HomeMy WebLinkAboutCorrespondence - 11 BAYFIELD DRIVE 9/2/1987 RECEIVED
DANIEt. LONG
OWN C L F'R
NEEMOMMMe NOR "I,i ANMYER
CHANNEL MAY I 3 12
11 May 19$8
North Andover Planning Board
120 Main Street
North Andover MA 01$45
Re: MATERIAL INSTALLATION'S ADDITION PROJECT
Lot 113/11 Bayfield Drive
North Andover Business Park
Dear Board Members:
My clients wish to withdraw the Special Permit Amendment Application
currently before the Board.
Thank you.
Si erely,
e
James Bourgeois, R.A.
Vice President, Architectural & Engineering Services
Channel/Bayfield Companies
on behalf of Material Installations Inc.
cc: Michael Rice
Norman Gill , Material Installations
JB: rsk
NEW DRESS.
A r P uom�ommuuuuummmmouuuumi1uuu w wu � �� `f t—wif ��
Auuuuuuuuuuu EM 242 Neck Road moiuiui a i�mm �mouo uuuuum�uummmm�i�
23 h Haveffio6l, MA 01830 522 Andover 0 M89sechusetts01810 517^475^°1651
374-4511
OFFICES OF: Town of 1:2() Nliflll Slrcct
APPEALS NORTH ANDOVER Noilli Ai)( vi',
BUILDING N I ISI;i 10 1 L ISCI IS 0184-5
CONSE;RVATION ssno"�51 1)1\'[.';[()N(A (G17)6854-i7 i
HEALTH
PLANNING PLANNING & COMMUNrrY DEVELOPMENT
KAREN H.P. NELSON, DIHECT(M
July 11, 1988
Mr . James Bourgeois , R.A.
V.P . Architectural & Engineering Services
Channel Building Company
242 Neck Road
Haverhill, MA 01835
RE: Material Installation Addition
Dear Jim:
Upon my review of your submittal of an amended plan for the
above referenced project, I find the changes made fall into the
Section 8 . 36 (revisions to approved site plan) of the Zoning ByLaw.
After confering with DPW staff I have made the determination
that the changes to the site plan are not substantial or materially
different and does not need to be resubmitted to the Planning Board
for review. You may now proceed with the building permit process
at your convenance.
Sincer ly,
Scott A. Stocking
Town Planner
SAS:mm
CHANNEL
April 28, 1988
North Andover Planning Board
120 Main Street
North Andover, MA 01845
RE: MATERIAL INSTALLATIONS ADDITION PROJECT
Lot 1B/11 Bayfield Drive, North Andover Business Park
Dear Board Members
My clients have asked me to request a continuance of the Special Permit
Amendment Hearing of April 28, 1988, until the meeting of May 12, 1988.
This request is due to their inability to attend the scheduled hearing.
Thank you for your consideration.
Si cerely,
kAA^,-A f47
James Bourgeois, R. A. , Vice President
Architectural and Engineering Services
Channel/Bayfield Companies
On behalf of Material Installations, Inc.
i
cc. M. Rice
N. Gill, Material Installations
s
N ,W Ne CK Road
242 p 018
3a
3 Main Street F Nayer i,ltl M
5 -.jr I as achusetts °1 * 6 17^475* 1651
T S E. VE*d'
ASSOCIATE S, ING
April 19 , 1988
Planning Board
Town Hall
North Andover, MA 01845
RE: North Andover Business Park, Lot 1-B, Materials Installation
For Channel Building Company-Revision to Site Plan
and Hydrologic Analysis
Attn: Town Planner, Scott Stocking
Dear Board Members :
Please find herewith and attached:
1 . Revised Site, Grading and Utilities Plan-Sheet L2-1 showing
the new addition, parking and circulation pattern and new
drainage proposed for the above-referenced lot.
2 . Revised drainage calculations which compares the new proposal
with the Master Site Plan previously approved for the Park.
Please note that these drainage calculations clearly
demonstrate that the site plan as proposed creates less of
an impact then the Master Site Plan had indicated. Please
note that the peak rate of runoff shall be less than permitted
for the 100 year, 25 year and 10 year storm events .
Please accept this revised site plan since it is consistent with
Master Site Plan for this lot.
If there are any questions regarding this project, please do not
hesitate to contact me.
Very truly yours,
THOMAS E-; EVE O A EIS, INC.
