HomeMy WebLinkAboutMiscellaneous - 280 GRAY STREET 7/21/2005 07/21/2005 THU 12:07 FAX 1781:. 9406 Litchfield Company (3j002/011
JUL-21-2005 11:32AM FROM-MILLER ENGINEERING 1-808-688-8641 T-828 P.001/010 F-142
MILLER ENGINEERING & TESTING INC$
FAX TRANSMITTAL
TO: Qw U l 1 l 4�L .Nate: r
,job Noe
Projects a-x�
Location:
FAX NO.
Attached,we are sending you the following:
1P_ Sa
v
Remarks:
THANK YOU,
Total No.Of Pages
Including Transmittal:_L0_ MIL'LE�R ENGINEERING&TESTING INC.
I3y: t r� o \k C
MILLER FAX: (603)668-8641
CORPORATE OFFICE: 100 Sheffield Road-PO BOX 4776-Manchester,NH 03108-TEL,(603)668.6016.-FAX:(603)668-8641
SATELLITE OFFICES: 130 East Main St.-P.O.BOX 1 I -Northboro,MA 01532-TEL,(508)393-2607-FAX:(508)393-8490
474 Dorchester Ava.-Boston,MA 02127—TEL:(617)269-8829-FAX:(617)269-8837
07/21/2005 TffTT 11 !.11A r ann Nr)- 7nA7 1 RAni
i
liuu J LLIUL UN tiUl"j 9G• t L 1lriL `�VUG/ LG/LU
Q
� G3f.IIt113J iN70d3d
r ry o N c�
�i a� o -
�,•,,.�.,(I � , -�• Ln Ln <o n• U.} Ali �
rli I i O
r.�.} .0 '^� lid, ,,,, ,7 ....... .. `...`.-- ..._. �.,� ....�.—�_._..,_ .._...•_�.. -..1.._�•_ W. ICS
ex
Ln
LLJ
LLJ LL
LLJ
LL/O�, yam, �F/ _ �� 4
Ln
CL
CIJ t
O �.
---1 -----�
-
LAJ
p rT) CO h. cP n ct r1 N O
' 1W4,)13M !-.8 83NId IN3383d
y7
4 V7
Ci
ZVH 010/900'd 626-1 P98-899-09-1 9NI433NI9N3 43111HIOU WWII 11 5002-1Z-1nr
TTn innn rfi SUUdUlo'J PIDT1401T 190V60LZTSLT XVA 80:ZT IIHI 5009/TZ/LO
07/21/2005 THU 12:07 FAX 178 09406 Litchfield Company 8003/011
JUL-21-2005 11:32AM FROM-MILLER ENGINEERING 1-803-668-8641 T-928 P•002/010 F-142
_1
t:l
to
4' I:,EF'IENT r NE R E,1 Vn 4':HT
rn
• m
r
1•I) ,,jT - - _... _..... .. Y '_' --. 1 ^- "i ? {1- ifs � 17 r
.•,rl
to rrl _ _ ....... . ..; .._. w m 7. I•p
F F, I,n
'1• I 1
r
C:
PEPCEviT RET-a1 fl-
' tea
C1:
R �
nv i91 /9AAA TMT s I •ad r.Tnu mn "Ina7 1 tfinn9
310 CUR: DEPARTMENT OF ENVIRONMENTAL PROTECTi
15.255: continued
(a) The retaining wall shall be constructed of reinforced concrete,shall have no weep
holes,and shall be waterproof.
(b) The retaining wall shall be designed by a Registered Professional Engineer,who shall
certify that the above condition is met by the submitted design.
(c) The upgradient side of the retaining wall shall be waterproofed.
(d) Construction of the retaining wall shall be supervised by the design engineer,
(e) An as-built plan shall be prepared and certified by the design engineer that the wall
has been constructed in accordance with his approved design plan.
(f) The elevation of the top of the retaining wall shall be no lower than the"breakout"
elevation,which is the elevation of the top of the two inch layer of 1/8 inch to%inch
washed stone aggregate cover.
