Loading...
HomeMy WebLinkAboutStormwater Report - 815 CHESTNUT STREET 7/14/1994 HYDROLOGIC STORM RUNOFF COMPUTATIONS AND STORM DRAINAGE SYSTEM DESIGN WATTS INDUSTRIES PROPOSED BUILDING ADDITION July 14, 1994 As Prepared By PORT ENGINEERING ASSOCIATES, INC ONE HARRIS STREET NEWBURYR ` 4F ss9. 01950 I Wmmm � Na 303 PORT 75 -ISTER����``� ENGINEERING Civil Engineers& PAUL D. TURBIDE, PE/PLS Land Survevurs PRESIDENT One Harris Street Newburvpurt,MA 01950 (508)-165-8594 HYDROLOGIC STORM RUNOFF COMPUTATIONS AND STORM DRAINAGE SYSTEM DESIGN WATTS INDUSTRIES - FLAGSHIP DRIVE, NO® ANDOVER INTRODUCTION Port Engineering Associates, Inc. was retained by Watts Industries to provide engineering consulting services in conjunction with a project located on Flagship Drive in North Andover, Ma. The project proposes the construction of a new building addition to the existing Watts Indus- tries R & D facility on Chestnut Street which will have additional access from Flagship Drive. The scope of services involved the completion of hydro- logic storm runoff computations for the pre-development and post-development sites, and the preliminary design of a closed storm drainage system to be discharged directly to the existing Flagship Drive municipal drainage system with proper runoff mitigation being provided by a new on site runoff detention pond to be developed near the Flagship Drive entrance. The results of this study are to be reviewed by the Town of North Andover municipal boards as part of the North Andover Site Plan Review Process. In an effort to determine the changes to the drainage patterns of surface water to the basin outlets for the site, runoff computations have been made for the entire site as it exists under present conditions, and similar computations have been made for the site as it would exist after construction is completed. The drainage computations for the site were computed for storms fre- quencies of 2, 10, and 100 year recurrence interval and Type III 24 hr rainfall for the New England coastal area as specified by the USDA-SCS. For the 100 year storm calculations, a 24 hr rainfall of 7. 0 inches was used to be in compliance with DEP regulations 310 CMR. Runoff computations which were produced for inclusion in this report were based upon methods developed by the U.S. Dept. of Agriculture, Soil Conservation Services (S.C.S. ) in their publication, Technical Release # 20 (TR-20) PORT "COMPUTER PROGRAM FOR PROJECT FORMULATION HYDROLOGY", 2nd Edition (draft) , May 1983 . INGINFIRINGFlood routing and hydrograph generation were developed using a comprehensive computer hydrology program entitled Civil Engineers& "HYDROCAD" , developed by Applied Microcomputer Systems Land Surveyors Page Hill Road, Chocorua, New Hampshire 03817, which is also based on these same SCS TR-20 methods. One Harris Street Newburyport,MA 01950 (508)465-8594 1 HYDROLOGIC STORM RUNOFF COMPUTATIONS AND STORM DRAINAGE SYSTEM DESIGN WATTS INDUSTRIES - FLAGSHIP DRIVE, NO® ANDOVER EXISTING DRAINAGE PATTERNS The total site is divided into two drainage basins. One drainage area (Subcatchment 1) encompasses the area of proposed driveway and parking lot that will exit onto Flagship Drive. The other drainage area (Subcatchment 3) encompasses all of the existing improvements on the site including the existing building roofs, the existing driveways and parking lots, and the existing detention pond. All soils at the site have hydrological soil coefficients of "C". Flagship Drive Basin (Subcatchment 1) Preconstruction subcatchment 1 was modeled as 1.88 acres of good grass cover, and 0. 05 acres of pavement with a Time of Concentration of 4 . 6 minutes. As shown on the enclosed sketches, preconstruction Subcatchment 1 has a design point near existing drain manhole 5 located in Flagship Drive. Existing Detention Pond Area (Subcatchment 3) As shown on the enclosed sketches, preconstruction condi- tions were modeled as Subcatchment 3 and Pond 3 (the existing on site detention pond) which mitigates runoff from Subcatchment 3 including all of the improvements that exist at this time including roofs, parking lots and driveways. Subcatchment 3 was modeled as 2. 10 acres of good grass, and 1.90 acres of pavement and roof. PROPOSED DRAINAGE PATTERNS Flagship Drive Basin (Subcatchment 2) For Post-Development site conditions, runoff from the existing parking lot to the rear of the existing building located in Subcatchment 3 will be diverted from the existing detention pond (3) to the proposed detention PORT pond (1) located adjacent to the Flagship Drive entrance. From this point, Pond 1 discharges into drain manhole 5. Post construction Subcatchment 2 was modeled as 2. 