Thomas E. Neve, P.E. , R.L.S .`~�
President
Enclosures
EN C. RSChannel Building, Jim Bourgeois 447 OLD BOSTON ROAD
LAND SURVEYORS ToPSFIELD, MA 01383
LAND USE PLANNERS (61.7) 887-8586
Data for LOT 1B, NABP, MATERIALS INSTALLATION Page 1
Prepared by THOMAS E. NEVE ASSOCIATES, INC. TOPSFIELD, MASS 19APR88
HydroCAD rev. 9/30/87 (c ) 1986 Applied Microcomputer Svatems
`ooY2 sT'o(�r�i EV�N`T
SUBCATCHMENT1 to 2 =__ ________________________________________
SUBCATCHMENT i SITE SUBCATCHMENT FROM WATERSHED PLAN
PERCENT CN
80 98 AREA= 4.39 ACRES SCS TR-20 METHOD
20 79 LENGTH= 1000 FEET TYPE II 24-HOUR STORM
0 0 SLOPE= .8 % RAINFALL= 7.0 INCHES
0 0 Tc= 21 MINUTES PEAK= 26.8 CFS @ 12.08 HRS
100 94 VOLUME= 1 .93 AF
SUBCATCHMENT 1 RUNOFF
SITE SUBCATCHMENT FROM WATERSHED PLRN
26
24 RREA= 4 .39 RC
22 CN= 94
20 Tc= 21 MIN
18
16 SCS TR-20 METHOD
14 TYPE II 24-HOUR STORM
12 RAINFALL= 7 IN
0
10
LL 6 PERK= 26.8 CFS
6 C 12.08 HRS
4 VOLUME= 1 .93 AF
-I9 N M d' in (O N OD Q'1 G1
ru
TIME (hours)
SUBCATCHMENT 2 SITE AS PROPOSED,EXISTING AND NEW ADDITION
PERCENT GN
52 98 AREA= 4.39 ACRES SCS TR-20 METHOD
48 79 LENGTH= 1000 FEET TYPE II 24-HOUR STORM
0 0 SLOPE= 1 .0 % RAINFALL= 7.0 INCHES
0 0 Tc= 23 MINUTES PEAK= 24.3 CFS @ 12. 10 HRS
100 89 VOLUME= 1 .81 AF
Data for LOT 1B, NABP, MATERIALS INSTALLATION Page 2
Prepared by THOMAS E. NEVE ASSOCIATES, INC. TOPSFIELD, MASS 19APR88
HydroCAD rev. 9/30/87 (c ) 1986 Applied Microcomputer Systems
SUBCATCHMENT 2 RUNOFF
SITE AS PROPOSED,EXISTING AND NEW ADDITION
29
22 AREA= 4. 39 AC
2D CN= 89
18 Tc= 23 MIN
16
+ 14 SCS TR-20 METHOD
12 TYPE II 24—HOUR STORM
3 10 RAINFALL= 7 IN
PEAK= 24 .3 CFS
G 12. 1 HRS
4 VOLUME= 1 .81 AF
2
cQ m v- to to n- m m 61
TIME (hours )
Data for LOT 1B, NABP, MATERIALS INSTALLATION Page 3
Prepared by THOMAS E. NEVE ASSOCIATES, INC. TOPSFIELD, MASS 19APRBS
Hy droCAD rev. 9/30/87 (c ) 1986 Applied Microcomputer SV5teM5
zsyie. s7virm uvwr
SUBCATCHMENT 1 to 2
SUBCATCHMENT 1 SITE SUBCATCHMENT FROM WATERSHED PLAN
PERCENT CN
Be 98 AREA= 4.39 ACRES SCS TR-20 METHOD
20 79 LENGTH= 1000 FEET TYPE II 24-HOUR STORM
0 0 SLOPE= .8 % RAINFALL= 5.5 INCHES
0 0 Tc= 21 MINUTES PEAK= 20.8 CFS @ 12.08 HRS
100 94 VOLUME= 1 .49 AF
SUBCRTCHMENT 1 RUNOFF
SITE SUBCATCHMENT FROM WATERSHED PLRN
20 1
18 ARER= 4 .39 RC
lE CN= 94
Tc= 21 MIN
14
r+ 12 SCS TR-20 METHOD
1 10 TYPE II 24-HOUR STORM
3 RRINFRLL= 5.5 IN
� 8
6 PEAK= 20. 8 CFS
4 1l @ 12.08 HRS
2 VOLUME= 1 .49 RF
cu m v- to rr rl co m tS
TIME (hours )
SUBCATCHMENT 2 SITE AS PROPOSED,EXISTING AND NEW ADDITION
PERCENT CN
52 Be AREA= 4.39 ACRES SCS TR-20 METHOD
48 79 LENGTH= 1000 FEET TYPE II 24-HOUR STORM
0 0 SLOPE= 1 .0 % RAINFALL= 5.5 INCHES
0 0 Tc= 23 MINUTES PEAK= 18.3 CFS @ 12. 11 HRS
100 89 VOLUME= 1 .37 AF
Data for LOT 1B, NABP, MATERIALS INSTALLATION Page 4.
