Loading...
HomeMy WebLinkAboutCorrespondence - 200 CHICKERING ROAD 2/10/1997 MHF Design Consultants, Inc. 12-B Manor Parkway•Salem, NH 03079 •TEL(603)893-0720• FAX(603)893-0733 February 10, 1997 Mr. John C. Chessia, P.E. Coler& Colantonio, Inc. 101 Accord Park Drive, Suite One Norwell, Massachusetts 02061-1685 Re: Revised Site Plans Proposed Retail Site 200 Chickering Road MHF #45996 Dear Mr. Chessia: Please find enclosed revised plans and drainage calculations for the above referenced project located at 200 Chickering Road in North Andover, Massachusetts. These plans have been revised based on comments from the Town Departments as well as comments outlined in your November 27, 1996 correspondence regarding this project. Based on those comments we offer the following: 1. Comment acknowledged. 2. Response back from MEPA has been received (Copy attached). No further review is -necessary. The northerly driveway has been eliminated from the revised plans. The curb cut application has been submitted to MDPW for review. 3. The drainage easement shown on Sheet 4 reflects a drainage easement that was granted in 1931 for a ditch from a proposed culvert that was to be constructed at this location. (See attached easement description and plan.) Since this culvert does not exist, there appears to be no need for this drainage easement. 4. The table for zoning information has been completed. 5. The transformer and utility pads have been relocated outside the 15 foot buffer zone. 6. Building elevations are included. i i ENGINEERS PLANNERS SURVEYORS MHF Design Consultants, Inc. 7. The site has been revised to accommodate the turning radius for the WB-50 design vehicle. However, this type of truck delivery is not anticipated at the site. We have indicated to the Planning Board that box truck type of delivery vehicles will be making deliveries to the site given the small size of the retail units which are proposed for then site. 8. The proposed sign for the site is shown. 9. The report has been revised to show pre and post development flows from the site. These are identified in Exhibits A, B and C in the report. A table of comparisons for Pre and Post development flows has also been provided with and without detention for comparison purposes. The ultimate discharge for runoff from the site is via an end section at the southwesterly corner of the property. The discharge will be conveyed to a grassed treatment Swale and level spreader prior to flowing to the downstream wetland areas of the site. 10. The RCN number for the site was changed to a grass woods combination with a RCN value of 82.0 11. The time of concentration(tc) for the site under predeveloped conditions was calculated utilizing the Lag Method based on the hydraulic length and average slope of the watershed. The calculated time of Concentration was determined to be 9.2 minutes versus the 30 minutes used by the previous calculation which resulted in a higher peak flow rate under predevelopment conditions. 12. The underground stormwater detention systems have been redesigned utilizing a chamber type system ("Infiltrator Chambers"). The design for the proposed systems and the criteria used to size the systems, including the outflow structures are included in the revised report and plans. Additional design information which was requested for the previous system have been provided for this new design for your review. 13. Comment acknowledged. 14. The design has been revised accordingly. 15. Roof drains have been shown on the attached plans. 16. Hydrant locations have been changed accordingly. i 17. Comment acknowledged. All pipes have adequate cover. RINOW MHF Design Consultants, Inc. 18. Details of the pipe outlet protection apron have been shown on the revised plans and are detailed in the drainage report. 19. Details of the stormdrain manholes are included on the revised drawings. 20. Details have been revised to show the one foot " shoulder"behind the proposed curb and is also reflected on the grading plan. We are tentatively scheduled for a March 4, 1997 meeting with the Planning Board and would like to resolve as many outstanding items as possible prior to that meeting. Please review the attached plans and drainage calculations and should you have any questions, please feel free to contact me at your convenience. Sincerely yours, MHF W N T S, INC. Sincerely ours' N T S, 1 r n 0 ncipal c 4M c:, n-Colwell,Planning Director Mr. Steve Dubois, Scott Companies Atty. Peter G. Shaheen z WILLIAM'F.WELD GOVERNOR ARGEO PAUL CELLUCCI Tel: (617) 727.9800 LIEUTENANT GOVERNOR 2 (�(�� Fax: (617) 727-2754 TRUDY COXE DEC la 41 0 II SECRETARY vV,I6uants tnc. December 23 , 1996 CERTIFICATE OF THE SECRETARY OF ENVIRONMENTAL AFFAIRS ON THE ENVIRONMENTAL NOTIFICATION FORM PROJECT NAME : Old Town Village PROJECT LOCATION : North Andover EOEA NUMBER : 10967 PROJECT PROPONENT : Scott Construction Company DATE NOTICED IN MONITOR : November 22 , 1996 Pursuant to the Massachusetts Environmental Policy Act (G. L. c. 30, ss . 