5 acres INGINIIHING of good grass and 1.75 acres of pavement with a Time of Concentration of 2.3 minutes. Pond 1 was designed using Civil Engineers& three outlet control structures that will flow into Land Surveyors proposed drain manhole 4 : a 7 11pipe at elev 264.0 ' , a 8" One Harris Street pipe at elev 267.41 , and a 10" pipe at elev 270.01 . Newburyport, MA 01950 (508)467-8591 2 005r. rxrsr. CA /s AON r x509'38'• 6A !S 5� ZZ SUSCATC1• MENT 1 6WP J 1 I PRECONSYRUCTIO l- -- FLAGSHIP DRIVE A EA CAT / o � a IX/SMO A ON* av� J t Y � _ SU[�cA�'- ENT 3 1 PRECCNSTRUCTION ! 1 j EXISTING DETENTION BASIN � j HYDROLOGIC STORM RUNOFF COMPUTATIONS AND STORM DRAINAGE SYSTEM DESIGN WATTS INDUSTRIES - FLAGSHIP DRIVE® NO® ANDOVER Existing Detention Pond Area (Subcatchment 4) As shown on the enclosed sketches, post-construction conditions were modeled as Subcatchment 4 and Pond 4 . Pond 4 is the existing detention basin with the existing parking lot behind the building re-diverted to the pro- posed detention basin at Flagship Drive. Subcatchment 4 was modeled as 2 . 10 acres of good grass, and 1. 16 acres of roof and pavement. The following table is a summary of hydrologic runoff calculations: The following tables summarize hydrologic runoff calcula- tions: CONDITION PEAK STORM FLOW (CFS) 100 YR 10 YR 2YR PRECONSTRUCTION 9.7 5.4 2. 3 (SUBCATCHMENT 1) POSTCONSTRUCTION 8. 5 4.0 1.7 (POND 1) PRECONSTRUCTION 3. 0 3 .0 3 .0 (POND 3) POSTCONSTRUCTION 3. 0 3 .0 2.7 (POND 4) For more detailed drainage computation information, a full copy of the runoff computations is Attached as Appendix A. PODT Elk it ENGINEERING Civil Engineers& Land Surveyors One Barris Street Newburvport,MA 01950 (508)465-859-1 3 dsb938° V � ,e04rou MAP POND 1 OWL I J u CHMENT POST CONSTRUCTION FLAGSHIP DRIVE ARE CA M4,10 is O � D -� D � a D(1.4 M, mo-araer ewicocu� � cu R. Z`ks 4 4 I / Q� d S B AT HMENT 41 J POST CONSTRUCTION Z MSTINC DETENTION BASIN � °� HYDROLOGIC STORM RUNOFF COMPUTATIONS AND STORM DRAINAGE SYSTEM DESIGN WATTS INDUSTRIES - FLAGSHIP DRIVE® NO® ANDOVER STORM DRAINAGE SYSTEM DESIGN In sizing the closed storm drain system for the site, the surface inflow from each subcatchment contributary area was computed using the Rational Method. The pipes were designed to accommodate the cumulative increment of the catch basin inlets, and have been sized to accommodate the 10 year storm incident (i = 5.2 inches per hour) . All pipes are proposed to be high density polyethylene plastic (HDPE) , except for the pipeline between proposed drain manhole 4 and existing drain manhole 5. Because of its location beneath Flagship Drive, this line is pro- posed to be a 2411 reinforced concrete pipe. As per Town standards, the minimum pipe size used is 12 t' , except for outlet control structures. The minimum design velocity has been kept at 2 feet per second for self pipe clean- ing, and the maximum design velocity is 10 feet per second. The results of the pipe sizing calculations are shown in Appendix B. DRAINAGE SUMMARY Based upon the storm runoff computations (Appendix A) the added pavement and roof surfaces will not significantly alter the peak discharge rate of the site to Flagship Drive drainage structures nor would the existing or proposed ponding areas at any of the drainage system basin inlets be overtaxed for the 100 year storm inci- dent. RUNOFF MITIGATION MEASURES It is impossible to avoid changes in chemical constitu- P 1) T of surface runoff during the construction phase of oft I any project. Erosion and siltation of surface waters is an unavoidable aspect of any construction project. For INGINERNG the Watts Industries project, siltation is expected to be a problem only during the construction period as the surface water intrusions will diminish greatly as the Civil Engineers& areas proposed for development will be totally stabilized Land Surveyors by pavement or building construction and re-vegetation of the site. In an effort to control the effects of con- One Harris Sheet struction erosion and siltation, the following measures Newburvport,MA oi950 are suggested: (508).165-859,1 4 HYDROLOGIC STORM RUNOFF COMPUTATIONS AND STORM DRAINAGE SYSTEM DESIGN WATTS INDUSTRIES ® FLAGSHIP DRIVE, NO® ANDOVER SILTATION CONTROL MEASURES 1. All excavation shall be kept to the minimum that is required for the completion of the proposed work and it shall be scheduled as efficiently as possible so as to minimize the time which exposed areas remain without vegetative cover. All debris , fill and excavated material shall be stockpiled beyond the limits of any vegetated wetland and at a location to prevent surface runoff sediment from entering wetland resource areas. At no time shall any debris or other material be buried or disposed of within any area marked on the plans as wetland, other than that fill which is allowed by any valid order of conditions for the project that may be issued by the Conservation Commission or as outlined in final plans. 