Prepared by THOMAS E. NEVE ASSOCIATES, INC. TOPSFIELD, MASS 19APR88
HvdroCAD rev. 9/30/87 (c ) 1986 Applied Microcomputer Systems
SUBCATCHMENT 2 RUNOFF
SITE AS PROPOSED,EXISTINW AND NEW ADDITION
18
17 RRER= 4.39 RC
16
15 CN= 89
13 Tc= 23 MIN
n 111 SCS TR-20 METHOD
9 TYPE II 24-HOUR STORM
8 RRINFRLL= 5 .5 IN
5 PERK= 18. 3 CFS
4 C 12. 11 HRS
3 VOLUME= 1 . 37 RF
0 12 I j
1
co m -r un co N co cn m
TIME (hours )
Data for LOT 1B, NABP, MATERIALS INSTALLATION Page 5
Prepared by THOMAS E. NEVE ASSOCIATES, INC. TOPSFIELD, MASS 19APR88
HydroCAD rev. 9/30/87 (c ) 1986 Applied Microcomputer Systems
SUBCATCHMENT 1 to 2 ®_ Y9. STORM to-v61v�[.__ _
SUBCATCHMENT 1 SITE SUBCATCHMENT FROM WATERSHED PLAN
PERCENT CN
60 98 AREA= 4.39 ACRES SCS TR-20 METHOD
20 79 LENGTH= 1000 FEET TYPE II 24-HOUR STORM
0 0 SLOPE= .6 % RAINFALL= 4.8 INCHES
0 0 Tc= 21 MINUTES PEAK= 17.9 CFS @ 12.08 HRS
100 94 VOLUME= 1 .29 AF
SUBCRTCHMENT 1 RUNOFF
SITE SUBCRTCHMENT FROM WATERSHED PLRN
17
16 RREA= 4.38 RC
14 CN= 94
13 Tc= 21 MIN
12
vi 11
10 SCS TR-20 METHOD
9 TYPE II 24-HOUR STORM
X 7
RAINFALL= 4 .8 IN
� 5 PERK= 17. 9 CFS
4
C, 12.O8 HRS
3 j `�� VOLUME= 1 .29 AF
tU -- cv m v- 0 (D N 0 a) m
TIME (hours )
SUBCATCHMENT 2 SITE AS PROPOSED,EXISTING AND NEW ADDITION
PERCENT CN
52 96 AREA= 4.39 ACRES SCS TR-20 METHOD
48 79 LENGTH= 1000 FEET TYPE II 24-HOUR STORM
0 0 SLOPE= 1 .0 % RAINFALL= 4.8 INCHES
0 0 Tc= 23 MINUTES PEAK= 15.6 CFS_A 12. 11 HRS
100 89 VOLUME= 1 . 16 AF
Data For LOT 18, NABP, MATERIALS INSTALLATION Page 6
Prepared by THOMAS E. NEVE ASSOCIATES, INC. TOPSFIELD, MASS 19APRBS
HvdroCAD rev. 9/30/87 (c ) 1986 Applied Microcomputer SY5teM5
SUBCRTCHMENT 2 RUNOFF
SITE AS PROPOSED, EXISTING AND NEW ADDITION
15
14 RRER= 4 .39 RC
13 CN= 89
12 Tc= 23 MIN
11
10
y 9 SCS TR-20 METHOD
8 TYPE II 24—HOUR STORM
3 7 RRINFRLL= 4. 8 IN
0 6
4 PEAK= 15.6 CFS
3 @ 12. 11 HRS
2 VOLUME= 1 . 16 AF
1 L)
cv m v to ca n- w m 0
TIME (hours )
i` 1°`9 D.b
� �
NORTH ANDOVER FIRE DEPARTMENT
CENTRAL FIRE HEA1'.)W,)AR 1"ERS
124 Main Street
North Andover, Mass. 01845
WILLIAM V I DOLAN Tel. (617) 686.'3812
CFrf of Department
Toe Scott Stocking, Town Planner
From: Fire Chief Dolan
Re: Material Installations Addition
Date: April 1 , 1988
I have reviewed the plan submitted for site plan review for
the addition to Material Installations. The plan conforms to
the requests that I had made in referencing my letter of July
31, 1987. A copy of that letter is attached.
I have noted that in the plans there are provisions for a computer
room and we would suggest that the owner speak with us regarding
specific fire protection for that room.
Our usual recommendation is for the installation of a halon system
but we want to discuss recent environmental impacts relative to
the use of halons so that the owner may make an intelligent deci-
sion on fire protection for that room.
Chief Dolan
"SMOKE ET .G`G_C'"' SAVE U w S"
NORTH ANDOVER
POLICE DEPARTMENT
Officer's Report "
� � �� Site Plan Review,Material Installations .
Date April 1 , 1988 Time
Names & Addresses of persons involved:
This is an addition toan existing building . I would like to point out
that with each addition the traffic on Turnpike Street Rte . 114 at
Mill Road is becomming a factor . I would like to see the light at this
intersection installed. I feel that each new building in the area should
be accessed for that project .
71 7
Officer's Signature
FURM L
REFERRAL FORM
_Preliminary Plan
Definitive Sibdivision
Special Permit
Site Plan Review
Nor_tti Andover, Massachusetts
Director, Public Works
Sup't/Highway, Utilities & Operations
Director of Engineering & Administration
Supervisor of Forestry & Ground
Fire Chief
Conservation Commission
Inspector of Buildings
Board of Health
Police Chief
Planning Board
A. Public Hearing has beeii scheduled for ' ; ,: p.
to discuss these plans. (Pr.el-h!,,inary plans do not nee public hearing.)
May we have your comments and recommendations concerning these plans
no later than
Thank you,
ClWl-, Plan g
in Office
Material Installation
Vote to approve the Special Permit application by Channel Builders to
construct 18, 300 sq. ft. addition to the existing building located on
Bayfield Drive at the intersection of Willow Street .