61-62H) and Section 11 . 06 of the MEPA regulations (301 CMR 11 . 00) , I hereby determine that the above project does not require the preparation of an Environmental Impact Report . This project involves the construction of 16, 900 square feet (sf) of retail space with 86 parking spaces on a 6 . 2 acre site on the west aide of Route 125 immediately south of Farrwood Avenue . The project will include two driveways, utilities, landscaping and a stormwater collection system. The project will require a curb opening permit from the Massachusetts Highway Department (MHD) . It is being reviewed by MEPA because the project is expected to generate more than 1, 000 vehicle trips per day. It also will require local approvals, including an Order of Conditions from the North Andover Conservation Commission. A traffic study prepared for the project indicates that the traffic impacts of the project are minimal . MHD concurs with this opinion. No formal traffic mitigation is required and design details for the curb openings can be developed during the permitting process . � I � William F. Weld Paul Cellucci James J. Kerasiotes Kevin J. Sullivan Governor Lieutenant Governor Secretary Commissioner December 11, 1996 Trudy Coxe Secretary , Executive Office of Environmental Affairs 100 Cambridge Street, 20th Floor � - Boston, MA 02202 . ,aar RE: North Andover - Old Town Village - ENF (EOEA# 10967) ATTN: Jan Reitsma, Assistant Secretary MEPA Unit Dear Secretary Coxe: The Massachusetts Highway Department (MassHighway) has reviewed the Environmental Notification Form (ENF) for the proposed Old Town Village project in North Andover. The project entails the construction of 16,900 square feet of commercial/retail space on a 6.2-acre parcel located in the southwest corner of the Route 125/Farrwood Avenue intersection. An existing floral shop and greenhouse will be demolished as part of this project. According to information included in the ENF, the project is expected to generate 1,446 new vehicle-trips on an average weekday. A MassHighway permit is required for access to Route 125. We believe that the overall traffic impacts of this project to the state highway system will be minimal, and we recommend that an EIR not be required based on traffic issues. The details of any access-related issues can be handled during the MassHighway access permit process for this project. If you have any questions regarding these comments, please contact me at (617) 973-7858 or Richard Bourr6 of the Public/Private Development Unit at (617) 973-8238. Sincerely, / � Tj n Luisa Paiewonsky,,�Director Transportation and Development Programs Massachusetts Highway Department• Ten Park Plaza, Boston, MA 02116-3973• (617) 973-7500 7 cc: T. Broderick, Chief Engineer C. Sterling, State Traffic Engineer P. Leavenworth, Acting DHD, District 4 PPDU files Planning Board, Town of North Andover Merrimack Valley Planning Commission 2 559 fe, to me, dated June 5, 1926, recorded with Essex North District ` 1 , Registry.of,Deeds, book.523, page 482, acknowledge satisfaction of the same.: .WITNESS'•my hand..and seal this sixteenth day of June, 1931.+ Commonwealth of..Massaehusetts.•Es- ) Mary J. O'Brien (seal) sex..ss. June, 16, 1931. :.Th'en.persenally appeared the above named Mary J.=O*Brian.and' acknowledged the foregoing instrument to be. her'free ac i a nd .deed,,rbefore me, Halbert:W...Dow, Justice of the Peace. My commis- Sion expires March 3,1933. �^ Essex ss:Received June.17,1931 at 30m past 4P.M.Recorded and Examined RNOW_.ALL.MEN BY;THESE.PRESENTS that I, Me;y O'Brien, being unmarried, asemlent North Andover; in the,County.of Essex and Commonwealth-of Massachu- 'Brien •setts r:for.myself my heirs; executors, administrators and assigns, IN to CONSIDERATION OF the sum of one,dollar paid by-the Commonwealth of Mas ommbnwel t h al ~ chusetts; through its Department of Public Works, established,under of Mas§achlsetts y , thet�p.rovisions•?of'Chapter 16 of the General Laws and acts in amendment ' r'" thereof and iri:,addition thereto, the receipt whereof is hereby acknowl a .. edged, do. ereby grant unto the said Commonwealth of Massachusetts and ee Ilan r84 : a itsttassi• s foreder the right to construct upon my land situated on the nortfiweaterly side of 'the proposed state highway in the.Town of '• r 'North'`Andover, `a. ditch extending from a culvert to be constructed acro s . said,highway.at or near station 48+93, to discharge water from said cul vert-:iato said ditch and upon my said land,to carry water away from said_ ' :: 'highway.