NOTICE OF DECISION
-
D ate October .2.0.,. .1.9.9.5, . . . . . . . . . . ,
Sept 5, 19, 1995
Date of Hearing Oct, 3,, 17,. J995. , (}�
W
Petitionof . . . .. Inc. .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Premises affected . .._Flagship Drive
Referring to the above petition for a special permit from the requirements
North Andover Zoning Bylaw - Section 8.3 Site Plan Review - so as to
ofthe . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
allow. the addition, to, a_ building at,Willows Industrial Park, , ,
80 Flagship Drive, North Andover, MA 01845
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C
After a public hearing given on the above date, the Planning Board voted
CONDITIONALLY
to . .APPROVFi . . . . . . .the . .U.ZCJJAL .PZRnI.T. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
n�
�n
based upon the following conditions :
CC: Director of Public Works
Building InspectorA
Natural Resource/Land Use Planner
Health Sanitarian Signed V.
Assessors
Police Chief Joseph. V. Mahe;
on Chairman. . . . .
Fire Chief .
Applicant Richard Rowen„ Vice. Chairman. . . .
. . . . . . . . . . . . . . . . . . .
Engineer
File Alison. Lescarbeau, Clerk, . , , , ,
. . . . . . . .
interested Parties
Richard. Nardella, , , , , , , , , , , , , ,
John Simons ..
. . . . . . .
Town of North Andover f NORTH
OFFICE OF 3a o '` °,�oo<
COMMUNITY DEVELOPMENT AND SERVICES ° . p
146 Main Street
KENNETH R MAHONY North Andover, Massachusetts 01845 9SSACHUSE�
Director (508) 688-9533
October 20, 1995
Ms. Joyce Bradshaw
Town Clerk
120 Main Street
North Andover, MA 01845
Re: Special Permit - Site' Plan Review - Central Metal Finishing
Dear Ms. Bradshaw:
The North Andover Planning Board held a public hearing on
September 5, 1995 in the Library Conference Room of Town Hall upon
the application of Engineering for Development and Construction
(EDC, Inc. ) , 447 Boston Street, Suite 12 , Topsfield, MA 01983
requesting a special permit under Section 8 . 3 (Site Plan Review) of
the North Andover Zoning Bylaw. The legal notice was properly
advertised in the North Andover Citizen on August 16 and August 23 ,
1995 and all parties of interest were duly notified. The following
members were present: Joseph Mahoney, Chairman, Richard Rowen,
Vice Chairman, Alberto Angles, Associate Member. John Simons
arrived at 7 : 30 p.m. and Richard Nardella arrived at 8 : 20 p.m.
Kathleen Bradley Colwell, Town Planner was also present. Alison
Lescarbeau, Clerk, was absent.
The petitioner was requesting a special permit to allow for
the addition to a building at Willows Industrial Park, 80 Flagship
Drive, No. Andover, MA 01845 . The proposed addition is to be 9500
square feet and one story in height.
Richard Rowen read the legal notice to open the public hearing.
Jim Bourgeois presented the plan, and Carol Shibels, owner, was
also present.
The structure is a one story building constructed in the early
1980 's. Central Metal Finishing acquired the property in 1989
and are now ready to expand. A 9500 square foot one story addition
is proposed. Deliveries would be on the west side of the building;
landscape would be ornamental trees and shrubs.
Mr. Simons asked how far away is the nearest house?
1
BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535
Julie Parrino D.Robert Niceua Michael Howard Sandra Starr Kathleen Bradley Colwell
Mr. Bourgeois replied approximately 150 feet when all is done.
Mrs. Condon, 89 Marian Drive, stated that the present floodlights
light up her house at night in the winter time.
Mr. Bourgeois proposed a "boxed down" light for the building, and
they would replace existing lights with these also.
There will be 15 new employees bringing the work force to 65
people. The hours of work are 7 a.m. to midnight. Truck
deliveries are in early evening only.
Edward Condon, abutter, asked if the pond will be fenced in?
Mr. Bourgeois stated that it is not really a pond, but a detention
pond. It is not designedtto hold water.
Mr. Simons asked about the landscape plan.
Mr. Bourgeois replied they would plant ornamental trees and shrubs.
There will be no filling of wetlands, so no replications are
needed.
Mr. Mahoney asked if they would be adding to the air conditioning
and heating units.
Mr. Bourgeois stated yes, additional units will be comparable to
existing units.
Ms. Colwell asked if there was a dumpster on site and is it
enclosed?
Mr. Bourgeois replied yes, there is a dumpster, and no, it is not
enclosed.
Mr. Colwell stated that it will have to be enclosed.
Mr. Bourgeois pointed out on the plan where three chemical storage
units were located.
Mr. Condon, abutter, asked what kind of chemicals?
Ms. Shibels replied acids, alkalines.
Ms. Colwell stated that the drainage report was received today, and
there are some changes, nothing major.
On a motion by Mr. Simons, seconded by Mr. Angles, the public
hearing will be continued until September 19, 1995 .