Three issues of concern were discussed at the Public Hearings that
should be addressed in this Conditional Approval are as follows ;
1 . The unfinished Cul-de-Sac at the end of Bayfield Drive does not
allow for adequate fire protection and access-egress for the
existing building. It was discussed that the Cul-de-Sac was not
finished by the developer of North Andover Business Park prior
to this date because of a pending application to the Commonwealth
of Massachusetts to create an entry onto Route 125 . The Planning
Board is in receipt of a letter from the 'DI_ivision of Pub-116-
Works dated November 14 , 1986 denying the request for emergency
access onto Route 114 and is concerned that no work has -taken
place on Bayfield Drive thru 1987 .
2 . Concern by abuttors to the North of the Material Installation
property of truck noise and lights during the night. Proponents
for the project stated that the newest dwellings are 200 feet
and 400 feet respectively from the building, but admit that into
the winter months, a lack of foliage in the intervening woods
may be cause for concern and have suggested that truck traffic be
directed onto the locus by way of the Willow Street entrances
thereby minimizing headlights being directed to the North by the
present access from Bayfield Drive .
3 . There was a concern by the Planning Board of the increased rate
of runoff being produced within the North Andover Business Park
by the inclusion of additional impervious pavement and building
additions . The applicants Engineer, Mr. Thomas Neve, has
submitted drainage calculations stating the peak -runoff has been
decreased fromthe locus due to the fact that percentage of
impervious area on the lot has been reduced from the overall
Master Plan of the Park and that the lot size has been reduced.
Notwithstanding these factors, the Planning Board recognizes
that if this lot size has been reduced, another lot in the Park
must have been increased, and that Mr . Neve nor the Planning
Board has an accurate accounting of the present impervious area
versus the original Master Plan impervious area of the Business
Park overall .
Therefore, the Planning Board renders this Conditional Approval for the
construction of the proposed building additions for Material
Installations ,.
1 . Bayfield Drive will be constructed in accordance with the
Subdivision Plans of North Andover Business Park and be brought
to at least binder pavement to the satisfaction of the North
Andover Fire Department and to the Division of Public Works
( 2 )
prior to construction of the building addition.
2 . The lawn area to the East of the proposed building between the
building and Willow Street shall be designed as a Detention/
Retention Pond to further_ mitigate runoff flows and to account
for loss ground water infiltration due to the impervious area.
This will necessitate redirecting runoff flows into the Ponding
area, preferably from the parking lot prior to discharge
off site, with proper pipe sizing to detain storm water flows
to the maximum possible .
3 . Truck traffic flow will be required to access-egress the property
from the Willow Street curb cut only and automobile egress the
site from the curb cut on Bayfield Drive. This will be a
condition for continued occupancy and will be implemented by the
use of one-way signs and exit only signs and others as deemed
necessary both installed at the two curb cuts as well as at the
truck docks and pointed indications on the pavement throughout
the parking and access-egress areas .
4 . Upon completion of the building addition and prior to building
occupancy, the applicant shall file an As-Built plan of the total
site 4=ing at least',but not limited to the following, pavement
grades, QAas inverts, drainage size, access-egress signs,
lighting, landscaping and all utilities . Said plan to be
prepared and certified by a Professional Land Surveyor and
submitted for approval by the Planning Board.
5 . The landscape plan as submitted does not show the existing row of
planted arborvitae to the rear of the existing building and the
Planning Board is of the opinion that the proposed planting of
arborvitae will be of the same nature, and therefore will not
mature to a full effective screening for many years and therefore
will require that in addition to the landscaping plan as
submitted being conformed to in its entirety, a six ( 6) foot
closed stockade fence be erected along the property line from a
point starting fifty ( 50 ) feet from Route 125 and extending
Easterly to the Easterly line of the proposed building addition.
6 . In accordance with the Fire Department report of July 31, 1987,
the following shall be provided:
1 . The addition must be equipped with an automatic fire
suppression system ( sprinklers) and the fire detection and
alarms from the original building must be extended into the
addition. Both of -these systems must have plans submitted
-to the Fire Chief for approval
FIILC CNir17=VA�S
2 . requested that information regarding the material to be
stored and the amount of storage for products in this
im
expansion be submitted tohWself or the Fire Prevention
Officer.
7 . The North Andover Conservation Commission' s Order of Conditions
under File No. 242-193 , shall become a part of this approval
and be strictly adhered.
( 3 )
8 . In addition to the aforementioned Conditions, the Planning
Board approves only that work as shown on the submitted plane
namely;
1 . Sheet L1-1 dated 9/5/86 and revised 8/13/87
2 . Sheet L2-1 dated 9/5/86 and revised 8/13/87
3 . Sheet L4-1 dated 9/5/86 and revised 8/13/87
4 . Unnumbered Sheet dated 8/13/86 and revised 9/9/86 and
entitled "Scheme 3"
9- Any proposed changes and/or future Building expansion will be the
subject of a new Public Hearing under_ a new Special Permit application
and further that any changes from these approved plans and that may be
shown on -the As-Built plan submitted for approval prior to occupancy
will negate -this Special Permit and will require a new filing of
application.