2. After excavated materials are stockpiled, they shall be surrounded by siltation control fencing to trap silts before they can leave the stockpile. 3. Any cross drains shall have hay bale silt filters staked across the entrance and exit of the pipe. 4 . Any proposed drainage swales, either temporary or permanent, to be constructed at the site shall be provided with hay bale filters staked across the swale at regular intervals of 50 ft. along the swale. 5. Prior to any earth moving activities, all proposed work which takes place within 100 feet bordering any on or off site vegetated wetland areas shall be buffered from the wetland resource with a double row siltation filter consisting of a double row of staked hay bales, placed end to end, or a single row of geotextile fabric siltation fence along with a single row of hay bales. The barriers shall be P IDT placed along the entire interface between the OR I proposed work and the resource area. The erosion control measures shall be viewed by the local conservation commission prior to the commencement of INGINIIHING Civil Engineers& Land Surveyors One Harris Street Newburyport, MA 01950 (508)465-8594 5 HYDROLOGIC STORM RUNOFF COMPUTATIONS AND STORM DRAINAGE SYSTEM DESIGN WATTS INDUSTRIES - FLAGSHIP DRIVE® NO® ANDOVER SILTATION CONTROL MEASURES (continued) 6. All hay bale or geotextile fabric silt filters shall be staked in place prior to the commencement of any work in the area protected by the filters, and they shall remain in place and shall be maintained and replaced as required until a stabilizing cover of vegetation has been established, or a determination has been made by the local conservation commission that the control measures are no longer necessary. 7. Equipment, material, and fuel storage and refueling operations shall be situated in an upland area at a horizontal distance greater that 100 feet from the established boundaries of any vegetated wetlands. 8. After all new vegetation has been successfully established and all site improvements have been approved and accepted by the local Conservation Commission, remove the siltation barriers and any accumulated silt material for disposal at a location to be approved by the conservation commission. 9. Proposed Fill Specifications Any borrow fill used at the site shall be clean granular material with no more than 20 % passing a No 200 mesh sieve, and shall be free from organic matter, large stones, masonry, stumps, frozen clumps of earth, wood, tree branches, and construction waste material. All fill shall be properly placed and mechanically or hydraulically compacted in 6" lifts or allowed to settle for a period of 6 months. The major contributor to post-construction siltation will be 'the dirt and sand fraction of street and parking lot litter and oils and grease that will be washed off the paved site areas by rainfall runoff. The majority of the it i PO silt sediment and parking lot litter will be removed by the sumps in the catch basin structures, thus, leaving �NGI�EEGI�G only the soluble dust fraction of the litter and the oil and grease as a potential degrader of the surface water. Any remaining pollution from suspended solids and oil and Civil Engineers& grease would be attenuated by the vegetation that will Land Surveyors develop in the runoff mitigation detention basins. One Harris Street Newburyport,MA 01950 (508)465-8594 6 APPENDIX A HYDROLOGIC RUNOFF COMPUTATIONS PDT ofti INGINIEHING Civil Engineers& Lund Surveyors One Harris Street Newburvport,MA 01950 (508)-165-8594 Data for P1700 WATTS 100 YEAR STORM Prepared by PORT ENGINEERING ASSOC. INC. 7 Jul 94 HydroCAD 3.10 000482 (c) 1986-1993 Applied Microcomputer Systems WATERSHED ROUTING pjQ�Co�tST�uGT10�l 1D®57~Co1�ST�U WKI 1 2 1 0 SUBCATCHMENT F—] REACH APOND LINK Data for P1700 WATTS 100 YEAR STORM TOTAL BUILDOUT #2 Prepared by PORT ENGINEERING ASSOC. INC. 8 Jul 94 HydroCAD 3.10 000482 (c) 1986-1993 APplied Microcomputer Systems WATERSHED ROUTING 3 4 3 /4\ 0 SUBCATCHMENT ❑ REACH APOND LINK SECTION I PRE-DEVELOPMENT STORM RUNOFF POIDIII ft INGIREHING Civil Engineers& Land Surveyors One Harris Street Newhuryport,MA 01950 (508)465-8594 PRE-DEVELOPMENT STORM RUNOFF 2 YEAR STORM FREQUENCY PDT ORI tKINEEGING Civil Engineers& Land Surveyors One Harris Street Newburvport,MA 01950 (508) 165-8594 Data for P1700 WATTS 2 YEAR STORM 7 Jul 94 Prepared by PORT ENGINEERING ASSOC. INC. HydroCAD 3 t0 000482 (c) 1986 1993 Applied Microcomputer Systems SUBCATCHMENT 1 PRECONSTRUCTION ACRES CN 1.88 74 GOOD GRASS C SCS TR-20 METHOD .05 98 PAVEMENT TYPE III 24-HOUR 1.93 75 RAINFALL= 3.1 IN PEAK= 2.3 CFS @ 12.06 HRS VOLUME= .12 AF Method Comment Tr (min) SHALLOW CONCENTRATED/UPLAND FLOW PRECONSTRUCTION 4.6 Short Grass Pasture Kv=7 L=5001 s=.066 1/1 V=1.8 fps SUBCATCHMENT 1 RUNOFF PRECONSTRUCTION 2 . 2 2 . 0 AREA= 1 . 93 AC 1 . 8 Tc= 4 . 6 MIN CN= 75 r, 1 . 6 o 1 . 4 SCS TR-20 METHOD 1 . 