Loading...
HomeMy WebLinkAboutMiscellaneous - 236 GRAY STREET 4/13/2004 k: A a_� CHECKLIST FOR NORTH ANDOVER r S Job SEPTIC SYSTEM PLANS The following is a checklist that incorporates all Title 5 and local regulations for septic plans. Name of Applicant: :. / Name of Designer: f el Plan Date: Z3 C, Revision Date: Date of Review: 2 Zj -7�/C, Property Address: / rJ ,� Map: d t Lot: BOH Reviewer: �� e- Type of PIa ne or upgrade): Number of Bedrooms: — gpd) Garbage Disposal Allowed: General Information: N.A. =North Andover Septic Regulations Other numbers refer to Title 5 OK Problem N/A Street number and map/lot-220(4)(u) Maximum scale of 1 "=40'for plot plan -220(4) Maximum scale of 1 "=20'for profile and component details-220(4) 1 Legal boundaries of the facility being served-220(4)(a) Names of abutters from recent tax map- NA 8.02j Number of bedrooms,design calcs.,-NA 8.02i +— Name&address of record owner&applicant- NA 8.02k Name&address of designer-NA 8.021 Holder and location of all easements-220(4)(b) Date plan drawn&any revision date- NA 8.02m All dwellings and buildings,existing and proposed-220(4)(c) _ Location of all existing or proposed impervious areas-220(4)(d) ✓ All distances on site plan—NA 8.03a-c Elevation,of proposed driveway-NA 8.02t Location and elevation of foundation drain-NA 8.02y Location and dimensions of the system incl. reserve(new const.)-220(4)(e) Limits of excavation of leach area on site plan-NA 8.02z Locus plan-220(4)(t) (Not to scale) North arrow-220(4)(g) Existing and proposed contours-220(4)(g) Locations and logs of deep holes-220(4)(h) Locations and logs of percolation tests-220(4)(i) Date(s)of soil testing-220(4)(h)&(i) Existing grade elevation of each deep hole-220(4)(h) Elevation of percolation tests—N.A. 8.02n Name of approving authority representative-220(4)(h)&(i) Name of soil evaluator-220(4)0) Soil logs and perc test logs match BOH records Locations of waterlines, drains,and subsurface utilities-220(4)(m) Observed and adjusted g.w. elevation in the vicinity of the system-220(4)(n) Complete profile of the system to scale-220(4)(o),NA 8.02c Cross section of leaching facility-NA 8.02w (Not to scale) Location of benchmark(s)within 50-75 feet of facility-220(4)(q) Note listing all variance requests with proper citations-220(4)(p) �� Local upgrade approval request form submitted-403(1) 2 Original R.S./P.E. stamp, signature&date-220(1)&(2) P.E., discipline specified within stamp. MGL C. 112 s. 81M sfc. supplies(whn 400'),pub. wells(w/in 250'),pvt. wells(w/in 150')-220(4)( _ Location of watercourses,wetlands,wells, etc.Win 150'of system—NA 8.02r Wetland disclaimer—NA 8.02s RLS plan reference&certification required(prop line setbacks)-220(3) Plan contains designer's certification statement Use approvals/standards checked for I/A system-DEP does., , - Perc rate>30 MPI-not allowed for new,LUA for upgrade-245(1)&('3) - Perc rate> 60"1-must use modified tight tank or 11A technology-245(4) Proposed system qualifies as"shared"system-002(definitions) Flow is over 2,000 gpd-No RS. allowed-220(1) Design flow was set in accordance with code-203 Existing system location and note on proper abandonment-354 Leaching facility at least 1' above Base Flood elevation—NA 9.05 All piping Sch 40 minimum—NA 10.01 Basement floor minimum V above groundwater elevation—NA 5.04 Foundation drain present with elevation—NA 8.02y On-site Soil and Groundwater Review OK Problem N/A Proper deep observation hole logs on plan-220(4)(h) All deep holes and peres shown, including aborted tests—NA 8.02n Soil evaluation forms submitted within 60 days of field work-018(2) Proper percolation test log-220(4)(i) Ample deep observation holes in primary disposal area(minimum 2)- 102(2) Ample deep observation holes in secondary disposal area(minimum 2)- 102(2) Ample perc testing(one in each disposal area,3 in prim.