Material Installations, I
1 ,
August 6, 1987
Mr. and Mrs. Herb Redman
580 Andover Bypass
No. Andover, MA 01845
Dear Mr. and Mrs. Redman:
It has been brought to my attention that at times our operation
at 11 Bayfield Drive No. Andover has caused you some inconvenience.
Specifically, I understand our exterior building lights and truck
lights may be reflecting in your windows from the rear of our ware-
. house facility.
In order to alleviate this inconvenience, we have met with our
landscape architect and representatives from Channel-Building Company.
I believe we have come up with a solution which will eliminate the
existing problem as well as prevent future problems upon the possible
construction of our proposed addition. The solution basically involves
grade changes and landscaping additions to the rear of our property
line. In sumnary, we apologize for the undue inconvenience of which
we were previously unaware of,. In addition, we;would be most happy
to meet with you at your earliest convenience to discuss the resolution
of this issue to our mutual satisfaction.
Sincerely,
Michael J. Farrow
MJF/LAT
cc: Jim Bourgeois
Mike Rice
Karen H.P. Nelson
a ✓. y r�,,✓ r
.. r' ',,. W d A �� t , ° � � rrM✓ �` r re" ✓ ^, l 6 fist f) r3 x�lx�r���,�'�Fd`
a r i
r A
i,.• ,c`l 4v ;i ; :. ��., ✓i. .,.,;✓ „¢,, ';�� e �4y,e y k r✓,�✓,�✓��r'^rx
I
11 SAYFIELD DRIVE a NORTH ANDOVER, MASSACHUSETTS 01845,','* (617) 685-9685 ,��� ry,�✓ y `'�� `
i t ✓ a ? � ` r.��1 �fi r'f �r IK�r��O�
P ¢ r t 7 r
` f ° ✓ .t � i 1; F�7 ✓ '." i✓ E� p✓��r✓ r *r 'r i�°F�4y✓J y✓4.�'��ri� � �,
i .� ) ` d � 9f�✓ w .o-q laN° rrt�yy�t^ a;^ �Fr�� g a
F A .i I y",r i i !. yy r�l� ✓kb� gdu�
t: FFI( ES OF: Town of gq1gq20 Win Stre(-.,t
NORTH ANDOVER
� f
CON�,I�I�'�/A ION �AC�u- DIVISION C
1 tl- I'AI_ I-I
PLANNING PLANNING & CMS .7NITY EL NT'
KARL,N H.P. N121-SON, DIREC"I'01i
August 3, 1987
To: Planning Board
From: Nancy J. Sullivan, Cons. Admin.
Re: Request for Comment - Material Installation
DEQE #242-193 - North Andover Business Park
Please be advised that the North Andover Conservation Commission
has previously issued an Order of Conditions for the above referenced
property under File #242-193.
Nancy J. Sullivan
Conservation Administrator
Attachment
NJS/ mlb
J° 6H Try
, r 9
NORTH ANDOVER FIDE. DEPARTMENT
CENTRAL FIRE HEADQUARTERS
124 Main Street
North Andover, Mass. 01845
t ,r,M v D 0 L A N Tel. (617) 686-3812
To: Town Planner
From: Fire Chief Dolan
Re: Bayfield Drive-Site Plan addition to Materials Installation
Date: July 31, 1987
I have reviewed the site plan proposed for the addition to the
Materials Installation building and have visited the site. I have
the following comments:
1. ' Bayfield Drive must be upgraded to a proper conditions to
provide turn around for Fire Department vehicles and access
to the fire hydrant at the edge of the cul-de-sac. I have
reviewed this with Jim Burgeois and Nan--y Sullivan on Thursday,
July, 30.
2. The addition must be equipped with an automatic fire suppression
system (sprinklers) and the fire detection and alarms from the
original building must be extended into the addition. Both of
these systems must have plans submitted to the: Fire Chief for
approval.
3. I requested that information regarding the material to be
stored and the amount of storage for products in this expansion
be submitted to myself or the Fire Prevention Officer.
I intend to be at the meeting on August 3 .
William V. Dolan, Fire Chief
11911111 M=
CHANNEL
July 31, 1987
Ms. Karen H.P. Nelson, Director
DIVISION OF PLANNING & COMMUNITY DEVELOPMENT
120 Main Street
North Andover, MA 01845
Re: North Andover Business Park
Roadway Completion
Dear Karen:
Recent Special Permit Applications by Channel Building Company have
precipitated inquiries by Planning Board members, Fire Chief Dolan, and the
North Andover Conservation Commission as to the status of roadway work in the
Business Park. Work remaining for pratical purposes consists of completion
of the base paving, utility connections at the cul-de-sac at the end of
Bayfield Drive/Route 125 and final paving of the subdivison roadways.
The development is close to being built-out, and Mr. Osgood's timetable
accordingly calls for completion of the roadway work during this construction
season. Of necessity, the utility and base paving work at the cul-de-sac is
the first step, and this work has been delayed somewhat by the Enforcement
Order from the North Andover Conservation Commission and, more recently,
while Mass. Electric obtains an updated permit from the State D.P.W. to make
permanent connections in the Route 125 R.O.W. Mr. Upham of Mass. Electric
informs me that this permit application has been filed and is customarily
granted in several weeks time. This would place 114 Associates in a position
to start work. -`
As concerns conditions adjacent to the Willows Racquet Club, the potholes
there have long been patched. Final paving at this location will be done
with the rest of the roadway.
