NOTICE OF DECISION
Any appeal shall be filled
within (20) days after the
date of filling this Notice
in the Office of the Town
Clerk.
Date April 9, 1997
Date of Wearing March 18 &_APx_iJ_3_,_ 1997
Petition of 120 rear Main Street (senior Center)
Premise's affected 120 MaiN Street
Referring to the above petition for a special permit from the
requirements of the Zoning Bylaw Section 8.3 Site Plan Review
so as to allow 560 SP add; ;c a o the existing Senior Center
building.
After a public hearing given on the above date, the Planning Board
voted to APPROVE the Special Permit
based upon the following conditions:
f
Signed --;
CC: Director of Public Works Joseph V. Mahoney, Chairman
Building Inspector
Natural Resource/Land Use Planner Richard Rowen, Vice Chairman
Health Sanitarian
Assessors Alison Lescarbeau, Clerk
Police Chief
Fire Chief Richard Nardella
Applicant
Engineer John Simons
File
Interested Parties Planning Board
BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535
Town of North Andover NCRTN
OFFICE OF 3�a,t"`° °,tipot
COMMUNITY DEVELOPMENT AND SERVICES
146 Main Street **�9
North Andover, Massachusetts 01845 �, *1.A,,, °�y
WII.LIAM J.SCOTT 9SSACHUS��
Director
April 9, 1997
ti
Ms . Joyce Bradshaw
Town Clerk
120 Main Street
No . Andover, MA 01845
Re : Special Permit/Site Plan Review 120 Main Street
Dear Ms . Bradshaw,
The North Andover Planning Board held a public hearing on Tuesday
evening, March 18, 1997 at 7 : 30 p.m. in the Senior Center behind
the Town Building, on the application of System Builders, Inc.
202 Sutton Street, North Andover, MA 01845, for a special permit
under Section 8 . 3 (Site Plan Review) of the North Andover Zoning
Bylaw. The legal notice was properly advertised in the North
Andover Citizen on February 26 and March 5, 1997 and all parties
of interest were duly notified. The following members were
present : Joseph V. Mahoney, Chairman, Alberto Angles, Associate
Member, Alison Lescarbeau, Clerk, John Simons, Richard Nardella
and Richard Rowen. Kathleen Bradley Colwell,. Town Planner was
also present.
The petitioner was requesting a special permit to allow
construction to a 4, 560 SF addition to the existing Senior Center
building.
Kathleen Gorman, Director, was present representing the Senior
Center. Ms . Gorman stated that they have received a grant of
$583, 000 that will pay for all the construction and will not cost
the town anything. Ms . Gorman stated that the seniors gave a lot
of support and fundraised $42, 000 . The majority of that money
has come from the seniors themselves .
Dennis Ingram, architect for the Senior Center, stated that it
would be a 4, 500 SF addition. The building will not exceed in
height the existing building. There will be 10 parking spaces
lost but, they will still have an area for drop off. Mr. Ingram
stated that the initial plan did not have sidewalks but they have
added a 3' sidewalk along the front of the building. They would
like to use the side of the building for handicap parking spots
and for the loading dock.
1
BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535
Mr. Rowen asked what would be unloaded at the dock. Mr. Ingram
stated that it would be used for the Meals on Wheels .
Mr. Mahoney asked who owned the building and the parking lot.
Mr. Ingram stated that the town did. Mr. Mahoney asked if the
plan meets the parking regulations . Mr. Ingram stated yes it
did.
t
Mr. Rowen asked if the parking lot was full of cars often. Mr.
Ingram stated that when a special event is held the lot is full .
Such as when the flu clinics are held or when a bus trip is
scheduled. The Senior Center has discussed alternate parking
site on bus trip days .
Mr. Mahoney asked what the issues were with the drainage. Bill
Scott, Director of Community Development, stated that Bill
Hmurciak, Asst. Director DPW, said that there will be no problem
with the drainage.
Mr. Nardella asked if there was going to be any additional
lighting on the building and if so will they be on all night.
Mr. Ingram stated that they will add lighting to the loading area
side of the building but will not be on all night.
Mr. Mahoney asked how they are going to control the noise from
the HVAC Units . Mr. Ingram stated that they are putting them on
the roof and the smaller unit will be on the back for the
kitchen. They are planning to add baffling to control the noise.
