Loading...
HomeMy WebLinkAboutDecision - 284 SALEM STREET 9/22/2004 Town of 1�of I. Andover f�ORTIl Q SjllD Office of the Planning Department Community Development and Services Division 27 Charles Street North Andover,Massachusetts 01845 9SSncwus Telephone(978)688-9535 Fax(978)688-9542 Town Planner Notice Of Decision Any appeal shall be filed This is to certify that twenty(20)days C Within (20) days after the have elapsed from date of decision,filed Date of filing this Notice without fillDate aq,a ,e as In the Office of the Town Joyce A,Bradshaw r, Town Clark .- Clerlt - U Date: September 22, 2004 . ' Date of Hearing: September,7, 2004 Decision: September 21, 2004 Petition of David Palmer,284 Salem Street,North Andover,MA 01 845 Premises Affected: 284 Salem Street,North Andover, MA 01845 Referring to the above petition for a Watershed Special Permit. The application was determined to be complete and was noticed and reviewed in accordance with the procedures for review and approval in accordance with the Rules and Regulations Governing the Subdivision of Land and M.G.L. Chapter 40-A,see 11 So as to allow: The re-permitting of reconstruction of a driveway, installation of a storm water management system, reconstruction of an existing deck and landscaping activities on the site located within the Non-Discharge and Non-Discharge Zones of the Watershed Protection District. After a public hearing given on the above date, the Planning Board voted to APPR(3 , the Watershed Special Permit, based upon the following co, ' 'tions: X'Tul Sign d;- berto Angles, Chiflitman Cc: Applicant ` `George White,Vice Chairman Engineer Felipe Schwarz, Clerk Abutters John Simons DPW James Phinney Building Department Conservation Department Health Department AT`t'['Co A True Copy ZBA BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLt NKftgWFJ 35 284 Salem Street Special Permit-Watershed Protection District The Planning Board makes the following findings regarding the application of David Palmer, filed on July 19, 2004. The area affected is located at 284 Salem Street in the R-3 Zoning District, Map 37D, Lot 39. The lot was created in 1984 and is subject to the Watershed Protection District provisions for lots created on or prior to October 24, 1994. The applicant is requesting a Watershed Special Permit for the re-permitting of reconstruction of a driveway, installation of a stormwater management system, reconstruction of an existing deck and landscaping activities on the site. Proposed activities will be located within the Non-Disturbance and Non-Discharge Zones of the Watershed Protection District.Public hearings were held on September 7,2004. History: The project was previously approved by the North Andover Planning Board, decision dated December 19, 2001. Activities did not commence within the 2 year permit period,therefore,the applicant re-filed the project with minor changes. FE4DINGS OF FACT: In accordance with 4.136 the Planning Board makes the finding that the intent of the Bylaw, as well as its specific criteria, are met. Specifically the Planning Board finds: 1. That as a result of the proposed construction in conjunction with other uses nearby, there will not be any significant degradation of the quality or quantity of water in or entering Lake Cochichewick. The Planning Board bases its findings on the following facts: a) The structure is iied into public sewer. b) A covenant will be placed in the deed restricting and limiting the types of fertilizers that can be used on the site. c) The topography of the site will not be altered substantially. d) The limit of clearing is restricted to the minimum necessary to construct the structure and appurtenances. All activities will be conducted in previously disturbed areas. e) Buffer zone restoration plantings will be conducted on the property, as required by the North Andover Conservation Commission. 2. There is no reasonable alternative location outside the Non-Discharge Buffer Zone, for any discharge, structure or activity, associated with the proposed project. 