Loading...
HomeMy WebLinkAboutCorrespondence - 196 MAIN STREET 1/21/1998 'own of North Andover HORTN OFFICE OF 3�o�s,<<o ,, q y10 COMMUNITY DEVELOPMENT SERVICES A 30 School Street North Andover,Massachusetts 01845 So4 �9oTH S ���y WILLIAM J.SCOTT Director January 21, 1998 Mr.Angelo Petrozzelli Design Partnership Architects 3 Washington Square, Suite 400 Haverhill,MA 01830-6139 Re: St. Michael's School and Church- Site Plan Review Dear Mr. Petrozzelli, Thank you for appearing before the Planning Board last night to discuss the site plan review application for the proposed expansion of the St. Michael's School and Church. The Board was pleased with the plans as presented however there are a few issues that remain. 1. Need written confirmation from the Building Inspector that the number of parking spaces proposed is adequate. 2. The chain-link sliding gate proposed for the center of the school parking lot is to be removed. A less intrusive method of keeping the children within the proposed play area is to be provided. 3. The Planning Board will grant a waiver from the requirement of providing planted parking lot islands as required by the Zoning Bylaw in that portion of the school parking lot to be used as a play area. The other parking areas are to contain islands as required. 4. A construction sequence must be provided with specific details provided as to the how the children will be protected from the construction site. 5. Need written confirmation from the Fire Chief and Police Chief regarding the design and location of the proposed pedestrian walkway and traffic light proposed for Main Street. 6. Need to provide sufficient information to the Department of Public Works to allow them to complete their review of the storm water management and utilities proposed for the site. The Planning Board continued the public hearing on this application until February 3, 1998 with the hopes that all issues will be resolved and the Board may render a decision that night. The additional information must be provided to the Planning Department by 4:00 p.m. on Thursday January 29`h so that it can be incorporated into the Planning Board packets. If you have any questions please do not hesitate to call me at 688-9535. Very truly yours, Kathleen Bradley Colwell Town Planner cc. R. Rowen,Chairman Planning Board BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535 R.Nicetta,Building Inspector Chief Dolan,Fire Department Chief Stanley,Police Department Father Paul Keyes Design 0 Inc. Three Washington Square Suite 400 Haverhill,NIA 01830-6139 978*372*9400 Fax; 978*373*6779 January 30, 1998 XVI " 1' m"mwam I Town of North Andover office of Community Development& Services 30 School Street North Andover, Massachusetts 01845 Att: Kathleen Bradley Coldwell Res St. Michael's Parish/School Renovation D.P. A.Project No.R95-9-126 Ms.Bradley Coldwell, This letter is in response to your letter dated January 21, 1998: 1. Need written confirmation from the Building Inspector that the number of parking spaces proposed is adequate. ♦ Design Partnership spoke with Mr.Bob Nicetta,Building Inspector for North Andover,MA., and he has agreed to forward you a letter indicating that the proposed number of parking spaces is adequate. 2. The chain-link sliding gate proposed for the center of the school parking lot is to be removed. A less intrusive method of keeping the children within the proposed play area is to be provided. ♦ Design Partnership has eliminated the chain-link fence and we will replace it with signage indicating that this area will be closed off between the hours of 7:00 A.M. to 3:30 P.M. and that No Vehicles are to enter. 3. The planning Board will grant a waiver from the requirement of providing planted parking lot islands as required by the Zoning Bylaw in that portion of the school parking lot to be used as a play area. The other parking areas are to be contained islands as required. ♦ Design.Partnership thanks you for granting us the waiver. 4. A construction sequence must be provided with specific details provided as to how the children will be protected from the construction site. ♦ Design Partnership has enclosed a construction sequence which should answer this question. 5. Need written confirmation from the Fire Chief&Police Chief regarding the design and location of the proposed pedestrian walkway and traffic Eight proposed for Main Street. ♦ Design Partnership has enclosed copies of letters from both the Fire&Police Chiefs which state their own personal feelings. 6. Need to provide sufficient information to the Department of Public Works to allow them to complete their review of the storm water management and utilities proposed for the site. ♦ Design Partnership has enclosed a letter from Andover Consultants,Inc.which answers this question. PRINCIPAL ANGELO PETROZZELLI AMERICAN INSTITUTE OF ARCHITECTS Design Partnership hopes that all materials accompanying this letter are sufficient and that they answer all of your questions and concerns. Should you have any further questions or comments,please feel free to call our offs anytime. Resp bmitted, DE IG TNERSHIP ARCHITECTS,INC. A ge etr zzelli,President Al /NC Enclosures CC: Father Paul T.Keyes Pat Siatta Peter Forte Richard White Sons, Inc. file AP/ka/stmich.cm Town of North Andover AORTH OFFICE OF COMMUNITY