(g) The distance from the wall to the edge of the leaching area should be at least ton feet.
(3) Fill material for systems constructed in fill shall consist of select on-site,or imported soil
material. The fill shall be comprised of clean granular sand,fine from organic matter and
deleterious substances. Mixtures and layers of different classes of soil shall not be used. The
fill shall not contain any material larger than two inches.A sieve analysis,using a#4 sieve,
shall be performed on a representative sample of the fill.Up to 45% by weight of the fill
sample may be retained on the #4 sieve. Sieve analyses also shall be performed on the
fraction of the fill sample passing the #4 sieve, such analyses must demonstrate that the
material meets each of the following specifications:
SIEVE SIZE EFFECTIVE %THAT MUST
PARTICLE SIZE PASS SIEVE
# 4 4.75 mm 100%
#50 0.30 min 10%_ 100%
#100 0.15 mm 0%- 20%
#200 0.075 ram 0%- 5%
A plot of the sieve analyses of the portion of the sample passing the#4 sieve shall fall on or
between the lines on the following graph:
F`Wffl(l Fz (-�JZE= J-
#200 #100 #50 04 Sieve Size
100
90
80
70
60
n_
W r)o
1 40
LI
0
n_-
30
20
10
0
Micron 60 200 600 2 6 10 MM
12/27/96 310 CMR-531
i
07/21/2005 THU 12:08 FAX 178, 99406 Litchfield Company' Ia004/011
JUL®21-20055 11:32AM FROM-MILLER ENGINEERING 1°609-668-8641 T-929 P.003/010 F-142
Wed Jul 20 15x53:01 2605 Page 1
GEOTECHNICAL LABORATORY TEST DATA
Project : 280 GRAY STREET,N AlWYEA MA Filename : L050533A
Project No. : 05,333.NH Depth ; 0-10 INCH$ e1cv4eion N/A
Boring No. N/A Teat Data : 7.20.05 Teased by DM/BM
Sample No. LOSOS33A TtAmt Method : ASTM checked by ; BC r
Location : IN PLACE MATMAL "
Sail Description = SAND
Remarku x 1YTLR 5 SAND
Pima SIRVE SET
slave sieve OpMndAgs Weight Cumultwive 8=scant
Mesh inches Millimeters Ret,71ned Weight Retained Finer
(9m) NO (t)
04 0.187 4,75 0.00 0.00 100
#10 0,079 2.00 18.00 18.00 95
1120 0.033 0185 85.10 73.10 80
if40 0.017 0143 89.70 162.80 56
050 0.012 0.30 55.70 218,50 41
060 0.010 0.25 28.90 241.40 3i-
#100 0.006 0.15 56.60 303.90 16
#200 0.003 0.07 43,30 347.20 6
Pan 22,70 369.90 0 .... -
To[al Weight oJ! Sample ,: 369.9
Tare Weight . 0 ''.....,.
Maiature content z 0
DOS 4-.1174 mm \V'< -S �+
D60 0.4766 mm �/ L1
T)50 0.3700 mm G�,C>ti 1 1 ',�C _7 ! t`c U �.' . �.._.
D30 ; 0.2253 mm
010
010 s 0.0938 mm
Soil elasailicanion
ASTM Group Symbol ; N/A
ASTM Group Name N/A
AAsHTO Group Symbol A-3(0)
AA81T'3'o1 GrauP Name : Sine Sand
67/2'1/2 06, TATT 9 9 t A4 r JnA Mn- 7AR7 1 0 nf)A
07/21/2005 THU 12:08 FAX 178," 09406 Litchfield Company Cj005/011
JUL-21-2005 11,39AM FROM-MILLER ENGINEERING i-603-666-8641 T-926 P.004/010 F-142
i
�i
Wed Jul 20 15:51:28 2005 cage 1
GWTBC$NICAL LABORATORY TEST DATA
Project : 280 GRAY sTRRRT,N ANDOVER,MA Filename : LOS0533A
Pt4jece Na. 05.233,NH Depth t 0-18 INCHS Elevation N/A
Boring No. N/A Test Date : 7-20-05 Tf-oted by DM/PM
Sample No. !.0505331 Test Method : As'A4 Checked by BC
Location : IN PLACE MATERIAL.
