Loading...
HomeMy WebLinkAboutConsultant Review - 65 FLAGSHIP DRIVE 9/17/2001 NNOW OEM --mum A wow USTAN ......... 103 Stiles Road-Suite One-Salem, New Hampshire 03079 MHF Design Consultants, Inc. TEL(603)893-0720-FAX(603)893-0733 September 14, 2001 RE EIVED Ms. Heidi Griffin,Town Planner Town of North Andover SEP 1 7 2001 27 Charles Street NORTH ANDOVER North Andover, MA 01845 PLANN!No UE'f`)AATME 17' Re: Map 107C Lot 76 65 Flagship Drive Response to Engineering Review Comments Dear Ms. Griffin: MHF Design Consultants, Inc. is pleased to provide our response to the engineering review comments by VHB dated August 30, 2001, including appropriate plan revisions. We believe that all the comments are minor in nature and are clarified as follows: Lb. A waiver from providing building elevations has been requested. We have provided photos of the existing building as requested by the Board. I c. Parking lot areas can be located in the 50 no-build area. A Notice of Intent has been filed with the Conservation Commission for the project. I d. Lighting illumination levels have been provided for the proposed lighting on the site. I e. A waiver from the traffic report requirements has been submitted to the Board. I f. A waiver from the sewer line profile will be requested since it is a sewer service and not a main line. I.g. A waiver request for the Fiscal Impact/Community Impact has been requested. 2. Section 8.4 Screening and Landscaping Requirements for off street parking have been reviewed and the landscaping on the site has been revised to conform to the requirements of that section. 3.a. The cross section has been revised accordingly. ENGINEERS PLANNERS SURVEYORS MHF Design Consultants, Inc. 3.b. The drainage patterns on the site will not be altered as a result of this development. All paved and roof areas will be treated in accordance with the Stormwater Management regulations as stipulated by the filing requirements for the Notice of Intent under the Wetland Protection Act. 3.c. The invert information has been corrected for the pipe slope information shown. 3.d. An overflow weir has been shown in the outlet control structure(DMH2). 4.a. Handicap ramp details have been provided. 4.b. The underdrain detail has been eliminated. 4.c. The plans have been revised to show snow storage areas. One set of plans and drainage calculations have been forwarded directly to VHB, Inc. Please call me if you have any questions. Very Truly Yours, MHF ign C ts,I .o , P.E. Principal Cc: Mr. David Murray, Ranger Development Mr. Timothy B. McIntosh,P.E. ,VHB, Inc. I i OMMOMMMERMEW mmmw am MOM EMNEW mom .-MEMO 103 Stiles Road-Suite One- Salem, New Hampshire 03079 MHF Design Consultants, Inc. TEL(603)893--0720- FAX(603)893-0733 F? September 14, 2001 RECEIVED 8F 7 9FP 2nol 2001 Ms. Heidi Griffin,Town Planner NO�J'rj-1 ANb()VLzH Town of North Andover P[ANWIK�-' r)(�PARTMFNT .«11 M�E NT 27 Charles Street North Andover, MA 01845 Re: Map 107C Lot 76 65 Flaashil)Drive Response to Site Plan Review Comments Dear Ms. Griffin: MI-IF Design Consultants, Inc. is pleased to provide our response to the site plan review comments dated August 15, 2001, including appropriate plan revisions. We believe that all the comments are minor in nature and are clarified as follows: vi. The plans have been revised to reflect the driveway width of 25 feet as required. vii. See attached letter for drainage review comments by VHB. X. The driveway has been revised to 25 feet. xii. No detail for the wall signage has been provided because the tenant is unknown at this time. xiii. The driveway width has been revised to 25 feet. xiv. Snow storage areas have been shown on the plans. xv. Existing landscaping as well as proposed landscaping has been shown. xvii. Lighting for the site has been revised and the lighting levels have been included on the plans. We have also included additional photographs of the existing building as requested by the Board. ENGINEERS PLANNERS SURVEYORS Enawr ow mom MHF Design Consultants, Inc. Attached are 2 sets of plans revised per these comment ( cvision date 9-12-01). One set of plans has been forwarded directly to VHB, Inc. Please call me if you have any questions, Very Truly Yours, MHF D ign C It nts nc. r ss, E. Principal Cc: Mr. David Murray, Ranger Development Mr, Timothy B. McIntosh,P.E. ,VHB, Inc, I I� 1 nn �u u sl 109900 #135 rr- ' + r 101: r 109900 #133 µ ya e�i A k� ,�q� ,��� �° r} f7�✓r�,1, �!N t v P e, l i ivnrrr, �(f' r 109900 #134 n ri v gyp" e r i f I o/ Uti'Lra'1�; l f I 109900 #129 Wif o 1 I � I 1 � 1 1 t � l 1 r / 109900 #130 J n 109900 #131 /i/l�i//l/,i ,�/�%�J J/f�/'�/ �i �i�,�i✓,,r rr!q//!f,//,r%F��/o���//�/�% / / /, %��o ,/ %r r y 1 J �l l/ Q 1 , 109900 #132 WRIVNEMMONEW MEMMor Imm No= Nomaw ffam .....AIR= W� A #own "NEMNEWMaw . .....In................ '103 Stiles Road-Suite One-Salem, New Hampshire 03079 MHF Design Consultants, Inc. `I-EL(603)893-0720- FAX(603)893-0733 September 18,2001 Ms.Heidi Griffin,Town Planner Town of North Andover Planning and Community Development 27 Charles Street North Andover,Massachusetts 01845 Re: 65 Flagship Drive Site Plan Application MHF# 109900 Dear Ms.Griffin: On behalf of Ranger Development,this letter serves as our request for a continuance to be granted for the above referenced project to the October 2"d meeting with the planning Board. Thank you for your time and consideration regarding this matter and should you have any questions,please contact me at your convenience. ,Sincerely yours, I MRIF IGZN T T'S,INC. r 0 Principal Cc: Mr.Dave Murray, Ranger Development ENGINEERS PLANNERS SURVEYORS � Transportation Land Development ~ m Environmental ° w sc , v | ce , imagination /vnovatmv|ene�yc"",�wns�*^o Our ah""mwab""s*a"our�*m""a�° a September 20,2001 Ref: 06716.46 � Ms.Heidi A.Griffin Town Planner Community Development&z�ervices ��������N������ ^ ���~����um "==- Town of North Andover 27 Charles Street North Andover,M&O1845 uAP 2 4 2001 � � � Re: Proposed Office f�d6bbon N0�THAMD�V�R Building PLANW|N� uFPART���NT Sitel�ooDevievv North Andover,M/\ Dear Heidi, VunaaaeHonaeo8zostlh-\Inc. (\/HB)has received MHB Design Consultants,luc.'awritten response letter(dated 9'14-01)to our Engineering Review for the above referenced project. It appears that all of VHB's comments have been adequately addressed and VHB's concerns iu this matter have been satisfied. No further engineering review is required mt this time. If you have any questions wz concerns,please call meat your convieueoce. Very truly yours, \/z\NASSBflANGBNBID]STLIN,INC. � ldntosh,P.E. Timothy B. � Project Manager—Highway&Municipal Engineering cc: Mark Gross—MB(g Design Consultants,Inc. ' l0 Walnut Street [lost Office Box *lsl Watertown, Massachusetts 02471-9151 ��������7� " ���������.���� «m^°",,xaom'�^u""^u",m,,usu°��p'"pp'",'»»z»ma= emai|: info@vhbzom wwwxhbzurn