Loading...
HomeMy WebLinkAboutApplication - 168 GRAY STREET 3/8/2005 Town of North Andover HEALTH DEPARTMENT 27 Charles Street North Andover, MA 01845 97$.688,9540 hennitlid)fft�oowno igorthanrdo►er:com EPTIC PLAN SUBMITTAL, FORM ... DATE OF SUBMISSION: 6 �P, SITE LOCATION: ` . ENGINEER: ..° ° :.. ...w. NEW PLANS: YES ) $225°00/Pja,n---' . Check#: (Includes 1 �''ewPLA'V and one Re-Review Only) REVISED PLANS: YES $ 75.00/Plan Check#: SITE EVALUATION FORMS INCLUDED: YES NO LOCAL UPGRADE DE FO INCLUDED: YES NO Telephone#: � � .� ,� Fax#° HOMEOWNER NAME: OFFICE USE ONLY When the submission is complete (including check): 1. Date stamp plans and letter 2. Complete and attach Receipt 3. Copy File; Forward to Consultant 4 Enter on Log,Sheet and Database TOWN OF NORTH ANI)OVI�R 011"ice OMMI,JNI'[')' DP,VEI,011'MF:N' " ANI) SdKIIVICT"S Al I-IF"ALAII DIKI"AR"I'MENT 400 OSG'001) SIT FIF-1- N0RI"If AND0W."IR, MASSACHUSI'A"I'S 018,45 CKU Swian Y. Sawycr, Rd V,,,/RS 978 688 9540— 11howle Public I�Cafth Dife'dor 97 9 6 J542, F W;`X" April 17, 2005 Joseph J. Serwatka, P.E. P. O. Box 1016 North Andover, MA 01845 RE: Lot 14 Gray Street, North Andover, MA Dear Mr. Serwatka, The proposed septic system design plan for the above site location, dated September 28, 2004 with a revision date of March 1, 2005 has been reviewed. Unfortunately, it cannot be approved until the following items are corrected. Each item is followed by the specific section in Title 5: 310 CMR 15.000, or North Andover regulations which is not met by this design. 1. The title area of the first sheet indicates"Lot 14", please add"Gray Street" or some other clarifying notation. On the title area of the second sheet there is nothing to indicate which property the design is for; please indicate"Lot 14 Gray Street" or some other clarifying notation and the assessor's map and lot in the title block.-220(4)(u) 2. Please provide names of the abutters to the property-N.A 8.020). 3. Elevation of foundation drain is needed. —NA8,02y 4. Regarding soil logs, the name of witness is needed. Also, the observed water, or lack there of, must be noted. Additionally, Test Pit 14-4 is missing the soil class description for the C horizon.-220(4)(1x)&(i) 5. Percolation test elevations are needed. —NA 8.02n 6. Soil data should have name of soil evaluator(even though on sheet I there is a certification statement). -220(4)0) 7. Site plan must show distances between property lines and SAS and tank. —NA8.03 a-c 8. Distance between dwelling and SAS is 19.5' where 20' is required.-15.211, NA 5.02 9. A benchmark is needed within 50'-75' of the onsite wastewater system. The current benchmark is 140' to the farthest end of the SAS. -220(4)(q) 10. The septic tank is located within the 5' overdig. 11. Regarding the effluent filter, a maintenance schedule is required. Also, the name and type must be noted on the manhole cover. 12. The septic tank detail does not provide for the inlet or outlet tee to be located beneath an access port. —227(1) 13. Stock pile area is over the soil absorption system and could likely lead to inappropriate or accidental removal of soil horizons needed for the onsite wastewater system. Please move the location to a different portion of the site. - 246 14. Design calculations show 3 trenches at 5.5' width while these dimensions are depicted differently on other parts of the plan. d220(4)(f), NA 8.02i 15. The size of the orifices in the leach lines must be stated. ®251(8) 16. A wetlands disclaimer statement, if appropriate, is needed. —NA 8.02s 17. Elevation of the proposed driveway is needed. NA 8.02t 18. Please depict final grade on the site plan over the septic system. -200(4)(8) 19. Spaces between trenches must be 3x the width of each trench, or 10.5'. There is only 10' provided on the site plan, even though 10.5' is stated.-251(1)(d), NA 14.01 20. The Peastone must be specified to be double washed. -247(2) 21. Breakout elevation(198.53) is not provided for a distance of 15' from all trenches (there is only 15' from edge of some trenches to EL 198). —255(2), NA 9.02 22. On the profile, please provide the finish grade elevations over the septic tank, d-box, and trench. —220(4), NA8.02 23. Please clarify, in writing, the change in notation of the field data sheets submitted which read"Deep Hole Number 4315-01" and"Deep Hole Number 43-15-02". It is not clear that this data applies to the test holes and design plan for Lot 1.5. 