2 TYPE III 24-HOUR RAINFALL= 3 . 1 IN 3 1 . 8 PEAK= 2 . 3 CFS LL 6 @ 12 . 06 HRS 4 UOLUME= . 12 AF . 2 8 . am Ln m LO m m Lo m R1 cv M rY) d- d- Ln TIME (hours ) Data for P1700 WATTS 2 YEAR STORM EAST AREA Prepared by PORT ENGINEERING ASSOC. INC. 8 Jul 94 HydroCAD 3.10 000482 (c) 1986-1993 Applied Microcomputer Systems SUBCATCHMENT 3 EXISTING CONDITIONS ACRES CN 2.10 74 GRASS GOOD C SCS TR-20 METHOD 1.90 98 PAVT AND ROOF TYPE III 24-HOUR 4.00 85 RAINFALL= 3.1 IN PEAK= 7.0 CFS @ 12.11 HRS VOLUME= .41 AF Method Comment Tc (min) DIRECT ENTRY FROM 27 MAR 90 CALCULATIONS 9.0 SUBCATCHMENT 3 RUNOFF EXISTING CONDITIONS 7 . 0 6 . 5 AREA= 4 AC 6 . 0 Tc- 9 MIN 5 . 5 5 . 0 CN= 85 4 . 5 SCS TR-20 METHOD 4 . 0 TYPE III 24-HOUR 3 . 5 -. 3 3 . 0 RAINFALL= 3 . 1 IN 0 2 . 5 2 . 0 PEAK-- 7 . 0 CFS 1 . 5 @ 12 . 11 HRS 1 . 0 VOLUME= . 41 AF . 5 e . Bm Ln m n M n CS) Ln m f V N �''1 m v T Ln TIME (hours ) PRE-DEVELOPMENT STORM RUNOFF 10 YEAR STORM FREQUENCY Po ENGI�EEGI�G Civil Engineers& Land Surveyors One Harris Street Newburyport,MA 01950 (508) I65-8591 Data for P1700 WATTS 10 YEAR STORM Prepared by PORT ENGINEERING ASSOC. INC. 7 Jul 94 HYdroCAD 3.10 000482 (c) 1986-1993 Applied Microcomputer SYStems SUBCATCHMENT 1 PRECONSTRUCTION ACRES CN 1.88 74 GOOD GRASS C SCS TR-20 METHOD .05 98 PAVEMENT TYPE III 24-HOUR 1.93 75 RAINFALL= 4.8 IN PEAK= 5.4 CFS a 12.05 HRS VOLUME= .27 AF Method Comment Tc (min) SHALLOW CONCENTRATED/UPLAND FLOW PRECONSTRUCTION 4.6 Short Grass Pasture Kv=7 L=5001 s=.066 1/1 V=1.8 fps SUBCATCHMENT 1 RUNOFF PRECONSTRUCTION 5 . 0 AREA- 1 . 93 AC 4 . 5 Tc- 4 . 6 MIN 4 . 0 CN= 75 3 . 5 to (4- 3 . 0 SCS TR-20 METHOD TYPE III 24-HOUR 2 . 5 RAINFALL- 4 . 8 IN a 2 . 0 1 . 5 PEAK= 5 . 4 CFS 1 . 0 @ 12 . 05 HRS UOLUME= . 27 AF 5 0 . am Ln ® D m LO m Ln m m m IT d- Ln TIME (hour5 ) Data for P1700 WATTS 10 YEAR STORM EAST AREA Prepared by PORT ENGINEERING ASSOC. INC. 8 Jul 94 HydroCAD 3.10 000482 (c) 1986-1993 Apptied Microcomputer Systems SUBCATCHMENT 3 EXISTING CONDITIONS ACRES CN 2.10 74 GRASS GOOD C SCS TR-20 METHOD 1.90 98 PAVT AND ROOF TYPE III 24-HOUR 4.00 85 RAINFALL= 4.8 IN PEAK= 13.2 CFS a 12.11 HRS VOLUME= .76 AF Method Comment Tc (min) DIRECT ENTRY FROM 27 MAR 90 CALCULATIONS 9.0 SUBCATCHMENT 3 RUNOFF EXISTING CONDITIONS 13 12 AREA= 4 AC 11 Tc= 9 MIN 10 CN- 85 r, 9 to 4 8 SCS TR-20 METHOD TYPE III 24—HOUR 6 RAINFALL— 4 . 8 IN 0 5 4 PEAK- 13 . 2 CFS 3 0 12 . 11 HRS 2 UOLUME- . 76 AF 1 C CD IS) LO CS3 LO cs) LO m TIME (hours ) PRE-DEVELOPMENT STORM RUNOFF 100 YEAR STORM FREQUENCY PORT INGINIIHING Civil Engineers& Land Surveyors One Harris Street Newburyport,MA 01950 (508)465-8594 Data for P1700 WATTS 100 YEAR STORM Prepared by PORT ENGINEERING ASSOC. INC. 7 Jul 94 HydroCAD 3.10 000482 (c) 1986-1993 Ac�lied MicrocomDuter SYstems SUBCATCHMENT 1 PRECONSTRUCTION ACRES CN 1.88 74 GOOD GRASS C SCS TR-20 METHOD .05 98 PAVEMENT TYPE III 24-HOUR 1.93 75 RAINFALL= 7.0 IN PEAK= 9.7 CFS a 12.05 HRS VOLUME= .48 AF Method Comment Tc (min) SHALLOW CONCENTRATED/UPLAND FLOW PRECONSTRUCTION 4.6 Short Grass Pasture Kv=7 L=5001 s=.066 1/1 V=1.8 fps SUBCATCHMENT 1 RUNOFF PRECONSTRUCTION 9 . 5 g : � AREA= 1 . 93 AC 8 . 0 - c- 4 . 6 MIN 7 . 0 CN= 75 6 . 5 u 5. 5 SCS TR-20 METHOD , ' -5 -HOUR TYPE III 24-HOUR 0 RAINFALL= 7 . 0 IN o 3 . 5 3 . 0 PEAK- 9 . 7 CFS 2 . 0 @ 12 . 05 HRS 1 . � UOLUME= . 46 AF . 5 0 . 0m Ln CS) n m n ® U-) m T (V CV m m IT d- In TIME (hours ) Data for P1700 WATTS 100 YEAR STORM EAST AREA Prepared by PORT ENGINEERING ASSOC. INC. 8 Jul 94 HydroCAD 3.10 000482 (c) 1986-1993 Applied Microcomputer Systems SUBCATCHMENT 3 EXISTING CONDITIONS ACRES CN 2.10 74 GRASS GOOD C SCS TR-20 METHOD 1.90 98 PAVT AND ROOF TYPE III 24-HOUR 4.00 85 RAINFALL= 7.0 IN PEAK= 21.4 CFS a 12.10 HRS VOLUME= 1.23 AF Method Comment Tc (min) DIRECT ENTRY FROM 27 MAR 90 CALCULATIONS 9.0 SUBCATCHMENT 3 RUNOFF EXISTING CONDITIONS 20 18 AREA= 4 AC Tc— 9 MIN 16 CN= 85 ,--� 14 to 12 SCS TR-20 METHOD 10 TYPE III 24—HOUR RAINFALL= 7 . 0 IN 0 8 6 PEAK- 21 . 4 CFS 4 @ 12 . 1 HRS UOLUME— 1 . 23 OF am in m m cv cv m d- d- to TIME (hours ) SECTION II POST-DEVELOPMENT STORM RUNOFF PORT tKINEEGING Civil Engineers& Land Surveyors One Harris Street Newburvport, !CIA 01950 (508),165-859,1 POST-DEVELOPMENT STORM RUNOFF 2 YEAR STORM FREQUENCY PORT ENGINEERING Civil Engineers& Land Surveyors One Harris Street Yewburyport,MA 01950 (508)465-8594 Data for P1700 WATTS 2 YEAR STORM Prepared by PORT ENGINEERING ASSOC. INC. 7 Jul 94 HydroCAD 3 10 000482 (c) 1986-1993 Applied Microcomputer Systems SUBCATCHMENT 2 POST CONSTRUCTION ACRES CN 1.75 98 PAVEMENT & ROOF SCS TR-20 METHOD 2.50 74 GOOD GRASS C TYPE III 24-HOUR 4.25 84 RAINFALL= 3.1 IN PEAK= 8.8 CFS a 12.02 HRS VOLUME= .41 AF Method Comment Tc (min) SHALLOW CONCENTRATED/UPLAND FLOW POSTCONSTRUCTION: GRASS 1.7 Short Grass Pasture Kv=7 L=2001 s=.075 1/1 V=1.92 fps CIRCULAR CHANNEL POST CONSTRUCTION .6 12" Diameter a=.79 sq-ft Pw=3.11 r=.251 s=.05 '/' n=.015 V=8.79 fps L=300' Capacity=6.9 cfs Total Length= 500 ft Total Tc= 2.3 SUBCATCHMENT 2 RUNOFF POST CONSTRUCTION 8 . 