If you have further questions, do not hesitate to call Mr. Osgood or myself.
S'ncerely,
James Bourgeois, R.A.
Vice President Architectural & Engineering Services
on behalf of 114 Associates
abs
cc: Benjamin Osgood, 114 Associates
Robert Webster, 114 Associates
Norman Gill, Material Installations
23 Main Street • P.O. Box 522 • Andover • Massachusetts 01810 • 617.475.1651
CHANNEL
July 31, 1987
Mr. Benjamin Osgood
114 ASSOCIATES
Osgood Mill
P.O. Box 536
North Andover, MA 01845
Re: North Andover Business Park
Dear Ben:
Channel Building Company has filed a Special Permit Application to construct
an addition to the Material Installations facility on Bayfield Drive. The
departmental review of this application has brought conditions at the end of
Bayfield Drive to the attention of Fire Chief William Dolan; specifically,
that fill on the as yet unpaved portion of the cul-de-sac is partially
obstructing access to the hydrant at this location.
Bill has been made aware of your intended construction timetable and the
delay caused by Mass. Electric. For now, he has requested that a path be
cleared sufficient for an engine to drive directly to the hydrant. It would
seem to me that most of this material will have to be removed to finish the
cul-de-sac anyway, which, if Mass. Electric keeps to their schedule (the
State Permit Application has been filed) , you should be able to commence in
3-4 weeks time.
I would, therefore, like to request that the siltation protection shown on
the implementation plan be completed and the material removed as soon
thereafter as is practical. I will take care of coordination with the North
Andover Conservation Commission. I think we are finally in a position to
start wrapping this up. Thanks.
Sincerely,
James'�urgeois, R.A.
Vice President Architectural & Engineering Services
on behalf of 114 Associates
abs
cc: Robert Webster/ CBC
William Dolan, N.A. Fire Chief
Karen Nelson, Div. of Planning & Community Development
Nancy Sullivan, Conservation Administrator
23MainStreet 0 P.O. Box 522 Andover Massachusetts 01810 617*475-I651
; �
p "1� V
III ��" �� 1 1 DEPARTMENT
� � a " _I 1 �:��� �.. �� � X6'1 686" 3812
r
Ij l
r
Toe Town Planner
From: Fire Chief Dolan
Re: Bayfield Drive-Site Plan addition to Materials Installation
Date: July 31 , 1987
I have reviewed the site plan proposed for the addition to the
Materials Installation building and have visited the site. I have
the following comments :
1 > Bayfield Drive must be upgraded to a proper conditions to
provide turn around for Fire Department vehicles and access
to the fire hydrant at the edge of the cul-de-sac. I have
reviewed this with Jim Burgeois and Nancy Sullivan on Thursday,
July, 30.
2. The addition must be equipped with an automatic fire suppression
system (sprinklers) and the fire detection and alarms from the
original building must be extended into the addition. Both of
these systems must have plans submitted to the Fire Chief for
approval.
3 . I requested that information regarding the material to be
stored and the amount of storage for products in this expansion
be submitted to myself or the Fire Prevention officer.
I intend to be at the meeting on August 3 .
William V. Dolan, Fire Chief
�,rYOSr�re� rrown of 120 Main stf,ex"'t
1. 11 1)1 V(x � DIVISION 4�;)F' i`�'1r.ISSW-11tIS(A;l',
7l AI �� �ea4. Yap' Milli "E'tiS()1Fi45
CONSERVATION 7)685-4775
k 1EAL I'l I
C
July 30, 1987 , t.
TO. PLANNING
BOARD
FROM: NANCY SULLIVAN, CONSERVATION ADMINISTRATOR
RE: REQUEST FOR COMMENT,
CHANNEL BUILDING, BAYFIELD DRIVE
I have reviewed the plans as submitted and my comments are as follows:
1) There appears to be a resource area on the site which is not depicted on the
plans. The NACC cannot comment on this proposal until this issue is resolved.
If you have any further questions, please feel free to contact me.
Sincerely,
dwb r �
., ..,,
Nancy J. S ivan,
Conservati Administrator
00
cr o",
OFFICES()F: Town of 12-0 Main Str(-..,,(.t
APPE'Al-S ........... E North Andover,
o
NORTH ANDOVR
-iusems 0 1845
BUIL-DING massacl
C(I)NSEFWATION DIVISION OF' (61 7)68.5-477,'
1-1 F,A I-AT-1
PLANNING PLANNING & COMMUNITY DEVEL,OPMENT
KAMEN 1-11'. NELSON, DIRECTOR
July 30 1987
Planning Board
re= Bayfield Drive
Chamiel Building
This office has no objection to the proposed addition.
