Loading...
HomeMy WebLinkAboutPermits Permit # 5/13/2005 Map-Block-Lot commonwealth of Massachusetts 105.D-0113 C @Tyy ----------------------- Board of Health PennitNo BHP-2005-0119 North Andover FEE $125.00 f 4 P.I. _-- ----------------------- �r�sAr.s+ 4f� F.I. ----- Disposal Works Construction Permit John Souc ------------------------ ranted -- - y -------------- -- permission is hereby g ----- - ------------------------ to(Repair-D-BOX ONLY) an Individual Sewage Disposal System. TREET - - - - - --- ------ ---- at No 45 LAC ----------------------------------- - - 13,2005 as shown on the application for Disposal Works Construction Permit No. BHP-2005-011_ Date aY --------------------------------------- -6 � --- -------- ---------- Boar-k f Heck Issued On:May-13-2005 _--_____ --------------------- f; G l Lf f Tf {1 l J f ff f J- J F" �..........f, fE; r /Ci, TOWN OF NORTH ANDOVER � ,aORTH � i 1 SERVICES 64,1 btlR l4 gaar�� Office of COMMUNITY LDC'�/E,�,f)PIVIC,NT �.fVD HEALTH DEPARTMENT 400 OSGOOD STREET NORTH ANDOVER MASSACHUSETTS 01845 �'�s"«,.,oar' �CNus 978.688.9540—Phone Susan V.Sawyer, REHS/RS 978.688.9542—FAX Public Health Director healthdeptatownofiiorthan dove r.com-e-mail www.townofnorthandover.com-website APPLICATION FOR DISPOSAL WORKS CONSTRUCTION PERMIT DATE: .._ LOCATION: LICENSED INSTALLER NAME: & PLEASE PRIN I SIGNATURE: ,.-..., k 4 TELEPHONE# c �.. �I CHECK ONE. FULL SYSTEM REPAIR: ($250) COMPONENT REPAIR(indicate what parts): ') f , %,k°µ ''3' ($125) • NEW CONSTRUCTION: • If NE ; CONSTRUCTION, please attach the Foundation As-Built Plan. ... $250.0010 125 Fe Attached? Yes No Project Manager Obligation From Attached? Yes No Foundation As-Built? Yes No Floor Plans? Yes No ate Approval of Health Agent :. ' ' INSTALLER PROJECT MANAGEMENT OBLIGATIONS As the North Andover licensed installer for the construction of the septic system for the property at relative to the application of dated 6_^/3 for plans by Leo -4e and dated with revisions dated I understand the following obligations for management of this project: 1. As the installer I am obligated to obtain all permits and Board of Health approved plans prior to performing any work on a site. I must have the approved plans and the permit on site when any work is being done. 2. As the installer I must call for any and all inspections. If homeowner, contractor, project manger, or any other person not associated with my company schedules an inspection and the system is not ready then item three shall be applicable. 3. As the installer I am required to have the necessary work completed prior to the applicable inspections as indicated below. I understand that requesting an inspection, without completion of the items in accordance with Tile 5 and the Board of Health Regulations may result in a$50.00 fine being levied against my company. a) Bottom of Bed - generally first inspection unless there is a retaining wall which should be done first. Installer must request the inspection but does not have to be present. b) Final inspection — Engineer must first do their inspection for elevations, ties, etc. As-built or verbal OK from engineer must be submitted to Board of Health, after which installer calls for inspection time. Installer must be present for this inspection. With pump system all electrical work must be ready and able to cause pump to work and alarm to function. c) Final Grade—Installer must request inspection when all grading is complete. Does not have to be on site. 4. As the installer I understand that only I may perform the work(other than simple excavation) required to complete the installation of the system identified in the attached application for installation. I further understand that work by others unlicensed to install septic systems in North Andover can constitute reasons for denial of the system, and/or revocation or suspension of my license to operate in the Town of North Andover; significant fines to all persons involved are also possible. 5. As the Installer I understand that I must be on site during the performance of the following construction steps: a) Determination that the proper elevation of the excavation has been reached. b) Inspection of the sand and stone to be used. c) Final inspection by Board of Health staff or consultant. d) Installation of tank, D-box, pipes, stone, vent, pump chamber, retaining wall and other components. 6. As the installer I understand that I am solely responsible for the installation of the system as per the approved plans. No instructions by the homeowner, general contractor, or any other persons shall absolve me of this obligation. Undersigned Ijlecen ed Septic Installer r r Date: C �� Disposal W rks Construction Per it#