HomeMy WebLinkAboutAs-Built Plan / Installation Certificate Form - 66 CEDAR LANE 6/19/2009 SUMMARY OF INVERTS BUILDING TIES
SEWER 0 FDTN. 95.96 BLDG. CORNER I A B C NQ T THIS PLAN & CERTIFICATION IS NOT
SEPTIC TANK-]N-------- 95.69 SEPTIC TANK 111.8 31.7 A WARRANTY OF THE SUBSURFACE DISPOSAL
SEPTIC TANK OUT 95.44 DIST. BOX 120.735.8 SYSTEM. IT IS A RECORD OF THE LOCATION
DIST. BOX IN 95.34 AND ELEVATION OF THE EXISTING SYSTEM
DIST. BOX OUT 95.18 COMPONENTS.
INV. IN CHAM. 95.14
BOTT. CHAM. 94.5
1 HEREBY CERTIFY THAT THE SEWAGE
DISPOSAL SYSTEM HAS BEEN INSTALLED
IN ACCORDANCE WITH THE PROVISIONS
OF 310 CMR. 15,00 (TITLE 5) AND THE
APPROVED DESIGNS PLANS.
LQLA
1,500 GAL
D—SOX SEPTIC TANK
LEACH FIELD W/ 10',• A Fl 14'
32 INFILTRATORS 4 REFk,l
CHAMBERS
INSP. B.M,TF-IDD.0
PORT
VENT
29.24• se S8
CEDAR LANE
VLAD kil L
NEIVIC E K
TT
AS BUILT PLAN
OF
STT A
UBS U IRFACE DISPO'S'AL SYSTIrl"'i M
LOCATED IN
NORTH ANDOVER, MASS./66 CEDAR LANE
AS PREPARED FOR
THOMAS HARDWICK TM: 106A
DATE: 6-19-09 TL: 143
2 5 SCALE: 1"=40'
20 40 80
1-4
MERRIMACK ENGINEERING SERVICES
66 PARK STREET
ANDOVER, MASSACHUSETTS 01810