>2,000 gpd)- 104(4) Deep hole testing conducted within two years—NA 7.05 Hole Identification Numbers: ground elevation el. acceptable soil el. Leach facility invert el. ground water el. refusal el. bottom of leach facility el. thickness of acceptable soil before&after soil R&R separation to groundwater separation to refusal soil class 2 3 perc rate loading rate septic tank below g.w. table (yes or no) pump tank below g.w. table (yes or no) l.f in fill -255(l) Setback Distances(Given in feet) 15.21 1 YES NO Is the lot in the Lake Cochiewick Watershed? NA 6.00&5.02 OK Problem N/A Septic Tank Leach Facility Property line 10 10 Cellar wall 10 20 -� Inground pool 10 20 Slab foundation 10 10 Deck,on footings,etc. 5 10 Waterline 10 10 c--"Private drinking well 75 100 Irrigation well 75 100 Wetlands 75 100 Public well 400 400 Wetlands bordering surface 150 150 water Supply or trib. (in Watershed) -' Trib. To Surface Water supply 325 325 Reservoirs 400 400 �---- 'Tributaries to reservoirs 200 200 Drains(wat. supply/trib.) 50 100 Drains(intercept g.w.) 25 50 Foundation drains 10 20 Drains(Other) 5 10 Drywells 20 25 Downhill slope 15'to 3:1 slope 3 4 w/o barrier Building Sewer OK Problem N/A w ' Grease trap required for certain uses(check 230 for details) Pipe diameter listed(4"minimum) 222(1) Pipe schedule listed-222(3) Pipe cast iron or Sch 40 PVC-NA 11.02 Watertight joints specified-222(3)&(4) - Pipe laid on compact,fin base-222(5) Pipe laid on continuous grade in straight line-222(7)@ �- Cleanouts precede all changes in alignment and grade-222(8) Cleanout provided every 100 feet-222(8) e Manhole at any 90 degree alignment change-222(8) Invert elevation at building: ' ,1d. t--.z Invert elevation at septic tank: 2.eD i Length of run: /e ' Slope: r1 L (minimum of 0.01 -0.02 desired)-222(6) 10'offset to private well or suction line-222(2) Septic Tank OK Problem N/A Tank is accessible-228(3) �— No structures above tank-(228(3) �-� Tank can accommodate both primary&reserve-NA 9.04 200%of flow(required&provided given. 1500 min.)-220(4)(fl&223)(1)(a) 2-3"drop from inlet to outlet-227(5) =- Minimum of 4'liquid depth-223(2) ^ 3"air space above teesibaffles(minimum)-227(4) 4 9"air space above flow line(minimum)-227(4) Tees are not to be replaced by baffles-227(1) Tees extend 6"above flow line-227(1) - Inlet tee extends 10"below flow line(minimum)-227(6) Outlet tee extends 14"below flow line(more for deeper tanks)-227(6) Gas baffle installed on outlet-227(4) Access manhole cover above center of tank&each tee(except 2 compart) 228(2) --'' 3-20"manholes-228(2) �--� 1 childproof 24"riser/manhole w/in 6"of final grade if<1000gpd-228(2) Inlet and outlet tees on center line-227(1) Soil compaction below tank specified(if soil is non-native)-221(2) 6"of<=3/4"stone beneath tank specified-221(2)&22 8(1) If> 1,000 gpd AND not a single fam. dwell.must be 2 tks or 2 comp.-223(1)(b) If plan specifies disposal must be 2 tanks in series or 2 compart.tank-223(1)(c) Buoyancy calcs.required if tank at or below water table-221(8) Tank is watertight-221 (1) 9"of cover over tank(minimum)-228(1) �- H- 10 loading(min.)-H-20 if traffic-226(3) _t r Top of tank<=36"below grade-221(7) -' All pumping to tank(if applies)in accordance with-229 Tank is set to keep old system in service during install if possible 4 5 Tight Tank(Check here if not present: ) OK Problem N/A 500%of design flow or 2000 gallons provided-260(2)(a) 3-20"manholes-228(2) Soil compaction below tank specified(if soil non-native)-221(2) 6"of<=3/4"stone beneath tank'specified-221(2)&228(1) Buoyancy calcs.Required if tank at or below water table-221(8) Tank is watertight-221(1) 9"of cover over tank specified(minimum)-228(1) H-10 loading(min.)