Soil Description : SAND
Remarks TITLE S SAVD r
COARSE SIM SET
siove Sieve openings weishr cumulative Percent s
Meth Inches Millimetets Retained Weight Retained Finer
(9m} 44m} ca}
1.511 1.500 39.10 0.00 0.00 100
1. 1.000 25.40 267,60 287.60 95
a.IV 0.752 19.10 42.40 330.00 94
0.5" 01500 12.70 82.30 412.30 93
,0.375tt 0.375 9-52 71.30 483.50 92
T}q O.ltt7 4.75 161.90 445.50 99
Total Wpighe Of Sample - 5701.6
Tare Weight - 0
PINE SIEVE SET
sieve SiOVC openings Woighu CumulativC PercEne
Mcuh Inches MillimeGCSa Retained Weight Retained Finer
(gm) (gm) 60
q;;Lo 0 079 2.00 igloo 18.00 85
020 01033 0.85 55.10 73.10 71
#40 0.017 0143 89.70 162.80 50
i
050 0.012 0.30 55.70 210.50 36 1
#60 0.010 0125 28.90 247.40 29 9
i
4100 0,006 0.15 56.50 303.90 f.6
1200 0.003 0,07 43.30 347.20 5
Pan 22.70 369.90 0
Total Weight or; sample = 369.9
Tase Weight 0
Moisture Content - 0
DOS 2,3050 mm
D60 s 0.5913 M
D50 0,4286 mm
D30 0.2538 (AM
DI5 0.1416 mm
D10 0.1008 mm
Soil clacri.gicati6n
ASTM Group Symbol N/A
A9TM Group Name N/A
AA5$TO Group Symbol : A-1-b(0)
AASKTO Groups Na(AP stone Fragments, Gravel and Sand
1)7 191 i9nnf; TMT 11 .3d C.TnR wn_ 7 nA71 171 AAA
Final Construction Inspection - T )t 1 Gray Street Page 1 of 1
DelleChiaie, Pamela
From: Lisa LeVasseur[lisal @millriverconsulting.com]
Sent: Friday, July 22, 2005 11:15 AM 1
To: Sawyer, Susan; amcbrearty @millriverconsulting.com; DelleChiaie, Pamela;
dano @millriverconsulting.com
C on - Str eet
I p . Lot 1 Gray Str �
Subject: FW: Final Construction Ins e ti
This final inspection is for today, 7-22 at 4:00.
Lisa LeVasseur
Mill River Consulting
Yemr°Complete Sourcefior Ons°ite Wustewaler/llanai ernent
2 Blackburn Center
Gloucester, MA 01.930-2250
978-282-0014 or 1-800-377-3044
fax: 978-282-0012
www.nli1lrivercoiisulting cAoin.
-----Original Message-----
From: DelleChiaie, Pamela [maiIto:pdellechiaie @townofnorthandover.com]
Sent: Thursday, July 21, 2005 4:36 PM
To: Daniel Ottenheimer (E-mail); Lisa LeVasseur (E-mail); McBrearty Andrew (E-mail)
Cc: Sawyer, Susan; Grant, Michele
Subject: Final Construction Inspection - Lot 1 Gray Street
Please schedule a final const. inspection here and let us know when all set. Skip's number is: 978.664.2126.
Thank you.