�4 Sincerely
e
-- ----- ----------
Sanitarian Boa of Health
30
E 21 GC
.A!jkel 16'4,97.y
November 14, 1986
NORTH ANDOVER - Layout 4384, Route 125
Request for Emergency Access
Ms. Lynne Wentworth Trombly_
Route 114 Associates
23 Main Street, P.O. Box 522
Andover, Massachusetts 01810
Dear Ms. Trombly:
This is to inform you that on October 15, 1986 the Department's Board
of Commissioners voted to deny the request initiated by Route 114
Associates for an emergency access onto Route 125 in North Andover.
Sincerely,
J ep A. Fanale, Director
iglu of Way Bureau
JPJ/HS/rcr
TOWN OF NORTH ANDOVER, MASSACHUSETTS
OFFICE OF
CONSERVATION COMMISSION
OF ,,Ot OTk
° TELEPHONE 683-7105
LS
OCT 1 71986 SS "LJS'�
A October 15, 1986
i.ANINIEL GULL DING CG
Mr. James Bourgeois
Channel
Baybank Building
23 Main Street
Andover, MA 01810
Re: Lotl/2 North Andover Business Park, 11242-193
Dear Mr. Bourgeois:
On Wednesday, October 8, 1986 the NACC unanimously voted to
approve the plans for a proposed addition at Lot 1/2 North Andover
Business Park, provided that the Order of Conditions 11242-1-93, are
followed. Said plans are entitled "Material -Installations for
Channel by Thomas E. Neve Associates, Inca dated September 5, 1986,
three (3) sheets.
Sincerely,
Tracy A. Peter
Conservation Administrator
TAP/mlb
DEQE Flie No. 242-193
j (To be provided by DEOE)
Commonwealth city/Town North Andover
of Massachusetts Applicant 114 ASSOCIATES
Enforcement Order
Massachusetts Wetlands Protection Act, G.L. c. 131 , §40
and under the Town- o I'1o1 :.ii. ., %]_;.t.'� l I .E)• U - _G�-a_Gll
f
Y From NO ,= ANDOV7, �,C:i;�r:- :�• . . (;^ >T'`'' issuing Authority
To
114 ASSOCIATES (Robert E. Webster)
Date of Issuance Marsh 17, 1986
Property lot/parcel number,address North Andover Business Park
Extent and type of activity:'
AMCY J
The 1.7 T:7 J'4DOVER has determined that the activity described
above Is in violation of the Wetlands Protection Act, G.L. c. 131, §40, and the Regulations promulgated'pur-
suant thereto 31 OICMR 10.00, because:
❑ Said activity has been/is being conducted without a valid Order of Conditions.
,D3; Said activity has been/is being conducted in violation of an Order of Conditions issued to
114 Associates , dated June 8, 1983
File number 242-193 Condition number(s) 22--&--25
• . ❑ Other(specify)
The Norti ��•rdover Con:•::�r«r:i-J, cr,� ��� :,�:i_ �i_r�erebyordersthefollowing:
❑ The property owner, his agents, permittees and all others shall immediately cease and desist from further
activity affecting the wetland portion of this property.
Wetland alterations resulting from said activity shall be corrected and the site returned to its original con-
ditlon.
Y
❑ Completed application forms and pians required by the Act and Regulations shall be filed with the
N Andover Con,, Co:-, on or before (date),
and no further work shall be performed until a public hearing has been held and an Order of Conditions
has been issued to regulate said work. Application forms are available at: ��` =" ( ee
❑ The property owner shall take,every reasonable step to prevent further violations of the act.
Other(specify)
Failure to comply with this Order may constitute grounds�6 egal action. Massac setts General Laws Chap-
ter 131, Section 40 provides:
o "r,ocver vioiares ai iy provision of this section shall be punished by a fine of not more
than one thousand dollars or by imprisonment for not more than six months or both.
. Each day or portion thereof of continuing violation shall constitute a separate offense.
Questions regarding this Enforcement Order should be directed to: �'? '- '_Ons . cop:;-n.
120 -recir,
Issued by .Tn�T�, t1iJDOV77 rf?i•;,r' �',,^'Tt1 Cl` °Ti II;' "
Signature(s)
(Signature of delivery person
or certified mail number)
cc : Channel Bldg. ,
Tom Neve
• � I
• t
J
Al
Any appeal shall be filed
Within (20) days after the
r, t
DECISION - APPROVAL date of filing of this Notice
NORTH ANDOVER BUSINESS PAR , f R in the Offic
K e of the Town
PAGE 2 Clerk.
JUL 10 I! so AM '84
9 . Two- catch basins shall be installed at Road A and Route 125 .
10 . Checkerboard type grates s'ha-11 be used on. all drainage catchbasins .
11 . All construction shall comply with the Conservation Commisssion' s
Order, of Conditions dated October 14 , 1983 , DEQE. File NO. 242-193 .
12 . The Willow Street Extension/Flagship Drive roadway intersection shall
be improved to the required width in accordance with Section_
• IV.A. 2 .b. Design Standards to permit safe traffic flow in and out of
the Business Park Plans shall be reviewed and approved by the
Highway Surveyor and Planning Board prior to any Park construction or
until adequate securtiy is posted for its completion.
13 . The applicant is required to mitigate any additional flooding on
abutting properties to zero, in accordance with Section III . B. l . e. of
the Planning Board ' s Rules $ Regulations Governing the Subdivision of
Land.