-H-20 if traffic-226(3) Top of tank<=36"below grade-221(7) All pumping to tank(if applies)in accordance with-229 AN alarm set at 3/5 tank capacity-260(2)(c) Min. 1-24"frame w/cover at finished grade-228(2)(f) Year round access for pumping-228(2)(g) Distribution Bog(Check here if not present: ) OK Problem N/A Inlet elevation: `"- Y f Outlet elevation: �5 , e 0.17'drop from inlet to outlet(minimum)-232(3)(b) 6"sump(minimum)-232(3)(e) .... All outlets at same elevation-232(3)(b) Outlet pipes laid level for first 2 ft. -232(3)(c) Pipe Sch 40-NA 10.01 Number of outlets: Number of laterals: Size of outlets: Inlet baffleltee min. 1"over outlet invert for all d-boxes-232(3)(a), `? Soil compaction below distribution box specified(if soil is non-native)-221(2) 6"of stone beneath distribution box specified-221(2) Box is watertight-221 (1) 6 Top of box<=36"below grade-221(7) Buoyancy calculations required if box is at or below water table-221(8) Pump Chamber(Check here if not present: ) OK Problem N/A Volume specified: 220(4)(r) Pump on elevation- 220(4)(r) Pump off elevation: 220(4)(r) Alarm on elevation: 220(4)(r) Number of cycles per day-220(4)(r)(also 254(l)(d)if gravity from d-box) Minimum 2"delivery line to d-box if gravity-254(1)(c) Pressure dosed l.f if flow>=2,000 gpd-254(1)(a)&254(2)(a) Cycles per day is consistent with chamber volume-23 1 Volume calculations include flowback volume-2') 1(2) 5 6 24 hour storage capacity above pump on elevation-231(2) Number of pumps: 2 if system serves>2 dwelling units-231(6) Capacity of pump(s)- gpm @ 'TDH-220(4)(r) Pump can pass 1 1/4"solids(minimum)-231(7) Pump controls specified-220(4)(r) Alarm equipment specified-231(2) Alarm is in building and powered on separate circuit from pump-2') 1(9) Pump sequence correct(off-lead on-lag on-alan-n on)-231(8) Pump performance curves included-220(4)(r) Manual operating switch-NA 12.01 Check valve,bleeder hole-NA 12.01 1 childproof;24"riser/manhole to final grade-231(5), Soil compaction beneath pump chamber specified(if soil is non-native)-221(2) 6"of<=3/4"stone beneath chmbr. specified-221(2)&228(1), Buoyancy calculations if chamber is at or below water table-221(8)@ 9"of cover over chamber(minimum)-228(1) H 10 loading(min.)-H-20 if traffic-226(')), Chamber is watertight-221 (1) Top of chamber<=36"below grade-221(7) Leaching Facility(general-complete for all designs) OK Problem N/A 50%larger if garbage disposal-240(4) Trenches to be used whenever possible-240(6) No vehicle or imperv. area above 1.£unless unavoidable-240(7);NA 13.02 4. Vented if under impervious cover-241 (1) Vented through same pipes as distribution system-241 (1)(a) c Vent protected from precipitation/animal entry-241 (1)(b) -' Vent is placed beyond traffic or impervious area-24 1 (1)(c) All lines connected to vent if bed or trenches-241(1)(d) 9"cover over peastone-240(9) Reserve area provided(new construction)-248(1) Reserve 4' from primary leach area—NA 9.04 4'(5'if perc rate<=2 MPI)separation to g.w. -212(a)&(b) ` 4'(down to 2'with variance or I/A-upgrades only)of natural soil under 11 GW separation is adjusted to highest existing grade if facility cuts into a hillside Pipe slope minimum of 0.005-251(9) Require 5'removal and replacement if in fill-255(5) Top of leach facility<=36"below grade-221(7) Final grade over It minimum 0.02 ft/ft-240(10) Surface&subsurface drainage away from 11 -240(1 1)&245(5) Minimum design flow 440 gpd without deed restriction—NA 13.01 ✓� 3:1 slope where grading required-255(2) Toe of fill slope stops 5' from property line or swale installed-255(2) Impermeable barrier if<3:1 slope or< 15 feet to—3:lslope-255(2) Impermeable barrier/retaining wall poured concrete—NA 9.02 Retaining wall stamped by P.E.