Loading...
HomeMy WebLinkAboutDecision - 815 CHESTNUT STREET 8/19/1994 TOWN OF NORTH ANDOVEAO'"' ` ? ' MASSACHUSETTS HORT�, r +I 'ij4'ER Auc 19 3 i6 P� °9►� Of NORTH 1 '4. ti0 Fo Any appeal shall be filed `• � - _' within (20) days after the 9SSACHUSE' date of filing of this Notice in the Off ice of-the Town NOTICE OF DECISION Clerk. Date,August ,19: 1994 . . July 19, 1994 Date of Hearing ,August 2, 1994 August 16, 1994 Petition of , , ,Watts. Industries . . . . . . . . . . . . , Premises affected , 815 Chestnut Street. . . , . . , , . . . . . . . . . . . . . . . . . . . . Referring to the above petition for a special permit from the requirements of the , , North Andover Zoning Bylaw - Section.8;3 ...Site.Plan.RevieW . . . . . . . . . . . . . . . . . . . . . . . . . . so as to permit . , the construction of a 15,000, sq:ft., two, stor�.addition to an . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . existing building: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . After a public hearing given on the above date, the Planning Board voted CONDITIONALLY to . APPROVE. . . . . . . .the . . . . SITE PLAN REVIEW. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . based upon the following conditions : CC. Director of Public Works Building Inspector ,,������� /� ,�.// Conservation Administrator Signed /l.C-( a,L !�. `�- Health SAnitarian Richard A. Nardella, Chairman Assessors Police Chief . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Fire Chief Joseph.Mahoney; ,Vice Chairman . . . . . . . . . . . . . . . . . . . . . . . . . . Applicant Engineer Richard .Rowen: .Clerk . . . . , , . . File . . . . . . . . . . . . . interested Parties John Simons Alison Lescarbeau, Associate Member 'planning Board. . . . . . . . Of HOATy Ii.iRE H.P. NEL-�O\ o� TOVVIl Of 120 Main Street, 01845 Director NORTH ANDOVER (508) 682-6483 BUILDING CONSERVATION �sCH DIVISION OF L I-I PANN'I\G PLANNING & COMMUNITY DEVELOPMENT L.-1\\ August 19 , 1994 Ms . Joyce Bradshaw, Town Clerk 120 Main Street North Andover, MA 01845 Re: Site Plan Review 815 Chestnut Street Dear Ms . Bradshaw: The North Andover Planning Board held a public hearing on July 19 , 1994 , in the Senior Center behind the Town Building, upon the application of Watts Industries, requesting Site Plan approval under Section 8 . 3 of the North Andover Zoning Bylaw. The legal notice was duly advertised in the North Andover Citizen and all parties of interest were properly notified. The following members were present: Richard Nardella, Chairman, Joseph Mahoney Vice Chairman, Richard Rowen, Clerk, John Simons and Alison Lescarbeau, Associate Member. The petitioner was requesting Site Plan approval for the construction of a 15, 000 sq. ft. , two story addition to an existing building located at 815 Chestnut Street. Mr. Rowen read the legal notice to open the public hearing. Mr. Joseph LaGrasse passed out revised plan to the Board. - 40, 000 sq. ft. existing building - 3 . 8 acre parcel purchased adjacent to site off of Flagship Drive - proposed 15 , 000 sq. ft. addition on the Route 114 side - executive offices of Watts exist now on site - moving out engineering, purchasing and sales into the new building - will access site from Flagship Drive, eliminate traffic problem on Chestnut Street and Route 114 - separate entrance off Flagship Drive with loading dock, moving existing loading area and replacing it with grassy area with area for employees to eat outside Mr. Rowen asked if additional parking spaces were adequate for the new construction. Mr. LaGrasse submitted drainage calculations, landscape plan and location of outdoor lighting. Major sign on Route 114 currently, but because main entrance for sales will be off of Flagship Drive, will have an additional sign. The building will have white metal siding with glass panels, same material as existing building. Ms . Colwell to check that two signs are allowed by sign bylaw. Mr. Nardella concerned about people cutting through parking lot to Route 114 given fact that traffic light will be put in at the corner of Flagship Drive and Route 114 . Mr. LaGrasse told the Board that a 25 ' wide driveway is provided. Steep slope between Flagship Drive and Chestnut Street parking lots. Mr. Nardella asked Mr. LaGrasse to add size of building on building outline on sheet C-2 . Mr. Nardella asked if existing lights were downcast. Mr. LaGrasse told him yes, they were typical shoebox light fixtures. Mr. Nardella stated that the Planning Board was concerned previously about lights shinning from the parking