HomeMy WebLinkAboutMiscellaneous - 255 HAY MEADOW ROAD 4/7/1988 l ' 4_01_1, Form B D E 0 E File No. 242-456 _ g* (To be provided by DEQE) = City/Town North Andover Commonwealth of Massachusetts Applicant G & P Realty Trust ` Lot 64A - Haymeadow Road I�t order of Conditions Massachusetts �otlar�ds Protection Act � w, G.L. tc. 131 , §40 rand under the Town of North Andover's Town Bylaw, Chapter 3.5 A&B From North Andover Can erva G & P Realty Trust G & P Realty Trust To (Name of Applicant) (Name of property owner) 731 Winter Street 731 Winter Street Address North Andover, MA Address North Andover, MA This Order is issued and delivered as follows: (date) (� by hand delivery to applicant or representative on O by certified mail, return receipt requested on • (lake) This project is located at Lot 64A - Haymeadow Road The property is recorded at the Registry of North Essex Boo k 2463 Page 2_ 3 Certificate (if registered) The Notice of Intent for this project was filed on Anri7 7 198$ (date) The public hearing was closed on June $, 19$$ (date) Findings The North Andover Conservation Commission has reviewed the above-referenced Notice of Intent and plans and has held a public hearing on the project. Based on the information available to the NACC at this time, the NACC has determined that the area on which the proposed work is to be done is significant to the following interests in accordance with the Presumptions of Significance set forth in the regulations and precedent and practice under this Town's ByLaw for each area subject to protection under the Act and ByLaw: d Public water supply 9 Flood control ❑/ Land containing shellfish L3� Private water supply 9 Storm darnage prevention ® Fisheries C� Ground water supply C� Prevention of pollution U Protection of wildlife habitat 5-1 242-458 Lot 64A, - Haymeadow Road Therefore, the NACC hereby finds that the following conditions arc necessary, in accordance with the Performance Standards set forth in the regulations, to protect those inter- r ests checked above. The —. AC-Cd orders that all work shall be performed in accordance with said conditions and with the Notice of Intent referenced above. To the extent that the fol- lowing conditions modify or differ from the plans, specifications'or other proposals submitted with the Notice of Intent, the conditions shall control. General Conditions 1. Failure to comply with all'condiiions slated herein, and with rill related statutes and other regulatory meas- ures, shall be deemed cause to revoke or modify this; Order. 2. This Order does not grant any property rights or nny exclusive privileges,. it does not authorize any injury to private property or invasion of private rights. 3. This Order does not relieve the permillee or any other person of file necessity of complying with all other applicable fedetal, slate or local statutes, ordinances, by-laws or regulations. 4. The work authorized hereunder shall be completed within three years from the dale of this Order unless either of the following apply: (a) the work is a maintenance dredging project as provided for in the Act; or (b) the limn: for completion has been extended to a specified date more than three years, but less Char five years, from the dale of issuance and both that dale and the special circumstances warranting the exlcndcd time period are set forth in this Order. S. This Order rnny be extended by the issuing authority for one or more, periods of up tpthree years each upon application to the Issuing authority nt least 30 days prior to the expiration dale of the Order. 6. Any fill used in connection with this project ;;hall be clean fill, containing no trash, refuse rubbish or de- bris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles or parts of any of the foregoing. 7: � No work shall be undertaken until all administrative appeal periods.from.this Order have elapsed or, if such an appeal has been filed, until all proceedings before the Department have been completed. 8. No work shall be undertaken until the Final Order has been recorded in the Registry of Deeds or the land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of registered land, the Final Order shall also be noted on the land Court Certificate of Title of the owner of the land upon which the proposed work is to be done. The recording information shall be submitted to the NACC on the form at the end of this Order prior to commencement of the work. 9. A sign shall be displayed at the site not less than two square feel or more than three square feet in'size bearing the words, "Massachusetts Department of Environmental Quality Engineering, File Number 242- 458 10, Where the Department of Environmental Qualily Lngincerinq Is requested to make a determination and to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before the Department. 11 , Upon completion of the work described herein, the applicant shall forthwith request in writing that a ;•;'2 Certificate of Compliance be issued stating that the work lips been satisfactorily completed. 