Ms . Colwell asked what they are planning to do with the
landscaping. Mr. Ingram stated that they want to work with the
existing trees and plants and would like to transplant them.
Ms . Colwell asked where they plan on putting the dumpster. Mr.
Ingram stated that they will use trash barrels and keep them in
the back near the loading dock.
Ms . Lescarbeau asked what the total number of parking spaces
there were . Mr. Scott stated that there was about 62 in the
lower parking lot near the• Annex Building and 35 in the upper
building. Mr. Scott added that a lot of the senior citizens
either walk, carpool or take the Weebus service . Ms . Colwell
stated that the regulations require 1 space for every 4 people.
Frank Generelli, Brewster Street, stated that this is an asset to
the community and will put the seniors into the 21st century.
Mr. Generelli also stated that a lot of people have put many of
hours into this grant and the new building will entice new
residents .
2
Gene Willis, believes this is a tremendous asset to the town but
has a concern for keeping the screening and to continue to keep
the gate closed entering his neighborhood.
Lillian Boyle, stated that she moved here two years ago and the
Senior Center has opened so many doors for her. She also stated
that the Town of North Andover has been wonderful and has been
t like a lifeline for her.
On a motion by Mr. Rowen, seconded by Mr. Nardella the Board
voted unanimously to close the Public Hearing.
The Board directed Ms . Colwell to draft a decision based upon
the Boards comments .
The North Andover Planning Board held a public hearing on Tuesday
evening, April 8, 1997 . The following members were present:
Richard Rowen, Vice Chairman, Alison Lescarbeau, Clerk, Alberto
Angles, Associate Member and Richard Nardella. Kathleen Bradley
Colwell, Town Planner was also present.
Ms . Colwell stated that in her draft decision she put in that the
HVAC units must shielded from the residential neighborhoods .
On a motion by Mr. Angles, seconded by Ms . Lescarbeau the Board
voted unanimously to accept the Site Plan Review Special Permit
draft decision as amended.
Attached are the conditions .
Sincerely,
-�
r-4
Joseph V. Mahoney
3
120 Main Street(Senior Center)
Site Plan Review-Special Permit
The Planning Board herein approves the Special Permit/Site Plan Review for the construction of a
4,560 SF addition to the existing Senior Center located at 120 Main Street, North Andover, MA
01845. This Special Permit was requested by Kathleen Gorman, Director, North Andover Senior
Center, 120 Main Street,.North Andover,MA 01845 on February 20, 1997.
The Planning Board makes the following findings as required by the Zoning Bylaw Section 8.3 and
10.3:
FINDINGS OF FACT:
1. The specific site is an appropriate location for the project as this is an addition to the existing
Senior Center building.
2. The use, as developed, will not adversely affect the neighborhood as lighting and air
conditioning units will be shielded from abutting homes,
3. There will be no nuisance or serious hazard to vehicles or pedestrians as the majority of senior
citizens either car pool or use the wee bus service to attend functions at the Senior Center,
4. The existing landscaping will be replanted with the addition,
5. No new drainage is proposed on site as no additional impervious surface will be created.
6. No new lighting is proposed on the site. The existing lights will be adjusted to fit the new
addition.
7. The applicant has met the requirements of the Town for Site Plan Review as stated in Section
8.3 of the Zoning Bylaw;
8. Adequate and appropriate facilities will be provided for the proper operation of the proposed
use.
Finally, the Planning Board finds that this project generally complies with the Town of North Andover
Zoning Bylaw requirements as listed in Section 8.35 but requires conditions in order to be fully in
compliance. The Planning Board hereby grants an approval to the applicant provided the following
conditions are met: `
SPECIAL CONDITIONS:
1. Prior to any work on site,the applicant shall adhere to the following:
a) The final plan must be reviewed and approved by the Town Planner and subsequently
endorsed by the Planning Board. The final plans must be submitted for review within
ninety days of filing the decision with the Town Clerk.
1
b) A bond in the amount of two thousand ($2,000) dollars shall be posted for the
purpose of insuring that a final as-built plan showing the location of all on-site utilities,
structures, curb cuts, parking spaces and drainage facilities is submitted. The bond is
also in place to insure that the site is constructed in accordance with the approved plan.
This bond shall be in the form of a check made out to the Town of North Andover.
This check will then be deposited into an interest bearing escrow account.
c) A construction schedule must be submitted to the Planning Staff for the purpose of
tracking the construction and informing the public of anticipated activities on the site.