2
The North Andover Planning Board held a regular meeting on
September 19, 1995. The following members were present: Joseph
Mahoney, Chairman. Alison Lescarbeau arrived at 7 : 15 p.m. , John
Simons arrived at 7 : 30 p.m. Richard Rowen, Vice Chairman, Alberto
Angles, Associate Member and Richard Nardella were all absent.
Due to the lack of a quorum, the Planning Board was unable to
continue the public hearing. The Board will continue the public
hearing at the October 3, 1995 meeting.
The North Andover Planning Board held a regular meeting on
October 3 , 1995. The following members were present: Joseph
Mahoney, Chairman, Richard Rowen, Vice Chairman, Alberto Angles,
Associate Member, Alison Lescarbeau, Clerk, John Simons and Richard
Nardella. Kathleen Bradley Colwell, Town Planner, was also
present.
Ms. Colwell pointed out that none of the Board members were present
for the site walk. She met Carol Shibels, owner of Central Metal
Finishing, and Mr. & Mrs. Krieger, abutters at the site.
The Krieger's live directly behind the site and claimed that noise
and lighting coming from there was very disturbing. It was
discovered, however, during the site walk that the noise and
lighting were coming from another business, not Central Metal
Finishing. Ms. Shibels stated that if there were any problems,
people were to contact her and they would be discussed and
hopefully taken care of.
The equipment at Central Metal Finishing was left on all night, and
it was decided that not much noise at all was present, just a dull
hum.
Ms. Colwell stated that the drainage calcs have come back and final
changes will be made. All hazardous chemicals will be stored
inside the building.
On a motion by Mr. Nardella, seconded by Mr. Rowen, the Board voted
unanimously to close the public hearing.
Staff was directed to draft a decision for the October 17 , 1995
meeting.
The North Andover Planning Board held a regular meeting on
October 17, 1995. The following members were present: Richard
Rowen, Vice Chairman, Alison Lescarbeau, Clerk, Alberto Angles,
Associate Member, John Simons and Richard Nardella.
Ms. Colwell had a draft decision ready for the Board.
Issues from Coler & Colantonio to be itemized.
3
The Board agreed upon a $10, 000 bond for the purpose of insuring
that. a final as-built plan is submitted.
On a motion by Mr. Simons, seconded by Ms. Lescarbeau, the Board
voted unanimously to approve the special permit as drafted.
Sincerely
v 0
Joseph V. Mahoney, Chairman
North Andover Planning Board
4
80 Flagship Drive (Central Metal Finishing)
Site Plan Review - Special Permit
The Planning Board makes the following findings regarding the application of EDC
Inc. , 447 Boston Street, Suite 12, Topsfield, MA 01983, dated August 14, 1995
requesting a special permit to construct a 9,500 square foot addition to the
existing Central Metal Finishing building located at 80 Flagship Drive in the
Industrial - 1 Zoning District.
The Planning Board makes the following findings as required by the Zoning Bylaw
Section 8.3 and 10.3:
FINDINGS OF FACT:
1. The specific site is an appropriate location for the project as it is
zoned for Business and is an addition to the existing industrial building;
2. The use, as developed, will not adversely affect the neighborhood as the
site is currently developed an industrial park. The lighting will be
downcast and will not shine off site. There will be landscaping added to
the rear of the property if necessary to provide screening,
3. There will be no nuisance or serious hazard to vehicles or pedestrians;
4. The landscaping plan approved as a part of this plan meets the
requirements of Section 8.4 of the Zoning Bylaw;
5. The site drainage system is designed in accordance with the Town Bylaw
requirements;
6. The applicant has met the requirements of the Town for Site Plan Review as
stated in Section 8.3 of the Zoning Bylaw;
7. Adequate and appropriate facilities will be provided for the proper
operation of the proposed use.
Finally, the Planning Board finds that this project generally complies with the
Town of North Andover Zoning Bylaw requirements as listed in Section 8.35 but
requires conditions in order to be fully in compliance. The Planning Board
hereby GRANTS an approval to the applicant provided the following conditions are
met:
SPECIAL CONDITIONS:
1. Prior to the endorsement of the plans by the Planning Board, the applicant
shall adhere to the following:
a. A final set of site plans must be submitted to the Town Planner and
to the outside drainage consultant for review within ninety days of
filing the decision with the Town Clerk.
The following comments raised in the September 27, 1995 letter from
Coler and Colantonio must be addressed:
i. The hydraulic grade line of the existing and proposed storm
drains should be calculated to determine if an outlet control
"f condition would exist at the proposed detention basin.
ii. The proposed six inch rip rap surface should have suitable
filter fabric under it to prevent the growth of nuisance
vegetation and stabilize the soil/stone interface.
I 1
iii. The model number and total opening size must be provided on
the beehive grate. A maintenance program must be instituted
to keep the structure clear of debris.
iv. An emergency spillway should be provided to prevent the dike
from being eroded in the event that the outlet 'orifice and
catch basin are plugged with debris. This spillway should be
sized to pass a 100-yr storm with the outlet plugged.
c A bond in the amount of ten thousand ($10,000) dollars shall be
posted for the purpose of insuring that a final as-built plan
showing the location of all on-site utilities, structures, curb
cuts, parking spaces and drainage facilities is submitted. The
bond is also in place to insure that the site is constructed in
accordance with the approved plan. This bond shall be in the form
of a check made out to the Town of North Andover. This check will
then be deposited into an interest bearing escrow account.