8asf Ragards,
PuH,raBl►A000064ia110
Health Department Assistant
Town of North Andover
400 Osgood Street
North Andover,MA 01845
978.688.9540-Phone
978.688.8476-Fax
http://www,townofiic)rthan over.(;oni
healthdept @townofnorthandover.com
7/22/2005
DelleChiaie, Pamela
Subject: Updated: Susan & Michele-Final Grade Inspection - Bob Innis/NEES
Location: 240 (aka-Lot 4) Gray Street
Start: Mon 8/8/2005 12:00 AM
End: Tue 8/9/2005 12:00 AM
Show Time As: Tentative
Recurrence: (none)
Meeting Status: Not yet responded
Required Attendees: Sawyer, Susan; Grant, Michele
Optional Attendees: McGuire, Mike
Importance: High
8/5/05- Not ready for FG Inspection. Change to Monday, per Susan @ 1:45 p.m.
Note: Check out Lot 1 Gray Street while you are out there. They have not called as of today(Friday) but may be ready......
Setup FG Inspection - Per Susan's request 8/4/05 @ 1:30 p.m. -she spoke with Bob Innis
Note: Ben needs to change some things on the As Built
So, the comments below show he did it, but it is not the full filled out sheet. He probably hasn't sent it.
Susan -----Original Message-----
From: DelleChiaie, Pamela
Sent: Wednesday, August 03, 2005 8:52 AM
To: Sawyer, Susan
Subject: FW: 240 aka Lot 4 Gray Street
I don't know if you received this in the Word format or not. If you have it, can you send it along,just in case I get it from you
before him. Tx!
P -----Original Message-----
From: DelleChiaie, Pamela
Sent: Wednesday, August 03, 2005 8:50 AM
To: 'Andy McBrearty'
Subject: RE: 240 aka Lot 4 Gray Street
Hi Andy,
I cannot open your attachment. Can you send it in Word format?Thank you.
-----Original Message-----
From: Andy McBrearty [mailto:amcbrearty@millriverconsulting.com]
Sent: Tuesday, August 02, 2005 5:09 PM
To: DelleChiaie, Pamela
Cc: Daniel Ottenheimer (E-mail); Lisa LeVasseur(E-mail)
Subject: Re: 240 aka Lot 4 Gray Street
Hi Pamela,
I thought we sent this, but ... Here is the Final for Lot 4/240 Gray Street. There were a couple of issues
1
herc;
Sue noted that the fill around the tank was unacceptable, and needed to be removed. At inspection
time, it was still there. My bet is that he did not remove it. Sue and I talked about this a week or
so ago.
He did not use stone under d-box. I let this pass,but requested that he install speed levelers on D-box
and hydraulic all pipe junctions to the tanks and d-box.
The original design did NOT require a barrier. Innis did not cut chambers, so his field is longer than
the design called for. I talked with Ben Osgood and Ben was supposed to stake out the edge of
the fill so that breakout is met. You might check with Ben on this before final grade inspection.
-andy
DelleChiaie, Pamela wrote:
Hello,
Can you send me the Final Construction Inspection Report for the above? I have on record that the
request came in on 6/27/05, but I don't show anything in e-mail coming in. Thanks!
4610st q.004Ads,
Health Department Assistant
Town of North Andover
400 Osgood Street
North Andover,MA 01845
978.688-9540-Phone
978.688.8476-Fax
�511tt jjj
Ld-ov er se o i i i>
W 1 th-a c t.@),t o h A P A L)N1 Q L,CQ 1 n, j 11 iffl tQ:.h('�d,0 A&p i @ L(1)Ll_0 C,lo-Et 11 a x1d 9 Q o i:n- t
2
i
i
d
C N N N �'•
0
A OON OQ', _
0 0 C) rn I-o d�7 FN
arc? .,
rn
0 0 o CI r, ..— o tp
(10'
N
{
��--
a 1
171
pr�Gy m Q' Z V
O �
z
V+ Q
1 ` 1
a
I a�Q
o
f) �
O fP
i
K l t
C• A � �
1 wrt C O
C itI t7
b O O
CD t7'
i
G b H
a
ro
?� r•• : Ir
uc o,
0 0 �
0