2. The hours for construction must be limited to between the hours of 7:00 a.m. and 7:00 p.m..
Trucking of supplies and the use of heavy of equipment must also be restricted to these hours.
Sunday and Holiday construction will not be permitted.
3. Prior to FORM U verification(Building Permit Issuance):
a) The final site plan mylars must be endorsed and three (3) copies of the signed plans
must be delivered to the Planning Department.
b) This decision must be recorded at the Essex North Registry of Deeds and a certified
copy of the decision delivered to the Planning Staff.
4. Prior to verification of the Certificate of Occupancy:
a) HVAC units or other noise producing mechanisms must be shielded from the
residential neighborhood.
a) The applicant must submit a letter from the architect or engineer of the project stating
that the building, signs, landscaping, lighting and site layout substantially comply with
the plans referenced at the end of this decision as endorsed by the Planning Board.
b) All artificial lighting used to illuminate the site shall be approved by the Planning Staff.
All lighting shall have underground wiring and shall be so arranged that all direct rays
from such lighting falls entirely within the site and shall be shielded or recessed so as
not to shine upon abutting properties or streets. The site shall be reviewed by the
Planning Staff Any changes to the approved lighting plan as may be reasonably
required by the Planning Staff shall be made at the owner's expense.
c) The building must have commercial fire sprinklers installed in accordance with the
North Andover Fire Department.
2. Prior to the final release of security:
a) The site shall be reviewed by the Planning Staff. Any screening as may be reasonably
required by the Planning Staff will be added at the applicant's expense.
b) A final as-built plan showing the location of all on- site utilities, structures, curb cuts,
2
parking spaces and drainage facilities must be submitted to and reviewed by the
Planning Staff and the Division of Public Works.
3. Any stockpiling of materials (dirt, wood, construction material, etc.) must be shown on a plan
and reviewed and approved by the Planning Staff. Any approved piles must remain covered at
all times to minimize any dust problems that may occur with adjacent properties. Any stock
piles to remain for longer than one week must be fenced off and covered.
4. Any plants, trees or shrubs that have been incorporated into the Landscape Plan approved in
this decision that die within one year from the date of planting shall be replaced by the owner.
5. The contractor shall contact Dig Safe at least 72 hours prior to commencing any excavation.
6. Gas, Telephone, Cable and Electric utilities shall be installed as specified by the respective
utility companies.
7. All catch basins shall be protected and maintained during construction with hay bales to prevent
siltation into the drain lines.
8. No open burning shall be done except as is permitted during burning season under the Fire
Department regulations.
9. No underground fuel storage shall be installed except as may be allowed by Town Regulations.
10. The provisions of this conditional approval shall apply to and be binding upon the applicant, its
employees and all successors and assigns in interest or control.
11. Any action by a Town Board, Commission, or Department which requires changes in the plan
or design of the building as presented to the Planning Board, may be subject to modification by
the Planning Board.
12. Any revisions shall be submitted to the Town Planner for review. If these revisions are deemed
substantial, the applicant must submit revised plans to the Planning Board for approval.
13. This Special Permit approval shall be deemed to have lapsed after CA pc G ►GG
(two years from the date permit granted) unless substantial use or construction has
commenced. Substantial use or construction will be determined by a majority vote of the
Planning Board. `
14. The following information shall be deemed part of the decision:
Plan titled: Addition to North Andover Senior Center
126 Rear Main Street
North Andover,Massachusetts
Architect: Facility Design&Management,Inc.
855 Turnpike Street
North Andover,Massachusetts 01845
3
Issues Date: February 18, 1997
Sheets: A-1 Plan of Land
A-2 Existing Conditions
A-3 Existing-Utilities'
A-4. Proposed Plan
A-5 Utility Layout
A-6 Layout and Grading Plan
A-7 Proposed Planting Plan
A-1.1 Floor Plan Loading Dock(Service Area)
Elevation titled:North Andover Senior Center Expansion
Dated: March 18, 1997
Created by: Facility Design and Management,Inc.
North Andover,Massachusetts
cc: Director of Public Works
Building Inspector
Health Administrator
Assessors
Conservation Administrator
Planning Board
Police Chief
Fire Chief
Applicant
Engineer
File
120 Main Street(Senior Center)-Site Plan Review
4