Dear John:
The attached site plans and drainage calculations were submitted to the Town of North Andover on
August 4, 1997 for a Planning Board hearing on September 2, 1997. We are also in the process of filling a
Notice of Intent with the Conservation Commission by August 8, 1997 for a hearing on August 20, 1997.
Bill Scott suggested that we send the drainage calculations directly to you for review on behalf of the
Planning Board. Mike Howard also requested that you review the drainage with respect to water quality issues
on behalf of the Conservation Commission.
Please forward your review comments to our office and let us know if you need any additional
information.
Very Truly Yours,
M1IF ign Consu ants, Inc.
r, C. Monteiro, P.E.
icipal
FCM:jjn
42696.1tr
CR42696
Enclosures
cc: Bill Scott -N. Andover Community Dev.
Mike Howard - N. Andover Cons. Cam.
Greg Wiech- Channel Building Co., Inc.
ENGINEERS PLANNERS SURVEYORS
MHF Design Consultants, Inc. 12-B Manor Parkway^ Salem, NH 03079 ^TEL(603) 893-0720• FAX(603)893-0733
Se
Mr. John Chessia, P.E.
Coler & Colantonio, Inc. I ',
101 Accord Park Drive, Suite One
Norwell, MA 02061-1685
Re: Channel Building Co., Inc.
Map 25 Lot 75
Flagship Drive
N. Andover, MA
S ub: Engineering Review
Dear John:
Attached for your review are revised site plans and drainage calculations for the above referenced project.
These revisions incorporate your review comments dated August 29, 1997.
Since your initial review, we have met with Mike Howard to discuss design changes whereby this project
would no longer disturb the 100' wetland buffer. Therefore, this project would no longer be subject to the Wetlands
Protection Act nor the MA DEP Stormwater Policy (see attached letter to Mike Howard dated 9-23-97).
The following is out response to your comments which have been numbered to correspond with your letter.
1. No response required.
2. Revised accordingly.
".. � A letter shall be forthcoming from the owner of abutting Lot 82 acknowledging minor grading and
construction of the driveway on Lot 82,
(44� Grading into the Flagship ROW has been deleted. A letter shall be forthcoming from the owner of
. abutting Lot 85 acknowledging the slope easement.
5 Drainage revised.
6. Slope added to detail
7. The wetland delineation on Lot 85 which was done by W.P.I. in 1990 has been added to the plans.
It is our understanding that this was accepted by the Conservation Commission.
8. No response required.
9. See note#6 on Site Plan.
10. All refuse is enclosed by means of trash compactor and trailer body. The landscape plan shows heavy
landscape screening in front of the compactor and truck loading facility. Ten Austrian Pine (6 to 7'
in height) in the background and twelve variegated Red Twig Dogwood (3' to 4' in height) in the
foreground have been proposed for screening,
11. Wall mounted light fixtures are shown on the Site Plan and labeled.
12. No response required .
13. Revised accordingly.
ENGINEERS ® PLANNERS 0 SURVEYORS
NNEJOW no=
-----OMM
A MWM�
MHF Design Consultants, Inc.
Mr. John Chessia, P.E.
September 23, 1997
Page 2
14. The drainage calculations have been revised. Only the closed system drainage design uses the Rational
Method. The software used for this analysis is StorniCad by Haestad Methods, Inc. Excerpts from
previous calculations verify the proposed drainage system outlets into the existing drainage systems.
The report explains previous design assumptions.
15. Full scale prints are now included with the drainage calculations for the Pre & Post-Development
drainage areas. Ground cover and soil type has been indicated on the Existing Conditions Plan. All
disturbed area on the site will be loamed and hydroseeded, as noted on the landscape plan.
16. No longer applicable.
17. All slopes are 3H:1V adjacent to the swale.
18. Test pits have been performed and are included in the drainage report appendix. No on-site storm
water storage is proposed at this time. As mentioned previously, the MA DEP Stormwater policy is
no longer applicable to this project.
19. If the DI structure,located in the grass swale along the southerly portion of the site becomes plugged,
an emergency outlet exists through the proposed weir opening. Both openings have been covered by
proposed trash racks.
20. Revised accordingly.
21. Added accordingly.
22 thru 26. No longer applicable.
The Standards of the Stormwater Policy are no longer applicable to this project. Please call our office if
you have any additional comments.
Very Truly Yours,
MtlT esign Consultants, Inc.
r, k C. Monteiro, P.E.
incipal
ric
FCM:jjn
4269 63,Itr
CR42696
Enclosures
cc: Bill Scott - N. Andover Planning Dept.
Mike Howard - N. Andover Cons. Cam.
Greg Wiech - Channel Building Co., Inc.
D
womw am
® o
MHF Design Consultants, Inc.
12-B Manor Parkway•Salem, NH 03079 •TEL(603)893-0720• FAX(603)893-0733
September 23, 1997
Mr. Michael Howard
North Andover Conservation Commission
30 School Street
North Andover,MA 01845
Re: Nlap 25 Lot 75
Flagship Drive
Sub: NOI Submission
Dear Mike:
Please find attached for your review a revised
reved site
th plans g ading and drainage design so that there is
discussed at our meeting on September 12, 1997,
no disturbance to the 100'wetland buffer. Additionally,the proposed point of stormwater discharge is located on site
and outside of the 100' buffer. Therefore, it is our opinion that the NIA DEP Stormwater Policy is no longer
applicable to this project.