lot into homes . Existing tree line found to be adequate to shield homes from car headlights. Mr. Simons arrived at 8: 20 p.m. Mr. Nardella asked that the language on plan be change to reference 1 1/2 story building. Mr. Rowen asked Mr. LaGrasse to revise elevation to show how addition fits onto existing building, show roof line of existing building. Mr. Simons asked if there was a model for this site. If so it would be helpful to see it. Mr. LaGrasse said there was a model of the site and he would being it to the next meeting. Mr. Nardella scheduled a site visit for next Tuesday, July 26, 1994 at 6 : 30. On a motion by Mr. Rowen, seconded by Mr. Mahoney, the Board voted to continue the public hearing to August 2 , 1994 and asked that revised plans be ready. Ms. Colwell to review landscape plan for compliance with zoning. Mr. Nardella suggested that landscape plan be colored in to aid in review by Planning Board. Ms . Kelner lives across from Watts expressed the following concerns: concern about traffic coming out onto Chestnut Street concern about trucks entering site at 1: 30 a.m. - concern about lighting - light shine into her house now Mr. LaGrasse stated that trucks will be accessing site through Flagship Drive, employees only will park on Chestnut Street side, therefore traffic will be reduced on Chestnut Street. Mr. Nardella had a discussion of directing traffic out through to Flagship Drive with signage. On August 2 , 1994 the Planning Board held a regular meeting. The following members were present: Richard Nardella, Chairman, Joseph Mahoney Vice Chairman, Richard Rowen Clerk, John Daghlian and Alison Lescarbeau, Associate Member. The following members attended the site visit at Watts Regulator, Mr. Mahoney, Ms. Lescarbeau, and Mr. Daghlian. The members concurred that it was an appropriate site for the addition. Mr. Joseph LaGrasse gave the Board a hand out on the proposed addition. Highlights of the presentation: 1. Existing building gross area is approximately 40, 800 sq. ft. , proposed addition is approximately 15 , 200 sq. ft. for a total of 56, 000 sq. ft. 2 . Based on use, Watts Industries will require 133 parking spaces for office and executive employees, 16 spaces for storage, maintenance, receiving production and shop areas. Minimum required under zoning is 149 spaces, proposed plans shows 194 . 3 . proposed sign will be similar to existing sign on Route 114 4 . lighting will be similar to the existing, supplying 5 new street poles and fixtures, 5 new building mounted fixtures and 4 new sidewalk fixtures 5 . proposed building floor elevation to coincide with existing lower floor elevation - driveway slope slightly less than 6% 6 . landscaping will compliment existing trees and shrubs 7 . drainage system planned is combined with the existing drainage system. 8 . loop road design on Chestnut Street side (parking lot) used by corporate headquarters - Flagship Drive side will be used by employees A model was shown to the Board. [Note: ] KBC - Check previous decisions regarding lighting requirements and when the lights are turned off. Condition track traffic to access egress by means of Flagship Drive only. [KHPN] fence in detention pond discuss with Mr. Nicetta. On a motion by Mr. Mahoney, seconded by Mr. Daghlian, the Board voted to close the public hearing and directed staff to draft decision for the August 16, 1994 meeting. [NOTE: ] Review curbing along access road. On August 16, 1994 the Planning Board held a regular meeting. The following members were present: Richard Nardella, Chairman, Joseph Mahoney, Vice Chairman, Richard Rowen, Clerk, John Simons. and Alison Lescarbeau, Associate Member. A bond to be set at $15, 000. On a motion by Ms. Lescarbeau, seconded by Mr. Simons, the Board voted to approve the Site Plan for Watts Regulator. The Chairman also voted. Attached are those conditions. Sincerely, North Andover Planning Board R�aAct 0 . XaA,5�& Richard A. Nardella, Chairman attachment cc: Director of Public Works Building Inspector Conservation Administrator Health Sanitarian Assessors Police Chief Fire Chief Applicant Engineer File 815 Chestnut Street - Watts Industries Site Plan Review - Special Permit The Planning Board herein approves the Special Permit/Site Plan Review for the construction of a 15 , 000 square foot addition to the existing 40 , 000 square foot Watts Industries Building in an I-1 Zoning District . This Special Permit was requested by Watts Industries , 815 Chestnut Street, North Andover, MA 01845 on June 27 , 1994 . The Planning Board makes the following findings as required by the Zoning Bylaw Section 8 . 