4 No test p 4s or p erwrwoki lrrrr tesp : are located In the vl6�61:y r:rl 0ic proposed leach frr,,,nches, While jI is likely that 0e cr:nditior are cotisimeta tlrrLLorr r,hr:ut flrc prrrrprose( soil al;sorpr6mi `r st(-rri area, rrcldi6otrrrl cotifirmmgato ry WM holes and p er'colatio[r tests Mli ticed k.) be p ei,ftrrrr ed prior to palrrrr approval, Please feel free to contact the office with any questions you may have. We look forward to working with you to obtain a septic system which will be in compliance with all regulations and assure protection of public health and the environment of North Andover. Sincerely, Susan Y. Sawyer, REHS/RS Public Health Director cc: Owner File Joseph I Serwat>ra, P.E. Post Office Box 1416 North Andover,AM 0.1845 (978)-683®6595 October 13, 2005 . .. Mr. Susan Sawyer, Director f North Andover Health Department 400 Osgood Street � North Andover, MA 01845 Re: Lot 14, Gray Street Septic Plan Revisions Dear Ms. Sawyer: Attached please find revised plans for lot 14,Gray Street that address most of the issues in your April 17, 2005 review letter. Per our conversations, the plans are "technically" approved, but we have agreed to address as many issues as possible to demonstrate our cooperation. The revisions are as follows: 1, The titles on the sheets have been revised according to your letter. 2. The abutting lots are owned by Litchfield and Stella. This has been added to the plan. 3. The foundation drain elevation has been added. 4. The witness name has been added to the soil logs, as well as observed water. 5. Percolation elevations have been added. 6. The soil evaluator name has been added to sheet 1. 7. The distances are now shown on the plan. & The distance between the dwelling and SAS is specified as 20' and 22'. Any reputable installer will use stated distance before he attempts to scale the drawing and come to his own conclusions. 9. A benchmark has been added as requested. 10. The overdig has been adjusted to be away from the septic tank, although 1 am not sure this is a Title 5 requirement. 11. The effluent filter was added because we thought it would be a good idea. Typically the effluent filter is pulled out and hosed off whenever the septic tank is pumped. There is not special maintenance agreement, or manhole labelling required. We have removed the effluent Ater to avoid complications. 12. A note has been added to the detail that the tees must be located beneath the access covers. This will be verified during the multiple inspections during installation. 13. The soil stockpile area has been moved. 14. The design calculations have been revised to show 4 trenches. The 5.5 refers to square feet per foot, not width. 15. Although the contractor has no control over perforated pipe specs, the orifice size has been added to the plan. 16. A wetlands disclaimer is not needed. The wetlands line has been approved, as well as the proposed work, by the Conservation Commission. 17. Elevations have been added to the driveway. 18. Final grades have been added to the site plan. 19. The plan states 10.5' feet between trenches, and that is what the contractor must follow. If he scales the plan, or comes up with a different number, the installation will not be approved. I have not had a problem with a contractor not being able to use the numbers shown on a plan. 20. Peastone has been specified as double washed. 21. Breakout elevation has been provided. 22. Finish grades have been added to the profile, as minimums. 23. This review observation should apply to lot 15, not lot 14. In either case, the Town's consultant, John Noonan, labeled the test pits as applying to lot 13, but lot 13 is skipped in the subdivision. The surveyors staked the pits as 15-1 and 15-2, since they were located on lot 15. 24. The soils can be observed during installation. Additional perc tests are impossible, given the watertable. Should you have any questions concerning this letter, please contact me. Since Jos . J. Serwatka,P.E. Cc itchfield Company,Inc. TOWN OF NORT11 AN I)OVEAI Office of('�'OMMIJINITV 1.11 ELOPM EN"I' A N��[1) SERNIVES HEIALT'll DEF ART MEAT 400 OSGOOD STRI","E"T 11RT11 ANDOVER, MASSAOILISETTS M945 AC H U swsan )" Sawv(r 979,6980540 - Pliotle Public I lcahb ffireclor 978,6880542 F,�X October 23, 2005 Litchfield Company 126 Cambridge Street Burlington,MA 01803 RE: Subsurface Sewage Disposal System Plan for Lot 14 Gray Street,Map 107D, lot 16,North Andover, Massachusetts Dear Property Owner, The North Andover Board of Health has completed the review of the septic system design plans,for the above referenced property. These plans dated September 28, 2004,final revision date of October 13, 2005, have been approved for a five(5)bedroom,maximum 11-room home, Please note the conditions#2,3 below, As stated in the previous approval,the design has been approved for use in the construction of a new onsite septic system. This approval is valid for three years from the date