12. The work shall conform to the following plans and special conditions: r Page -3- ORDER OF CONDITIONS LOT 64A - HAYMEADOW ROAD D.E.Q.E. #242-458 12. The work shall conform to the following plans and additional Conditions: a. Notice of Intent submitted by G & P Realty Trust, prepared by Yankee Engineering of Methuen Inc. , dated April 6, 1988. Seven (7) sheets. b. Plan entitled "Site Plan of Land Located in North Andover, MA" prepared for Marino Custom Homes by Yankee Engineers, dated March 23, 1988, last revised June 13, 1988. One (1) sheet, Labeled Job No. 002-0171 . C. Letter from abutters dated May 12, 1988. Three (3) sheets. d. Plan entitled "Concrete Bridge - N. Andover, MA," prepared by Newstree International Inc. , for Marino Custom Homes. Undated One (1) sheet. Labeled Drawing No. PB-1 . e. Letter from abutters Mr. & Mrs. T. Snyder. Undated. One(1) sheet. f. Memorandum from Marino Custom Homes to NACC dated June 22, 1988. One (1) sheet. g. Sheet entitled "Construction Sequence - Lot 64 Haymeadow." Undated. Unsigned. h. Letter from Yankee Engineers to NACC. Undated. One (1) sheet i. Letter and report from Wetlands Preservation Inc. , to Marino Custom Homes dated June 25, 1988. Eight (8) sheets. j . Letter from G & P Relaty Trust dated April 27, 1988. One (1) sheet. k. Memorandum from Jack Lindon of NACC dated:October 19, 1987 Three (3) sheets. GENERAL CONDITIONS 13. The NACC has considered work at this site under Files X1242-16, 242-128, 242-263, and 242-413. Work for construction of the house proposed for this lot is covered under File 11242-413. This Order of Conditions, which only covers the proposed stream crossing and driveway, is issued in addition to that file. 14. Previous files have proposed multiple crossings of the wetland resource areas in this general location, specifically to create up to three drive- way crossings to access three residential house lots. The NACC has either denied the proposed work, or conditioned it to allow only one crossing for a common driveway. The applicant has attempted to secure a common drive- way permit through the Planning Board, and has not been successful in achieving this goal, although not all avenues of appeal have been exhausted. Page -4- ORDER OF CONDITIONS LOT 64A - Haymeadow Road D.E.Q.E. 11242-458 15. The following wetland resource areas are affected by the proposed work: bank, land under water, bordering land subject to flooding, and bordering vegetated wetland. These resource areas are significant to the interests of the Act and Town Bylaw as noted above. These resource areas are also significant to the recreation interests of the Bylaw. The applicant has not attempted to overcome the pre- sumption of significance of these resource areas to the identified interests. 16. The NACC agrees with the applicant's delineation of the wetland resource areas at the site. PERFORMANCE/DESIGN STANDARDS/CHANGES: 17. The applicant, despite strong NACC indications, relinquished the alternative of providing access to Lot 64A through Lot 62A by selling the latter lot without retaining a driveway easement. There- fore the NACC does not consider this a limited project since the applicant had an alternative access through the upland area on Lot 62A. Accordingly, the NACC approves a bridge crossing only if all bordering vetetated wetland impacts are eliminated by extending the length of the bridge. 18. No earthen embankment in the buffer zone shall have a slope steeper than 2: 1. Any slopes of steeper grade shall be rip-rapped to provide permanent stabilization. 19. The NACC finds the applicant's proposal for wetland replacement areas to be adequate, but finds the plan lacking in detail. Accordingly, prior to the start of construction on the site the applicant shall submit a comprehensive wetland replacement plan which meets all of the requirements of the wetland regulations. This plan shall be reviewed and approved by the NACC prior to its implementation. 20. Any changes in the submitted plans, Notice of Intent, or resulting from the aforementioned conditions must be submitted to the NACC for approval prior to implementation. If the NACC finds, by majority vote, said changes to be significant and/or to deviate from the original plans, Notice of Intent, or this Order of Condiitons to such an extent that the interests of. the Act and Bylaw cannot be protected by this Order of Conditions and would best be served by the issuance of additional conditions, then the NACC will call for another public hearing within 21 days, at the expense of the applicant, in order to take testimony from all interested parties. Within 21 days of the close of said public hearing, the NACC will issue an amended or new Order of Conditions. 