanes 1 1 0 0 0 0 Configuration ----T-77= TR LR Delay, Queue Length, and Level of Service Approach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration L L TR LR v (vph) 36 202 82--.- 85 C (m) (vph) 883 185 636 294 V/C 0.04 1.09 0.13 0.29 95% queue length 0.13 9.83 0.44 1.17 Control Delay 9.3 145.1 11.5 22.1 LOS A F B C ,Approach Delay -- 22.1 Epproach LOS F F C HCS200OTM Copyright(D 2000 University offlorida,All Rights Reserved Version 4.1c file:HC:\Documeiits%20and%2OSettingsTermot\Local%2OSettings\Temp\u2klF.tmp 1/30/2003