5 8 . 0 AREA- 4 . 25 AC 7 . 5 7 . 0 Tc= 2 . 3 MIN 6 . 5 CN- 84 r, 6 . 0 5 . 0 SCS TR-20 METHOD L) 4 . 5 TYPE III 24-HOUR 4 . 0 RAINFALL- 3 . 1 IN 3 . 5 0 3 . 0 2 . 5 PEAK- 8 . 8 CFS 2 . 0 @ 12 . 02 HRS 1 . 5 UOLUME= . 41 OF 1 . e . 5 ® . am Lo m m TIME (hours ) Data for P1700 WATTS 2 YEAR STORM Prepared by PORT ENGINEERING ASSOC. INC. 7 Jul 94 HydroCAD 3.10 000482 (c) 1986-1993 Applied Microcomputer Systems POND 1 FLAGSHIP DRIVE STARTING ELEV= 264.0 FT FLOOD ELEV= 273.0 FT 2 x FINER ROUTING ELEVATION AREA INC.STOR CUM.STOR STOR-IND METHOD (FT) (SF) (CF) (CF) PEAK ELEVATION= 266.8 FT 264.0 670 0 0 PEAK STORAGE = 7469 CF 265.0 1460 1065 1065 Qin = 8.8 CFS is 12.02 HRS 272.0 5500 24360 25425 Qout= 1.7 CFS 8 12.45 HRS 273.0 5700 5600 31025 ATTEN=. 81 % LAG= 26.0 MIN IN/OUT= .41 / .40 AF INVERT (FT) OUTLET DEVICES 264.0 7" CULVERT n=.015 L=40' S=.021/' Ke=.5 Cc=.9 Cd=.6 272.0 401 BROAD-CRESTED RECTANGULAR WEIR Q=C L H^1.5 C=2, 0, 0, 0, 0, 0, 0, 0 267.4 8" CULVERT n=.011 L=401 S=.011/' Ke=.5 Cc=.9 Cd=.6 270.0 10" CULVERT n=.011 L=40' S=.021/' Ke=.5 Cc=.9 Cd=.6 TOTAL DISCHARGE vs ELEVATION FEET 0.0 .1 .2 .3 .4 .5 .6 .7 .8 .9 264.0 0.0 0.0 .1 .3 .4 .6 .7 .8 .9 1.0 265.0 1.1 1.1 1.2 1.2 1.2 1.3 1.3 1.3 1.4 1.4 266.0 1.4 1.5 1.5 1.5 1.6 1.6 1.6 1.7 1.7 1.7 267.0 1.7 1.8 1.8 1.8 1.8 1.9 2.0 2.2 2.4 2.6 268.0 2.9 3.0 3.2 3.3 3.5 3.6 3.7 3.8 3.9 4.0 269.0 4.1 4.2 4.2 4.3 4.4 4.5 4.6 4.7 4.7 4.8 270.0 4.9 5.0 5.2 5.4 5.7 6.0 6.4 6.7 7.1 7.3 271.0 7.5 7.8 8.0 8.2 8.4 8.6 8.8 8.9 9.1 9.3 272.0 9.4 12.1 16.9 23.0 30.3 38.5 47.5 57.3 67.8 79.0 273.0 90.9 Data for P1700 WATTS 2 YEAR STORM Prepared by PORT ENGINEERING ASSOC. INC. 7 Jul 94 HydroCAD 3.10 000482 (c) 1986-1993 Applied Microcomputer Systems POND 1 INFLOW & OUTFLOW FLAGSHIP DRIUE 8 . 5 8 . 0 - STOR- IND METHOD 7 . 5 7 . 0 PEAK ELEU= 266 . 8 FT 6 . 5 PEAK STOR= 7469 CF 6 . 0 i 5 . 5 t+- 5 . 0 - Q i n= 8 . 8 C F S u 4 . 5 Qout= 1 . 7 CFS 4 . 0 LAG- 26 MIN 3 . 5 0 3 . 0 2 . 5 2 . 0 1 . 5 5 e . 0m Ln csD LO IS3 LO CS3 LO m c� N rn m IT cr- Ln TIME (hours ) Data for P1700 WATTS 100 YEAR STORM EAST AREA Prepared by PORT ENGINEERING ASSOC. INC. 8 Jul 94 HydroCAD 3.10 000482 (c) 1986-1993 Applied Microcomputer Systems SUBCATCHMENT 4 POST CONSTRUCTION ACRES CN 2.10 74 GRASS GOOD C SCS TR-20 METHOD 1.16 98 ROOF AND PAVT TYPE III 24-HOUR 3.26 83 RAINFALL= 7.0 IN PEAK= 20.0 CFS a 12.04 HRS VOLUME= .97 AF Method Comment Tc (min) DIRECT ENTRY 4.0 SUBCATCHMENT 4 RUNOFF POST CONSTRUCTION 20 AREA= 3 . 26 AC 17 - Tc— 4 MIN 14 CN= 83 3 to 2 (-l- SCS TR-20 METHOD TYPE III 24-HOUR RAINFALL= 7 . 0 IN a -� PEAK- 20 . 0 CFS 4 @ 12 . 04 HRS VOLUME= . 97 OF 1 Om m m TIME Chour57 Data for P1700 WATTS 100 YEAR STORM EAST AREA Prepared by PORT ENGINEERING ASSOC. INC. 8 Jul 94 HydroCAD 3.10 000482 (c) 1986-1993 Applied Microcomputer Systems POND 3 EXISTING POND PRECONSTRUCTION STARTING ELEV= 278.3 FT FLOOD ELEV= 282.5 FT 2 x FINER ROUTING ELEVATION CUM.STOR STOR-IND METHOD (FT) (AF) PEAK ELEVATION= 281.5 FT 278.3 0.00 PEAK STORAGE = .61 AF 280.0 .30 Gin = 21.4 CFS a 12.10 HRS 282.0 .70 Gout= 3.0 CFS a 11.88 HRS 282.5 1.20 ATTEN= 86 % LAG= 0.0 MIN IN/OUT= 1.23 / .89 AF INVERT (FT) OUTLET DEVICES 0.0 CATCHBASIN GRATE ELEV(FT) DISCH(CFS) 278.3 0.0 278.5 2.0 278.8 3.0 282.5 3.0 TOTAL DISCHARGE vs ELEVATION FEET 0.0 .1 .2 .3 .4 .5 .6 .7 .8 .9 278.3 ( 0.0 1.0 2.0 2.3 2.7 3.0 3.0 3.0 3.0 3.0 279.3 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 280.3 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 281.3 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 282.3 3.0 3.0 3.0 Data for P1700 WATTS 100 YEAR STORM EAST AREA Prepared by PORT ENGINEERING ASSOC. INC. 8 Jul 94 HydroCAD 3.10 000482 (c) 1986-1993 Applied Microcomputer Systems POND 3 INFLOW & OUTFLOW EXISTING POND PRECONSTRUCTION 23 - STOR- IND METHOD 18 - PEAK ELEU- 281 . 5 FT 16 - PEAK STOR- . 61 AF 14 - u12 - Qln-- 21 . 4 CFS Qout-- 3 . 0 CFS LAG- 0 MIN 0 8 - 4 - ....................................................... ........................................................................................................................... 