21. Any errors found in the plans or information submitted by the applicant shall be considered as changes, and procedures outlined above in Condition 1120 for changes shall be followed. Page -5- ORDER OF CONDITIONS Lot 64A - Haymeadow Road D.E.Q.E. X1242-458 22. A final set of plans shall be submitted to the NACC for review and approval prior to start of construction. These plans and letter shall address all items identified or requested by Conditions 17 thru 19 above. No work shall begin on this project until written approval has been given by the NACC. All changes shall be considered as specified in Condition 1120 above. RESIDENTIAL LOT DEVELOPMENT 23. The NACC shall be notified in writing of any lot line or lot number changes with a copy of a plan showing these changes prior to any work on this lot. 24. In conjunction with the sale of this lot, the applicant shall submit to the NACC a signed statement by the buyer that he is aware of an outstanding Order of Conditions on the lot, has received a copy of this Order of Conditions, and has received notice about Condition X145 below. 25. The utilities for the house on this lot shall not be constructed as to pass under or through any vetland resource areas on this site. 26. No underground storage of fuel oils shall be allowed on any lot within one-hundred (100) feet of any wetland resource area. This Condition shall survive this Order of Conditions, and shall run with the title of the property. 27. Fertilizers utilized for landscaping and lawn care shall be of the low- nitrogen content variety, and shall be used in moderation. Pesticides and herbicides shall not be used on any lot in the subdivision within 100 feet of a wetland resource area. DURING CONSTRUCTION: 28. In advance of any work on this project the applicant shall notify the NACC, and at the request of the NACC, shall arrange an on-site conference among the NACC, the' contractor, and the applicant to ensure that all of the Conditions of this Order are understood. This Order also shall be made a part of the contractor's written contract. 29. The applicant, or its successors, shall notify the NACC in writing of the identity of the on-site construction supervisor hired to coordinate construction during the work on the site and to ensure compliance with this Order. 30. Commencing with the issuance of this Order, and continuing through the existence of same, the applicant shall submit to the NACC a written progress report every month detailing what work has been done in or near resource areas, and what work is anticipated to be done over the next period. Page -6- ORDER OF CONDITIONS Lot 64A - Haymeadow Road D.E.Q.E. 4242-458 31. Wetland flagging shall be checked prior to start of construction and shall be re-established where missing so that required erosion control measures between construction activity and wetland resource areas can be properly placed. 32. The construction of the wetland crossing shall follow the sequence out- lined in Item 12.f above. The NACC shall be notified at least two (2) days prior to the start of this portion of the project. 33. Prior to any activity on the site, a double row of staked hay bales shall be placed between all construction areas and wetland areas per Soil Conservation Service or D.E.Q.E.Standards. This barrier shall be inspected and approved by the NACC prior to start of construction. This row of hay bales shall remain intact until all disturbed areas have been mulched, seeded, and stabilized to prevent erosion. 34. The applicant shall have on hand at the start of any soil disturbance, removal or stockpiling, a minimum of fifty (50) hay bales and sufficient stakes for staking these bales. Said bales shall be used only for the control of emergency erosion problems, and shall not be used for the normal control of erosion, as described in the Erosion Control Plan submitted with the Notice of Intnet or the hay bale barrier described in Condition #33. 35. Upon completion of construction and grading, all disturbed areas located outside resource areas shall be stabilized permenently against erosion. This shall be done either by sodding or by loaming, seeding, and mulching according to Soil Conservation Service standards. If the latter course is chosen, stabilization will be considered once the surface shows complete vegetative cover has been achieved. 36. No exposed area shall remain unfinished for more than thirty (30 ) days, unless approved by the NACC or it' s agent. 