DEVELOPMENT AND SERVICES 10 p 30 School Street ' t North Andover,Massachusetts 01845 ��SSACHUS���y WILLIAM J. SCOTT Director ` September 25, 1998 Mr. Angelo Petrozzelli Design Partnership Architects Inc. Three Washington Square, Suite 400 Haverhill, MA 01830 Re: 196 Main Street— St. Michael's School Site Plan Approval Dear Mr. Petrozelli, As you approach the completion of the new addition to the St, Michael's school, I would like to remind you of the Planning Board conditions that must be met prior to occupancy as set forth in the site plan approval issued on February 20, 1998. I have attached a copy of the approval with those conditions highlighted. If you have any questions or need additional information please do not hesitate to contact me at 688-9535. Very truly yours, Kathleen Bradley Colwell Town Planner cc. W. Scott, Dir. CD&S R. Nicetta, Building Inspector BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535 own of North Andover 1 HORT4 OFFICE OF 01" COMM-UNITY DEVELOPMENT AND SERVICES �? }- 00 p 30'School"Street ' AZ°I'ES WII LIAM J. SCOTT North Andover, Massachusetts 01845 - 'off Director �` I'TAC cNUS b� NOTICE OF DECISION Town Clerk rn Qom-, rte, o Any appeal shall be filled ThiststocsrffyffWt y(2c;c! ,,s ° within 20 da s afterthe byo elapsed from date ofdeCW=ff_d --==0 Y without filing of w appw& date of filling this Notice in the Office of the Town TCM C,etk -� m Clerk. Date February 18, 1998 Date of Hearing 1/20/98, 2/3/98, 2/17/98 Petition of 196 Main Street St_ Michael's Parish & School - A C/O Roman Catholic Archdiocese of Boston Keys Premises affected 196 Main Street Referring to the above petition for a special permit from the requirements of the north Andover zoning Bylaw so as to allow a 13,722 SF 1 floor church with mezzanine constructed of wood and a 15,430 SF school constructed of wood with 2 floors and a basement After a public hearing given on the above date, the Planning Board voted to APPROVE the Special Permit- Site Plan Review based upon the following conditions: Signed CC: Director of Public Works Richard S.Rowen Chairman Building Inspector Natural Resource/Land Use Planner Alison Lescarbeau V. Chairman Health Sanitarian Assessors Police Chief John Simons, Clerk Fire Chief Richard Nardella Applicant Engineer Joseph V. Mahoney Towns Outside Consultant File Planning Board Interested Parties CONSERVATION-(978)688 9530 • HEALTH-(978)688-9540 ° PLANNING-(978)688-9535 *BUILDINGOFFICE-(978)688-9545 ' *ZONING BOARD OF APPEALS- (978)688-9541 • *146 MAIN STREET downtown North Andover the Planning Board deemed it necessary to have a cash bond available to access directly should any emergencies arise. This bond will take the form of a check made out to the Town of North Andover which be will placed into an interest bearing account. 2. Prior to the start of construction: a) A construction schedule shall be submitted to the Planning Staff for the purpose of tracking the construction and informing the public of anticipated activities on the site. b During construction of the addition to the school, the existing school site must be enclosed with construction fence and secured as presented to the Planning Board and shown on a plan titled "Site Plan of Land in North Andover, Mass., Scale: 1" = 40', prepared by Andover Consultants Inc., 1 East River Place, Methuen, Mass, 01844, received by the Planning Board on January 30, 1998. C) During construction, the site must be kept clean and swept regularly. 3. Prior to FORM U verification (Building Permit Issuance): a) The Planning Board must endorse the final site plan mylars and three (3) Ycopies of the signed plans must be delivered to the Planning Department. b) One certified copy of the recorded decision must be submitted to the Planning Department. 4. In accordance with N.A.D.P.W. policy, this project may require 2:1 mitigation of the existing infiltration/inflow from the receiving sewer system. The mitigation may take the form of actual work performed or a fee paid to the DPW. 5. Prior to verification of the Certificate of Occupancy: a) The applicant must submit a letter from the architect and engineer of the project stating that the building, signs, landscaping, lighting and site layout substantially comply with the plans referenced at the end of this decision as endorsed by the Planning Board. b) The Planning Staff shall approve all artificial lighting used to illuminate the site. All lighting shall have underground wiring and shall be so arranged that all direct rays from such lighting falls entirely within the site and shall be shielded or recessed so as not to shine upon abutting properties or streets. The Planning Staff shall review the site. Any changes to the .approved lighting plan as may be reasonably required by the Planning Staff 3 Y rY shall be made at the owner's expense. All site lighting shall provide security for the site and structures however it must not create any glare or project any light onto adjacent residential properties. C) The building must have commercial fire sprinklers installed in accordance with the North Andover Fire Department. 