+.and over and through my land above described, for public con- jvenience'and-for the proper construction and care of said highway, and to..,:enter upon my land at any. time for the purpose of constructing,re- pairing.an d maintaining said culvert, ditch and an outlet thereof, unde ;th6i;provisions of Section 4, Chapter 83 of the General Laws and acts n amendment thereof and in addition thereto; the proposed location o ssid.culvert, ditch and outlet being as shown on plan drawn by A.W.Dea i Chdef,VEngineer, dated May 5, 1931, and entitled: "The Commonwealth of Massachusetts,:Department of Public Works. Town of North Andover Plan f t of Proposed 157 Pipe Culvert and Outlet About Ste. 48+93 on the Pro- posed State Highway Scale: 40-feet to the inch" which is to be recorded 1 . ;' herew�t�. And" the consideration aforesaid I do accept said sum in i )• t :t 1 fulL payment-CT:--said easement and for myself and my'heirs, executors, .administrators-and assigns do hereby release the said Commonwealth of Massachusetts-.'and all'other persons from all damages that have arisen or may.hereafter arise by reason of the construction of said culvert i .� and ditch and the carrying of water away from the said highway and ove or through any of the land'hereinbefore described. And I do hereby,fo yse1P and my heirs, executors,:administrators and assigns covenant Kl` y � R,'ik,-�a'+� COMMONWEALTH OF MASSACHUSETTS , "� � DEPARTMENT OF .`�-` PU6LIC WORKS ; '> Xo ft am RJ rMT K1 TOW N OF NO TH AV4LJ Uv EL pIon of proposed 15 pipe Culve rfi and Outlet A�oUT 3TA.48t93 ONTHf= PRoQOS D { E STATE H\c„FaWAY Si SCAT E:40F'��TTOTl-[EII�IC}i Tf ilc� - FV CHIEF"_ENG1i�lE: FZ ,- °c� MAR`( O'BREN i r P Proposed F-L OP F-N CL L. _ - � proposed �� Location g -�+ �4c�eof Proposed D.I. pro osed fion � P Loc 54 _ 1, si- MHF Design Consultants, Inc. 12-B Manor Parkway•Salem, NH 03079 •TEL(603)893-0720 •FAX(603)893-0733 March 17, 1997 Mr. John Chessia, P.E. Coler& Colontonio, Inc. 101 Accord Park Drive, Suite One Norwell, Massachusetts, Inc. Re: Proposed Retail Site 200 Chickering Road MHF#45996 Dear Mr. Chessia: Please find enclosed a revised set of plans and drainage calculations for the above referenced project. These plans have been revised based on the comments outlined in your correspondence dated February 20, 1997 and March 10, 1997 regarding this project. Based on those comments we offer the following: From the correspondence dated February 20, 1997: i 1-2. Comment acknowledged. ;. As part of the curb cut application process, we will pursue release of this easement. 4-8. Comment acknowledged 9. The drainage report has been revised to reflect the additional information requested and two design points have been designated for the proposed analysis. The additional information for the existing 12" culvert has been provided as well. 10. Comment acknowledged. 11. The times of concentration have been recalculated as requested and can be found in the revised drainage report. 12-13. Comment acknowledged. 14. The design has been modified to eliminate the catch basin to catch basin arrangement. mow WMWW sm In= MHF Design Consultants, Inc. 15-20. Comment acknowledged. 21. Pipe material has been defined . 22. Comment acknowledged. 23. The easement has been relabled as grading and drainage easement. 24. Input data is shown on the exhibits and shown elsewhere in the drainage report. 25. The 20' easement label has been elimined. Based on the March 10, 1997 correspondence, we offer the following: 1. The revised drainage report and plans provide additional information and calculations to verify compliance with the applicable standards set forth in the Stormwater Management Policy. Section E of the drainage report describes in detail the compliance with these standards. Please review the attached information and should you have any questions, please feel free to contact me at your convenience. Sincerely yours, MI-IF GN O TS, INC. ark S. o , Principal cc: Mr. Steve Dubois, Scott Companies Atty. Peter Shaheen Ms. Kathleen Colwell;North Andover Planning Department ,, Mr. Micheal Howard,North Andover Conservation Commission