3. In accordance with Section 10.31 of the North Andover Zoning Bylaw,the Planning Board makes the following findings: a) The specific site is an appropriate location for the proposed use as all feasible stone waxer and erosion controls have been placed on the site; b) The use will not adversely affect the neighborhood as the use is accessory to an existing single family; c) There will be no nuisance or serious hazard to vehicles or pedestrians; d) Adequate and appropriate facilities are provided for the proper operation of the proposed use; stormwater mitigation structures will be installed on site and maintained in perpetuity; e) The Planning Board also makes a specific finding that the use is in harmony with the general purpose and intent of the North Andover Zoning Bylaw. Upon reaching the above findings, the Planning Board approves this Special Permit based upon the following conditions: 2)SPECL&L CONDITIONS: a) This Special Permit is being issued for the proposed activities submitted with this filing only. b) This decision must be filed with the North Essex Registry of Deeds. The following information is included as part of this decision: • Town of North Andover Planning Board Application for Watershed Special Permit filed by David Palmer,284 Salem Street,North Andover,MA; • Drainage Calculations for Residential Landscaping Improvements at 284 Salem Street, North Andover, MA, prepared by McKenzie Engineering Croup,Inc.dated May 21,2004; • Plans entitled: Plan to Accompany Notice of Intent Sheets 1-2, prepared by McKenzie Engineering Group,Inc.,dated March 24,2004,revised August 17,2004; d) The Town Planner shall approve any changes made to these plans. Any changes deemed substantial by the Town Planner would require a public hearing and modification by the Planning Board. e) Stormwater management structures must be maintained in perpetuity by the homeowners and in accordance to the maintenance schedule outlined on Sheet 2 of the record plans. 3) PRIOR TO ANY WORK ON SITE: a) A performance guarantee of two thousand dollars ($1,000) in the form of a check made out to the Town of Forth Andover must be posted to insure that construction Will take place in accordance with the plans and the conditions of this decision and to ensure that the as-built plans will be submitted. b) The decision must be filed with the North Essex Registry of Deeds. One certified copy ofthe recorded decision must be submitted to the Planning Department. c) Erosion controls as shown on the referenced plan must be installed and must be reviewed and approved by the Town Planner. d) The site shall have received all necessary permits and approvals from the North Andover Conservation Commission,Board of Health, and the Department of Public Works and be in compliance with the above permits and approvals. el Wetland resource area boundary flags must be in place and reviewed by the Town Planner. 4) PRIOR TO THE ISSUANCE OF A BUILDING PE Te a) Only organic or slow release lawn or garden products shall be used in lawn care or maintenance within 325' of Lake Cochichewick or within 325' of wetland resource areas. The applicant shall incorporate this condition as a deed restriction, and a copy of the recorded deed shall be submitted to the Town Planner and included in the file. b) The Planning Board must endorse the final site plan mylars and three copies of the signed plans must delivered to the Planning Department. 5) PRIOR TO THE RELEASE OF THE PERFORMANCE BOND: a) The applicant shall submit an as-built plan stamped by a Registered Professional Engineer or Land Surveyor in Massachusetts that shows all construction, limits of disturbance, existing topography, storm water mitigation structures and other pertinent site features. This as-built plan shall be submitted to the Town Planner and the Department of Public Works for approval. The applicant must submit a written stamped and signed, certification letter from the design engineer stating that the site was constructed in accordance with the approved plan, in addition to certification that the drainage structures have been properly installed. Any and all changes from the original plans must be clearly identified in the letter. b) The Planning Board must by a majority vote make a finding that the site is in conformance with the approved plan. 6) In no instance shall the applicant's proposed construction be allowed to further impact the site than as proposed on the plan referenced in Condition 4e. 7) No open burning shall be done except as is permitted during burning season under the Fire Department regulations. 8) The Contractor shall contact Dig Safe at least 72 hours prior to commencing excavation. 9)The provisions of this conditional approval shall apply to and be binding upon the applicant, it's employees and all successors and assigns in interest or control. 10 ) This Special Permit approval shall be deemed to have lapsed September 21, 2006 (two years from the date of issuance) exclusive of the time required to pursue or await determination of any appeals, unless substantial use or construction has commenced within said two year period. Substantial use or construction will be determined by a majority vote of the Planning Board. cc: Applicant Engineer File