of this letter and during this time a licensed septic system installer must obtain a permit and complete this work,and a Certificate of Compliance must be endorsed by the installer,designer and the Town of North Andover. This approval is subject to the following conditions: 1. Title V regulation section 1020—requires 2 deep hole observation tests in the primary and secondary disposal areas.Lot 2 primary and secondary areas only have 2 deep hole tests,both on the north side.According to agreements between the BOH representative and the engineer, the onsite decision was made to reduce the required number of tests for each system.In this case,due to the lack of soil information within the system,this plan approval conditions that upon construction at least one or possibly 2 confirming test holes will be conducted prior to allowing the installer to move forward with the system construction.Please note;this criterion is given on this particular lot due the Health Department's lack of action taken on this plan's first review within the 45-day review requirement. This lack of soil test within the Soil Absorption System would not be approved otherwise. 2. If site conditions are found in the field to be different from those indicated on the design plan and/or soil evaluation,the originally issued Disposal System Construction Permit is void,installation shall stop,and the applicant shall reapply for a new Disposal Systems Construction Permit(3 10 CMR 15.020(1)). 3. The issuance of the disposal works construction permit is contingent upon the receipt of a foundation as-built of the dwelling. The as-built must be in a scale of I"=20'. Also, if none exist within the building department,please submit a floor plan of the proposed home. 4. It is the responsibility of the applicant and/or the applicant's septic system designer, septic system installer or other representative to ensure that all other state and municipal requirements are met. These may include review by the Conservation Commission,Zoning Board,Planning Board, Building Inspector,Plumbing Inspector and/or Electrical Inspector. The issuance of a Disposal System Construction Permit shall not construe and/or imply compliance with any of the aforementioned requirements. 5. The final As-built must meet the minimum requirements as found on the attached sheet. In addition, it appears that the grades towards the road may extend into town owned property to meet breakout. The applicant will be required to show final grades on this As-built. This is to ensure that neither an easement from the Town of North Andover is necessary nor a wall will have to be constructed to achieve compliance to the code regarding break out. Your effort to provide a properly functioning septic system for your dwelling is greatly appreciated. The Health Department may be reached at 978-688-9540 with any questions you might have. Smcerel , san . Sawyer, /RS Public Health Director cc: Joe Serwatka,P.E. At.)� _ ° T Joy ' Professional Land Surveyors & Civil Engineers ESSEX SURVEY SERVICE 1958- 1986 OSBORN PALMER 1911 - 1970 October 23, 2006 BRADFORD&WEED 1885- 1972 Ms. Susan Y. Sawyer, Public Health Director RECEIV ED Town of North Andover Office of Community Development& Services 0 CT 2 00 Health Department N RTH ANDU VLK 1600 Osgood Street, Building 20 Suite 2-36 HEALTH PAF North. Andover, MA. 01845 RE: F13877 LOT 14 GRAY STREET N. ANDOVER, MA. Dear Ms. Sawyer: h7 the process of setting up Lot 14 for stake out by the survey crew, we determined a minor modification of the layout, as shown on the approved plan, was necessary to maintain 10.5 feet between the trench ends nearest the distribution box. The accompanying sketch shows Trenches I and 2 being moved approximately 4 feet to the northeast. Please do not hesitate to contact the undersigned or Clayton A. Morin, P.E. if there are any questions. Very truly yours, Ja-ncs_H MacDowel JHM:aIv Enclosure CC: The Litchfield Company 104 LOWELL STREET PEABODY, MASS. 01960 TELEPHONE: 978-531-8121 FAX: 978-531-5920 �R �r �1 }U i V9 7' U RECEIVED TO �3 i cz p z o h ✓ "� =� r v W 6 0 Cam/] F I C o W C!) 3 � � U y f� C W 00 GL C, o 1.0 o ° v7 Cd ® ; a > A (PO 0 E C U ti C? I 5 eC O O ° • r N z bf) C) C> v c o � by >, 1c; Ln i bfi q Qd I®r C7 Ply id C> C) Sol , VI 4 Q "`j' ® O is � y � 4a i. ~✓' `,!. W � a. a � W Ln r- C7 W 6 � V1 C7 C7 In N r. L/] Ln ° o a r Ra w cl� 4. b11 w bli VD km C,7 TOWN OF 11, RT _ ANDOVER 00WT r ® gg4an e H14 Office of COMMUNITY DEVELOPMENT AND SERVICES HEALTH DEPARTMENT i%4-00 OSGOOD STREET � x - A NORTH ANDOVER, MASSACHUSETTS 0184.5 Susan Y. Sawyer 978.688.9540—Plione Public Health Director 978.688.9542—F'AX October 23,2005 Litchfield Company 126 