Loading...
HomeMy WebLinkAboutDecision - 334 CLARK STREET 10/26/1987 MUM MH TOWN OF NOR ,ril ANDOVER MASSACHUSLTTS ".`. ' p' NORTH 14 O OL p P SACNUSE Any appeal shall be filed S within (20) days after the date of filing of this Notice NOTICE OF DECISION in the Office of the Town Clerk. Date.October+ 26 . . 1987 . . . , . . . . . Date of Hearing ,October 22., .1987 Petitionof sky. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 334 Clark Street y Premises affected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Referring to the above petition for a special permit from the requirements of the , . North Andover, Zoning. Bylaw,. Section •8,, Paragraph. 3 . • . . . . so as to permit . , , to ,construct, a .one. .story, addition, of 6 , 00.0 squa.r.e . . . . ,feet, onto. an .existing masonry building containing. 3 , 600 square feet. . . . . . . . . . . . . . . . . . . . . . . . . . After a public hearing given on the above date, the Planning Board voted Conditionally .. to .p'pP.ro. . . . . . . . .the . . . . .Site. Plan. Review. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . based upon the following conditions : Signed Paul ,A:, Hedstromc . Chairman . George, Perna:, vice-Chairman . . . . . . . . . . . . . . . . . . . . John Simons, Clerk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Erich Nitzsche . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . of tw."y qti OFFICES OF: 3?' `' Town of 120 Main Street o m �.T North Andover, APPEALS ;o :'_; AAA nlj,ssjjchtisetts 01845 BUILDING (G 1 7)G85-4775 'SSncHOeeta UIV/ISIO c) N P CONSERVATION PLANT NG PLANNING & COMMUNITY DEVELI P�'I,��}� t „ KAREN I I.P. NEI SON, O�l2EC'I'OR October 26 , 1987 Mr. Daniel Long, Town Clerk Town Hall 120 Main Street North Andover, MA 01845 Re: Marco Industries • 334 Clark Street Site Plan Review Through Special Dear Mr. Long: Permit The North Andover Planning Board held a public hearing on Monday evening, September 14 , 1987 at 8 : 30 p.m. in the Town Hall Library/Conference Room upon the application of Marco Industries 334 Clark Street for Leon SiBthenNorthfAndover Industries, on August 27 applicant.The hearing was advertised n and September 3 , 1987 . The petitioner. seeks a Special Permit under Section 8 , paragraph 3 (Site Plan Review) of the North Andover Zoning Bylaw. The purpose of the request is to construct a one story addition of 6 , 000 square feet onto an existing masonry building containing 3 ,600 square feet, on a lot containing 94 , 960 square feet, located on the west side of Clark Street in an Industrial-2 (I-2) Zoning District. The Board met on September 14 , 1987 . A motion by John Burke and seconded by John Simons to continue the public hearing until September 28 , 1987 due to a lack of quorum, the vote was unanimous . On September 28 , 1987 , the Planning Board listened to representatives of Kaminski & Associates , who designed the site plan. A motion by John Burke to take the matter under advisement and have the Town Planner make sure everything is in order, and close the public hearing. Seconded by John Simons and voted unanimous by the Board. On October 5th the Board received a memo from the Town Planner dated October lst. The Town Planner indicated that he has met with the staff at Kaminski & Associates and they have made the changes to the site plan as he had requested and that the plans submitted to the Board meet all the requirements of teh Zoning Bylaw. A motion was made by John Burke and seconded by George Perna to direct the Town Planner to write the decision to approve the site plant pending review and approval of the drainage calculation by Erich Nitzsche. Page 2 : The meeting held on October 19 , 1987 , the Board voted to carry over this decision until October 22 , 1987 , due to the length of the meeting. On October 22 , 1987 the following members were present and voting: Paul Hedstrom, George Perna, John Simons and Erich Nitzsche. Concern was expressed over the mitigation of drainage on the site prior to entering the town' s system. Upon a motion by John Simons and seconded by Erich Nitzsche, the Board voted unanimously to conditionally approve the Special Permit for the first phase only of the Site Plan, based upon the following plans: 1 . Existing Conditions 2 . Phase I 3 . Sewer Plans Also, approved as submitted are the prints showing the elevations of the structure, submitted by Pater Samaris, A. I .A. , dated August 24 , 1987 and September 1987 . The Board voted unanimously to approve the Special Permit Application with the following conditions : 1 . Approval granted for the first phase only. 2 . The Board to receive a letter from DPW that the proposed tie-in to the Town' s stormwater drainage lines is ok as designed prior to issurance of a building permit. 3 . A complete set of As-Built Plans must be submitted and approved by the Board prior to issurance of a Certificate of Occupancy for the addition to the existing structure . The Board also stated that the Phase II Plans must be submitted to the Board for Site Plan Review under a new application. Sincerely, PLLANNING BOARD cc: Director of Public Works Paul A. Hedstrom, Public Works Department Chairman Highway Surveyor Tree Warden NACC Building Inspector Board of Health Assessor Police Chief Fire Chief Engineer applicant Interested Parties File