Loading...
HomeMy WebLinkAboutAs-Built Plan / Installation Certificate Form - 66 CEDAR LANE 6/19/2009 SUMMARY OF INVERTS BUILDING TIES SEWER 0 FDTN. 95.96 BLDG. CORNER I A B C NQ T THIS PLAN & CERTIFICATION IS NOT SEPTIC TANK-]N-------- 95.69 SEPTIC TANK 111.8 31.7 A WARRANTY OF THE SUBSURFACE DISPOSAL SEPTIC TANK OUT 95.44 DIST. BOX 120.735.8 SYSTEM. IT IS A RECORD OF THE LOCATION DIST. BOX IN 95.34 AND ELEVATION OF THE EXISTING SYSTEM DIST. BOX OUT 95.18 COMPONENTS. INV. IN CHAM. 95.14 BOTT. CHAM. 94.5 1 HEREBY CERTIFY THAT THE SEWAGE DISPOSAL SYSTEM HAS BEEN INSTALLED IN ACCORDANCE WITH THE PROVISIONS OF 310 CMR. 15,00 (TITLE 5) AND THE APPROVED DESIGNS PLANS. LQLA 1,500 GAL D—SOX SEPTIC TANK LEACH FIELD W/ 10',• A Fl 14' 32 INFILTRATORS 4 REFk,l CHAMBERS INSP. B.M,TF-IDD.0 PORT VENT 29.24• se S8 CEDAR LANE VLAD kil L NEIVIC E K TT AS BUILT PLAN OF STT A UBS U IRFACE DISPO'S'AL SYSTIrl"'i M LOCATED IN NORTH ANDOVER, MASS./66 CEDAR LANE AS PREPARED FOR THOMAS HARDWICK TM: 106A DATE: 6-19-09 TL: 143 2 5 SCALE: 1"=40' 20 40 80 1-4 MERRIMACK ENGINEERING SERVICES 66 PARK STREET ANDOVER, MASSACHUSETTS 01810