-255(2)(b) �- Top of retaining wall>=top of peastone elevation-255(2)(0 10'offset from edge of leach facility to edge of ret.wall-255(2)(g) v, Pere test(s)done in most restrictive layer- 104(2) Pere test 4' below leaching elevation—NA 7.06 Design flow listed and required/provided leach area given-220(4)(f) Leach pipes SCH40 PVC—NA 10.01 Leach pipes minimum 4"diameter except for dosed system—NA 14.04 6 7 Leach lines capped,vented, or connected together-251(9) "! Pressure dosing guidance followed if pressure distribution-254(2)(c), Pressure dosing required over 2,000 gpd or with I/A remedial use-231(1) Leaching Trenches(Check here if not present: ) OK Problem NIA , ` K Number of trenches: Minimum of 2'trenches''-NA 9.01(2 Depth of trenches(max'eff.2'): -247(l) Width of trenches(2'min.,4'max.):_31 ,s -251 (1)(b) Length of trenches(100'max.): 5 5 1 (1)(a) Trenches are vented(when>50')-251 (11) Trenches follow contour lines-251(2) Trench spacing 3 times effective width or depth minimum-251 (1)(d) In fill or reserve between trenches, 10' min.-NA 14.01& 14.03 Available leach area given(Min. 500 s.f.)-NA 9.01(2) Bottom=L S 5 x W '3, x# _ 3 J'S s.f. Sidewall=Lam_x D I x# '2_.. x 2= z- a s. f. {� Effective leach area given Loading factor: 17 `Y O Effective area=total area G 6 4 s.f.x LTAR ,'7`` _ /V T g/day Effective area is>=design flow of facility being served 2"of 1/8"- 1/2"2x washed peastone.-247(2) Trench depth of 3/4"to 1 1/2"double washed stone-247(1) Leaching Pits(Check here if not present: ) OK Problem N/A #of pits/pit systems: (dosing chamber if>1,231 (1)) Dimensions of each pit or system: L W D Depth of pits(max eff.2'): -253(1)(a) Available leach area given Bottom=L x W x#of systems= s.f. Sidewall=L+W x D x 2 x#of systems= s.f Total area=bottom +sidewall = s.f. Effective leach area given Loading factor: Effective area=total area s.f.x LTAR Effective area is>=design flow of facility being served Minimum of pits at least 13'X16' —NA 9.01(3) Distribution for galleries/chmbrs. in trench config. -pipe every 20'-253(6) Distribution for galleries/chmbrs. in bed config.-ea.pipe serves<=40 s.f-253(6) Spacing-2 times the effective width or depth(the greater)-253(1)(c) 2"of 1/8"- 1/2"2x washed peastone.-247(2) 3/4"to 1 1/2"double washed stone-247(1) Each pit has at least one 20"access cover.24"Cl to grade over 2,000 gpd -253(3) Surrounding aggregate thickness between 1'(min.)and 4'(max.)-253(1)(b) Vents,if necessary,extend under covers of pit(s)-241 (e) Leach Fields(Check here if not present: ) OK Problem N/A Number of fields: (need dosing chamber if> 1,231 (1)) 7 8 Length(100' max.): -252(2)(b) Width: Total area: L x W = s. f. Minimum 900 square feet-NA 9.01(1) Distribution lines connected with solid pipe—NA 15.01 Effective leach area given Loading factor: Effective area=total area s.f x LTAR = g/dav Effective area is>=design flow of facility being served Minimum of two distribution lines-252(2)(a) 6'line separation(max.)-252(2)(d) 4'maximum separation from edge of field to line-252(2)(e) 10'minimum separation between adjacent leach fields-252(2)(f) Between 6"and 12"of 3/4- 1 1/2"stone beneath field-252(2)(g)&247(2) 2"of 1/8"-1/2"2x washed peastone.-247(2) Final Grading OK Problem N/A Slope over leach area minimum of 0.02 feet/foot—240(10) Grading shall divert drainage away from leach area—240(l 1) Grading slopes away from dwelling 5/24/01 8