6. Prior to the final release of security: a) The Planning Staff shall review the site. Any screening as may be reasonably required by the Planning Staff will be added at the applicant's expense. b) A final as-built plan showing final topography, the location of all on- site utilities, structures, curb cuts, parking spaces and drainage facilities must be submitted to and reviewed by the Planning Staff and the Division of Public Works. 7. Any stockpiling of materials (dirt, wood, construction material, etc.) must be shown on a plan and reviewed and approved by the Planning Stag. Any approved piles must remain covered at all times to minimize any dust problems that may occur with adjacent properties. Any stock piles to remain for longer than one week must be fenced off and covered. 8. In an effort to reduce noise levels, the applicant shall keep in optimum working order, through regular maintenance, any and all equipment that shall emanate sounds from the structures or site. 9. The hours for construction shall be limited to between 7:00 a.m. and 7:00 p.m. Monday through Friday and between 8:00 a.m. and 5:00 p.m on Saturday. 10. Any plants, trees or shrubs that have been incorporated into the Landscape Plan approved in this decision that die within one year from the date of planting shall be replaced by the owner. 11. The contractor shall contact Dig Safe at least 72 hours prior to commencing any excavation. 12. Gas, Telephone, Cable and Electric utilities shall be installed underground as specified by the respective utility companies. 13. No open burning shall be done except as is permitted during burning season under the Fire Department regulations. 4 ® hip AychitecbtS� 97�x3 3 x Inc. Deswn -partners 139 978 372 x 400 Fa x: hill,M A 01830-6 Three Washing ton Square• Suite 400 • Hav 9 May 25,2000 Town of North Andover Community Development 27 Charles Street 01845 North Andover,MA Attn: Heidi Griffin,Town Planner Re: St.Michael's Parish Church DPA Pro'ect No.95-9-126 f the bond held by the Town of North Andover for Walsh .sting the release o ro ect. This letter is req nBrothers,Incorporated for the above reference p � you have any questions do not hesitate to Please reimburse Walsh Brothers for this bond and if call our office. Respectful submitted, DES TNERSHIP ARCHITECTS,INC. Angelo e o ,Ili,President AIA/NCARB Cc: R.Nicetta,No. Andover Bldg.Dept. File p.S. Bob, we would like to receive a full occupancy permit. Thanks, Angelo � ANGELO PETROZZELLI � AMERICAN INSTITUTE OF ARCHITECT PAL Design 1 1t Inc. Partnership Three Washington Square* Suite 400 ® Haverhill,MA 01830-6139 ® 978*372*9400 ® Fax: 978*373*6779 June 27, 2000 North Andover Town Planner 27 Charles Street No. Andover,MA 01845 Attn: Heidi Griffin RE: St. Michael's Parish/School DPA Project No.R95-9-126 I hereby certify that I am a licensed architect in the State of Massachusetts and that to the best of my knowledge, information and belief all landscape and site development work for both the new church and school were done in accordance with the plans submitted to the Town of North Andover on plans shown by Andover Consultants with landscape design done by Huntress Associates,Inc, and in my professional opinion is in compliance with all applicable laws, codes and ordinances. Therefore I respectfully request that you grant this project an occupancy permit. Design Partnership thanks you in advance for your assistance with this matter and if we can be of further assistance please call our office. Respect f ly submitted, DE.I N J A TNERSHIP ARCHITECTS,INC. �(tED ARCy� P E TF C) w Ain el t o ge�el �' #3344 Alk C RB ¢ �3osto C S. Cc: Rev. Paul Keyes, St. Michael's � • r�F�' Peter Silva,Arch. Of Boston FA(� Walsh Brothers,Inc. PRINCIPAL ANGELO PETROZZELLI AMERICAN INSTITUTE OF ARCHITECTS Town of North Andover f NORTH , O «E o ti OFFICE OF �� ytt b"6 10 0 COMMUNITY DEVELOPMENT AND SERVICES ® ; 27 Charles Street North Andover,Massachusetts 01845 �s9SSgcHUS���y WILLIAM J. SCOTT Director (978)688-9531 Fax(978)688-9542 June 28, 2000 Ms. Roberta McGowan Town Treasurer 120 Main Street No Andover, MA 01845 Re: St Michael's Church-Bond Release Ms. McGowan, On June 27, 2000 the Planning Board voted to release all remaining funds totaling $13,000.00. Name of Applicant: Walsh Brothers Inc. 150 Hampshire St Cambridge, MA 02139 Project; St Michael's Church Type of Bond: Form-G Thank you for your attention with this. Sincerely, ,.F Jacki Byerley Planning Secretary BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535 INFORMATION REQUIRED FOR SITE PLAN REVIEW Project: St.Michael's Church expansion and new school 1. North Arrow/Location Map(1"=1500') OK 2. Survey of the Lot/Parcel OK 3. Name/Description of Project OK 4. Easements/Legal Conditions OK 5. Topography: OK 6. Zoning Information: table to be added 7. Storm water Drainage Plan:DPW to review-need current and proposed impervious surface 8. Building(s)Location OK 9. Building Elevation: OK 10. Location of Parking/Walkways:Need to provide table of current,proposed, and required spaces 11. Location of Wetlands OK 12. Location of Walls/Signs OK 13. Location of Roadways/Drives OK 14. Outdoor Storage/Display Area OK 15. Landscaping Plan OK 16. Refuse Areas OK 17. Lighting Facilities OK 18. Drainage Basin Study N/A 19. Traffic Impact Study narrative submitted 20. Commonwealth Review N/A 21. Utilities, OK 22. Fiscal Impact narrative submitted 23. Community Impact narrative submitted Additional Comments: playground equipment location in parking lot??????? rn