2 - .......... CD Ln CSD L0 CS3 LO 0 in CD N m m "T Ln TIME (hours ) Data for P1700 WATTS 100 YEAR STORM EAST AREA Prepared by PORT ENGINEERING ASSOC. INC. 8 Jul 94 HydroCAD 3.10 000482 (c) 1986-1993 Applied Microcomputer Systems POND 4 EXISTING POND POST CONSTRUCTION STARTING ELEV= 278.3 FT FLOOD ELEV= 282.5 FT 2 x FINER ROUTING ELEVATION CUM.STOR STOR-IND METHOD (FT) (AF) PEAK ELEVATION= 280.7 FT 278.3 0.00 PEAK STORAGE = .44 AF 280.0 .30 Oin = 20.0 CFS a 12.04 HRS 282.0 .70 Cout= 3.0 CFS is 11.88 HRS 282.5 1.20 ATTEN= 85 % LAG= 0.0 MIN IN/OUT= .97 / .88 AF INVERT (FT) OUTLET DEVICES 0.0 CATCHBASIN GRATE ELEV(FT) DISCH(CFS) 278.3 0.0 278.5 2.0 278.8 3.0 282.5 3.0 TOTAL DISCHARGE vs ELEVATION FEET 0.0 .1 .2 .3 .4 .5 .6 .7 .8 .9 278.3 ( 0.0 1.0 2.0 2.3 2.7 3.0 3.0 3.0 3.0 3.0 279.3 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 280.3 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 281.3 ( 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 282.3 3.0 3.0 3.0 Data for P1700 WATTS 100 YEAR STORM EAST AREA Prepared by PORT ENGINEERING ASSOC. INC. 8 Jul 94 HydroCAD 3.10 000482 (c) 1986-1993 Applied Microcomputer systems POND 4 INFLOW & OUTFLOW EXISTING POND POST CONSTRUCTION 20 19 - 18 - STOR- IND METHOD 17 - 16 - PEAK ELEU- 280 . 7 FT ' 5 - PEAK STOR- . 44 AF ' 4 - ' 3 - ' 2 - c+- Qln-- 20 . 0 CFS U Qout- 3 . 0 CFS LAG- 0 MIN 0 4 - 3 - ..............................................................................................................................I..................................................... 2 - 1 a CD Ln CD Ln CD Ln ED Ln N N m m v "T U) TIME (hours ) i POST-DEVELOPMENT STORM RUNOFF 10 YEAR STORM FREQUENCY PORT INGINIIHING Civil Engineers& Land Surveyors One Harris Street Newburvport,MA 01950 (508)465-8594 Data for P1700 WATTS 10 YEAR STORM Prepared by PORT ENGINEERING ASSOC. INC. 7 Jul 94 HydroCAD 3.10 000482 (c) 1986-1993 Applied Microcomputer Systems SUBCATCHMENT 2 POST CONSTRUCTION ACRES CN 1.75 98 PAVEMENT & ROOF SCS TR-20 METHOD 2.50 74 GOOD GRASS C TYPE III 24-HOUR 4.25 84 RAINFALL= 4.8 IN PEAK= 16.9 CFS a 12.02 HRS VOLUME= .79 AF Method Comment Tc (min) SHALLOW CONCENTRATED/UPLAND FLOW POSTCONSTRUCTION: GRASS 1.7 Short Grass Pasture Kv=7 L=2001 s=.075 1/1 V=1.92 fps CIRCULAR CHANNEL POST CONSTRUCTION .6 12" Diameter a=.79 sq-ft Pw=3.1' r=.251 s=.05 1/1 n=.015 V=8.79 fps L=3001 Capacity=6.9 cfs Total Length= 500 ft Total Tc= 2.3 SUBCATCHMENT 2 RUNOFF POST CONSTRUCTION 16 14 AREA= 4 . 25 AC 13 Tc- 2 . 0 MIN 12 CN- 84 11 4- 18 SCS TR-20 METHOD U TYPE III 24-HOUR RAINFALL- 4 . 8 IN 0 6 -� 5 PEAK- 16 . 9 CFS �. 4 3 @ 12 . 02 HRS UOLUME- . 79 AF 2 1 am CS) LO CS] LO m TIME (hours ) Data for P1700 WATTS 10 YEAR STORM Prepared by PORT ENGINEERING ASSOC. INC. 7 Jul 94 HydroCAD 3.10 000482 (c) 1986-1993 Applied Microcomputer Systems POND 1 FLAGSHIP DRIVE STARTING ELEV= 264.0 FT FLOOD ELEV= 273.0 FT 2 x FINER ROUTING ELEVATION AREA INC.STOR CUM.STOR STOR-IND METHOD (FT) (SF) (CF) (CF) PEAK ELEVATION= 269.0 FT 264.0 670 0 0 PEAK STORAGE = 14881 CF 265.0 1460 1065 1065 Qin = 16.9 CFS is 12.02 HRS 272.0 5500 24360 25425 Qout= 4.0 CFS @ 12.39 HRS 273.0 5700 5600 31025 ATTEN=. 76 % LAG= 22.1 MIN IN/OUT= .79 / .67 AF _INVERT (FT) OUTLET DEVICES 264.0 7" CULVERT n=.015 L=401 S=.021/1 Ke=.5 Cc=.9 Cd=.6 272.0 40, BROAD-CRESTED RECTANGULAR WEIR Q=C L H^1.5 C=2, 0, 0, 0, 0, 0, 0, 0 267.4 8" CULVERT n=.011 L=401 S=.011/1 Ke=.5 Cc=.9 Cd=.6 270.0 10" CULVERT n=.011 L=401 S=.021/' Ke=.5 Cc=.9 Cd=.6 TOTAL DISCHARGE vs ELEVATION FEET 0.0 .1 .2 .3 .4 .5 .6 .7 .8 .9 264.0 0.0 0.0 .1 .3 .4 .6 .7 .8 .9 1.0 265.0 1.1 1.1 1.2 1.2 1.2 1.3 1.3 1.3 1.4 1.4 266.0 1.4 1.5 1.5 1.5 1.6 1.6 1.6 1.7 1.7 1.7 267.0 1.7 1.8 1.8 1.8 1.8 1.9 2.0 2.2 2.4 2.6 268.0 2.9 3.0 3.2 3.3 3.5 3.6 3.7 3.8 3.9 4.0 269.0 4.1 4.2 4.2 4.3 4.4 4.5 4.6 4.7 4.7 4.8 270.0 ( 4.9 5.0 5.2 5.4 5.7 6.0 6.4 6.7 7.1 7.3 271.0 7.5 7.8 8.0 8.2 8.4 8.6 8.8 8.9 9.1 9.3 272.0 9.4 12.1 16.9 23.0 30.3 38.5 47.5 57.3 67.8 79.0 273.0 90.9 Data for P1700 WATTS 10 YEAR STORM Prepared by PORT ENGINEERING ASSOC. INC. 7 Jul 94 HydroCAD 3.10 000482 (c) 1986-1993 Applied Microcomputer Systems POND 1 INFLOW & OUTFLOW FLAGSHIP DRIUE 16 14 - STOR- IND METHOD PEAK ELEU= 269 FT 13 - 12 PEAK STOR- 14881 CF 11 u `- 10 Q i n= 1 6 . 9 CFS 9 - 8 Qout= 4 . 0 CFS LAG- 22 . 1 MIN 0 6 5 4 3 - 2 �m Ln CSD LO 0 n CS3 Ln m TIME (hours ) Data for P1700 WATTS 10 YEAR STORM EAST AREA Prepared by PORT ENGINEERING ASSOC. INC. 8 Jul 94 HydroCAD 3.10 000482 (c) 1986-1993 Applied Microc2MMter Systems SUBCATCHMENT 4 POST CONSTRUCTION ACRES CN 2.10 74 GRASS GOOD C SCS TR-20 METHOD 1.16 98 ROOF AND PAVT TYPE III 24-HOUR 3.26 83 RAINFALL= 4.8 IN PEAK= 12.1 CFS a1 12.04 HRS VOLUME= .59 AF Method Comment Tc (min) DIRECT ENTRY 4.0 SUBCATCHMENT 4 RUNOFF POST CONSTRUCTION 12 11 AREA= 3 . 26 AC 10 Tc= 4 MIN 9 CN- 83 0 SCS TR-20 METHOD 6 TYPE III 24-HOUR 3 5 RAINFALL-- 4 . 8 IN 4 PEAK- 12 . 1 CFS 3 @ 12 . 04 HRS 2 VOLUME= . 