As discussed with you on September 12, 1997, the stormwater runoff from the development of this lot was
master planned to discharge into e cisting detention basins s no located off-site.detention These basin required on-site. were
designed to include runoff from this lot. Therefore,
there is no ad
As discussed in the Stormwater Policy (Volume One on page 2-4, r�Protect noAct.s It is our opinion
outside of the 100' buffer zone, then there is no jurisdiction unr the lW Wetlands
which is outside of the 100 buffer zone.
that the "new point source" is located on-site, in a proposed grass
Please review the revised plans and let us know if you concur with our opinion. Thank you for
consideration.
Very Truly Yours,
tiIHT esign Consultants, Inc.
k C. Monteiro, P.E.
incipal
FCM:j jn
4269 62.1tr
CR42696
Attachment
cc: William Scott- Planning Department
Greg Wiech - Channel Building
- ENGINEERS •
PLANNERS SURVEYORS
® MEMEW A NEEMMMO
MHF Design Consultants, Inc.
12-B Manor Parkway• Salem, NH 03079 -TES 3 �„ 9a�0 33
September 29, 1997
Mr. John Chessia, P.E.
Coler & Colantonio, Inc.
101 Accord Park Drive, Suite One
Norwell, MA 02061-1685
Re: Channel Building Co., Inc.
Map 25 Lot 75
Flagship Drive
N. Andover, MA
Sub: Engineering Review
Dear John:
Attached for your review are revised plans and drainage calculations for the above referenced project. These
revisions incorporate review comments made to us by Mike Howard via the telephone on September 25, 1997. These
are the same revisions which were faxed to your office on September 26, 1997.
Please call our office if you have any additional comments.
Very Truly Yours,
MHF esign Consultants, Inc.
C. Monteiro, P.E.
rincipal
FCM:clp
426964.1tr
CR42696
Enclosures
cc: Bill Scott - N. Andover Planning Dept.
Mike Howard - N. Andover Cons. Cam.
Greg Wiech - Channel Building Co., Inc.
ENGINEERS PLANNERS SURVEYORS
5-14-98; 11 :49AM;Channe1 2uilding Co. ;978 657 7788 # 2/ 2
r
HF DesIgn Consultants, Inca 12•S Manor Parkway,Salem,NH 03079 o TEL(603)893-0720,FAX(603)893.0733
May 14, 1998
h1s.Kathleen. Colwell
N. Andover Office of Community
Development and Services
30 School Street
N. Andover, MA 01845
Re: MW 25 Lot 75 (aka Lot 2A)
Flagship give
Sub: Certificate of occupancy
Dear Kathleen:
It is out void ding that Channel i3uilding Company is in the process of obtaining a Certificate of
Occupancy for the above referenced project. In accordance with the Notice of Decision issued by the Planning
Hoard on October 10, 1997, the intent of this letter is to determine if the consuuWon complies with the
approved plus.
On May 13, 1998, we conducted a site visit to observe the construction to date. Based upon oug
obsetvstious, the project substantially complies with the approved plans with the following exceptions:
1. The final wearing course of pavement needs to be placed. The parking spaces have been striped
on the binder coarse.
2. Norte of the landscaping has been installed nor has the hydroseeding been done.
3. The directional signs have not been installed at the driveway.
4. The main ground sip has not been installed
5. 'The handicap sign8ge has not beery installed.
6. The side slopes of the grass Swale on the south side of the building creed to be adjusted The
sidcslopes of the Swale need to be planted with a wetland grass mix per the plans.
7. Tire a-AA racks need to be installed on Drop Wet#1.
S. The grease traps treed to be installed oil the outlet pipes of the catch basins.
Please contact our office if you have any questions.
Very Truly Yours,
MHF Consultants, Inc
C. moniteiro, PE
cipal
Fcm.bn
42696.Itr
CR 422696
cc: Jerry D'Orio - Channel
eNGINEERS a PLANNERS SURVEYORS
Design vam
MHF on ultant , Inc. 12-5 Manor Parkway«Salem, NI-1 03079 r TEL(003)303-0720-FAX(003)393-0733
Novemker'10;1998
Ms. Kathleen Colwell,Town Planner
N. Andover Office of Community
Development and Services
27 Charles Street
N. Andover,MA 01845
Re: Map 25 Lot 75 (aka Lot 2A)
Material Installations
Flagship Drive
Sub: Site Plan Compliance
i
Dear Kathleen:
I
This letter is a follow-up to our May 1.4, 1998 letter regarding the above referenced project. We
conducted a site visit on November 9, 1998 to observe the site construction to date. Based upon our observations,
the site has been constructed insubstantial compliance with the approved plans. It should be noted that one"van-
accessible" sign is missing at the handicapped parking spaces. Also, some of the landscaping around the
perimeter of the building was omitted.
Please contact our office if you have any questions.
Very Truly Yours,
7cipal gn Cons Itants,Inc.
onteiro,P
i
i
i
FCM:jjn
426 96a.1tr
CR 42696
cc: Jerry Diorio-Channel
ENGINEERS PLANNERS SURVEYORS