3 and 10 . 3 : FINDINGS OF FACT: 1 . The specific site is an appropriate location for the project as it is an addition to the existing building; 2 . The use, as developed, will not adversely affect the neighborhood as the site is currently developed as an Industrial Park; 3 . There will be no nuisance or serious hazard to vehicles or pedestrians as long as truck traffic access is limited to Flagship Drive; 4 . The landscaping plan approved as a part of this plan meets the requirements of Section 8 . 4 of the Zoning Bylaw; 5 . The site drainage system is designed in accordance with the Town Bylaw requirements; 6 . The applicant has met the requirements of the Town for Site Plan Review as stated in Section 8 . 3 of the Zoning Bylaw; 7 . Adequate and appropriate facilities will be provided for the proper operation of the proposed use . Finally, the Planning Board finds that this project generally complies with the Town of North Andover Zoning Bylaw requirements as listed in Section 8 . 35 but requires conditions in order to be fully in compliance . The Planning Board hereby grants an approval to the applicant provided the following conditions are met : SPECIAL CONDITIONS: 1 . Prior to the endorsement of the plans by the Planning Board, the applicant shall adhere to the following: a . A full set of final plans must be submitted to the Town Planner for review no later than November 30, 1994_ 1 b. A bond in the amount of fifteen thousand dollars ($15, 000) shall be posted for the purpose of insuring that a final as-built plan showing the location of all on-site utilities, structures, curb cuts, parking spaces and drainage facilities is submitted. The bond is also in place to insure that the site is constructed in accordance with the approved plan. This bond shall be in the form of a check made out to the Town of North Andover. This check will then be deposited into an interest bearing escrow account . "c . A construction schedule shall be submitted to the Planning Staff . 2 . Prior to FORM U verification (Building Permit Issuance) : a . The applicant shall place erosion control measures on the site as directed by the Town Planner. b. This decision shall be recorded at the Essex North Registry of Deeds and a recorded copy delivered to the Planning Staff . 3 . Prior to verification of the Certificate of Occupancy: a . The building must be constructed as presented to the Planning Board and as shown on the following plans : Project Name : Watts Industries Headquarter Expansion Prepared For: Watts Industries Project Address : 815 Chestnut Street North Andover, MA Prepared By: Joseph D. LaGrasse & Associates Inc . One Elm Square Andover, MA 01810 Sheet A-4 Elevations Date : August 1, 1994 ; rev. August 10 , 1994 Scale : as noted The material used in the construction of the proposed addition must be of the same material used for the existing structure . b . The landscaping must be as shown on the following plans : Project Name : Watts Industries Headquarter Expansion Prepared For: Watts Industries Project Address : 815 Chestnut Street North Andover, MA Prepared By: Joseph D. LaGrasse & Associates Inc . One Elm Square 2 Andover, MA 01810 Sheet C-4 Site Landscaping Plan Date : July 18 , 1994 ; rev. August 1, 1994 , August 10, 1994 Scale : i" = 40 ' C . The site shall be reviewed by the Planning Staff . Any screening as may be reasonably required by the Planning Staff and/or Tree Warden will be added at the applicant ' s expense . d. A final as-built plan showing the location of all on- site utilities, structures, curb cuts, parking spaces and drainage facilities must be submitted to and approved by the Division of Public Works . e . All artificial lighting used to illuminate the site shall be approved by the Planning Staff . All lighting shall have underground wiring and shall be so arranged that all direct rays from such lighting falls entirely within the site and shall be shielded or recessed so as not to shine upon abutting properties or streets . The site shall be reviewed by the Planning Staff . Any changes to the approved lighting plan as may be reasonably required by the Planning Staff shall be made at the owner' s expense . f . All buildings shall have commercial fire sprinklers installed in accordance with the North Andover Fire Department . g. The site must have received all necessary permits and approvals from the North Andover Board of Health and the Conservation Commission. h. The site will be reviewed by the Planning Board or Staff . Any screening as may be reasonably required by the Planning Board shall be added at the applicant ' s expense . 