September 5, 1995
i
North Andover planning Board
120 Main Street
North Andover, MA 01845 `
Re: Addition Proposal
Central Metal Finishing Inc./Electroplating Realty Trust
80 Flagship Drive
i
Attn: Ms. Kathleen Colwell,Town Planner
Dear Kathleen:
I wish to submit the following minor changes to the Central Metal Addition Proposal:
1. Evolution of the structural design for the addition has led us to conclude that extra
interior clear height is desirable. This would make the height of the addition
approximately fifteen feet-six inches (15' 6") at the rear and nineteen feet (19') at
the loading docks. This represents an increase in height of two feet (2') over the
existing manufacturing building.
2. Additional landscaping along the Trugreen-Chemlawn property line.
Thank you for your cooperation.
1
Sinarely,
i
S
I
i
James Bourgeois,RA
President EDC INC.
1
cc: Carol Shibles, Central Metal Finishing, Inc.
Steve Foster,Dutton& Garfield,Inc.
I
i
NEW MEADOWS PROFESSIONAL BUILDING 447 OLD 'BOSTON ROAD TOPSFIELD, MA 01983
PHONE (508) 887-8586 FAX '(508) 887-3480