14 . Street drainage not shown on definitive plan will not be added during
construction unless required by the Highway Surveyor and will be
detailed on the "AS BUILT" plans .
15. Additional drainage calculations shall be submitted and reviewed by
the -Planning- Board_; for all drainage -pipes -prior--- to_ signing- the .-
definitive plans .
16-. Information regarding the metes and bounds of the outside
construction limit of Willow Street Extension shall be submitted for
proper .acceptence -by the town.
17. As built plans -shall be submitted to the Planning Board for review =
and approval in accordance with Section III . B.J. 4 . Conveyance of
Improvements . - In addition, prior to final release of- security, the-_
applicantt sfiall forward to the Planning Board copies of those plans
required by the Conservation Commission detailing the extent of
impervious areas associated with site development to ensure that --
development does not exceed that described in the drainage
calculations dated March 1983 .
18 . Road cross-sections will be clearly illustrated on the final
definitive plan for signatures specified in Section V,c.
19. There shall be no weephole An- drainage structures as noted. -on detail
sheet .`
20. As required in the Preliminary Plan .Approval Condition #7 , the
applicant shall provide the proper buffer zone of 1.00 feet on lots 6
and _7 abutting residential districts in accordance with Table II of
the North Andover Zoning Bylaw. -
'-. M a ea! '
Y PP_ shall_ be fi
within (20) days after
date of filing of this No
DECISION '= APPROVAL "� in the Office of, the Tc
NORTH ANDOVER BUSINESS PARK��I o� Clerk.
PAGE 3 ,
21 .' Final definitive plan shall show solid lines on proposed street and
lot lines .
22 . All easements shall be fully dimensioned on plan's for proper,
conveyance. The owner shall retain title to the fee of each street,
path, or easement in or appurtenant to the subdivision until conveyed
to , the town and shall maintain and repair,, the roads end drainage
facilities in a manner satisfactory to during that period.
NOTE: ;Notation that fee is to be retained .shall be placed„ on .the
definitive plan.
23 . A sedimentation' and 'erosion control plan specifying methods shall be ”
submitted and approved in accordance with. Section III ,B,1 .k. , prior
to construction.
24. Copies of site regrading plans (showing . lot regrading, . cuts and
242-193 will:be submitted by Conservation Commission Order P. Condition y
fills) as
required
as ,required by `Section 8 of the Nolannin Board alo;ng .wtth Site Plans :
ubmi_tted to the P g
rth' Andover :Zoning Bylaw.
25 . The applicant shall plan, and coordinate the installation of
underground utilities- prior to binder coat,--application Final
--
release of_ bond 'money' applicable °to binder- shah Tnot ;. be released
s.
unti<1 h e applicant 's° engineere of-=xecord 'h'as cer ified, `,that
_ utll-ities_ ar-e- installed and .upon inspectin -by .the Highway : Survsyor
261. Where drain-•inveris are set below the'- existing grade and close - o
- property 1ine.s, proper rip-rap and; erosion ,control measures, shail be
provi,'ded w er.e deemed necessary b -the Hig1%way ��rveyor and-P arming
,-Boar to protect' =properxy' owners and/o,r the Znteg Yi of embankments
`from adverse' affects -of surface water: Applicant 'well'" detail such
erosion control and rip-rap ' on definitive plans prior to
endorsements : ' -
The termination of ,the drainage easement on Lot 7 -shall be shown on
the Final Plan.
28 . All drain easements shall be delineated on the topographic and
drainage plans to; insure „thenPlanning Board and Highway Surveyor that,
the drainage -is indeed "wi_thin _the easement's
y
,,
29 If. °inj.the` opinion"of the Fire =-Chief, the install ed- taster, inedoes
not meet �adequate� "flow tests<:intgallons per minute as:> regU,, r n r a
Section 26G -in the J North..'Ari Ever . Fire Oode, ">,the developer, o61 er
shall , after-- notice to the Planning Board, submit `revi$ed' plans to
the , No th and rve�r� Fire Chief -and the North Andover` Board of Publi_Cr;
p , 1, ,which- plans shall then be submitted to the
=Planning Boa-rd.` for approval., . �°Plan`"s for pipe�r.spaces'- azid �calculatlojis--
for the- spr-lnkler� systems;"sha:,1 be s<ubmi,tted -:-to the , Fire Chief; for, '
review. ,
_ 'f Any appeal shall.be filet
within '(20) days after th
�
1041 Ihk dale of filing of this Noti�
NOV , WER in the Office of SAW
DECISION
RPBUS NESS PARK JUL (S I I X50 � Clerk. '
PAGE4
30 . The applicant/owner/developer shall be aware of the fact that .
approval of this ,subdivision under, the ,Planning Board's ,Rules ,
Regulations will not relieve said parties of the re'sponsibil .ty to
other property owners upon whose land is affected `by indirect or
direct development storm water discharge .
**Notation into be placed on the definitive plans to-,he, re d
vs
s
$W100 SEE AVVERSTON
7 g
Manz
An, WMWWIQ�
u—MoUT 717 7'
xv
WON-
NEI
s
Y
n... "ta - -
lf" u3- ,r 4
ci J"
f^
APT
_
F
t