4 . Prior to the final release of security: a . An as-built plan conforming to Condition i (b) must be submitted for review to the Planning Office and Division of Public Works . The site must be constructed according to the approved plans . This will be determined by a majority vote of the Planning Board. b . The Planning Board will review the site . Any additional landscaping as may reasonably be required by the Board must be added at the applicant ' s expense . 3 5 . The parking lot lights must be turned off by 10:00 pm. a . Security lights will be left on; staff will coordinate with the Police Department as to specifications . All lighting must be approved by the Building Inspector. 6 . Deliveries shall not occur after 10 : 00 pm. 7 . Truck traffic shall access the site from Flagship Drive only. This condition will minimize the traffic on Chestnut Street and subsequently exiting onto Route 114 . 8 . Any plants, trees or shrubs that have been incorporated into the Landscape Plan approved in this decision that die within one year from the date of planting shall be replaced by the owner. 9 . The contractor shall contact Dig Safe at least 72 hours prior to commencing any excavation. 10 . Gas, Telephone, Cable and Electric utilities shall be installed as specified by the respective utility companies . 11 . All catch basins shall be protected and maintained with hay bales to prevent siltation into the drain lines during construction. 12 . No open burning shall be done except as is permitted during burning season under the Fire Department regulations . 13 . No underground fuel storage shall be installed except as may be allowed by Town Regulations . 14 . All signs within the project shall be of wood with uniform lettering and design. The signs shall in no way be interior illuminated (neon or other means) . All signs designed for this project must be reviewed and coordinated between the Building Inspector and the Town Planner for approval . 15 . No mechanical devices (ie : HVAC, vents, etc . . . ) which may be visible from any surrounding roadways shall be placed on the roof . 16 . The provisions of this conditional approval shall apply to and be binding upon the applicant, its employees and all successors and assigns in interest or control . 17 . Any action by a Town Board, Commission, or Department which requires changes in the plan or design of the building as presented to the Planning Board, may be subject to modification by the Planning Board. 4 18 . Any revisions to a development that has secured site plan approval shall be submitted to the Town Planner for review. If these revisions are deemed substantial, the applicant must submit revised plans to the Planning Board for approval . 19 . This Special Permit approval shall be deemed to have lapsed after August 19, 1996 (two years from the date permit granted) unless substantial use or construction has commenced . Substantial use or construction will be determined by a majority vote of the Planning Board. The following information shall be deemed as part of the decision: a . Project Name : Watts Industries Headquarter Expansion Prepared For : Watts Industries Project Address : 815 Chestnut Street North Andover, MA Prepared By: Joseph D. LaGrasse & Associates Inc . One Elm Square Andover, MA 01810 Sheet C-2 Site Layout & Improvements Plan Date : July 18 , 1994 ; rev. August 2 , 1994 , August 10 , 1994 Scale : 1" = 40 ' Sheet C-3 Site Grading & Utility Plan Date : July 15 , 1994 ; rev. August 1, 1994 , August 10 , 1994 Scale : 1" = 40 ' Sheet C-4 Site Landscaping Plan Date : July 18 , 1994 ; rev. August 1 , 1994 , August 10 , 1994 Scale : 1" = 40 ' Sheet A-4 Elevations Date : August 1, 1994 ; rev. August 10 , 1994 Scale : as noted b . Plan of Land in North Andover, Massachusetts As Prepared for Watts Industries 815 Chestnut Street No. Andover, MA Prepared by: Port Engineering Associates, Inc . One Harris St . Newburyport, MA 01950 Dated: 7/11/94 Scale : 1" = 40 ' 5 Sheet : 1 of 1 c . Booklet Titled: Hydrologic Storm Runoff Computations and Storm Drainage Design, Watts Industries Proposed Building Addition Dated: July 14, 1994 Prepared by: Port Engineering One Harris Street Newburyport, MA 01950 cc : Director of Public Works Building Inspector Health Administrator Assessors Conservation Administrator Planning Board Police Chief Fire Chief Applicant Engineer File 815 . chestnut 6