59 OF 1 am Ln m m Ln m Ln m N (V m v d Ln TIME (hours ) Data for P1700 WATTS 10 YEAR STORM EAST AREA Prepared by PORT ENGINEERING ASSOC. INC. 8 Jul 94 HydroCAD 3.10 000482 (c) 1986-1993 Applied Microcomputer Systems POND 3 EXISTING POND PRECONSTRUCTION STARTING ELEV= 278.3 FT FLOOD ELEV= 282.5 FT 2 x FINER ROUTING ELEVATION CUM.STOR STOR-IND METHOD (FT) (AF) PEAK ELEVATION= 280.0 FT 278.3 0.00 PEAK STORAGE = .30 AF 280.0 .30 Oin = 13.2 CFS @ 12.11 HRS 282.0 .70 pout= 3.0 CFS is 12.04 HRS 282.5 1.20 ATTEN= 77 % LAG= 0.0 MIN IN/OUT= .76 / .75 AF INVERT (FT) OUTLET DEVICES 0.0 CATCHBASIN GRATE ELEV(FT) DISCH(CFS) 278.3 0.0 278.5 2.0 278.8 3.0 282.5 3.0 TOTAL DISCHARGE vs ELEVATION FEET 0.0 .1 .2 .3 .4 .5 .6 .7 .8 .9 278.3 0.0 1.0 2.0 2.3 2.7 3.0 3.0 3.0 3.0 3.0 279.3 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 280.3 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 281.3 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 282.3 3.0 3.0 3.0 Data for P1700 WATTS 10 YEAR STORM EAST AREA Prepared by PORT ENGINEERING ASSOC. INC. 8 Jul 94 HydroCAD 3.10 000482 (c) 1986-1993 Applied Microcomputer Systems POND 3 INFLOW & OUTFLOW EXISTING POND PRECONSTRUCTION 13 12 STOR- IND METHOD 11 PEAK ELEU- 280 FT 10 PEAK STOR= . 30 AF 9 LO 4 O Gin= 13 . 2 CFS u Gout= 3 . 0 CFS 6 LAG= 0 MIN o 5 � 4 3 ;. ........_.._......................_..........._.......__........._....._....................... 2 aCD m m tW N m m d- IT Ln TIME Chour57 Data for P1700 WATTS 10 YEAR STORM EAST AREA Prepared by PORT ENGINEERING ASSOC. INC. 8 Jul 94 HydroCAD 3.10 000482 (c) 1986-1993 Applied Microcomputer Systems POND 4 EXISTING POND POST CONSTRUCTION STARTING ELEV= 278.3 FT FLOOD ELEV= 282.5 FT 2 x FINER ROUTING ELEVATION CUM.STOR STOR-IND METHOD (FT) (AF) PEAK ELEVATION= 279.5 FT 278.3 0.00 PEAK STORAGE = .20 AF 280.0 .30 Qin = 12.1 CFS a 12.04 HRS 282.0 .70 Qout= 3.0 CFS @ 12.04 HRS 282.5 1.20 ATTEN= 75 % LAG= 0.0 MIN IN/OUT= .59 / .58 AF INVERT (FT) OUTLET DEVICES 0.0 CATCHBASIN GRATE ELEV(FT) DISCH(CFS) 278.3 0.0 278.5 2.0 278.8 3.0 282.5 3.0 TOTAL DISCHARGE vs ELEVATION FEET 0.0 .1 .2 .3 .4 .5 .6 .7 .8 .9 278.3 0.0 1.0 2.0 2.3 2.7 3.0 3.0 3.0 3.0 3.0 279.3 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 280.3 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 281.3 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 282.3 3.0 3.0 3.0 Data for P1700 WATTS 10 YEAR STORM EAST AREA Prepared by PORT ENGINEERING ASSOC. INC. 8 Jul 94 HydroCAD 3.10 000482 (c) 1986-1993 Applied Microcomputer Systems POND 4 INFLOW & OUTFLOW EXISTING POND POST CONSTRUCTION 12 11 STOR- IND METHOD 10 PEAK ELEU= 279 . 5 FT 9 PEAK STOR-- . 20 AF n 8 � 7 Gin= 12 . 1 CFS u 6 Gout= 3 . 0 CFS LAG- 0 MIN 0 4 3 .............. ....................................... 2 1 0m ............ Ln m U-) m Ln M Ln m m m v v m TIME (hours ) POST-DEVELOPMENT STORM RUNOFF 300 YEAR STORM FREQUENCY PORT ENGINEEGING :ivil Engineers& Land Surveyors hie Harris Street Vewburvport,MA 01950 (508)465-8594 Data for P1700 WATTS 100 YEAR STORM Prepared by PORT ENGINEERING ASSOC. INC. 7 Jul 94 HydroCAD 3.10 000482 (c) 1986-1993 Applied Microcomputer Systems SUBCATCHMENT 2 POST CONSTRUCTION ACRES CN 1.75 98 PAVEMENT & ROOF SCS TR-20 METHOD 2.50 74 GOOD GRASS C TYPE III 24-HOUR 4.25 84 RAINFALL= 7.0 IN PEAK= 27.7 CFS a 12.01 HRS VOLUME= 1.28 AF Method Comment Tc (min) SHALLOW CONCENTRATED/UPLAND FLOW POSTCONSTRUCTION: GRASS 1.7 Short Grass Pasture Kv=7 L=200' s=.075 1/1 V=1.92 fps CIRCULAR CHANNEL POST CONSTRUCTION .6 12" Diameter a=.79 sq-ft Pw=3.11 r=.251 s=.05 '/' n=.015 V=8.79 fps L=300' Capacity=6.9 cfs Total Length= 500 ft Total Tc= 2.3 SUBCATCHMENT 2 RUNOFF POST CONSTRUCTION 26 24 AREA- 4 . 25 AC 22 Tc= 2 . 3 MIN 20 CN= 84 ,-� 18 - C�- 16 SCS TR-20 METHOD U 14 TYPE III 24-HOUR 12 RAINFALL= 7 . 0 IN 0 10 -� 8 PEAK= 27 . 7 CFS 6 @ 12 . 01 HRS 4 UOLUME- 1 . 28 AF 2 TIME (hours ) Data for P1700 WATTS 100 YEAR STORM Prepared by PORT ENGINEERING ASSOC. INC. 7 Jul 94 HydroCAD 3.10 000482 (c) 1986-1993 ApRtied Microcomputer Systems POND 1 FLAGSHIP DRIVE STARTING ELEV= 264.0 FT FLOOD ELEV= 273.0 FT 2 x FINER ROUTING ELEVATION AREA INC.STOR CUM.STOR STOR-IND METHOD (FT) (SF) (CF) (CF) PEAK ELEVATION= 271.4 FT 264.0 670 0 0 PEAK STORAGE = 23510 CF 265.0 1460 1065 1065 Qin = 27.7 CFS is 12.01 HRS 272.0 5500 24360 25425 Qout= 8.5 CFS @ 12.29 HRS 273.0 5700 5600 31025 ATTEN= 69 % LAG= 16.8 MIN IN/OUT= 1.28 / 1.09 AF INVERT (FT) OUTLET DEVICES 264.0 7" CULVERT n=.015 L=401 S=.021/1 Ke=.5 Cc=.9 Cd=.6 272.0 401 BROAD-CRESTED RECTANGULAR WEIR Q=C L H^1.5 C=2, 0, 0, 0, 0, 0, 0, 0 267.4 8° CULVERT n=.011 L=401 S=.011/' Ke=.5 Cc=.9 Cd=.6 270.0 10" CULVERT n=.011 L=401 S=.021/' Ke=.5 Cc=.9 Cd=.6 TOTAL DISCHARGE vs ELEVATION FEET 0.0 .1 .2 .3 .4 .5 .6 .7 .8 .9 264.0 0.0 0.0 .1 .3 .4 .6 .7 .8 .9 1.0 265.0 1.1 1.1 1.2 1.2 1.2 1.3 1.3 1.3 1.4 1.4 266.0 1.4 1.5 1.5 1.5 1.6 1.6 1.6 1.7 1.7 1.7 267.0 1.7 1.8 1.8 1.8 1.8 1.9 2.0 2.2 2.4 2.6 268.0 2.9 3.0 3.2 3.3 3.5 3.6 3.7 3.8 3.9 4.0 269.0 4.1 4.2 4.2 4.3 4.4 4.5 4.6 4.7 4.7 4.8 270.0 4.9 5.0 5.2 5.4 5.7 6.0 6.4 6.7 7.1 7.3 271.0 7.5 7.8 8.0 8.2 8.4 8.6 8.8 8.9 9.1 9.3 272.0 9.4 12.1 16.9 23.0 30.3 38.5 47.5 57.3 67.8 79.0 273.0 90.9 Data for P1700 WATTS 100 YEAR STORM Prepared by PORT ENGINEERING ASSOC. INC. 7 Jul 94 HydroCAD 3.10 000482 (c) 1986-1993 Applied Microcomputer Systems POND 1 INFLOW & OUTFLOW FLAGSHIP DRIUE 26 24 STOR- IND METHOD 22 PEAK ELEU= 271 . 