Loading...
HomeMy WebLinkAboutCertificate of Compliance - 1499 SALEM STREET 6/9/1999 TOWN OF NORTH ANDOVER BOARD OF HEALTH CERTIFICATE OF COMPLIANCE DATE OF COMPLIANCE: 06/09/99 This is to certify that the individual subsurface disposal system constructed O or repaired (X ) by Dave Maynard at 1499 Salem Street has been installed in accordance with the provisions of Title V of the State Sanitary Code and with the North Andover Board of Health regulations as described in the Design Approval Site System Permit# 1013 dated 5/5/98. The Issuance of this certificate shall not be construed as a guarantee that the system will function satisfactorily. Board of Health Inspector TOWN OF NORTH ANDOVER SEWAGE DISPOSAL SYSTEM INSTALLATION CERTIFICATION The undersigned hereby certify that the Sewage Disposal System ) constructed; ( ) repaired; by - located at was installed in conformance with the North Andover Board of Health approved plan, System Design Permit# %> dated with an approved design flow of gallons per day. The materials used were in conformance with those specified on the approved plan; the system was installed in accordance with the provisions of 310 CMR 15.000, Title 5 and local regulations, and the final grading agrees substantially with the approved plan. All work is accurately represented on the As-built which has been submitted to the Board of Health. Bed inspection date: En ineer Representative Final inspection date: Engineer Representative Installer: Lic.#: Date: Design Engineer: Date: Z I J AS-BUILT CHECKLIST LOT NUMBER, STREET NAME �✓ ASSESSORS MAP & PARCEL MJNIBER LOT LINES & LOCATION OF DWELLINGS LOCATION & DEMENSIONS OF SYSTEM, INCLUDING RESERVE TIES TO LOT LINES & DWELLING, WELLS a. FROM SEPTIC TANK b. FROM LEACH AREA LOCATIONS OF DEEP HOLES & PERC TESTS ELEVATIONS OF DISPOSAL SYSTEM TOP OF FDN ELEVATION LOCATIONS OF WELLS, DRAINS, WATERCOURSES W/IN 150' OF SYSTEM LOCATION OF WATER, GAS, ELECTRIC LINES, CABLE DISTANCES FROM CORNERS OF HOUSE TO CENTER OF TANK & D-BOX STAMP & SIGNATURE 1 IMPERVIOUS AREAS - DRIVEWAYS, ETC. NORTH ARROW FINAL CONTOURS LOCATION & ELEVATION OF BENCHMARK USED LOCUS PLAN