A construction schedule shall be submitted to the Planning Staff for
the purpose of tracKing the construction and informing the public of
anticipated activities on the site.
2. Prior to FORM U verification (Building Permit Issuance) :
a. The final site plan mylar must be endorsed and three (3) copies of
the signed plans must be delivered to the Planning Department.
This decision shall be recorded at the Essex North Registry of Deeds
and a recorded copy delivered to the Planning Staff.
3. Prior to verification of the Certificate of Occupancy:
a. The building must be constructed as presented to the Planning Board
and as shown on the following plans:
Plans titled: Central Metal Finishing
80 Flagship Drive
North Andover, MA 01845
Prepared by: Thomas E. Neve Associates, Inc.
447 Old Boston Road
Topsfield, MA
Sheet: Building Elevations
Dated: 5 Sept 95, 13 Sept 95, 19 Sept 95
b. The landscaping of the site will be reviewed by the Town Planner.
Where the existing vegetation is not sufficient as per Section 8.4
of the Zoning Bylaw, landscaping must be added. The Town Planner
will review in particular the area to the rear of the property
adjacent to the Residential-2 Zoning District boundary. A row of
evergreens may be necessary to provide a dense buffer between the
industrial and residential use.
C. All artificial lighting used to illuminate the site shall be
approved by the Planning Staff. All lighting shall have underground
wiring and shall be so arranged that all direct rays from such
lighting falls entirely within the site and shall be shielded or
recessed so as not to shine upon abutting properties or streets.
The site shall be reviewed by the Planning Staff. Any changes to
the approved lighting plan as may be reasonably required by the
Planning Staff shall be made at the owner's expense.
d. All buildings shall have commercial fire sprinklers installed in
2
accordance with the North Andover Fire Department.
e. The site must have received all necessary permits and approvals from
the North Andover Board of Health and the Conservation Commission.
4. Prior to the final release of security:
Ca. The site shall be reviewed by the Planning Staff. Any screening as
may be reasonably required by the Planning Staff and/or Tree Warden
will be added at the applicant' s expense.
b. A final as-built plan showing the location of all on-site utilities,
structures, curb cuts, parking spaces and drainage facilities must
be submitted to and reviewed by the Division of Public Works.
5. The dumpster shown on the plan must be enclosed entirely by a wooden
stockade. fence two (2) feet higher than the dumpster.
6. Any plants, trees or shrubs that have been incorporated into the Landscape
Plan approved in this decision that die within one year from the date of
planting shall be replaced by the owner.
7. The contractor shall contact Dig Safe at least 72 hours prior to
commencing any excavation.
8. Gas, Telephone, Cable and Electric utilities shall be installed as
specified by the respective utility companies.
9. All catch basins shall be protected and maintained during construction
with hay bales to prevent siltation into the drain lines.
10. No open burning shall be done except as is permitted during burning
season under the Fire Department regulations.
11. No underground fuel storage shall be installed except as may be allowed
by Town Regulations.
12. All signs must be consistent with the signage currently on site and must
comply with the sign bylaw.
13. All mechanical devices (ie: HVAC, vents, etc. . . ) which may be visible
from any surrounding roadways shall be placed on the rear roof line.
14. The provisions of this conditional approval shall apply to and be binding
upon the applicant, its employees and all successors and assigns in
interest or control.
15. Any action by a Town Board, Commission, or Department which requires
changes in the plan or design of the building as presented to the Planning
Board, may be subject to modification by the Planning Board.
16. Any revisions shall be submitted to the Town Planner for review. If these
revisions are deemed substantial, the applicant must submit revised plans
to the Planning Board for approval.
17. This Special Permit approval shall be deemed to have lapsed after
Q��ub�r ao. i99'7 (two years from the date permit granted) unless
substantial use or construction has commenced. Substantial use or
construction will be determined by a majority vote of the Planning Board.
18. The following information shall be deemed part of the decision:
3
a. Plans titled: Central Metal Finishing
80 Flagship Drive
North Andover, MA 01845
Prepared by: Thomas E. Neve Associates, Inc.
447 Old Boston Road
Topsfield, MA
Sheets: L2-1 Site Development Plan
11 Aug 95, 5 Sept 95, 13 Sept 95, 19 Sept 95
L2-2 Engineering Details
11 Aug 95, 5 Sept 95, 13 Sept 95
A-1
11 Aug 95, rev. 19 Sept 95
A-2 Building Elevations
5 Sept 95, 13 Sept 95, 19 Sept 95
H-1 Pre-Development Hydrology
91/11/95, rev. 9/12/95
H-2 Post-Development Hydrology
9/13/95, rev. 9/19/95
b. Letter dated September 27, 1995 to Kathleen Colwell from John C.
Chessia, P.E. , Coler & Colantonio regarding the supplemental
engineering review for 80 Flagship Drive Building Addition and
Parking Lot expansion.
cc: Director of Public Works