Cambridge Street Burlington,MA 01803 RE: Subsurface Sewage Disposal System Plan for Lot 14 Gray Street,Map 107D,lot 16,North Andover, Massachusetts Dear Property Owner, The North Andover Board of Health has completed the review of the septic system design plans,for the above referenced property.These plans dated September 28,2004,final revision date of October 13,2005,have been approved for a five(5)bedroom,maximum 11-room home.Please note the conditions#2,3 below. As stated in the previous approval,the design has been approved for use in the construction of a new onsite septic system.This approval is valid for three years from the date of this letter and during this time a licensed septic system installer must obtain a permit and complete this work,and a Certificate of Compliance must be endorsed by the installer,designer and the Town of North Andover. This approval is subject to the following conditions: 1. Title V regulation section 102C--requires 2 deep hole observation tests in the primary and secondary disposal areas.Lot 2 primary and secondary areas only have 2 deep hole tests,both on the north side.According to agreements between the BOH representative and the engineer, the onsite decision was made to reduce the required number of tests for each system.In this case,due to the lack of soil information within the system,this plan approval conditions that upon construction at least one or possibly 2 confirming test holes will be conducted prior to allowing the installer to move forward with the system construction.Please note;this criterion is given on this particular lot dace the Health Department's lack of action taken on this plan's first review within the 45-day review requirement.This lack of soil test within the Soil Absorption System would not be approved otherwise. 2. If site conditions are found in the field to be different from those indicated on the design plan and/or soil evaluation,the originally issued Disposal System Construction Permit is void,installation shall stop,and the applicant shall reapply for a new Disposal Systems Construction Permit(3 10 CMR 15.020(1)). 3. The issuance of the disposal works construction permit is contingent upon the receipt of a foundation as-built of the dwelling. The as-built must be in a scale of 1"=20`. Also,if none exist within the building department,please submit a floor plan of the proposed home. 4. It is the responsibility of the applicant and/or the applicant's septic system designer, septic system installer or other representative to ensure that all other state and municipal requirements are met. These may include review by the Conservation Commission,Zoning Board,Planning Board, Building Inspector,Plumbing Inspector and/or Electrical Inspector. The issuance of a Disposal System Construction Permit shall not construe and/or imply comps—.,ce with any of the aforementioned requirements. 5. The final As-built must meet the minimum requirements as found on the attached sheet. In addition, it appears that the grades towards the road may extend into town owned property to meet breakout. The applicant will be required to show final grades on this As-built.This is to ensure that neither an easement from the Town of North Andover is necessary nor a wall will have to be constructed to achieve compliance to the code regarding break out. Your effort to provide a properly functioning septic system for your dwelling is greatly appreciated. The Health Department may be reached at 978-688-9540 with any questions you might have. YSawyer, /RS Public Health Director cc: Joe Serwatka,P.E. .r... F OF SE\� ARC,E DISPOSAL Tanning,'NNlassa e'Body Art Swimnning Pools -� Sewer _ Tobacco Sales - Food Packaging'Sales Well Permanent Dumpster on Site Electric 'deter location to Private(septic tank,etc. A project NO'Z'E: Persons contracting with 1111r�gist ci!ca�itractors clo nut have access to the guaranty,16nd attire of A ent�Owner-___ _ .x Signature of Contractor____ Sign � �� ,.-�� - Plans Submitted Plans Waived Certified Plot Plan {Ir tamped Plans THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF-U FORM DATE REJECTED DATE APPROVED PLANNING & DEVELOPMENT ❑Water Shed Special Permit Site Plan Special Permit LJ Other COMMENTS w DATE REJECTED DATE APPROVED : CONSERVATION' 1 Cpl �1 'd G f� fig COMMENTS DATE REJECTED DATE APPROVED HEALTH COMMEN S Zonino Board of Appeals: Variance, Petition No:._ "Zoning Decision/receipt submitted yes planning Board Decision: ..---- _ Comments . . Comments Conserv�.�Cron Decision: ,__-_-__---- \k,'ltcr& Scva�er connection si,,nature&date T em p Dum stet on site es no___ Fire Department siUgnature date t p }. Building Permit Approved ,trid lsSUed by: — --