4 FT 20 PEAK STOR= 25510 CF 18 + 16 Qin= 27 . 7 CFS u 14 Qout= 8 . 5 CFS 3 12 LAG= 16 . 8 MIN 0 10 � S ; 6 4 ,_ 2 '` _.. ........_...... ............... csD Ln CS) LO csl LO CD Lo CD TIME (hours ) Data for P1700 WATTS 2 YEAR STORM EAST AREA Prepared by PORT ENGINEERING ASSOC. INC. 8 Jul 94 HydroCAD 3.10 000482 (c) 1986-1993 Applied Microcomputer Systems SUBCATCHMENT 4 POST CONSTRUCTION ACRES CN 2.10 74 GRASS GOOD C SCS TR-20 METHOD 1.16 98 ROOF AND PAVT TYPE III 24-HOUR 3.26 83 RAINFALL= 3.1 IN PEAK= 6.2 CFS a 12.04 HRS VOLUME= .30 AF Method Comment Tc (min) DIRECT ENTRY 4.0 SUBCATCHMENT 4 RUNOFF POST CONSTRUCTION 6 . 0 5 . 5 AREA- 3 . 26 AC 5 . 0 Tc- 4 MIN 4 . 5 CN-- 83 4 . 0 3 . 5 SCS TR-20 METHOD ,u 3 0 TYPE III 24-HOUR 2 . 5 RAINFALL- 3 . 1 IN 2 . 0 PEAK= 6 . 2 CFS 1 . 5 @ 12 . 04 HRS 1 . 0 UOLUME-- . 30 AF 5 8 . Bm Ln m LO m n m Ltd m TIME (hours ) Data for P1700 WATTS 2 YEAR STORM EAST AREA Prepared by PORT ENGINEERING ASSOC. INC. 8 Jul 94 HydroCAD 3.10 000482 (c) 1986-1993 Applied Microcomputer Systems POND 3 EXISTING POND PRECONSTRUCTION STARTING ELEV= 278.3 FT FLOOD ELEV= 282.5 FT 2 x FINER ROUTING ELEVATION CUM.STOR STOR-IND METHOD (FT) (AF) PEAK ELEVATION= 278.9 FT 278.3 0.00 PEAK STORAGE = .11 AF 280.0 .30 Qin = 7.0 CFS a 12.11 HRS 282.0 .70 Qout= 3.0 CFS a 12.20 HRS 282.5 1.20 ATTEN= 57 % LAG= 5.4 MIN IN/OUT= .41 / .40 AF INVERT (FT) OUTLET DEVICES 0.0 CATCHBASIN GRATE ELEV(FT) DISCH(CFS) 278.3 0.0 278.5 2.0 278.8 3.0 282.5 3.0 TOTAL DISCHARGE vs ELEVATION FEET 0.0 .1 .2 .3 .4 .5 .6 .7 .8 .9 278.3 0.0 1.0 2.0 2.3 2.7 3.0 3.0 3.0 3.0 3.0 279.3 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 280.3 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 281.3 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 282.3 3.0 3.0 3.0 Data for P1700 WATTS 2 YEAR STORM EAST AREA Prepared by PORT ENGINEERING ASSOC. INC. 8 Jul 94 HydroCAD 3.10 000482 (c) 1986-1993 Applied Microcomputer Systems POND 3 INFLOW & OUTFLOW EXISTING POND PRECONSTRUCTION 7 . 0 6 . 5 STOR- IND METHOD 6 . 0 PEAK ELEU= 278 . 9 FT 5 . 5 - PEAK STOR= . 11 AF 5 . 0 LO 4 . 5 4 0 Q i n= 7 . 0 CFS 3 5 Qout= 3 . 0 CFS 3 . 0 LAG= 5 . 4 MIN 0 2 . 5 1 . 5 5 .......... to m m in m m TIME (hour5 ) Data for P1700 WATTS 2 YEAR STORM EAST AREA Prepared by PORT ENGINEERING ASSOC. INC. 8 Jul 94 HydroCAD 3.10 000482 (c) 1986-1993 Applied Microcomputer Systems POND 4 INFLOW & OUTFLOW EXISTING POND POST CONSTRUCTION 6 . 0 5 . 5 STOR- IND METHOD 5 , 0 PEAK ELEU= 275 . 7 FT 4 . 5 PEAK STOR- . 07 AF LO 4 . ® S 5 Q i n= 6 . 2 CFS U 3 . 0 Qout- 2 . 7 CFS LAG= 11 . 2 MIN 2 . 5 - ° 2 . 0 1 . 5 - 1 . 0 . 5 0 . em...................Ln m T n1 cv m m d- d- LSD TIME (hours ) APPENDIX B STORM DRAINAGE SYSTEM DESIGN PoDrr ILI iNGINEEGING ,ivil Engineers& Land Surveyors )ne Harris Street Vewburyport,MA 01950 (508)465-8594 STORM DRAINAGE PIPE CULVERT CAPACITY ANALYSIS (FROM MANNING'S FORMULA) PODT iti c�lGI�IEEGI�IG ;ivil Engineers& Land Surveyors hie Harris Street lewburvport,MA 01950 (508)465-8594 �EL ?7?0• / a NV.27(200' A9179 Jd° s?r rRA^FES AXCF 6 E WV x3740' exnr. yQ CA I ixcr sus MR A451V — —— /NV 131.00' CAAr4H 2f'RGr AA5/N NN W A3' TAIf IM OF MINIM, sc", r-4,wA/t ARaV �R ems r. LA raq r IX/ST. DAD/N Mal pMH 15 R/4 R/M 787/4' [NV 264.5' /AV a5?SO' _ fX/3. twor a4lw i4 A N tA=PZTAfU r9CQ! \`Lr R.27 401, KgrAINN� wN�' C3. /NV a x 7j, Ff�'. /NV a 237.J' y/!r A 1L /1�Of• Zit vv of GM 216J' AW?7[75' AVV 1340 / .9A 2660} 6A pr ib Mal./ 14A 770! GD. 16 N/?764 A1V 2n73' INV?71941' MV SrYK f r 05' AN M frr P M97E ALL MOIV:5� ORA/A4/AE5 5H4L4 DE ACF 9L VA MN J6 5A400rH 50KC EXCFJT rCK LIA!'iROAi CW t4 r0 Pw " WH/CH SHALL AE/W/AFMCIP ccne��r�w� Mal '. oAU r �? RAN?AS.?, INV AY?7S.1b' NW 4 Vr 77310 R/M LW a7d00' L.D. i5 RN/ s+y b AMV a77 275 M' f, io mor 6A ,C/W X64 RAW?DO> a V 27555' AYV 21335' NV IRa^. GRAPHIC SCALE `�e0i 2nz i e AW OVr-77V'' Co.i &.Aw 1 RIM 2% RAY. — INV?7'fAY IIImr) 1 hieh- AO ft 3MIC-rI Kir R/M INVeWr IN /Nv&x T cvr 3t 276 00 CS 14 ?B6+ ?75.55 t 2 f 272 2 y 2 CIO M ;27175 t STORM DRAINAGE SYSTEM DESIGN tf f WATTS INDUSTRIFS UM! d3 ?76.Ot ?7/.60 ?67.3 1 816 CxMWM sr., Na ANDOVA VA 14 --- Z�:15TAII---- i PORT PORT ENGINEERING ASSOCIATES, INC. ENE HA" ST.. ?"DUkM". " o195o lol�,e3 if/ 266.0 EWEN TELEPHONE: 500 465-0594 2 ax ® r a n omm n nur n,oeT,n rr�r n # 2!.O 071111941 CAB r..AA P.D.7. AS NOTFD P 1700 1 Or 1 PORT ENGINEERING ASSOCIATES, I ay: DATE: CIVIL ENGINEERS AND LAND SURVEYORBY' DATE: ART ONE HARRIS STREET, NEWBURYPORT, M PAS EcTNa: GINEERIN6 TELEPHONE (508) 465°85� - 0 9(cap Z OF I G-D, LENG7h PIPE FULL FULL ACTUAL �OF LOCA710N (�� DMM. PA VEL FLOW FROM TO (IN.) (C.FS) (F.P.S.) (FP.S) 1 (/N. PL STIG , Q c82 pool 40 ` �" 73 10, 9. 9 ,0 c 5a DIV, 10 , 2.8 ca3 p +— 0 12" , S 6, 1 3. , �J cs - i2 4. 5- 6, 1 4, t t r0, 0 6 , c7m m4 45 — cP 2S,-9 8.7 7, / l0, :5