Loading...
HomeMy WebLinkAboutMiscellaneous - 60 PATTON LANE 1/21/1985 -19 TO: NORTH, ANDOVER, MASS BOARD OF HEALTH Re:,Soil.Absorption Sewage FROM: DE SIGN .ENGINE'ER , System Inspection This is to certify, that I have inspected the construction, of the said disposal system at /) ,. . L, North Andover, Mass. S OC'ATION The grades and construction are as specified in y- plans and specifications dated CoM MdN�i eg. f ngf cry /�N S 11-1c, TO: NORTH ANDOVER,.MASS =•, —j 19----- BOARD OF HEALTH ' Re:,Soil Absorption Sewage FROM: DESIGN .ENGINEER`, ,Syste'm Inspection. This is to certify; that I have ispectcd the construction, Of the said disposal system at North Andover, Mass. SITE LPC'ATION The grades and constructioh are as specified iln plans and specifications dated COMd1 m �yFy Pq eg. I n cr/ c ni J� Board of HO&IO' sEpTIC SISTIEM North Andqver Fi" s INsTAIIATICK CHEICK LIST LOT P OV" DATE DISUPrtUOM � DIET x AVA1ICN Q� 1" IL ca sons t FAIL OK /l/' �� l,� ° 1 Vff . 1. Di •tance Tot a detlands b. Drains c.. Well 2. Wa• er Line Location 3. No PVC Pips 4. Septic Tank a. Tess _Length & To Clean Out Corers b. Cement Pipe to Tank - on Both Sides of Tank 5. Distribution. Box a. Covers & Box - No Cracks b. All Lines Flowing Equal Amounts C. No Baca Flow 6. L,-ach Field or Trench a. Dimensions b, Stone Depth cm Ci ped Ends d. Clean Double Washed Stone 7. Lc-,ch Fits a. Dimensions b. Stone Depth c. Splash Pads d. Tess e. Cement Pipe to Pit - Both Sides f. Clean Double Washed Stone 8. No Carbage 'Disposal q. Final Grading Inspection 10. Barricading Covered'System 4.1. ` ) 11. As Built Submitted ' a. Lot Location { b. Dimensions of System C Location with, Regard-to Perc Test d. Elevations t Water Table 7 Y l t SOIL, PROF'ILE & P RCOLWrION' TEST DATA North Andover, Maas. Street Nca „�.�' �.� s����� _��� �, �„ Lot No Loc/Subdiv. r' :;77 Pland Owner Investigator �°" ..� Observer,� SOIL PROP411,E DATES 1 °El,ev 2.E1ev � .Elev 4.E1ev 0 0 0 0 _ Tina P s eat 2 2 2 2 _ 4 4 4 4 5 -- - 5 5 6 F%"C- 6 Floe 6 6 7 7 7 7 8 8 8 9 _ 9 9 - 9 1.0 10 10 Benchmark Location Elevation Datum __ _..... _ PERCO TION TE TS BATES Stmt Saturation Soak.-Minutes T7xwop o f 3".-Time 611- Time _...- �.�� C°°e r colatii on Bo ,,4,of He al t1 MTBSURFACE DISPOSAL MIC d CHWK_T fir LOT APPROVED DATE DISAPPROVED DATE Reasons I Title V FAIL OK Reg 2.5 The submitted playa must show as a mininumt ) the lot to be se ed-ar ,dim lions lot ,abutters —��4b location and log deep observation Mes ce to ties c location and results percolation tests-distance to ties dj design calculations & calculations showing required leaching area (e)` lcac tiox and dimensions of system-including rese area f) existing and proposed contours (g) location any wet areas within 1001 of sewage disposal system or disclaimer-check tl d mapping (b) mwface and subsurface drains within 1001 of s e disposal, , system or disclaimer (i) location any drainage easements within 100t of sewage disposal system or disclaimr-Planning Board tiles (J) known sources of water supply .t 2000 of sewage disposal a system or disclaimer (k) location of anr proposed well to serve lot-1000 from leaching facilit; (1) location of water lines on p p t -101 from leaching facility t (m) location of benchmark (n) driveways (o garbage disposals (p no PVC to be used in construction (q) profile of stem-elevations of bas t„ pl b$ pipe, septic tank, distribution box lets and outlets9 distribution field, piping and Other elevations ( ) maximum ground water elevation in area sewage disposal„ system (s) playa mast be prepared by a Professional Engineer or other professional authorized by law to prepare such plans 'Reg 6 Septic Tanks ( s-50% of. flow, water table.,—tees$ depth of tees access.. pumping ( ) cleanout (c) 10r from cellar wall or inground. nuiming pool (d) 251 from subsurface dramas Reg 1Ci 2 Distribution Boxes (a) s pe greater t -tl Reg gala - (b) Check List Mu i it ; h prari rod ^ .meta a . � . � , ) spacing 0) surface drainago'2% O l xh" splash pad too nt olbow g) no bonds An pipe from -box �o p1po � � � eac m � tr, 15.E / c t - t, x.5.4 �co"O"lotion of flead Leachin a ehh k o;: h f -min,',� ) as 114.3 to spacing- min 6 t reserve between 4. ) c 14.6 d) construction 11.7 0 stone 111.10 . r a e Downhill , o 1b �� i lb) y/x x 150 = (to bo shoes e tog 9.1 a) .6 Btand-by power