37. All erosion prevention and sedimentation protection measures found necessary during construction by the NACC will be implemented at the direction of the NACC. 38. There shall be no stockpiling of soil or other materials within twenty- five (25) feet of any resource area. 39. During and after work on this project, there shall be no discharge or spillage of fuel, oil, or oilier pollutants into any wetland resource area. If duing any phase of site preparation, construction, or clean-up, there is an unintentional spill of discharge of any fuel, oil or other pollutant, the NACC shall be notified by the applicant as soon as practical. No vehicles are to be stored within 100 feet of wetland resource areas, and no vehicle refueling, equipment lubrication, or maintenance is to be done within 100 feet of a resource area. Page -7- ORDER OF CONDITIONS Lot 64A - Haymeadow Road D.E.Q.E. #242-458 40. Washings from concrete trucks, or surplus concrete, shall not be directed to, or dumped in, any drainage system or wetland resource area. 41. All waste generated by, or associated with, the construction activity shall be contained within the construction area, and away from any wetland resource area. There shall be no burying of spent construction materials on the site, nor shall any waste be disposed of on the site by any othr means. The applicant shall maintain dumpsters at the site for the storage and removal of such spent construction materials offsite. 42. Members of the NACC or its agent shall have the right to enter upon and inspect the premises to evaluate compliance with this Order of Conditions. The NACC reserves the right to require, following field inspection, additional information or resource protection measures. 43. Accepted engineering and construction standards and procedures shall be followed in the completion of the project. OTHER CONDITIONS: 44. The provisions of this Order shall apply to and be binding upon the applicant, its employees, and all successors and assigns in interest or control. 45. Issuance of these Conditions does not in any way imply or certify that the site or downstream areas will not be subject to flooding, storm damage, or any other form of damage due to wetness. 46. A proper bond or a deposit of money or negotiable securities running to the Town of North Andover shall be provided in the amount of $20,000 which shall be in all respects satisfactory to Town Counsel, Town Treasurer, and the NACC, and shall be posted with the Treasurer of the Town of North Andover before commencement of work. Said bond or deposit of money shall be conditioned on the completion of all Conditions hereof, shall be signed by a party or parties satisfactory to the NACC and Town Counsel, and shall be released after completion of the project, provided that provision, satisfactory to the NACC, has been made for performance of any Conditions which are of a continuing nature. The applicant may propose a bond release schedule keyed to completion of specific portions of the project for the NACC's review and approval. This Condition is issued under the authority of the Town of North Andover Wetlands Protection Bylaw. 47. In addition to the requirements of Condition No. 11, the applicant shall submit a letter to the NACC from a registered professional civil Page -8- ORDER OF CONDITIONS Lot 64A - Haymeadow Road DEQE #242-458 47. (Continued) . . . . engineer certifying compliance with this Order of Conditions. Said letter will certify, but not be limited to the following: a. "As-Built" elevations of all drainage ways constructed within 100 feet of any wetland resource area. b. "As-Built" elevations and grades of all filled or altered wetland resource areas. C. Distances to all structures and alterations within 100 feet of any wetland resource areas. An "As-Built" topographic plan of all areas within the jurisdiction of the Wetlands Protection Act and Bylaw shall be submitted when a Certificate of Compliance is requested. Issued By North Andover Conservation COmrniSsion SI®nature( °-�—� This Order must bo signed by a majority of Ilia Conservalion Comrnisslon. r • On this 6th day of July 19' 88 , before me personally appeared Jack Lindon , to me known to be the person described In end who executed Ilia foregoing Instrument and acknowledged that he/she executed ' he s me as his tier Ir act and deed. G'Ga/ September - Se Notary Public My cornrnlssion expires • The eppilcanl,the owner,any person aggrieved by this Order,any owner of land abutting the land upon which Ilia proposed work Is to be done or any ten residents of the city or town In which such land Is located ore hereby notified of their riphl to request the Department of Environmental Quality Engineerino to issue of Superseding inglhOls Order./viding of Ilia gtequosl that at the rsan o time be sent byicertired Ule Department within ten days from Ilia mall or hand delivery to the Conservation Commission end Ilia appllcant. If you wish to appeal this decision under the Town By Law, a complaint must be filed in -Superior Court. r prior to commencement of work. Detach on dotted line and submit to the ..».............................................................................. 'Issuing Authority please be advised that the Order of Conditions for'the project a ' and File Number 242-45.8 ---.,._•has been recorded at the Hegletry of has been noted In the chain of till@ of Ilia effected property In accordance with General Condition 8 on • It recorded land, the Instrument number which Identifies this Iraneection Is II registered land, the document number which Idenlilles this transaction is r Applicant. Signinure